Join

Compare · GDEV vs NEE

GDEV vs NEE

Side-by-side comparison of GDEV Inc. (GDEV) and NextEra Energy Inc. (NEE): market cap, price performance, sector, and recent activity on the wire.

Summary

  • Both GDEV and NEE operate in EDP Services (Technology), so they compete in similar markets.
  • NEE is the larger of the two at $142.25B, about 100.1x GDEV ($1.42B).
  • Over the past year, GDEV is up 40.6% and NEE is up 44.0% - NEE leads by 3.4 points.
  • NEE has hit the wire 6 times in the past 4 weeks while GDEV has been quiet.
  • NEE has more recent analyst coverage (25 ratings vs 3 for GDEV).
PerformanceGDEV+40.59%NEE+44.03%
2025-04-28+0.00%2026-04-24
MetricGDEVNEE
Company
GDEV Inc.
NextEra Energy Inc.
Price
$18.20+7.00%
$95.29-1.01%
Market cap
$1.42B
$142.25B
1M return
+16.37%
+4.52%
1Y return
+40.59%
+44.03%
Industry
EDP Services
EDP Services
Exchange
NASDAQ
NYSE
IPO
News (4w)
0
6
Recent ratings
3
25
GDEV

GDEV Inc.

Nexters Inc. operates as a game development company worldwide. It also offers mobile games. The company is headquartered in Limassol, Cyprus.

NEE

NextEra Energy Inc.

NextEra Energy, Inc., through its subsidiaries, generates, transmits, distributes, and sells electric power to retail and wholesale customers in North America. The company generates electricity through wind, solar, nuclear, and fossil fuel, such as coal and natural gas facilities. It also develops, constructs, and operates long-term contracted assets with a focus on renewable generation facilities, electric transmission facilities, and battery storage projects; and owns, develops, constructs, manages and operates electric generation facilities in wholesale energy markets. As of December 31, 2020, the company operated approximately 28,400 megawatts of net generating capacity. It serves approximately 11 million people through approximately 5.6 million customer accounts in the east and lower west coasts of Florida with approximately 76,200 circuit miles of transmission and distribution lines and 673 substations. The company was formerly known as FPL Group, Inc. and changed its name to NextEra Energy, Inc. in 2010. NextEra Energy, Inc. was founded in 1925 and is headquartered in Juno Beach, Florida.