Join

Compare · GLG vs NEE

GLG vs NEE

Side-by-side comparison of TD Holdings Inc. (GLG) and NextEra Energy Inc. (NEE): market cap, price performance, sector, and recent activity on the wire.

Summary

  • Both GLG and NEE operate in EDP Services (Technology), so they compete in similar markets.
  • NEE is the larger of the two at $142.25B, about 4476.2x GLG ($31.8M).
  • NEE has hit the wire 6 times in the past 4 weeks while GLG has been quiet.
  • NEE has more recent analyst coverage (25 ratings vs 0 for GLG).
MetricGLGNEE
Company
TD Holdings Inc.
NextEra Energy Inc.
Price
$2.95+4206.57%
$95.29-1.01%
Market cap
$31.8M
$142.25B
1M return
-
+4.52%
1Y return
-
+44.03%
Industry
EDP Services
EDP Services
Exchange
NASDAQ
NYSE
IPO
2013
News (4w)
0
6
Recent ratings
0
25
GLG

TD Holdings Inc.

TD Holdings, Inc. engages in commodities trading and supply chain service businesses in China. Its commodity trading business engages in purchasing non-ferrous metal products, such as aluminium ingots, copper, silver, and gold, from upstream metal and mineral suppliers and then selling to downstream customers. The company's supply chain service business covers a range of commodities, including non-ferrous metals, ferrous metals, coal, metallurgical raw materials, soybean oils, oils, rubber, wood, and various other types of commodities. It serves as a one-stop commodity supply chain service and digital intelligence supply chain platform integrating upstream and downstream enterprises, warehouses, logistics, information, and futures trading. The company was formerly known as Bat Group, Inc. and changed its name to TD Holdings, Inc. in March 2020. TD Holdings, Inc. was incorporated in 2011 and is based in Beijing, the People's Republic of China.

NEE

NextEra Energy Inc.

NextEra Energy, Inc., through its subsidiaries, generates, transmits, distributes, and sells electric power to retail and wholesale customers in North America. The company generates electricity through wind, solar, nuclear, and fossil fuel, such as coal and natural gas facilities. It also develops, constructs, and operates long-term contracted assets with a focus on renewable generation facilities, electric transmission facilities, and battery storage projects; and owns, develops, constructs, manages and operates electric generation facilities in wholesale energy markets. As of December 31, 2020, the company operated approximately 28,400 megawatts of net generating capacity. It serves approximately 11 million people through approximately 5.6 million customer accounts in the east and lower west coasts of Florida with approximately 76,200 circuit miles of transmission and distribution lines and 673 substations. The company was formerly known as FPL Group, Inc. and changed its name to NextEra Energy, Inc. in 2010. NextEra Energy, Inc. was founded in 1925 and is headquartered in Juno Beach, Florida.