• Live Feeds
    • Press Releases
    • Insider Trading
    • FDA Approvals
    • Analyst Ratings
    • Insider Trading
    • SEC filings
    • Market insights
  • Analyst Ratings
  • Alerts
  • Subscriptions
  • Settings
  • RSS Feeds
Quantisnow Logo
  • Live Feeds
    • Press Releases
    • Insider Trading
    • FDA Approvals
    • Analyst Ratings
    • Insider Trading
    • SEC filings
    • Market insights
  • Analyst Ratings
  • Alerts
  • Subscriptions
  • Settings
  • RSS Feeds
Dashboard
    Quantisnow Logo

    © 2025 quantisnow.com
    Democratizing insights since 2022

    Services
    Live news feedsRSS FeedsAlerts
    Company
    AboutQuantisnow PlusContactJobs
    Legal
    Terms of usePrivacy policyCookie policy

    Amendment: SEC Form 10-K/A filed by Ivanhoe Electric Inc.

    2/28/25 5:04:16 PM ET
    $IE
    Metal Mining
    Basic Materials
    Get the next $IE alert in real time by email
    ie-20241231
    0001879016false2024FYiso4217:USDxbrli:shares00018790162024-01-012024-12-3100018790162024-06-3000018790162025-02-27

    UNITED STATES
    SECURITIES AND EXCHANGE COMMISSION
    Washington, D.C. 20549
    FORM 10-K/A
    (Mark One)
    xANNUAL REPORT PURSUANT TO SECTION 13 OR 15(d) OF THE SECURITIES EXCHANGE ACT OF 1934
    For the fiscal year ended December 31, 2024
    OR
    o
    TRANSITION REPORT PURSUANT TO SECTION 13 OR 15(d) OF THE SECURITIES EXCHANGE ACT OF 1934
    For the transition period from to
    Commission File Number 001-41436
    Ivanhoe Electric Inc.
    (Exact name of Registrant as specified in its Charter)
    Delaware
    32-0633823
    (State or other jurisdiction of
    incorporation or organization)
    (I.R.S. Employer Identification No.)
    450 E Rio Salado Parkway, Suite 130
    Tempe, Arizona
    85281
     (Address of principal executive offices)
    (Zip Code)
    Registrant's telephone number, including area code (480) 656-5821
    Securities registered pursuant to Section 12(b) of the Act:
    Title of each classTrading Symbol(s)Name of each exchange on which registered
    Common Stock, par value $0.0001 per shareIENYSE American
    Securities registered pursuant to Section 12(g) of the Act: None
    Indicate by check mark if the Registrant is a well-known seasoned issuer, as defined in Rule 405 of the Securities Act. Yes x No o
    Indicate by check mark if the Registrant is not required to file reports pursuant to Section 13 or Section 15(d) of the Act. Yes o No x
    Indicate by check mark whether the Registrant: (1) has filed all reports required to be filed by Section 13 or 15(d) of the Securities Exchange Act of 1934 during the preceding 12 months (or for such shorter period that the Registrant was required to file such reports), and (2) has been subject to such filing requirements for the past 90 days.    Yes  x    No  o 
    Indicate by check mark whether the registrant has submitted electronically every Interactive Data File required to be submitted pursuant to Rule 405 of Regulation S-T (§232.405 of this chapter) during the preceding 12 months (or for such shorter period that the Registrant was required to submit such files).Yes  x   No  o 
    Indicate by check mark whether the registrant is a large accelerated filer, an accelerated filer, a non-accelerated filer, a smaller reporting company, or an emerging growth company. See the definitions of “large accelerated filer,” “accelerated filer,” “smaller reporting company” and “emerging growth company” in Rule 12b-2 of the Exchange Act.



    Large accelerated filer
    x
    Accelerated filer
    o
    Non-accelerated filer
    o
    Smaller reporting company
    o
    Emerging growth company
    o
    If an emerging growth company, indicate by check mark if the registrant has elected not to use the extended transition period for complying with any new or revised financial accounting standards provided pursuant to Section 13(a) of the Exchange Act. ☐
    Indicate by check mark whether the registrant has filed a report on and attestation to its management’s assessment of the effectiveness of its internal control over financial reporting under Section 404(b) of the Sarbanes-Oxley Act (15 U.S.C. 7262(b)) by the registered public accounting firm that prepared or issued its audit report. YES x NO o

    If securities are registered pursuant to Section 12(b) of the Act, indicate by check mark whether the financial statements of the registrant included in the filing reflect the correction of an error to previously issued financial statements.☐
    Indicate by check mark whether any of those error corrections are restatements that required a recovery analysis of incentive-based compensation received by any of the registrant’s executive officers during the relevant recovery period pursuant to §240.10D-1(b). ☐
    Indicate by check mark whether the registrant is a shell company (as defined in Rule 12b-2 of the Exchange Act).     Yes o No x

    The aggregate market value of the voting and non-voting common equity held by non-affiliates of the Registrant, based on the closing price of the shares of common stock on NYSE American as of June 30, 2024 (the last business day of the registrant’s most recently completed second fiscal quarter) was approximately $917.9 million.
    The number of shares of Registrant’s Common Stock outstanding as of February 27, 2025 was 132,565,318.
    DOCUMENTS INCORPORATED BY REFERENCE
    Portions of the registrant’s definitive proxy statement to be filed within 120 days of December 31, 2024 in connection with its 2025 Annual Meeting of Stockholders are incorporated by reference into Part III, Items 11-14 of this Form 10-K.




















    Explanatory Note
    This Amendment No. 1 to the Annual Report on Form 10-K (this “Amendment No. 1”) of Ivanhoe Electric Inc. (the “Company”) amends our Annual Report on Form 10-K for the year ended December 31, 2024 that was filed with the Securities and Exchange Commission on February 27, 2025 (the “Original 10-K”).

    This Amendment No. 1 is being filed for the purposes of (i) correcting typographical errors in the tables of mineral resources and related footnotes for the rows for the Company’s non-material Alacran and Samapleu properties and Total, as contained in Item 1. Business; (ii) including a new consent from Glen Kuntz, qualified person, relating to the above corrections, and (iii) correcting Exhibits 4.1, 10.39, 10.40 and 23.1.

    In addition, pursuant to Rule 12b-15 under the Securities Exchange Act of 1934, as amended (the “Exchange Act”), currently dated certifications from the Company’s principal executive officer and principal financial officer are filed herewith as exhibits to this Amendment No. 1 pursuant to Rule 13a-14(a) or 15d-14(a) of the Exchange Act. Because no financial statements have been included in this Amendment No. 1 and this Amendment No. 1 does not contain or amend any disclosure with respect to Items 307 and 308 of Regulation S-K, paragraphs 3, 4, and 5 of the certifications have been omitted. Similarly, because no financial statements have been included in this Amendment No. 1, certifications pursuant to Section 906 of the Sarbanes Oxley Act of 2002 have been omitted.

    Except as described above, no other amendments are being made to the Original 10-K. This Amendment No. 1 does not reflect events occurring after the Original 10-K or modify or update the disclosure contained therein in any way other than as required to reflect the amendments discussed above. The complete text of Item 1. Business and Item 15. Exhibits, as amended, is repeated in this Amendment No. 1.



    Part I
    Item 1. Business
    Overview
    We are a United States domiciled minerals exploration company with a focus on developing mines from mineral deposits principally located in the United States. We seek to support American supply chain independence by finding and delivering the critical metals necessary for electrification of the economy, with a focus on copper. We believe the United States is significantly under explored and has the potential to yield major new discoveries of these metals.
    We are committed to the sustainable development of our projects by embedding Environmental, Social and Governance (“ESG”) criteria in our decision-making framework from the earliest stages of project exploration and development. We continue to build upon our team’s strong ESG track record for leveraging best practices to establish Ivanhoe Electric as a leader in the mining sector. Key considerations that will influence our decision making include, but are not limited to, using clean and renewable energy, and energy storage, in our future mining operations, following best practices to meet health, safety and environmental standards, optimizing our water resources, protecting local cultural heritage and biodiversity, minimizing our environmental footprint, as well as ensuring workforce diversity and hiring from local communities. Most importantly, the minerals that are the focus of our exploration and development efforts play a critical role by supporting electrification and enabling the clean energy transition.
    Our United States Mineral Projects
    Our sole material mineral project is the Santa Cruz Project in Arizona.
    Santa Cruz Project
    The Santa Cruz Project is a copper exploration project situated in a prolific mining region that hosts some of the largest copper mines in the United States. The Project encompasses 5,975 acres on private land and includes associated water rights. The project location provides excellent infrastructure, including access to rail, interstate highways, and electric transmission lines.
    The Initial Assessment for the Santa Cruz Project, completed in September 2023, focuses on an underground copper mine with an average of 5.5 million tonnes mined annually, exclusively from the high-grade exotic, oxide and enriched domains of the Santa Cruz and East Ridge Deposits. The Initial Assessment estimates life of mine (“LOM”) copper production of 1.6 million tonnes over a 20-year mine life, with projected cash costs of $1.36 per pound of copper produced.
    At the Santa Cruz Project, we are advancing environmental, technical, trade-off and economic studies in preparation for a Preliminary Feasibility Study for a copper mining operation incorporating leading technologies to improve efficiencies and costs. We are designing a technologically advanced mine that we expect to result in low carbon dioxide emissions per pound of copper produced and be a leading example of responsibly produced domestic copper.
    Our other mineral projects in the United States include the Tintic Project, located in Utah, and the Hog Heaven Copper-Silver-Gold Project, located in Montana. We also hold a portfolio of exploration projects in the western United States, including projects in Arizona, Nevada, New Mexico and Montana.
    For purposes of Subpart 1300 of Regulation S-K (“S-K 1300”), we are defined as an exploration stage issuer because our material property, Santa Cruz, is at the exploration stage and does not have any declared Mineral Reserves.



    Map: United States Mineral Projects
    Ivanhoe Electric Map US3.jpg

    Ma’aden Ivanhoe Electric Exploration and Development Limited Company
    In 2023, we established an exploration joint venture with the Saudi Arabian Mining Company (“Ma’aden”) (“Joint Venture”). The Joint Venture is owned 50/50 by Ivanhoe Electric and Ma’aden and has an initial term of five years, which may be extended up to 10 years upon mutual agreement of the parties. The Joint Venture operates through a limited liability company established under Saudi Arabian law (“Saudi JVCo”). Ma’aden has made available approximately 48,500 km2 of land under an exploration license (or license application) within Saudi Arabia for exploration by the Joint Venture. We contributed $66.4 million of the proceeds from the sale of our common shares to Ma’aden to initially fund Saudi JVCo and we provided Saudi JVCo with a royalty-free license to use Typhoon™ within Saudi Arabia for the purpose of mineral exploration. The license will remain exclusive to the Joint Venture in Saudi Arabia and effective during the term of the Joint Venture. Saudi JVCo has purchased three new generation Typhoon™ units from the Company’s former parent, I-Pulse, all of which have now been delivered to the Joint Venture and are active in Saudi Arabia. The Joint Venture has also entered into a services agreement with Computational Geosciences Inc. (“CGI”), our 94.3% owned subsidiary, pursuant to which CGI is responsible for the supply of the services for the analysis of data and processing of the full spectrum of geophysical datasets produced by the Typhoon™ systems. The Joint Venture commenced exploration activities in November 2023 and announced its first mineral discovery in January 2025.

    Exploration Alliance with BHP Mineral Resources
    In 2024, we established an exploration alliance (“Exploration Alliance”) with BHP Mineral Resources Inc.(“BHP”), a subsidiary of BHP Group Limited, to search for critical minerals in the United States. The Exploration Alliance Agreement sets out the framework for us (acting through a wholly owned subsidiary) and BHP to explore mutually agreed “Areas of Interest” or AOIs in the United States to identify projects within those AOIs that may become 50/50 owned joint ventures. The initial AOIs are in Arizona, New Mexico, and Utah. The Alliance is for an initial term of three years, which may be extended upon mutual agreement. BHP will provide the initial funding of $15 million and any subsequent funding would be on a 50/50 basis. We will provide the Exploration Alliance with access to one of its new generation Typhoon™ geophysical survey systems as well as the machine learning algorithmic software and data inversion services of CGI. In January 2025, the Exploration Alliance announced that it was conducting its first Typhoon™ survey at an area of interest in Arizona.



    Other International Mineral Projects

    As at December 31, 2024, our other mineral projects outside of the United States are the Alacran Project in Colombia (owned through our 62.5% interest in publicly traded company Cordoba Minerals Corp.), the Ivory Coast Project (owned through our interest in publicly traded company Sama Resources Inc. (“Sama”) and our 60% interest in a joint venture entity that directly owns the mineral titles of the project) in Ivory Coast, and the wholly owned Pinaya Project in Peru.

    The Alacran Project (also known as the San Matias Project) is owned by our publicly-traded subsidiary Cordoba Minerals Corp. (“Cordoba”). At December 31, 2024, we owned 62.5% of Cordoba’s issued and outstanding shares. The Alacran Project, which is owned 50% by Cordoba and 50% by JCHX Mining Management Co., Ltd. (“JCHX”), is being developed jointly between the owners.
    Alacran is located in the Municipality of Puerto Libertador, Department of Córdoba, Colombia, and is approximately 200 km north of the city of Medellín. The Alacran Project hosts the El Alacrán, Costa Azul, Montiel East, and Montiel West deposits across various mining titles. Initial capital cost is estimated to be approximately $420.4 million for the construction of a conventional truck-shovel open pit mine. The Project is anticipated to hold an after-tax Net Present Value (“NPV”) of $360 million with an Internal Rate of Return (“IRR”) of 23.8% and a payback period of 3 years. The Project’s mine life is projected to be 14.0 years in addition to the estimated two years of construction and pre-production mining, during which, freshly mined ore will be stockpiled alongside historical tailings. The estimated LOM cash costs for copper, net of by-product credits, is $1.35/lb with by-product credits at $1.31/lb, and a total estimated LOM cash cost at $2.66/lb (cash costs excludes sustaining capital).
    The Ivory Coast Nickel-Copper Project in Ivory Coast is focused on the Samapleu-Grata deposits and is operated through a joint venture, the Samapleu Nickel Corporation (“SNC”), with Sama. At December 31, 2024, we directly owned 60% of the joint venture entity SNC. The Ivory Coast Nickel-Copper Project has potential for a conventional open pit mining operation supporting 86.5 million tonnes of modelled mill feed together with 1.62 million tonnes of direct shipped laterite material entirely from the Grata, Main and Extension deposits and the Sipilou Sud Laterite deposit.
    The Pinaya Gold-Copper Project, owned by our 100%-owned subsidiary Kaizen, covers approximately 101 km2 of granted title, plus an additional 28 km2 under application and includes more than 10 km of underexplored strike length in southeastern Peru. The Project is an intermediate stage exploration project and includes a NI 43-101 Mineral Resource estimate contained in a NI 43-101 Technical Report titled Pinaya Gold-Copper Project, Caylloma and Lampa Provinces, Peru, NI 43-101 Technical Report, with an effective date of April 26, 2016.
    Typhoon and Computational Geosciences
    In addition to our portfolio of mineral projects, we own, through a wholly-owned subsidiary, patents to a proprietary geophysical mineral exploration technology known as Typhoon™. We also own a 94.3% controlling interest in a data inversion business, CGI. CGI was founded in 2010 to commercialize innovative technology developed at the University of British Columbia, Canada to improve and enhance mineral exploration.
    The Typhoon™ technology allows us to cost effectively and efficiently generate geophysical images of large-scale mineral deposits to depths of one and a half kilometers or more. CGI software technology consists of sophisticated codes to process geophysical data and build three-dimensional (“3D”) subsurface images that could indicate the presence of various sulfide metals and minerals. Typhoon™ can and has been used successfully to accelerate and de-risk the exploration process enabling a higher frequency of mineral discovery and lowering total exploration costs by more quickly identifying targets for drill testing over large areas of prospective land. Typhoon™ has proven to be an important exploration tool during its deployment at the Santa Cruz Project, the Tintic Project and in Saudi Arabia.



    Map: Current and historical deployment of Typhoon™
    Typhoon world map.jpg


    VRB Energy
    We also have interests in grid scale energy storage systems utilizing vanadium redox flow technology. We own a 90.0% interest in VRB Energy Inc. (“VRB Energy”), which itself owns 100% of VRB USA Inc. (“VRB USA”), an Arizona-based business focused on the development and manufacture of grid-scale energy storage systems utilizing vanadium redox flow batteries for integration with renewable power sources. VRB Energy also has a 49% interest in VRB Energy System (Beijing) Co., Ltd, a joint venture in China (“VRB China Joint Venture”) with a subsidiary of privately held Shanxi Red Sun Co., Ltd., which owns 51% of the VRB China Joint Venture. The VRB China Joint Venture manufactures, develops and sells vanadium redox flow batteries for Asian, African and Middle Eastern markets.




    Mineral Projects
    Our portfolio of highly prospective mineral projects, predominantly focused on copper and other metals needed for the clean energy transition, has been assembled by Robert Friedland and his team over the past decade.
    The Santa Cruz, Tintic and Hog Heaven Projects are situated in the high-quality copper producing jurisdictions of Arizona, Utah and Montana, respectively. According to the Fraser Institute’s Annual Survey of Mining Companies, Utah and Arizona rank as some of the most attractive copper mining investment jurisdictions compared to other major copper mining jurisdictions around the world.
    626

    ___________
    Source: Fraser Institute 2023 Investment Attractiveness
    Quality Assurance/Quality Control
    Throughout all of our mineral exploration properties, quality assurance and quality control (“QA/QC”) measures are in place to ensure the reliability and trustworthiness of our exploration data and results. These measures include written standard operating procedures and independent verifications of aspects such as drilling, surveying, sampling, assaying, data management, and database integrity. Appropriate documentation of QC measures and regular analysis of QC data is essential as a safeguard for project data and form the basis for the QA program implemented during exploration.
    Analytical QC measures involve internal and external laboratory procedures implemented to monitor the precision and accuracy of the sample preparation and assay data. These measures are also important to identify potential sample sequencing errors and to monitor for contamination of samples.
    We submit a blank, standard, or duplicate sample on every seventh sample. Sampling and analytical QA/QC protocols typically involve taking duplicate samples and inserting QC samples (certified reference material (CRM) and blanks) to monitor the assay results' reliability throughout the drill program.
    Samples are securely shipped to reputable analytical laboratories with global quality management systems that meets all requirements of the international standards ISO/IEC 17025:2017 and ISO 9001:2015. The independent labs that we use have robust internal QA/QC program to monitor and ensure quality of assay and other analytical results.

    United States
    Santa Cruz Project, Arizona, USA (the “Santa Cruz Project”)

    As used herein, references to the “Santa Cruz Initial Assessment” or “IA” is to the “S-K 1300 Initial Assessment & Technical Report Summary, Santa Cruz Project, Arizona”, by qualified persons SRK Consulting (U.S.), Inc., KCB Consultants Ltd., Life Cycle Geo, LLC, M3 Engineering and Technology Corp., Nordmin Engineering Ltd. (“Nordmin”), Call & Nicholas, Inc., Tetra Tech, Inc., INTERA Incorporated, Haley & Aldrich, Inc., and Met Engineering, LLC (collectively, the “Santa Cruz Qualified Persons”), dated September 6, 2023 and still current as of December 31, 2024. It was prepared in accordance with the requirements of S-K 1300. None of the Santa Cruz Qualified Persons is affiliated with us or any other entity that has an ownership, royalty or other interest in the Santa Cruz Project. The Technical Report Summary on the Santa Cruz Project, Arizona, U.S.A. is included as Exhibit 96.1 hereto. Scientific and technical information in this section is based upon, or in some cases extracted from these reports.



    Location, Infrastructure, and Access. Our exploration stage Santa Cruz Project is located in Pinal County, Arizona, 11km to the west of Casa Grande and approximately a one-hour drive, on paved roads, south of Phoenix. The Santa Cruz Project encompasses approximately 75.66 km2 of land. Santa Cruz was discovered in the 1970s but was undeveloped due to market conditions as well as fragmented title and ownership. The Santa Cruz Project centroid is approximately -111.88212, 32.89319 (WGS84) in Township 6 S, Range 4E, Section 13, Quarter C.
    Map: Location of the Santa Cruz Project within the state of Arizona.
    santa_cruz_map_ivanhoe_apr4.jpg
    Title. The Santa Cruz Project covers 75.66 km2, including 25.79 km2 of private land, 2.6 km2 of Stockraising Homestead Act (“SRHA”) lands, 238 unpatented claims covering 19.32 km2 of U.S. Bureau of Land Management (“BLM”) land, and 16 mineral exploration permits with the Arizona State Land Department (“ASLD”) covering 27.95 km2.
    In 2024, Ivanhoe Electric’s wholly owned subsidiary, Mesa Cobre, executed an agreement with Central Arizona Resources (“CAR”) for the right to acquire 100% of CAR’s option over DRH Energy, Inc. (“DRHE”) mineral title, 39 federal unpatented mining lode claims, and 3 surface parcels. This option was exercised in August 2024 and we now own, through our wholly owned subsidiary Mesa Cobre, all mineral title over the project area. Aggregate consideration was $27.9 million, of which $10.0 million was paid in August 2024, plus certain contingent obligations discussed further below.
    In May 2023, we acquired 5,975 acres of surface title from Legend Property Group (now known as Wolff-Harvard Ventures). At closing, we paid a total of $34.3 million to the seller, which included $5.1 million of previously paid deposits. We also issued a secured promissory note to the seller in the principal amount of approximately $82.6 million over a period of 4.5 years. The promissory note includes an annual interest rate of prime plus 1%. As at December 31, 2024, $36.2 million of principal is remaining to be paid on the promissory note.
    In February 2022, Ivanhoe Electric acquired the surface title to 20 acres in the southeast area of the Santa Cruz Project known as Skull Valley. And in May 2022, we acquired the surface title to 100.33 acres in the northeast area of the Project known as CG100. At closing for CG100 we paid $300,000, and then on each the first and second anniversaries of the



    closing date we paid $300,000. On the third anniversary of the closing date, we will pay the final installment of $600,000 to release the deed from escrow.
    The mineral rights to Skull Valley were acquired in February 2022 along with the surface title. The mineral rights to CG100 were acquired in May 2022 along with the surface title.
    In November 2023, Ivanhoe Electric acquired 16 mineral exploration permits from ASLD, adding an additional 27.95 km2 of mineral control to the project. These permits are granted for 5-year terms provided annual renewals, renewal applications, and work commitment documentation or in-lieu fees are submitted. At the end of the 5-year term, Ivanhoe Electric can submit for a new mineral exploration permit and be “first in line” to receive another 5-year mineral exploration permit term. These permits grant us the exclusive right to explore for minerals during the permit term. Revenue generated by ASLD for these permits is used to support several public entities, including K-12 public education and State universities.

    Royalty interests on the Santa Cruz Project include royalties in favor of ASARCO Santa Cruz, Inc. and Freeport Copper Company of a combined 5% NSR derived from DRHE portions of the project area, and in favor of Simmons Devcor Company of a 10% NSR on specific parcels (capped to $7 million with consumer price index calculation). In addition, six other NSR royalties in favor of several individuals encumber specified parcels of the project area with NSR royalty rates of 2%, 1%, 0.5%, 0.075%, 0.015% and 0.0125%. No royalty encumbers the entire known Mineral Resources at the Santa Cruz Project, other than the ASARCO Santa Cruz, Inc. and Freeport Copper Company royalty. The Simmons Devcor Company royalty and the several individual royalties aggregating to 2.09% encumber specified parcels of the project. NSR royalties are only payable upon production and sale of product. There are no advance royalties.
    In addition, under the Option Agreement for Purchase and Sale dated August 16, 2021 between Central Arizona Resources, LLC (“CAR”) and DRHE (“Option Agreement”) as assigned by CAR to our wholly-owned subsidiary, Mesa Cobre, on October 27, 2021, there are potential additional payments to DRHE, including an “AMRC Payment” and a “Generational Payment”, to be calculated based on mineral reserves set forth in a definitive feasibility study (a “DFS”) and based on future mineral production. The AMRC Payment, if any, will be equal to $0.015 per pound of copper for every pound of additional mineable reserve copper over 2 billion pounds, as determined by the DFS, payable in five equal annual installments commencing one year following the commencement of commercial mining operations. The decision to proceed with commercial mining operations shall be at the sole discretion and determination of Mesa Cobre. The Generational Payment, if any, will be equal to $0.015 per pound of copper (adjusted based on a price index) for every pound of copper produced over and above the copper reserves estimate in the DFS. Pursuant to the Option Agreement, Mesa Cobre has committed to prepare the DFS no later than August 16, 2027, granted DRHE a right to elect to receive all or any portion of such future payments in the Company’s common stock at a 10% discount to the 5-day volume weighted average price, registration rights and is subject to indemnification obligations.





    Map: Ivanhoe Electric Surface Rights of the Santa Cruz Project.
    SC_IE_Surface_Rights_2025_0219.jpg




    Map: Ivanhoe Electric Mineral Rights of the Santa Cruz Project.
    IE_SC_Mineral_Control_2025_0108_noLogo.jpg

    History. The first discovery of copper mineralization in the Santa Cruz Project area occurred in February 1961 by geologists from the American Smelting and Refining Company (“ASARCO”). They proceeded with preliminary geophysical surveys that same year, including IP, resistivity, seismic reflection, and magnetics. Upon positive results from the geophysical surveys, a small drill program of six holes was funded, with the last hole being the first to intersect the significant mineralization that became known as the ‘West Orebody’ and, in time, the Sacaton open pit mine which lies approximately 8 km to the northeast of the center of the Santa Cruz Project.
    ASARCO expanded exploration efforts across the Casa Grande Valley and in 1964 the first hole was drilled on what is now the Santa Cruz Project. By May 1965, seventeen drill holes were completed without similar success, and ASARCO reduced its land position. Subsequent reviews in 1970-1971 deemed the Santa Cruz Project worth renewed exploration activity. Following the initiation of the Santa Cruz Joint Venture (“SCJV”) between ASARCO Santa Cruz, Inc. and Freeport McMoRan Copper & Gold Inc. in 1974, additional ground was acquired around the Santa Cruz North deposit. By this time, various joint ventures, as noted below, had staked considerable ground over and around what would eventually be the Casa Grande West (now Santa Cruz) deposit.
    In 1973, David Lowell put together an exploration program called the Covered Area Project (“CAP”) that was funded first by Newmont Mining, then, in succession, by a joint venture between Newmont and Hanna Mining, then Hanna with Getty Oil Corp. and Quintana Corp.; though both Quintana and Newmont would pull out of the project before any discoveries were made. By 1974 over 120 holes were drilled at 20 projects across Southwestern Arizona, with a focus on the Santa Cruz system. Drilling under the CAP program continued through to 1977, at which point Hanna Mining took over as operator under a joint venture with operation funding from Getty Oil Corp. Between 1977 and 1982, Hanna-Getty advanced a tight spaced drill program that delineated an estimated 500 Mt of 1% Cu at Casa Grande West, and countless exploration holes in the surrounding Casa Grande Valley.



    In 1986, the Bureau of Mines obtained Congressional approval and funding to study in situ copper mining. In 1988, the Santa Cruz deposit was selected for this research project sponsored by a joint venture program between landowners ASARCO Santa Cruz Inc. and Freeport McMoRan Copper & Gold Inc., and the US Department of the Interior, Bureau of Reclamation. The in-situ testing began in February 1996, but research funding was halted in October 1997 due to a change from Congress.
    Property Condition and Stage of Development. The Santa Cruz Project is an exploration stage project without mineral reserves. No mining activity has ever taken place on the land constituting the Santa Cruz Project. There is no mine in production at the project. There is currently no significant equipment, infrastructure or facilities at the Santa Cruz Project, and no mine development or operating equipment at the project site.
    Existing and past land uses in the Santa Cruz Project area and immediately surrounding areas include agriculture, residential home development, light industrial facilities, and mineral exploration and development. Some dispersed recreation occurs in the area. The climate is dry, and most of the Santa Cruz Project area is flat, sandy, and sparsely vegetated. Portions of the Santa Cruz Project area are in the 100-year flood plain. Within the Santa Cruz Project area, approximately 85 acres of land located 1.2 km north of the intersection of N. Spike Road and W. Clayton Road was used during an in situ leaching project in 1991.
    We have a large private land package covering the Santa Cruz Project area and area of known mineralization. The ability to operate on private land has the potential to reduce lengthy permitting timelines that result from federal permitting processes. The precise list of permits required to authorize the construction and operation of the Santa Cruz Project will be determined as the mining and processing methods are designed.
    Permitting and encumbrances. Current exploration is conducted on private land. Royalties are discussed above, under “Title”. Current permits are listed in the Table below.
    Table. Current permits for the Santa Cruz Project.
    Permit Name
    Agency
    Status
    Renewal Date
    Requirements
    Violations
    Dust Control Permit
    DUSTW-22-0292
    Pinal County Air Quality Control District (PCAQCD)Approved05/20/2025Daily inspections; limit vehicle access to work areas; reduce vehicle speeds; water disturbed areas; apply stabilizers as needed; concurrent reclamation; install track-out devices as needed.No Violations
    Non-exempt Well Permit No. T-930301 Well Registration No. 55-930301 (MW-09)Arizona Department of Water ResourcesApprovedN/AApproval to withdraw groundwater from a well under authorized Type 1 groundwater right No. 58-110104.0004. Maximum pumping capacity: 350 gallons per minute; maximum annual volume: 9.4 acre ft. Permittee shall monitor withdrawals and report the total amount withdrawn on an Annual Water Withdrawal and Use Report.No Violations
    NOI AZPDES Stormwater General Construction Permit AZCN96111Arizona Dept. of Environmental QualityApproved06/30/2025Stormwater Pollution Prevention Plan in place; monthly inspectionsNo Violations
    Santa Cruz Mine Major General Plan Amendment DSA-24-00003
    City of Casa Grande
    Approved
    N/A
    Resolution No. 5273.29 - Land use designation of +/- 2.898 acres was changed from Neighborhoods to Manufacturing/Industry
    No Violations



    Temporary Use Permit DSA-22-00200City of Casa GrandeApproved11/08/2025N/ANo Violations
    Floodplain Use Permit FUP2206-165
    Pinal County
    Approved
    N/A
    Existing grades within the area of disturbance shall be restored per the reclamation plan.
    No Violations
    Special Flood Hazard Area Permit - CDP-23-01296
    City of Casa Grande
    Approved
    11/08/2025
    Existing grades within the area of disturbance shall be restored per the reclamation plan. Stormwater shall be managed per the Stormwater Pollution Prevention Plan.
    No Violations.
    Special Flood Hazard Area Permit - CDP-24-01218
    City of Casa Grande
    Approved
    11/08/2025Existing grades within the area of disturbance shall be restored per the reclamation plan. Stormwater shall be managed per the Stormwater Pollution Prevention Plan.
    No Violations
    Temporary Use Permit - (Non-SFHA) - DSA-23-00116
    City of Casa Grande
    Approved
    11/08/2025Existing grades within the area of disturbance shall be restored per the reclamation plan. Stormwater shall be managed per the Stormwater Pollution Prevention Plan.
    No Violations
    Temporary Use Permit - (Non-SFHA) - CDP-24-01233
    City of Casa Grande
    Approved
    11/08/2025Existing grades within the area of disturbance shall be restored per the reclamation plan. Stormwater shall be managed per the Stormwater Pollution Prevention Plan.
    No Violations
    Planned Area of Development (PAD) AmendmentCity of Casa GrandeApprovedN/AOrdinance No. 1178.287.01 - Zoning amended to allow for mining activities on approximately 3,323 acres of land for the Santa Cruz Project.N/A
    Exploration Drilling Reclamation PlanArizona State Mine Inspector (ASMI)
    Approved
    12/31/2025
    Maximum extent of surface disturbance to be left unreclaimed at any one time during exploration operations is 20.0 acres.
    N/A
    The information and the table below identifies the major permits and approvals that we will need to obtain either prior to the construction or before start-up of the mine and processing plant(s). The permits listed are not meant to be all-inclusive and cover only the major permits required for the mine and processing plant that are known at the current time. Design information is in progress.
    Major Permits or ApprovalsIssuing Agency
    Dust Control and Class II Air Quality Permits
    Pinal County Air Quality Control District
    Aquifer Protection PermitArizona Department of Environmental Quality
    Mine Land Reclamation Plan Approval
    Arizona State Mine Inspector
    45-513 Groundwater Withdrawal Permit
    Arizona Department of Water Resources
    Recycled Water Discharge Permit
    Arizona Department of Environmental Quality
    Major Site Plan Approval
    City of Casa Grande
    Class V Underground Injection Control PermitPpl

    Class V Underground Injection Control (“UIC”) Permit. A UIC permit is administered by Region 9 of the EPA under the federal Safe Drinking Water Act but the issuance of a Class V UIC permit, which is what the project would



    require for paste backfill, is “authorized by rule”. “Authorized by rule” means that an injection well may be operated without a permit as long as the owners or operators, submit inventory information to their permitting authority and verify that they are authorized to inject, operate the wells in a way that does not endanger underground sources of drinking water (“USDW”), and properly close their Class V well when it is no longer being used. After reviewing an owner or operator’s inventory information the permitting authority may determine that an individual permit is necessary to prevent USDW contamination. The technical information to support a UIC application is extensive and requires significant data on subsurface geology and hydrology. Detailed design would be needed and much of the data requirements would overlap with the Arizona Aquifer Protection Permit (below).
    Dust Control and Air Quality Permits. Emissions of fugitive dust caused by activities that disturb the soil, such as earthmoving, vehicular/equipment traffic on unpaved surfaces, project activities disturbing unpaved services and wind require a dust control permit from the Pinal County Air Quality Control District (“PCAQCD”). Dust caused by vehicles traveling on unpaved roads, construction and wind events create a type of air pollution called particulate matter. Rules and regulations have been adopted to limit the amount of particulate matter produced by certain types of activities. A permit is submitted annually through the online portal to cover the exploration activities. A separate dust control permit will be submitted for the commencement of mining operations.
    As the project is anticipated to have the potential to create emissions of regulated air pollutants above a minimum threshold during the mining phase for the processing plants, a final permit from PCAQCD must be obtained before construction begins. The permit application would identify emission sources, emission controls and other relevant information. Development of a dispersion model to estimate impacts to background ambient air quality from project emission may be required. The permitting process includes a 30-day public comment period, and the time needed by PCAQCD to complete the technical review depends on the complexity of the project. We anticipate the permit could be obtained within 12 months of application submittal but will be dependent on the category of permit needed and the agency backlog at the time of submittal.

    Aquifer Protection Permit (“APP”). During mine commercial operations, unless specifically exempted or designed, constructed and operated so that there will be no migration of pollutants directly to the aquifer or to the vadose zone, mine facilities such as surface impoundments, waste rock or overburden disposal units, tailings impoundments, and leaching facilities are generally considered to be discharging facilities and must be operated pursuant to either an individual APP or general permit. For facilities during decline development, we believe a Type 2.02 General APP Permit would be required. For full project operations, we anticipate that an Individual (as opposed to General) permit would be required and that a public hearing would be held. Technical information to support an APP application is extensive and requires that facility design be advanced to the point that the potential for impacts to groundwater quality can be adequately assessed. Arizona Administrative Code R18-1-525 limits the time for a complex Individual APP with public hearing to 329 business days. This time could be extended if the application review identifies additional information that is required to be submitted or if agency backlog is high at the time of submittal. We anticipate being able to obtain this information within 24 months of developing the permit application.

    Mined Land Reclamation Plan Approval. All surface facilities must be reclaimed and a reclamation plan must be developed to describe the methods and the schedule for reclamation. In addition, a reclamation bond, the costs for a third-party to complete the reclamation, must be estimated. The reclamation plan and reclamation cost estimate must be provided to the Arizona State Mine Inspector for approval, a process expected to take 120 days. Financial assurance must also be secured by means of a surety bond, certificate of deposit, cash deposit and corporate guarantee, to ensure that the funds are available to complete reclamation in the event of operator default. The Santa Cruz Project is currently operating under an Exploration Drilling Reclamation Plan that has been approved by the Arizona State Mine Inspector. A Mined Land Reclamation Plan (“MLRP”) for full operations will be completed and submitted for approval prior to construction of the project.

    45-513 Dewatering Permit. The Santa Cruz Project is located within the Pinal County Active Management Area and will require a permit to withdraw groundwater for dewatering purposes. Per Arizona Revised Statute 45-513, a person who is engaged in or proposes to engage in the extraction and processing of minerals shall be issued a dewatering permit for the beneficial use of the land for mineral extraction, for metallurgical processing, and for compliance with applicable environmental controls. Licensing time frames for a 513 dewatering permit include administrative completeness and substantive reviews with a public hearing for a total duration of 100 to 245 days.

    Recycled Water Individual Permit. A Recycled Water Individual Permit is required for treatment and reuse of industrial reclaimed water. In the event the Santa Cruz Project has excess water, and the water must be treated prior to redistribution per the regulated priority uses, a Recycled Water Individual Permit must be issued by the Arizona



    Department of Environmental Quality. Per the Arizona Administrative Code R18-9-7, licensing timeframes for permit approval can run anywhere from 186 to 294 business days.
    City/County Zoning Changes. The Santa Cruz Project would be required to undergo the City of Casa Grande Entitlement Process in order to rezone the area from a “Planned Area of Development” designation to an “Industrial” designation. In accordance with the provisions of the Arizona Revised Statutes, the city council may from time to time change the zoning of parcels within the municipality. These changes in zoning classification are for the purpose of meeting the land use needs of the residents of the city in conformance with the city's general plan. A Major General Plan Amendment Application must be submitted and approved prior to a rezoning petition. The Major General Plan Amendment for the Santa Cruz Project has been approved. The Planned Area of Development (“PAD”) Amendment must be submitted after the Major General Plan Amendment approval is received. Once the PAD amendment is approved, a Major Site Plan must be submitted and approved prior to commencement of construction activities. The Major Site Plan and rezoning process both require a public hearing process and can be expected to take up to 250 days for final approval.
    The Migratory Bird Treaty Act prohibits “Take” without prior authorization by the U.S. Fish and Wildlife Service (USFWS). This includes “Incidental Take” which is harming or killing resulting from, but is not the purpose of, carrying out an otherwise lawful act. Santa Cruz has implemented beneficial practices in accordance with USFWS Nationwide Standard Conservation Measures which include employee education, preconstruction surveys, nest monitoring, and avoidance of active nests. This may affect access points and the ability to perform work on the property. There are no known occurrences of federally listed threatened and endangered species and there are no planned impacts to potential federally regulated waters of the U.S. Portions of the Project site are a known nesting area for burrowing owls protected under the Migratory Bird Treaty Act and US Fish and Wildlife. Beneficial practices to avoid and minimize impacts to birds have been and will continue to be implemented as the Project develops.
    The foregoing is intended to identify the major, or long-lead time, permits and approvals, and is not exhaustive. Additional permits or authorizations will be required. However, additional permit requirements and approvals are not anticipated to require extensive technical detail or review and lengthy issuance timelines.
    These additional permits may include:
    •Hazardous materials permits
    •Solid or hazardous waste permits
    •City/County building permits, utility permits, road access permits
    •City/County Special Use permit or Development Plan approval
    •Floodplain use permit
    •Stormwater permit
    •Septic or sewage treatment permit
    •Onsite landfill permit
    •Potable water system permit
    •Threatened or endangered species consultation
    •Cultural resources consultation
    Numerous large mine operations have been permitted in Arizona, and specifically in Pinal County where the Santa Cruz Project is located. Given the prevalence of copper mining, these jurisdictions have developed regulatory programs that have well-defined permitting requirements and that are relatively predictable in terms of the permitting process and associated timelines, although we cannot provide assurance that all permits will be received.
    Geological Setting, Mineralization and Deposit Types. The Santa Cruz Project lies along a northwest to southeast trending, approximately 600 km long porphyry copper belt that includes many productive deposits such as Mineral Park, Bagdad, Globe-Miami, and the neighboring Sacaton. These deposits lie within the Basin and Range province that covers most of the southwestern United States and northwestern Mexico. The porphyry copper deposits within this trend are the product of igneous activity during an approximately 80 Ma to 50 Ma orogenic event that involved northeast-directed subduction and a northwest-southeast-striking magmatic arc. During Basin and Range tectonic extension, porphyry copper systems were dismembered, tilted and buried beneath basinal deposits that now fill the Casa Grande Valley. Prior to concealment, the porphyry systems of Arizona experienced supergene enrichment events that make them economically significant deposits.
    The Santa Cruz system (comprising the Santa Cruz, Texaco, Park-Salyer, and Sacaton deposits) represents one or more large, Laramide-aged porphyry copper systems that were subsequently enriched by supergene processes. Supergene enrichment is a mineral deposition process in which near-surface oxidation produces acidic solutions that leach metals, carry them downward, and reprecipitate them, thus enriching sulfide minerals already present. Sometime following the



    development of supergene mineralization, the Santa Cruz system was dismembered, displaced, and eventually buried as a result of Basin and Range extensional tectonism.
    Mineralization at the Santa Cruz Project is generally divided into three main types:
    •Primary hypogene sulfide mineralization: chalcopyrite, pyrite, and molybdenite hosted within quartz-sulfide stringers, veinlets, veins, vein breccias, and breccias as well as fine to coarse disseminations within vein envelopes associated with hydrothermal porphyry-style mineralization. Hypogene mineralization appears to be the most concentrated within the Southwest Exploration Area, Texaco Ridge Exploration Area, and Texaco Deposit areas based on Ivanhoe Electric drill holes.
    •Secondary supergene sulfide mineralization: dominantly chalcocite which rims primary hypogene sulfides and completely replaces hypogene mineralization. Other sulfides that fall within this category include lesser bornite and covellite as well as djurleite and digenite which have been identified by historic XRD analyses. Supergene sulfide mineralization developed as sub-horizontal domains, known as “chalcocite blankets”, within the phreatic zone (below the paleo water table). They result from the weathering, oxidation, and leaching of sulfides under oxidizing conditions in the vadose zone (above the water table) and the transport and re-precipitation of copper sulfides in a more reducing environment below the water table.
    •Secondary supergene “oxide” mineralization: chrysocolla (copper silicate) with lesser dioptase, tenorite, cuprite, copper wad, and native copper, and as copper-bearing smectite group clays. This mineralization style resides immediately above supergene sulfide mineralization near the paleo water table. Superimposed in-situ within the copper oxide zone is atacamite (copper chloride) and copper sulfates (e.g., antlerite, chalcanthite). Atacamite accounts for much of the copper grades within the oxide zone and requires formation of a brine to precipitate.
    Exploration and Drilling. Ivanhoe Electric initiated our exploration on the Santa Cruz project with a twin hole program in 2021 to validate historical drill data and produce an initial Mineral Resource Estimate in 2021 (December 8, 2021) and accompanying Technical Report Summary (June 7, 2022). Further exploration in 2021 – 2022 included (i) geophysical surveys, comprising ground gravity, ground magnetics, Typhoon™ three-dimensional Perpendicular Pole Dipole Induced Polarization (“3D PPD IP”), refraction, and passive seismic, and a combination of diamond drill and rotary drilling totaling 88 holes and approximately 55,291 m. Exploration drilling in 2023 included a combination of diamond drill, rotary, and sonic drilling totaling 94 holes and approximately 68,300 m.
    Exploration drilling in 2024 focused on the Texaco deposit and the Southwest Exploration Area with eight drill holes totaling approximately 8,700 meters completed. See 2024 Exploration Sampling Method and Table 1 below. Both drilling campaigns were guided by previous Typhoon™ surveys. Exploration drilling in the Southwest Exploration Area included four drill holes. The Southwest Exploration Area was recognized after the Company drilled an anomaly generated by Typhoon™ and intersected sulfide copper mineralization under cover more than one kilometer southwest of the Santa Cruz deposit. The deposits for the Santa Cruz Project are expected to have an updated Mineral Resource estimate as part of the Santa Cruz Project Preliminary Feasibility Study expected to be completed by the end of the second quarter of 2025. At December 31, 2024, Ivanhoe Electric has drilled over 249 holes totaling over 125 km length within the Santa Cruz Project area.

    2024 Exploration Sampling Method

    2024 exploration drilling and sampling are not included in the 2023 Initial Assessment. Sample intervals are planned on a half meter to two-meter-long basis in areas with good drill recovery (>70% recovery), with two-meter-long samples being the most common. In areas of poor drill recovery (<70% recovery), sample intervals are planned from run block-to-run block, for a maximum length equivalent to the maximum length of a drill run (10.5-feet; 3.2-meters). If two drill runs occur back-to-back with poor recovery, they may be combined into a single sample if the total recovered length of either run is less than half of one meter. Sample labels are custom printed and follow the labeling convention of the Hole ID with a three-digit sample identifier (e.g., SCC-139_001). Sampling books utilize a unique six-digit unique identifier.
    Samples collected in 2024 were cut lengthwise in half, using the NTT Coresaw™ brand diamond-bladed saw. Each sample consisted of one-half of the split drill core, which was placed in an 8mm thick 18” x 24” plastic sample bag labeled with the sample number and a sample tag affixed to the outside of the plastic bag. The plastic sample bags were then placed in super sacks on pallets for transport to the laboratory facility.





    Table 1 below details the eight 2024 Santa Cruz exploration drill holes with number of samples, total length of samples/assays, total drill hole length, lithology, and key geologic properties.

    2024 Exploration Drilling
    Number of Samples/ Assays
    Sum of Sample Lengths (m)
    Total Drill hole Length (m)
    Lithology (with increasing depth)
    Target
    Key Geologic Properties
    SCC-236

    162
    282.65
    1123.80
    Whitetail Conglomerate, Oracle Granite, Diabase, Porphyry
    Southwest Exploration Area
    Intermittent intercepts of copper mineralization as secondary copper sulfides
    SCC-238
    134
    243.52
    1023.52
    Whitetail Conglomerate, Basal Conglomerate, Oracle Granite, Diabase, Porphyry
    Southwest Exploration Area
    Exhibited copper mineralization at Typhoon geophysical target as secondary copper sulfides
    SCC-242
    159
    307.71
    1149.71
    Gila Conglomerate, Whitetail Conglomerate, Apache Leap Tuff, Basal Conglomerate, Oracle Granite, Porphyry
    Texaco Deposit
    Validated mineralization on northeast limit of Texaco as primary and secondary copper sulfides
    SCC-244
    57
    102
    1167.38
    Whitetail Conglomerate, Oracle Granite, Diabase, Porphyry
    Southwest Exploration Area
    Intermittent intercepts of copper mineralization as secondary copper sulfides
    SCC-245
    33
    58.04
    1114.04
    Whitetail Conglomerate, Apache Leap Tuff, Mafic Conglomerate, Oracle Granite, Porphyry, Diabase
    Texaco Deposit
    Refined northeastern limit of Texaco mineralization
    SCC-246
    72
    133.15
    924.15
    Whitetail Conglomerate, Oracle Granite, Porphyry
    Southwest Exploration Area
    Intermittent intercepts of copper mineralization as secondary copper sulfides
    SCC-248
    256
    474.18
    1091.18
    Whitetail Conglomerate, Basal Conglomerate, Oracle Granite, Porphyry
    Texaco Deposit
    Extended Texaco mineralization north as secondary and primary sulfides
    SCC-249
    140
    239.87
    1104.29
    Whitetail Conglomerate, Basal Conglomerate, Oracle Granite, Porphyry
    Texaco Deposit
    Validated mineralization on northeast limit of Texaco as primary and secondary copper sulfides
    Grand Total
    1,013
    1841
    8,698.07






    Sampling, Analysis and Data Verification. The sampling procedures for the IA include specific gravity measurements, geotechnical logging, photography (dry and wet), geological logging, and then sampling. Drill core was cut lengthwise, either in half or in quarters, using an NTT brand diamond bladed saw or a Husqvarna table saw. The sample consisted of one half or one quarter of the core which was placed in a plastic sample bag labeled with the sample number and the sample bag. samples were analyzed at one of four independent laboratories: Skyline Laboratories located in Tucson, AZ, USA; SGS Laboratories located in Burnaby, BC, Canada, SGS Lakefield, ON, Canada for SEQ Analysis; or American Assay Laboratories located in Sparks, NV, USA. All samples sent through SGS Laboratories were prepped at SGS Burnaby, BC, Canada. At the time, all assay labs were well established and recognized assay and geochemical analytical services companies and are independent of IE. All four laboratories are recognized by the International Standard demonstrating technical competence for a defined scope and the operation of a laboratory quality management system (ISO 17025). The Company submitted a blank, standard, or duplicate sample on every seventh sample. Sampling and analytical Quality Assurance/Quality Control protocols typically involve taking duplicate samples and inserting Quality Control samples (certified reference material and blanks) to monitor the assay results' reliability throughout the drill program.
    Nordmin and Met Engineering, both Qualified Persons for the Santa Cruz Initial Assessment, are not aware of any drilling, sampling, or recovery factors that could materially impact the accuracy and reliability of the results. In the opinion of Nordmin and Met Engineering, the drilling, core handling, logging and sampling procedures meet or exceed industry standards and are adequate for the purpose of Mineral Resource estimation.
    The authors of the IA consider the QA/QC protocols in place for the Santa Cruz Project to be acceptable and in line with standard industry practice. Based on the data validation and the results of the standard, blank, and duplicate analyses, the authors are of the opinion that the assay and specific gravity databases are of sufficient quality for Mineral Resource estimation for the Santa Cruz Project.

    Mineral Resources. The December 31, 2022, Mineral Resource Estimate (“MRE”) set forth in the IA was prepared by Nordmin and includes a detailed geological and structural re-examination of the Santa Cruz, East Ridge, and Texaco Deposits. Nordmin has also confirmed that the MRE remained accurate as of December 31, 2024.
    The Santa Cruz Deposit MRE benefits from approximately 116,388 meters of diamond drilling in 129 drill holes, the East Ridge Deposit MRE has 18 holes totaling 15,448 m, and the Texaco Deposit MRE has 23 drill holes totaling 21,289 m. All drill holes were completed from 1964 to 2022. Drilling in 2023 and 2024 was predominantly to further define the resource.
    Diamond drill hole samples were analyzed for total Cu and acid soluble Cu using Atomic Absorption Spectroscopy ("AAS"). A decade after initial drilling, ASARCO re-analyzed select samples for cyanide soluble Cu (AAS) and molybdenum (multi-element ICP-MS). The Company currently analyzes all samples for total Cu, acid soluble Cu, cyanide soluble Cu, and molybdenum. Due to the re-analyses to determine cyanide soluble Cu within historic samples, there are instances where cyanide soluble Cu is greater than total Cu. It has been determined that the historic cyanide soluble assays are valid as they align with recent assays in 2022 drill holes.




    Table:   In Situ Santa Cruz Project Mineral Resource Estimates as at December 31, 2024 and December 31, 2023,
    at 0.70% Cu cut-off for Santa Cruz, 0.80% Cu cut-off for Texaco, and 0.90% Cu Cut-off for East Ridge
    Classification
    Deposit
    Mineralized Material (ktonne)
    Total
    Cu %
    Total
    Soluble
    Cu %
    Total Cu (ktonne)
    Total
    Soluble
    Cu (ktonne)
    IndicatedSanta Cruz (0.70% COG)223,1551.240.822,7591,824
    Texaco (0.80% COG)3,5601.330.974735
    East Ridge (0.90% COG)—————
    InferredSanta Cruz (0.70% COG)62,7091.230.92768576
    Texaco (0.80% COG)62,3111.210.56753348
    East Ridge (0.90% COG)23,9781.361.26326302
    Total
    IndicatedAll Deposits226,7151.240.822,8071,859
    InferredAll Deposits148,9981.240.821,8471,225
    Source: Nordmin, 2023
    Notes on Mineral Resources
    •k=thousand; t=tonne; Cu=copper; M=million; lb=pounds; CoG or COG=cut-off grade; and d=day.
    •The Mineral Resources in this estimate were independently prepared, including estimation and classification, by Nordmin Engineering Ltd. and in accordance with the definitions for Mineral Resources in S-K 1300.
    •Mineral resources that are not mineral reserves do not have demonstrated economic viability. This estimate of Mineral Resources may be materially affected by environmental, permitting, legal, title, taxation, sociopolitical, marketing, or other relevant issues.
    •Verification included multiple site visits to inspect drilling, logging, density measurement procedures and sampling procedures, and a review of the control sample results used to assess laboratory assay quality. In addition, a random selection of the drill hole database results was compared with the original records.
    •The Mineral Resources in this estimate for the Santa Cruz, East Ridge, and Texaco deposits used Datamine Studio RMTM software to create the block models.
    •The Mineral Resources are current to December 31, 2024.
    •Underground-constrained Mineral Resources for the Santa Cruz deposit are reported at a CoG of 0.70% total copper, Texaco deposit are reported at a CoG of 0.80% total copper and East Ridge deposit are reported at a CoG of 0.90% total copper. The CoG reflects total operating costs to define reasonable prospects for eventual economic extracted by conventional underground mining methods with a maximum production rate of 15,000 t/d. All material within mineable shape-optimized wireframes has been included in the Mineral Resource. Underground mineable shape optimization parameters include a long-term copper price of $3.70/lb, process recovery of 94%, direct mining costs between $24.50 to $40.00/processed tonne reflecting various mining method costs (long hole or room and pillar), mining general and administration cost of $4.00/t processed, onsite processing and solvent extraction and electrowinning (“SX/EW”) costs between $13.40 to $14.47/t processed, offsite costs between $3.29 to $4.67/t processed, along with variable royalties between 5.00% to 6.96% net smelter royalty (“NSR”) and a mining recovery of 100%.
    •Specific gravity was applied using weighted averages by deposit sub-domain.
    •All figures are rounded to reflect the relative accuracy of the estimates, and totals may not add correctly.
    •Excludes unclassified mineralization located along edges of the Santa Cruz, East Ridge, and Texaco deposits where drill density is poor.
    •Reported from within a mineralization envelope accounting for mineral continuity.
    •Total soluble copper means the addition of sequential acid soluble copper and sequential cyanide soluble copper assays. Total soluble copper is not reported for the primary domain.

    The Santa Cruz Project did not have any Mineral Reserves as at December 31, 2024.



    Mineral Processing and Metallurgical Testing. Metallurgy and processing test work were directed by Met Engineering LLC and conducted at McClelland Labs in Sparks, Nevada. McClelland Labs is recognized by the International Accreditation Service (“IAS”) for its technical competence and quality of service and has proven that it meets recognized standards. The studies are ongoing. Study focus has been on:
    •Confirming total copper recovery of the leach-float flow sheet proposed by historical operator, CGCC, circa 1980, on Exotic, Oxide and Chalcocite mineral domains.
    •Investigating heap leaching of Exotic, Oxide and Chalcocite mineral domains. The test program for heap leaching is in progress. Initial column leach testing progress is below.
    Agitation leach tests undertaken in mid-2022 verified historical test results and after adjusting the particle size distribution, acid-soluble copper recovery of 92% was achieved. Ivanhoe Electric subsequently conducted a leach-float test program in which the same mill composite sample used in prior testing was subjected to the standard leach procedure developed earlier in the year. Three standard leach tests were conducted, each subjected to different grind sizes. The studies support achieving up to 94% total copper recovery with the leach-float circuit at the Santa Cruz deposit. Further, the studies support that a smelter saleable concentrate could be produced without any penalties grading 48% total copper and 23% sulfur.
    One phase of column leaching tests was performed on two composite samples representing oxide and chalcocite mineral domains in the upper ore. There were no solution flow issues or operational issues in any of the column cells. Estimated copper recoveries and extraction rates on the two column cells cured with a chloride dopant were 98% and 94% copper and 70 and 63 days, respectively.
    There are some factors to follow up on with future testing to ensure all processing factors are effectively investigated. These are confirmation of corrosion resistant materials and linings for the thickeners in the counter-current-decantation system for pregnant leach solution recovery and studying sulfide flotation with expected process water chemistry at the site. Otherwise, there are no deleterious elements that could have a significant effect on economic extraction.
    Mining Methods. The Project is currently not being mined. Mineral Resources are stated for three deposits: Santa Cruz, Texaco, and East Ridge. For mine planning work, only the Santa Cruz and East Ridge deposits were evaluated.
    The Santa Cruz deposit is located approximately 430 to 970 meters below the surface. Based on the mineralization geometry and geotechnical information, an underground longhole stoping (“LHS”) method is suitable for the Oxide and Chalcocite-enriched domains within the deposit. The Santa Cruz deposit would be mined in blocks where mining within a block occurs from bottom to top with paste backfill (“PBF”) for support. A sill pillar is left in situ between blocks.
    Within the Santa Cruz deposit, there is an Exotic domain located approximately 500 to 688 meters below the surface and to the east of the main deposit. The Exotic domain consists of flatter lenses that are more amenable to drift and fill (“DAF”) mining. Cemented waste rockfill would be used for support. The backfill would have sufficient strength to allow mining of adjacent drifts without leaving pillars.
    The East Ridge deposit is approximately 380 to 690 meters below the surface and to the north of the main Santa Cruz deposit. The East Ridge deposit consists of two tabular lenses and would be mined using DAF with cemented waste rock backfill for support.
    The mine would be accessed by dual decline drifts from surface, with one drift serving as the main access and the other as a railveyor drift for material handling. Mineralization would be transported from stopes via loader to an ore pass system and then to surface by the railveyor. Main intake and exhaust raises would be developed with conventional shaft sinking methods to provide air to the mine workings. The mine would target a combined production of 15,000 t/d from the Santa Cruz and East Ridge deposits.
    Portal box cut is assumed in the IA to start in 2026. Decline and railveyor activities begin in 2027 through to 2028 to access the top portion of the mine. Decline and railveyor resumes in 2033 to access the bottom of the mine. Stoping begins in 2029 with a 1 year ramp-up period until the mine and plant are operating at full capacity. The currently defined mine life is approximately 3 years of construction and 20 years of production.
    Using historical data and the results of recent hydrogeologic testing, the hydrogeological conceptual site model was updated and the groundwater flow model was developed. The groundwater flow model was used to evaluate multiple passive and active dewatering scenarios for the proposed mine plan. With an active dewatering scenario pumping approximately 3,000 gallons per minute (“gpm”) for the first two years of life of mine (“LoM”), the model shows that the annual average residual passive inflows for the first 10 years of the mine are at or below 12,000 gpm. From year 11 through 25 of LoM, the residual passive inflows range from approximately 15,000 to 18,000 gpm.



    Figure: Completed Mine Plan
    Mine plan.jpg
    The table below summarizes the total tonnage and grades within the proposed mine plan.
    Table: Mine Plan Summary
    ClassificationDomainTonnage (kt)Total
    Soluble
    Cu (%)
    Acid
     Soluble
    Cu (%)
    Cyanide
    Soluble
     Cu (%)
    IndicatedTotal74,7131.641.070.39
    InferredTotal25,5301.600.990.48
    Indicated + InferredTotal100,2441.631.050.41
    Source: SRK, 2023

    Note:4.94 Mt of marginal material at a grade of 0.56% is not included in this table.

    The IA is preliminary in nature, it includes inferred mineral resources that are considered too speculative geologically to have modifying factors applied to them that would enable them to be categorized as mineral reserves, and there is no certainty that this initial economic assessment will be realized, including whether the mine would be developed as set out in the IA.
    Recovery Methods. The Santa Cruz Project processing facility would recover copper by conventional weak sulfuric acid agitated leaching of the oxide mineralized material, and by sulfide flotation of the residue produced after leaching. Leached oxide copper would be processed through SX/EW to produce high purity copper cathodes. Sulfide copper and by-product precious metals would be recovered in copper flotation mineral concentrate. Copper concentrates would be of suitable quality to be sold to a domestic or international copper smelters.



    The following process flow diagram illustrates the potential sequence of operations to recover copper in the Santa Cruz plant. This flowsheet provides the basis for the process description that follows.
    Figure. Santa Cruz IA processing flowsheet showing the production of both copper cathode from copper oxide mineralization and copper concentrate from copper sulfide mineralization.
    Flowsheet.jpg
    Source: M3, 2023
    The nominal capacity of the mill process would be 5.475 million tonnes per year (“Mt/y”). Process availability factors include both the mechanical availability and the use of this mechanical availability. For the design, an availability factor of 92% was used throughout the plant because the primary and secondary grinding lines have a single ball mill in each.
    The currently proposed mine plan for the Santa Cruz Project is based on a 365-day calendar year. The yearly mine production tonnage would vary from 4.0 million tonnes (“Mt”) at the start of production to a high of 5.9 Mt in Year 5 of production.
    The mass balance was developed for the Santa Cruz process using MetSim mass balance software. The process simulation used overall recoveries of 96% for the acid soluble copper as cathode copper and 93% for the sulfide copper into concentrate.
    Project Infrastructure. The Santa Cruz Project has excellent existing infrastructure including access to roads and interstate highways, railroads, power lines, and an abundant supply of water from dewatering operations and water rights associated with the private land constituting portions of Project. The Santa Cruz Project owns sufficient fee simple land to allow for all surface infrastructure including the process facility, Tailings Storage Facility (“TSF”), offices borrow pit, and other related mine structures.
    Interstate highways near the Project (<10 km) are Interstate 8 and Interstate 10. The Union Pacific/Southern Pacific (“UPSP”) rail borders the northern edge of the Santa Cruz Project and the BNSF rail has a spur and terminal in Phoenix, Arizona.




    Figure. Santa Cruz IA site layout, requiring approximately one-third of the total land package for the mine, plant, process, tailings storage facilities and on-site generation of solar power.
    Site Layout.jpg





    Tailings Storage Facility. A significant portion of the mined material would be returned underground as backfill in the mine. Backfill is used to fill voids created during mining. By returning tailings as paste backfill underground, the size and impact of the surface Tailings Storage Facility (“TSF”) will be reduced.
    The TSF is proposed to be located on relatively flat terrain directly east of the plant site and sited to avoid: the underground ore body outline; mine’s infrastructure; and the 1% annual exceedance probability (“AEP”) (1 in 100-yr return period) floodplain from Federal Emergency Management Agency (“FEMA”) (2007) flood hazard mapping. The TSF is sized to store all the tailings estimated to be produced over the mine life and not used for underground backfill (56.7 Mt, without additional contingency) on surface. The tailings will be retained by a perimeter embankment (up to 50 meters high) constructed primarily of compacted, structural fill sourced from on-site borrow areas. The TSF impoundment will be lined with a low-permeability liner, which will be raised within the perimeter embankment for seepage control. During operations, tailings slurry water and precipitation which collects in the TSF will be reclaimed to the mine for use in the mining process or treated (if required) and discharged. At closure, the TSF impoundment will be regraded to prevent ponding and covered with a soil cover and vegetated to limit infiltration and resist erosion. Closure channels will be constructed to shed water off the impoundment surface and over the embankment slopes.
    Power. Power consumption for the Santa Cruz Project is anticipated to average 450,000 megawatt hours per year (“MWh/y”). Initially the source of power for the Project will be provided from a 69 kilovolt (“kV”) power line operated by Pinal County Electric District 3 (“ED3”). Several other higher voltage transmission lines border the property within close proximity.
    Power for the Santa Cruz Project could be provided from a number of sources, or combination of sources, ranging from grid supply to microgrid renewable energy supply. The goal of the mine development is to achieve much of the energy supply from renewable sources, such as solar or geothermal, either at the start or through a phased in approach during the mine operation. The base case of the Santa Cruz Project is that the mine would operate using 70% renewable power within the first three years of operations.
    Water. The water balance for the Santa Cruz Project indicates that there will be a surplus of water from the Project from dewatering of the underground operations. The mining and processing operations will consume approximately 3.5 million cubic meters (“Mm3”) of water per year, while water supplies from dewatering will range from 20 million to over 30 million cubic meters per year (“Mm3/y”). The amount of water for distribution to local stakeholders during operations will average 27 Mm3/y. The water balance excludes the water rights associated with the surface title of the land associated with the Santa Cruz Project.
    Market Studies and Contracts. A flat copper price of $3.80/lb has been selected for this study. In the opinion of SRK, this price is generally in-line with pricing over the last 3 years and forward-looking pricing is appropriate for use during an Initial Assessment of the Project with an estimated mine life of 20 years. As the Project progresses, more detailed market work in the form of market studies will be completed to support further study efforts. Price forecasting is an inherently forward-looking exercise dependent upon numerous assumptions. The uncertainty around timing of supply and demand forces has the potential to create a volatile price environment and SRK fully expects that the price will move significantly above and below the selected price over the expected life of the Project.
    Cathode is assumed to be 100% payable with no premium or discount applied for the purposes of the study. This approach assumes that the cathode has not received registration or certification that would result in a premium; nor is the cathode assumed to contain any deleterious or penalty elements.
    Concentrate terms for the study are generic terms and do not reflect the presence of any deleterious or penalty elements within the concentrate. The following table presents the concentrate terms applied for this study.
    Table: Concentrate Terms
    ItemUnitValue
    Payability%96.5
    Treatment Charge$/dmt65
    Refining Charge$/lb0.065
    Transport Cost$/wmt90
    Source: SRK, 2023



    As the Santa Cruz Project is an early-stage greenfield project, there are a large number of contracts required for the development and operation of the site. None of the major required contracts have been executed at the time of this study.

    Environmental, Closing and Permitting. The Santa Cruz Project is located on private land and permitting is primarily with the State of Arizona, Pinal County, and City of Casa Grande. See “— Permitting and encumbrances” for a detailed discussion of permitting requirements.
    The utilization of a renewable microgrid will allow the Santa Cruz Project to produce copper with one of the industry's lowest carbon intensities. Such intensities highlight Ivanhoe Electric commitment to implementing cutting-edge mining techniques, conserving energy, and utilizing renewable energy.

    In addition to the Exploration Drilling Reclamation Plan that has been approved by the Arizona State Mine Inspector, we will be required to submit a Mined Land Reclamation Plan for reclamation of all surface facilities. The closure approach and related closure cost estimates must be approved before facility construction and operation. See “— Permitting and encumbrances” for a detailed discussion of permitting requirements.
    Capital and Operating Cost Estimates
    Mining Capital Cost Estimate. The mining capital cost estimate is based on first principal cost model build-up and budgetary quotes. The initial mining capital costs plus sustaining mining capital costs in the IA are equal to $960.48 million, which includes an estimated capital of $878.08 million plus 9.4% contingency of $82.40 million.
    Development costs are derived from the mining schedule prepared by SRK. The prepared mining schedule includes meters of development during pre-production, this schedule of meters was combined with unit costs, based on site specific data, to estimate the cost of this development operation. The following table provides the breakdown of the estimated initial capital costs.
    Table: Estimated Mining Initial Capital Cost
    ItemUS$ Million
    Capital Development Cost166.99
    Equipment Purchase and Rebuilds241.24
    Mine Services17.96
    Owner Cost32.75
    Contingency38.76
    Total497.70
    Source: SRK, 2023
    The Santa Cruz Project would require sustaining capital to maintain the equipment and all supporting infrastructure necessary to continue operations until the end of its projected production schedule. The sustaining capital cost estimate developed includes the costs associated with the engineering, procurement, construction and commissioning.
    The IA estimate indicates that the Santa Cruz Project would require sustaining capital of $462.78 million to support the projected production schedule through the LoM, as shown below.
    Table: Estimated Mining Sustaining Capital Cost
    ItemUS$ Million
    Capital Development Cost60.79
    Equipment Purchase and Rebuilds322.64
    Mine Services0
    Owner Cost35.71
    Contingency43.63
    Total462.78
    Source: SRK, 2023
    Process Capital Cost Estimate. The initial capital cost for the Santa Cruz plant and infrastructure facilities totals $563.7 million as summarized in the table below. This capital cost includes all process areas facilities in the Santa Cruz



    plant proper starting with the primary crushing, and continuing through grinding, agitated leaching, solvent extraction and electrowinning, leach residue neutralization, leach residue grinding, rougher flotation, concentrate regrinding, cleaner flotation, concentrate dewatering and tailing dewatering and pumping to the TSF. The initial capital expenditure includes the ventilation chiller for the underground mine, the main plant substation, fresh and process water ponds, and the batch plant, and the surface ancillary buildings.
    Table: Estimated Initial Plant Capital Cost Summary
    DescriptionHoursTotal Cost (US$ Million)% of Total Capital Cost
    Directs1,290,000.00 345.461.3
    Indirects72.012.8
    Contingency111.319.7
    Owner’s Costs35.06.2
    Escalation— 0.0
    Total Capital Cost (TCC)563.7100.0
    Source: M3, 2023
    No sustaining capital costs have been included for the Santa Cruz process plant. The mine life is 20 years, and the capital equipment will be designed to last for the duration of the Project. Preventative maintenance and periodic rebuilds/relining is captured in the annual maintenance cost estimation. The only place where sustaining capital is expected is in the TSF for annual embankment enlargement which was estimated separately.
    Tailings Capital Cost Estimate. The initial capital cost for the Santa Cruz tailings facilities totals $75.1 million as shown below. The estimated sustaining capital costs total $486.8 million as shown below. The key elements of the tailings capital cost estimation methodology include:
    •Material take offs
    •Earthworks, lining, and piping rates from standard schedule
    •Borrow-to-fill provided by budgetary quotation
    Table: Estimated TSF Initial Capital Cost
    ItemUS$ Million
    Directs48.8
    Indirects11.3
    Contingency15.0
    Total75.1
    Source: M3, 2023
    Table: Estimated TSF Sustaining Capital Cost
    ItemUS$ Million
    Sustaining382.2
    Closure104.6
    Total486.8
    Source: M3, 2023
    Mining Operating Cost Estimate. The required mining equipment fleet, production operating hours, and manpower were estimated to arrive at mining costs. The mining cost estimate was developed from first principles and compared to recent actual costs.
    A maintenance cost was allocated to each category that required equipment maintenance. A summary of the LoM unit mine operating costs is presented below.



    Table: Mining Operating Costs
    LoM Tonnes Mined (000) CategoryUS$000107,134*
    US$/t Mined
    Operating Development481,021 4.49
    Production (Drilling, Blasting, Loading, Hauling and Backfill)1,139,843 10.64
    Other mining costs (Services, Maintenance, Rehab and Definition Drilling)458,564 4.28
    Mine engineering and administration592,085 5.54
    Contingency (9.5%)254,664 2.39
    Total2,926,177 27.33
    * LoM Tonnes mined includes 100,244 kt of process material, 4,942 kt of marginal material and 1,948 kt of waste.
    Source: SRK, 2023
    Processing Operating Cost Estimate. The process plant operating costs are summarized by the categories of labor, electric power, liners (wear steel), grinding media, reagents, maintenance parts, and supplies and services, as presented below.
    Table: Process Plant Operating Expenditures (OPEX) Summary by Category
    Operating and MaintenanceAverage Annual
    Cost (US$000)
    $/t Processed
     (US$)
    LoM Operating
    Cost (US$000)
    %
    Labor11,119 2.11222,383 16.8
    Electrical Power23,297 4.43465,939 35.1
    Reagents18,447 3.51368,947 27.8
    Wear Parts (Liners & Grinding Media)6,811 1.30136,221 10.3
    Maintenance Parts5,993 1.14 119,865 9.0
    Supplies and Services623 0.12 12,557 0.9
    Total (US$000)66,296 12.611,325,912 100.0
    Source: M3, 2023
    TSF operating costs are included in the processing operating costs and include labor, power, reagents, and maintenance.
    G&A Operating Cost Estimate. The general and administrative (“G&A”) and laboratory costs are summarized below.
    Table: G&A Operating Cost Summary
    Item$/t processedLoM Operating
    Cost ($000)
    Lab Opex0.2424,798.00 
    G&A Opex2.39251,543.00 
    Total2.63276,341.00 
    Source: M3, 2023




    Total modeled initial capital costs are estimated at $1.15 billion, as summarized below:

    Table. Modeled Initial Capital*

    Initial Capital CostValue ($000)
    Underground Capital Development Cost167.0
    Underground Equipment Purchase240.4
    Underground Rebuilds0.8
    Underground Services18.0
    Underground Owner Cost10.9
    Underground Related Contingency Costs34.8
    Underground Capitalized Opex35.6
    Mill and Surface Capital563.7
    TSF75.1
    Total1,146.3
    Source: SRK, 2023
    * Initial capital estimates and expenditure schedule were developed external to the model. No additional contingency has been included in the model.

    Total modeled sustaining capital costs are estimated at $0.98 billion, as summarized below:

    Table. Modeled Sustaining Capital*

    Sustaining CapitalValue ($000)
    Underground Mining462.8
    Tailings486.6
    Closure27.0
    Total976.4
    Source: SRK, 2023
    * Sustaining capital is modeled on an annual basis and is used in the model as developed in previous sections. No contingency amounts have been added to the sustaining capital within the model. General closure costs are modeled as sustaining capital and are captured as a one-time payment the year following cessation of operations. For the tailings impoundment, closure costs run several years past the end of the mine life, this cost has been captured by extending the model life beyond the end of the mine life.
    Economic Analysis. Economic analysis, including estimation of capital and operating costs is inherently a forward-looking exercise. These estimates rely upon a range of assumptions and forecasts that are subject to change depending upon macroeconomic conditions, operating strategy and new data collected through future study or operations and therefore actual economic outcomes often deviate significantly from forecasts.
    As permitted by Subpart 1300 and Item 601 of Regulation S-K, the IA includes an economic analysis of the Santa Cruz Project without taking into consideration Inferred Mineral Resources and also includes an economic analysis of the Santa Cruz Project including the Inferred Mineral Resources. It should be noted that the IA is preliminary in nature, and is based on Mineral Resources. Unlike mineral reserves, Mineral Resources do not have demonstrated economic viability. It should also be noted that the version of the economic analysis that includes inferred Mineral Resources includes inferred Mineral Resources that are considered too speculative geologically to have modifying factors applied to them that would enable them to be categorized as mineral reserves, and there is no certainty that this economic assessment will be realized.
    The IA anticipates that the Santa Cruz Project would consist of an underground mine and processing facility producing both copper concentrate and copper cathode.
    The economic analysis metrics are prepared on annual after-tax basis in US$. The results of the analysis are presented in the table below. The results indicate that, at a copper price of US$3.80/lb., the Project without inferred material returns an after tax net present value (“NPV”) at 8% of US$0.5 billion calculated from the start of construction, an after tax internal rate of return (“IRR”) of 14% and a payback period from the start of construction of 10 years. When the inferred



    material is included in the economic analysis, the after tax NPV @ 8% increases to US$1.3 billion, the after tax IRR increases to 23% and the payback period decreases to 7 years from the start of construction.
    The economic model is based on mine plans that were prepared as outlined in previous sections. Inferred resources account for approximately 21% of the tonnage contained within the mine plan. The economic results of the Project both without inferred resources and including inferred resources are presented within this section. However, the removal of the inferred material from the mine plan is a gross adjustment and no recalculation of fixed capital and operating costs has been completed for the scenario without inferred Mineral Resources.
    As the stage of study for the Santa Cruz Project is initial assessment, no reserves are estimated for use in this analysis. The economic evaluation was completed using resource material that includes material in the inferred category. To evaluate the risk associated with the use of inferred material in the mine plan, a model was completed where the inferred material was removed from the mine plan. SRK notes that this model result should be viewed with caution as the removal of the inferred material is a gross adjustment and no corresponding adjustments to capital, operating cost or mill performance were made.
    The book value of the Santa Cruz property and its associated plant and equipment as at December 31, 2024 was $177.1 million.
    Table: Indicative Economic Results of the IA
    LoM Cash Flow (Unfinanced)UnitsValue
     (without Inferred)
    Value
    (with Inferred)
    Total Revenue$ million10,031.62 12,865.90 
    Total Opex$ million(4,616.93)(4,617.00)
    Operating Margin$ million5,414.70 8,248.90 
    Operating Margin Ratio%5464 
    Taxes Paid$ million(426.56)(984.80)
    Free Cash Flow$ million3,241.07 5,350.07 
    Before Tax
    Free Cash Flow$ million2,549.49 5,216.71 
    NPV at 8%$ million583.40 1,642.51 
    IRR%1525 
    After Tax
    Free Cash Flow$ million2,122.93 4,231.91 
    NPV at 8%$ million457.66 1,316.60 
    IRR%1423 
    PaybackYears107 
    Source: SRK, 2023
    Within the constraints of this analysis, the Project appears to be most sensitive to material classification, mined grades, commodity prices and recovery assumptions within the processing plant.



    A summary of the cash flow on an annual basis is presented below.
    Figure: Annual Cash Flow Summary (Without Inferred Material)
    Cash flow no inferred.jpg
    Source: SRK, 2023
    For Conclusions and Recommendations by the Qualified Persons. Under the assumptions presented in the IA, and based on the available data, the Mineral Resource estimates show reasonable prospects of economic extraction.
    The recommended program is for the Company to complete a Pre-Feasibility Study (“PFS”). The work program required to complete a PFS will consist of associated infill and exploration drilling, analytical and metallurgical test work, hydrogeological and geotechnical drilling, geological modeling, mine planning, and environmental baseline studies to support permitting efforts.
    Proposed Plan of Exploration and Development

    As recommended by the authors of the IA, we are advancing the Santa Cruz project to complete a PFS by the end of the second fiscal quarter of 2025. We have completed infill drilling to allow for drill results to be incorporated into an updated resource model that would allow for the Indicated Mineral Resource to be developed into an initial Probable Mineral Reserve for the life of mine.

    We will explore different mine access locations and mining orientations for the Santa Cruz long hole stoping areas. There are areas that require long ore drives to access. Exploring different orientations can potentially lead to shorter ore drives and consequently shorter hauls to the ore passes. We are optimizing the stope size when additional geotechnical information is available. Once the geotechnical information is incorporated, the mining team will determine if an increase in the stope lengths or width is possible which may improve mining efficiency. Additionally, we are also evaluating more efficient materials handling methodologies. By developing a centralized materials handling system that can utilize ore passes inside the mineralized rock, production efficiencies can be optimized to reduce loader tramming and rehandling times. We are also conducting tradeoff and other studies analyzing alternative processing scenarios, including potentially heap leaching. We are also continuing to investigate renewable power options for the Project to develop costs and timelines for installing solar and other green power generating facilities on or near the site.




    Other Properties
    We have been active with several of our other mineral projects in the United States including the Tintic Project, located in Utah and the Hog Heaven Project, located in Montana. We also hold a portfolio of exploration projects in the western United States including projects in Arizona, Nevada, New Mexico and Montana.


    Tintic Project, Utah, USA (the “Tintic Project”)

    As used herein, references to the “Tintic Technical Report Summary” is to the “S-K 1300 Technical Report Summary & Exploration Results Report, Tintic Project, Utah” dated February 23, 2024 and still current as of December 31, 2024, by qualified persons SRK Consulting (U.S.) Inc. It was prepared in accordance with the requirements of S-K 1300. SRK Consulting (U.S.) Inc. is not affiliated with us or any other entity that has an ownership, royalty or other interest in the Tintic Project. The Technical Report Summary on the Tintic Project, Utah, U.S.A. is included as Exhibit 99.1 hereto. Scientific and technical information in this section is based upon, or in some cases extracted from these reports.

    Location, Map, and Access. The Tintic Project is located near the City of Eureka, approximately 95 km south of Salt Lake City, and can be accessed from U.S. Highway 6, approximately 30 km west of the Interstate 15 junction. The exploration area covers approximately 81.97 km2 of private patented claims, unpatented claims, and state leases consolidated by Ivanhoe Electric into a cohesive package of interests.



    Figure: Location of the Tintic Project within the state of Utah.0602_Layout 3-1.jpg

    Title. Currently, Ivanhoe Electric holds various types of claims and leases through our wholly-owned subsidiary Tintic Copper & Gold Inc. (TCG) or other subsidiaries. Our holdings at the Tintic Project consist of:
    •486 Patented claims comprising 19.62 km2;
    •152 Patented claims and 1 fee parcel (subject to various lease or lease and option agreements) comprising 9.11 km2;
    •474 Unpatented mining lode claims comprising over 38.79 km2;
    •14.45 km2 of SITLA (Utah School and Institutional Trust Lands Association) mineral leases, in three agreements; and
    •6 Hardrock Prospecting Permit (“HRPP”) applications on Bankhead-Jones lands in the Tintic Valley, comprising 61 km2.
    To retain an unpatented claim on federal land in the USA, a $165 maintenance fee per claim is due annually by September 1st. Based on the current landholding this would amount to $78,210 in annual payments for claim retention.



    In October 2017, Ivanhoe Electric (through its predecessor High Power Exploration Inc. (“HPX”) at the time) signed a purchase and sale agreement with Mr. Spenst M. Hansen (“Hansen”) to acquire 100% of his patented claims and a portion of his unpatented claims. The last payment installment was made on April 19, 2022, making Ivanhoe Electric the current owner. In August 2018, Ivanhoe Electric signed a further purchase and sale agreement with Hansen to acquire the patented claims on the Mammoth, North Star, and Gemini properties. Payments were made over a five-year period with escalating payments as defined in the Definitive agreement. The last payment installment was made on August 7, 2023, making Ivanhoe Electric the owner of the patented claims.
    In addition to the Hansen agreements, Ivanhoe Electric entered into additional agreements, for the acquisition of claims, mineral and surface rights with numerous parties using various legal structures. These agreements are summarized in a simplified form in the table below.
    Table. Summary of Tintic Land Agreements
    VendorDeal TypeStatusLease / Option Payment FrequencyLease / Option Payment ($)Start DateTermExpiration Date
    Hansen PorphyryPurchase and SaleClosed— — 19-Oct-175 years— 
    Applied Minerals Inc. (Dragon)Exploration with Option to PurchaseClosed— — 22-Dec-17Option Executed in 2020— 
    Okelberry
    LeaseExecuted
    annually
    24,000.0014-Feb-2510 years with extensions14-Feb-30
    Gleed G ToombesPurchase and SaleClosed— — 1-Mar-18Closed— 
    New United Sunbeam Mining CompanyLeaseExecutedannually$10,000.00 21-Jul-1810 years with extensions21-Jul-28
    Hansen MammothPurchase and SaleClosed— — 4-Oct-185 years— 
    Hansen GeminiPurchase and SaleClosed— — 4-Oct-185 years— 
    Hansen North StarPurchase and SaleClosed— — 4-Oct-185 years— 
    SITLALeaseExecutedannually$3,570.00 1-Dec-1810 years1-Dec-28
    Lawrence LeeLease with Option to PurchaseExecutedannually$5,000.00 5-Dec-1810 years5-Dec-28
    Grand Central Silver MinesPurchase and SaleClosed— — 4-Apr-19Closed — 
    Duquette/McHattonLease with Option to PurchaseClosed— — 9-May-195 years— 
    Adrian Vashon - Jassamine ClaimLease with Option to Purchase
    Closed
    — — 27-Jun-195 years— 
    OldroydPurchase and SaleClosed— — 14-Jun-19Closed— 
    Todd WilhiteLease with Option to PurchaseExecutedannually$15,000.00 9-Jul-197 years9-Jul-26
    Silver City MinesLease with Option to PurchaseExecutedannually$10,000.00 20-Aug-1910 years20-Aug-29
    Unpatented ClaimsMaintenance Fees—annually$165/claim— — — 
    Tintic Gold Lease with Option to PurchaseExecutedannually$100,000.00 20-Jul-207 years20-Jul-27
    Crown PointLease with Option to PurchaseExecutedannually$15,000.00 1-Aug-205 years with extensions1-Aug-25
    Steve RichinsLease with Option to PurchaseExecutedon execution of option$75,000.00 27-Oct-205 years27-Oct-25
    BLMProspecting PermitsPendingannually14,840.00 — — — 
    Tintic Pioneer Mining CompanyPurchase and SaleClosed— — 10/20/2022— — 




    Figure: Map of our claims and leases at the Tintic Project.
    Layout 3-3.jpg
    SRK, 2023
    Royalties. Significant portions of the patented and unpatented mining lode claims are subject to NSR royalty agreements, ranging between 1% and 4%, which would be payable upon production and sale of product, i.e., there are no advance royalties.




    Figure: Map of our royalties at the Tintic Project.
    Tintic Royalties.jpg
    SRK, 2023
    Property Condition, Stage of Development and History. The Tintic Project is an exploration stage project without Mineral Reserves or Mineral Resources. There is no mine in production at the Tintic Project and no mining activity by us has ever taken place on the land constituting the Tintic Project.
    There is currently no significant equipment, infrastructure or facilities at the Tintic Project, and no mine development or operating equipment at the project site. Historical mine equipment, shafts, and adits are ubiquitous throughout the area. In 2021, we completed some basic rehabilitation on the Sioux-Ajax Tunnel to facilitate access and mapping. This included creating a tag system, installing a communications system, and washing the walls. Further rehabilitation is not currently planned or budgeted for and Ivanhoe Electric has prohibited access to the Sioux-Ajax Tunnel since March 2022. There is no mining or operating infrastructure at the Tintic Project that would be intended to be used in future mine operations.

    Permitting and encumbrances. In July 2021, the Department of Natural Resources of the State of Utah approved Tintic Copper & Gold Inc.’s Notice of Intention (“NOI”) to Conduct Exploration, which has been amended multiple times by TCG, with the most recent amendment approved in May 2024. The current permit allows for up to 31.2 acres of surface



    disturbance, and 104 drill holes totaling 121,000 m (396,880 ft), Reclamation bonding is required by the state of Utah, and is assessed at $680,600.00, covering 100% of permitted surface disturbance and up to 16 open holes (20,000 m). Bonding is fulfilled through an insurance surety instrument.
    There are two Recognized Environmental Conditions (“REC”) present on the Tintic project lands in the form of old mill sites. We do not anticipate doing any work in these areas, and therefore do not expect to trigger any potential environmental liability.
    See “— Mining and Mineral Project Exploration Laws”.
    Mineralization Styles. The host rocks at Tintic are Pre-Cambrian through Paleozoic sediments and carbonate rocks and were emplaced to their current position primarily during the Sevier orogeny (Cretaceous), forming a series of folds and thrusts, including a synform which forms the key host sequence in the Main Tintic District.
    Our interests in the Tintic District are focused on the southern portion of the Main District where Paleozoic sedimentary rocks and late Eocene — Oligocene volcanic rocks are intruded by the Silver City intrusive complex. Thin-skinned thrusting during the Sevier orogeny resulted in a complex pattern of faults and folds in the Paleozoic stratigraphy dominated by the east-west Sioux-Ajax fault through Mammoth and a large, east-verging asymmetric anticline-syncline pair that is cut by northeast trending faults. The thrust faults that underlay this folding have been identified in mines in the East Tintic District and locally at surface when not covered by later volcanic rocks. North of the Sioux-Ajax fault, the ‘ore runs’ of the Main District occur as sub-horizontal bodies connected by chimneys or pipes were crossed by faults in the shared subvertical limb of the anticline-syncline pair and along the axis of the Tintic syncline at the eastern margin. Exposure of Paleozoic rocks south of the Sioux-Ajax fault is limited to a less than 2 km2 area between the Silver City intrusive complex to the southwest and overlying volcanic rocks to the southeast; it does not show the magnitude of folding found to the north of the fault. Instead, the beds here dip moderately to the northeast and are cut by steep reverse faults referred to as fissures when mineralized which continue south to the contact with the intrusion. These fissures and the subvertical chimneys and pipes tend to be more Cu-Au rich than the sub-horizontal Ag-Pb-Zn rich ‘runs’ north of the fault. Where these fissures intersect the contact with the Silver City intrusive complex, deposits of massive Fe-oxide and halloysite occur such as the Dragon Mine.
    Mineralization in the Tintic District is typical of a porphyry-epithermal magmatic hydrothermal system. Known deposits predominantly occur as CRDs and epithermal veins with a few small porphyry deposits including the SWT porphyry in the Southwest District and the Big Hill porphyry in the East District. Exploration prospects identified by us on the Tintic Project include CRDs in the Paleozoic stratigraphy, areas with porphyry exploration potential in the Silver City intrusive complex and at depth below the CRDs, and skarns at intrusive contacts in the carbonate rocks.
    Exploration and Drilling. We commenced exploration on the Tintic Project in late 2017 with an airborne geophysical survey followed by on-the-ground exploration in early 2018. Surface exploration work included a ground geophysical survey and a geological baseline work program consisting of soil and rock grab sampling, age dating, petrology, mapping, prospecting, and identification of key intrusive and alteration phases. Additional work through 2018 and into 2019 included the re-logging of deep historical drill holes at the Dragon prospect and the compilation and 3D digitization of historical mines, underground workings, and mineralized zones termed ‘ore runs’. Exploration work in 2022, 2023 and 2024 included reverse circulation (“RC”) and diamond core drilling, geophysical surveys, and with small programs of soil samples, mapping, and surface sampling.

    Exploration drilling at the Tintic Project in 2024 included nearly 6,500 meters in five deep drill holes along with four wedges from main holes (see table below) drilled in a continuous program from January to November. Drilling in 2024 focused on exploring the areas below the Mammoth Mine and deep Typhoon™ anomalies in the Mammoth Area.





    Table. Summary of Ivanhoe Electric’s drilling on the Tintic Project from 2021 to 2024
    Hole numberYearNorthing (m)Easting (m)Elevation (m)Hole TypeAzimuthDipLength (m)
    TTR-001202144166004029191,803RC0-90251
    TTR-002202144167934029241,809RC0-90332
    TTD-003202144206144050782,166Diamond120-60469
    TTD-004202144206144050782,166Diamond120-50436
    TTD-005202144206144050782,166Diamond120-80371
    TTD-006202144206144050782,166Diamond94-45379
    TTD-007202244179704053851,989Diamond315-60997
    TTD-008202344186924043391,938Diamond140-75748
    TTD-009202344196974054902,119Diamond20-501,401
    TTD-010202344204824063052,216Diamond285-50794
    TTD-011202344206384046482,052Diamond157-65828
    TTD-012202344205884034301,942Diamond150-59549
    TTD-013202344201064061132,241Diamond315-63581
    TTD-013A*
    202344201064061132,241Diamond315-631,519
    TTD-014202344196974054902,119Diamond118-581,320
    TTD-015202344196974054902,119Diamond70-581,395
    TTD-016202344175094044851,882Diamond130-771,436
    TTD-017
    202444206384046482,052Diamond63-641,028
    TTD-017A*
    202444206384046482,052
    Diamond
    150-59515
    TTD-018
    202444206384046462,052
    Diamond
    157-65610
    TTD-018A*
    202444206384046462,052
    Diamond
    285-501,106
    TTD-018B*
    202444206384046462,052
    Diamond
    20-50838
    TTD-018X*
    202444206384046462,052Diamond140-75350
    TTD-019
    202444196224049182,105
    Diamond
    315-601,421
    TTD-020
    202444200004044192,040Diamond94-451,669
    TTD-021
    202444210594044792,102Diamond120-801,264
    * Drill hole wedged off of primary hole.
    NOTE: Drilling in 2024 is not included in the Tintic Technical Report Summary.
    In 2018 and 2019, a 72 km2 fully 3D induced polarization Typhoon™ survey was completed at Tintic with effective penetration depths averaging over 1.5 km, revealing porphyry copper-gold exploration potential areas. A ground gravity survey was also conducted in 2022 over an area of approximately 20 km2. A magnetotelluric survey was completed in 2024 and is being assessed, along with previously collected geophysical data
    We have also compiled a drill hole database from over 125 years of exploration and development operations in the Tintic Project district by dozens of historical owners and operators. A total of 489 drill holes were completed historically on the Tintic Project by several prior owners and operators. However not all of the details are available.
    All drill core, soil, and rock grab samples collected by us during exploration programs undertaken to date have been prepared by ALS Global-Geochemistry Analytical Lab (“ALS”) at Twin Falls, Idaho or Elko, Nevada and analyzed Reno, Nevada or Elko, Nevada. ALS is a reputable analytical laboratory with a global quality management system that meets all requirements of the international standards ISO/IEC 17025:2017 and ISO 9001:2015.
    The Tintic Project did not have any Mineral Resources or Mineral Reserves as at December 31, 2024.

    Hog Heaven Project
    The Hog Heaven Project in Montana is located on private land approximately 80 km south-southwest of the town of Kalispell, Montana. It is in the historical Hog Heaven District which consists of several high-sulfidation epithermal mineral



    deposits and prospects, as well as several historical mines, including the Flathead Mine. We believe the Hog Heaven District is underexplored at depth, with a substantial alteration footprint and multiple mineralized centers.
    Brixton Metals Corporation (“Brixton”) owns the Hog Heaven Project through its subsidiary Brixton USA, covering an area of 24.32 km2 through the following interests: 2.59 km2 of deeded fee simple land both surface and minerals and 14.06 km2 of fee simple mineral rights held by Brixton USA. The balance, 7.67 km2, is held via lease of three parcels owned by the Chester Company Ltd.
    In 2024, Ivanhoe Electric leased a further 4,925 acres of private surface and mineral rights at the Hog Heaven Project from a private owner, advancing additional consolidation of the district and providing additional access to areas prospective for porphyry systems. This lease is effective for an initial 10 year term and can be extended by up to 3 consecutive 10 year terms.

    Figure: Hog Heaven plan map showing Ivanhoe Electric drill hole locations, historical mine workings, and historical drilling.
    Hog Heaven.jpg

    We entered into an earn-in agreement on February 26, 2021 with Brixton as well as a subsidiary of Brixton, pursuant to which we may earn up to a 75% interest in the Hog Heaven Project by making cash payments totaling $4,500,000 and incurring an aggregate of $40,000,000 in exploration expenditures by 2032. We own 1.6% of the outstanding shares of Brixton, which we acquired from Newstar Advantage Ltd., an entity affiliated with Mr. Friedland (“Newstar”) on October 1, 2021 for Cdn$2.0 million. Newstar acquired shares and warrants of Brixton in a private placement for a purchase price of Cdn$2.0 million. Brixton used the funds to purchase a portion of a royalty on the Hog Heaven Project owned by Pan American Silver Corp. on which the Company had an earn-in.
    Under our earn-in agreement with Brixton, we have the right to earn a 51% interest in the Hog Heaven Project by making a total of $4,500,000 in cash payments and incurring $15,000,000 in exploration expenditures at stage 1. We may



    also earn an additional 24% interest (for a total 75% interest) in the Hog Heaven Project by incurring an additional $25,000,000 in exploration expenditures at stage 2. In order to complete stage 1, in addition to incurring $15,000,000 in exploration expenditures, we are required to make $500,000 in cash payments each year for four years, and $1,000,000 in cash payments on or before each of the fifth and sixth anniversaries of the date of the earn-in agreement. As of December 31, 2024, we had incurred $21.4 million in exploration expenditures and made $2,000,000 in cash payments.
    In order to complete stage 2, which is at our sole discretion, we would be required to incur an additional $25,000,000 in expenditures of which we must incur $10,000,000 by February 26, 2030 and $15,000,000 by February 26, 2032. For purposes of this earn-in, a joint venture company, Brixton JVC, a Nevada corporation, was established. Pursuant to the earn-in agreement, we are the operator of the Hog Heaven Project. We also control and direct all exploration, development and other related activities while we are earning-into the Hog Heaven Project.
    From the date that stage 2 is complete until the date that Brixton JVC makes a decision to commence the development and construction of an operating mine at the Hog Heaven Project, we and Brixton must each fund the activities and operations of Brixton JVC pro rata to our respective interests in the Hog Heaven Project, provided that, if requested by Brixton, we are required to fund its pro rata portion of the costs of the activities and operations of Brixton JVC, with such amount accruing with interest calculated at the annual rate equal to the U.S. Federal Reserve Secured Overnight Financing Rate plus seven percent. At the date a construction decision is made, the amounts we previously funded to Brixton will become due and payable to us, and shall be paid within 12 months of the date a construction decision is made, failing which Brixton would be subject to dilution pursuant to a standard dilution calculation.
    If a party’s interest in Brixton JVC is diluted below 10%, then the interest of such party in Brixton JVC will be cancelled and its shareholding interest converted into a 2.0% NSR. In addition, one NSR royalty at a rate of 1.5%, three Net Profit Interest (“NPI”) royalties with rates of 5% and 10%, and one Net Revenue Interest (“NRI”) royalty with a rate of 10% (capped at $1,314,702) exist on various portions of the property. The three sections of Chester Company Ltd. lands are subject to a long-term lease that requires a $12,500 annual lease payment.
    The ongoing drill program, which began in June 2023, is designed to search for additional silver, gold, and copper-rich high-sulfidation epithermal mineralization, which was the focus of historical mining activities. Our program is also intended to search for porphyry copper mineralization at depth.
    Ivanhoe Electric’s current exploration drill program at Hog Heaven has now completed twenty-two drill holes totaling approximately 24,400 meters (see table below) and is on-going.




    Table. Summary of Ivanhoe Electric’s drilling on the Hog Heaven Project from 2022 to 2024
    Hole numberYearNorthing (m)Easting (m)Elevation (m)Hole TypeAzimuthDipLength (m)
    HHD-001202253097036783521,200RC275-50580
    HHD-002202253090256783171,151RC265701,002
    HHD-003202353097046797601,067Diamond65-851,249
    HHD-004202353087126800931,027Diamond305-551,316
    HHD-005202353106246807251,250Diamond185-801,249
    HHD-006202353102546807481,210Diamond340-61774
    HHD-007202353106246807271,255Diamond210-75825
    HHD-008202353102596807521,226Diamond0-60735
    HHD-009202353105516805331,206Diamond100-77785
    HHD-010202353105656803641,214Diamond120-701,212
    HHD-011202353105656803641,214Diamond70-65633
    HHD-012202453104556804581,181Diamond285-75544
    HHD-013202453103826797681,111Diamond240-701,158
    HHD-014202453104686802731,192Diamond220-60865
    HHD-015202453104686802731,192Diamond250-60594
    HHD-016202453103706803721,169Diamond305-801,344
    HHD-017202453093116794661,077Diamond310-751,395
    HHD-018202453093116794661,077
    Diamond
    30-851,489
    HHD-019202453093886795641,058
    Diamond
    210-851,853
    HHD-020202453094966797751,078Diamond290-751,573
    HHD-021202453092736797041,079Diamond220-771,441
    HHD-022202453090666794891,056Diamond30-751,754
    Exploration efforts focused on identifying the extensions of shallow mineralization that characterized historical production near the Flathead Mine and exploring for porphyry systems in the Battle Butte Area associated with a deep Typhoon™-generated anomaly.
    Five drill holes intersecting the Battle Butte Porphyry demonstrate a porphyry system believed to be starting at approximately 900 meters depth, with a vertical thickness of 800 meters, at least 600 meters by 400 meters in lateral dimension, and open to the east and northeast. Initial assay results show broad intervals of low-grade mineralization with a gold-to-copper ratio near one-to-one. Narrower but higher-grade sub-intervals are associated with the presence of the higher-grade copper sulfide mineral bornite (approximately 63% copper by weight), where the gold-to-copper ratio starts to increase.
    Current evidence suggests that the Battle Butte Porphyry system is open to the east and north, where the Typhoon™ anomaly remains untested at depth. For 2025, continued exploration is proposed to test the Battle Butte Porphyry, searching for higher-grade copper-gold zones and the presence of additional porphyry centers across the project.
    BHP- Ivanhoe Electric Exploration Alliance (the “BHP Alliance”).
    On May 7, 2024, we entered into an Exploration Alliance Agreement with BHP Mineral Resources Inc. (“BHP”) for the exploration of mutually agreed “Areas of Interest” in the United States to identify copper and other critical metal exploration opportunities within those Areas of Interest that may become 50/50 owned joint ventures. The initial Areas of Interest are in New Mexico, Arizona, and Utah.
    The Exploration Alliance Agreement is for a term of three years, which may be extended upon mutual agreement. BHP will provide the initial funding of $15 million and any subsequent funding would be on a 50/50 basis. Ivanhoe Electric has provided access to one of the new Generation 2 Typhoon™ systems as directed by an Alliance Management Committee and in accordance with the requirements specified in the initial work program and budget and other approved work programs and budgets.




    The Exploration Alliance Agreement contemplates two stages – a Project Generation Phase and a Joint Venture Phase. A subsidiary of Ivanhoe Electric will be the operator during the Project Generation Phase and the operator of a project in the Joint Venture Phase will be mutually agreed upon in the future. During the Project Generation Phase, the parties will conduct early-stage generative exploration activities in the six initial Areas of Interest. The goal of these initial activities is to identify and stake mineral rights within the Areas of Interest to form a project and/or acquire such mineral rights from third parties. For each Area of Interest, an Area of Interest LLC will be created to hold the applicable rights and engage in all early-stage exploration. A subsidiary of Ivanhoe Electric will initially own 100% of each Area of Interest LLC. As of December 31, 2024, staking has occurred on one Area of Interest in New Mexico as well as in Arizona. In January 2025, the Exploration Alliance announced that it was conducting its first Typhoon™ survey at an area of interest in Arizona.

    International
    Saudi Arabian Joint Venture
    Ivanhoe Electric and Ma’aden established a Saudi Arabian exploration Joint Venture (the “Joint Venture”) through the limited liability company, Saudi JVCo, to unlock the significant mineral potential in Saudi Arabia. The Joint Venture has exclusive access to explore approximately 48,500 km2 of underexplored land on the Arabian Shield that Ma’aden has made available to the Saudi JVCo.
    Map: Location of the Ivanhoe Electric Ma’aden Joint Venture within the country of Saudi Arabia.
    SaudiJVCo.jpg

    The Arabian Shield is considered highly prospective for both VMS and epithermal styles of mineralization. A notable VMS deposit in the Arabian Shield is the Jabal Sayid copper mine operated as a joint venture between Barrick Gold Corporation and Ma’aden that produced 68,492 tonnes of copper in 2022. Ma’aden’s Mahd Ad Dhahab ‘Cradle of Gold’ gold mine is an example of an epithermal deposit on the shield that has been mined since pre-Islamic times.



    The Al Amar Belt is considered highly prospective for VMS and epithermal deposit types with historical work identifying zinc, copper, lead, silver and gold mineralization. Twenty-four exploration licenses that make up the Al Amar Belt cover 1,934 km2. The Joint Venture’s first TyphoonTM survey covered 76 square kilometers near Ma’aden’s Al Amar gold-copper-zinc mine, which was completed in March 2024. Subsequent TyphoonTM surveys have covered an additional 162 square kilometers of the Joint Venture exploration license areas. Typhoon surveys on the Joint Venture exploration license areas had covered 238 square kilometers as of January 13, 2025, identifying several targets for drilling and other technical work programs such as mapping and sampling. The Joint Venture is currently operating three Typhoon™ systems in Saudi Arabia, one in the Al Amar belt and two in the Wadi Bidah belt.

    On January 13, 2025, the Company announced initial drill results from the Joint Venture. The Joint Venture’s initial drill program focused on the Umm Ad Dabah prospect, near Ma’aden’s existing Al Amar gold-copper-zinc mine.
    Table: Highlighted new drill intercepts from Umm Ad Dabah

    Drill Hole
    Location
    From (m)
    To (m)
    Interval Length (m)
    Copper (%)
    Silver (g/t)
    UAD- 005
    Umm Ad Dabah
    699.0
    704.0
    5.0
    0.673.4
    and717.9
    731.0
    13.11.314.5
    UAD-006
    Umm Ad Dabah
    344.6
    347.0
    2.40.51
    1.0
    and
    351.0
    353.22.20.410.8
    and374.5380.45.90.791.9
    Mineralization is present as semi-massive to massive accumulations of precious metal-bearing iron and copper sulfides hosted in altered volcanic and volcaniclastic rocks. Drilling to date has defined a mineralized system extending over 250 meters in strike length and 400 meters down dip as

    The Joint Venture employs a comprehensive industry standard Quality Assurance/Quality Control (“QA/QC”) program. Diamond drill core is cut lengthwise into 2 halves, 1/2 is sent to for assay, and 1/2 is left behind in a secure facility for future assay verification.
    The Joint Venture uses ALS Minerals Laboratory in Jeddah, Saudi Arabia. This laboratory operates in accordance with ISO/IEC 17025. Gold is assayed by a 50 g fire assay with an atomic absorption finish. An initial multi-element suite including copper, molybdenum, silver, and additional elements are analyzed by four-acid digestion with an ICP-MS finish. All samples with copper values over 10,000 ppm and gold greater than 10 ppm are subjected to an overlimit method for higher grades, which also uses a four-acid digest with an ICP-ES finish, and fire assay with gravimetric finish. Certified reference materials, blanks, and duplicates are randomly but consistently inserted at the geologist's discretion and QA/QC geologist's approval into the sample stream to control laboratory performance.

    Ivory Coast Nickel-Copper Project, Ivory Coast (the “Ivory Coast Project”)
    The Ivory Coast Project is located approximately 650 road km northwest of Abidjan, Ivory Coast. As of December 31, 2024, our 69.1% interest in the Ivory Coast Project was held through our 22.7% equity interest in Sama and our 60% interest in the SNC joint venture described below. In 2024 we completed our 60% earn-in into SNC and as at December 31, 2024, we directly owned 60% of the joint venture entity SNC.
    The Ivory Coast Project consists of three exploration permits owned by SNC, which is the joint venture vehicle in which we are partnering with Sama to advance the Ivory Coast Project, which cover a total of 517 km2, as well as two additional exploration permits held in a joint venture with Société pour le Développement Minier de la Côte d’Ivoire, a parastatal organization established by the Ivory Coast and which together cover 318 km2.
    In March 2018, we entered into a binding term sheet for an earn-in and joint venture agreement with Sama which was subsequently formalized in March 2021 (the “Sama Earn-In and JV Agreement”). Pursuant to the terms of the Sama Earn-In and JV Agreement, we had the ability to earn a 60% shareholding interest in the Ivory Coast Project by incurring expenditures of Cdn$25,000,000 over a maximum of six years and meeting certain other conditions. In 2024, we completed our 60% earn-in.
    In April 2018, pursuant to an investment agreement, Sama granted to us a right to nominate to the Sama board of directors two (2) directors as long as our shareholding interest of Sama remains above 10% but less than 50%, and four (4) directors if our shareholding rises to greater than 50%. Mr. Quentin Markin and Mr. Terry Krepiakevich are our director



    representatives on the board of Sama. Other than as shareholders of Sama, we do not have any interest in Sama’s gold projects in Liberia.

    The Mineral Resource estimate for the Ivory Coast Project is set forth below, under the heading “Mineral Resources and Mineral Reserves”. Glen Kuntz, P. Geo., our non-independent Qualified Person, reviewed and confirmed that the estimate satisfied S-K 1300 standards and remained accurate as of December 31, 2024.

    Map: Location of the Ivory Coast Project within the country Ivory Coast.
    image (2).jpg
    The Ivory Coast Nickel-Copper Project has potential for a conventional open pit mining operation supporting 86.5 million tonnes of modelled mill feed together with 1.62 million tonnes of direct shipped laterite material entirely from the Grata, Main and Extension deposits and the Sipilou Sud Laterite deposit. The Ivory Coast Nickel-Copper Project has a potential average annual production of 38,627 tonnes of 26% copper concentrate and 55,119 t of 13% nickel concentrate and an average annual nickel metal in concentrate of approximately 7,165 tonnes per year and copper metal in concentrate of approximately 10,043 tonnes per year over a 16 year mine life.
    The estimates are preliminary in nature and include Inferred Mineral Resources, which are considered too speculative in nature to be categorized as mineral reserves. Mineral Resources that are not mineral reserves have not demonstrated economic viability. Additional trenching and/or drilling will be required to convert Inferred Mineral Resources to indicated or measured Mineral Resources. There is no certainty that the estimates for the Ivory Coast Nickel-Copper Project will be realized.





    Alacran Copper-Gold Project, Colombia (the “Alacran Project”).
    On July 31, 2017, we (then HPX) entered into an investment agreement with Cordoba. Under that agreement, Cordoba granted us a right to nominate directors to its board of directors based on our pro rata interest in Cordoba. The investment agreement provides for our nominees to the Cordoba board to be reduced to less than a majority of the directors if our ownership interest in Cordoba is diluted to below 50%, with further proportional reductions thereafter. Assuming the board of Cordoba is to be comprised of seven directors and we hold a 50% or greater interest in Cordoba, we are entitled to nominate four, with at least one of such nominees being independent. We own 62.5% of Cordoba as of December 31, 2024 and have nominated three directors currently serving on the Cordoba board: Quentin Markin, Jordan Neeser and Terry Krepiakevich.
    On December 8, 2022, Cordoba announced a strategic arrangement with JCHX, whereby JCHX, through a wholly owned subsidiary, acquired a 50% ownership interest in CMH Colombia S.A.S. (“CMH”), a company existing under the laws of Colombia, for aggregate consideration of $100 million. CMH owns 100% of the Alacran Project and is the joint venture vehicle for Cordoba and JCHX in the strategic project level partnership. For its 50% interest, JCHX will pay the $100 million purchase price in three installments. The transaction closed on May 8, 2023, and $40 million was paid in cash as a first installment. A second installment of $40 million was fully paid in cash by January 4, 2024 following completion of additional technical studies and the filing of the Environmental Impact Assessment (“EIA”) to the relevant Colombian Government authority. A third and final installment of $20 million is payable in cash once the approval of the EIA is obtained, which must be within two years of the transaction’s closing date. Should the EIA not be approved by the second anniversary of the closing date, JCHX will have the option to elect not to complete this final installment, which will result in JCHX being diluted to 40% and Cordoba increasing to a majority 60% shareholding in CMH. Cordoba owns 50% of CMH while JCHX directly owns the other 50% of CMH.
    A Joint Venture Shareholders’ Agreement (“JV SHA”) governs the relationship between Cordoba and JCHX, and sets forth the general responsibility and authority of the CMH board of directors, in addition to the entitlements of each shareholder. The JV SHA provides that (1) the CMH board comprises four individuals, of which two directors nominated by Cordoba and the other two directors nominated by JCHX; and for so long as the shareholdings in CMH remain 50%-50%, a Cordoba representative serves as the Chairperson of the CMH board, and possesses a casting vote on all matters subject to a list of reserved matters; (2) Cordoba is appointed as the operator and manager of the Alacran Project pursuant to a management services agreement and is responsible for setting the annual programs and budgets for the CMH board’s approval; (3) JCHX (or its affiliate) has right of first offer to bid on the Engineering, Procurement and Construction and Detailed Design Agreement contracts, provided that Cordoba has the right to open the process out to competitive tender; with JCHX having the right to match any competitive bid; and (4) JCHX (or its affiliate) shall be entitled to up to 100% of the offtake from the production currently estimated for the Alacran Project, provided that they are paying fair market value and they are the most competitive offer (including a matching right for other third-party proposals).
    The Alacran Project is situated in the municipality of Puerto Libertador, which is approximately 390 km northwest of Bogotá, and 160 km north of Medellín in Colombia, amongst 22 mining concessions owned by CMH or its affiliates, of which, 5 licenses are part of the Alacran Project. Cordoba conducted several exploration programs between 2012 and 2023, consisting of geological mapping, geochemical sampling, geophysical surveys, and various drilling campaigns, that supported the completion of the technical studies in 2019, 2022 and 2023, which marks the beginning of the development phase for the Alacran Project.




    Map: Location of the Alacran Project within the country of Colombia.
    Alacran location.jpg
    Initial capital cost is estimated to be approximately $420.4 million for the construction of a conventional truck-shovel open pit mine. The Project is anticipated to hold an after-tax NPV of $360 million with an IRR of 23.8% and a payback period of 3 years. The Project’s mine life is projected to be 14.0 years in addition to the estimated two years of construction and pre-production mining, of which, freshly mined ore will be stockpiled alongside historical tailings. The LOM cash costs for copper, net of by-product, is $1.35/lb with by-product credits at $1.31/lb, and a total LOM cash cost at $2.66/lb (cash costs excludes sustaining capital). The average mining rate for the project is projected to be 39.5 Mt of mined material per year of which ore material will be fed to dual processing plants consisting of a main processing facility for fresh and transition material, and a separate wash gravity plant for saprolite ore and historical tailings;
    The Company filed the EIA application with the relevant Colombian Government authority on December 11, 2023 and was issued the official filing number on December 12, 2023.
    The Mineral Resource and Mineral Reserve estimate for the Alacran Project is set forth below, under the heading “Mineral Resources and Mineral Reserves”. Glen Kuntz, P. Geo., our non-independent Qualified Person, reviewed and confirmed that the projected economics and the Mineral Resource estimate satisfied S-K 1300 standards and remained accurate as of December 31, 2024. Colin Shaw, P.E., our non-independent Qualified Person, reviewed and confirmed that the Mineral Reserve estimate satisfied S-K 1300 standards and remained accurate as of December 31, 2024.




    Pinaya Copper-Gold Project, Peru (the “Pinaya Project”).
    The Pinaya Project is 100% owned by Ivanhoe Electric as of February 6, 2024 through Ivanhoe Electric’s subsidiary Kaizen. Kaizen filed an NI 43-101 technical report for the Pinaya Project, titled “Pinaya Gold-Copper Project Technical Report” and which was prepared jointly by Brian Cole, P.Geo, and GeoSim Services Inc., with an effective date of April 26, 2016 (“Pinaya Technical Report”), which is available on SEDAR. Scientific and technical information in this section regarding the Pinaya Project is based upon, or in some cases extracted from, the Pinaya Technical Report.

    The Mineral Resource estimate for the Pinaya Project is set forth below, under the heading “Mineral Resources and Mineral Reserves”. Ronald G. Simpson, P.Geo., an independent Qualified Person, reviewed and confirmed that the Mineral Resource estimate satisfied S-K 1300 standards and remained accurate as of December 31, 2024.

    Map: Location of the Pinaya Project within the country of Peru.
    Pinaya map.jpg




    Summary
    Our portfolio of mineral exploration projects and equity investments are summarized in the tables below.
    Table: United States Mineral Exploration Projects as of December 31, 2024.
    Project Name
    Location and
    Project Size
    Stage of
    Development
    Ivanhoe Electric Interest
    and Nature of
    Interest
    Title Holders /
    Operator
    Primary
    Minerals
    Nature of
    Mineral Title
    Mineral
    Resources/
    Reserves
    Aggregate Annual
    Production –
    Last 3
    Fiscal Years
    Santa Cruz
    Arizona, USA
    Surface
    25.79 km2
    Exploration100% of surface rights
    Mesa Cobre Holding Corp., a wholly-owned subsidiary (surface rights)
    CopperFee Simple land, unpatented mining claims; Arizona State exploration permitsMineral ResourceNot in production
    Mineral 75.66 km2
    Exploration
    100% of the mineral title
    Mesa Cobre Holding Corp., a wholly owned subsidiary (remaining titles)
    Tintic
    Utah, USA
    81.97 km2
    ExplorationOptions and lease rights to 100% of the mineral title by acreageTintic Copper & Gold, Inc., a wholly-owned subsidiary
    Copper
    Gold
    Patented and unpatented mining claims; SITLA leases, and Hardrock Prospecting Permit Applicationsn/aNot in production
    Hog Heaven
    Montana, USA
    24.2 km2
    Exploration
    1.6% equity ownership of Brixton Metals Corporation
    0.1% ownership in Brixton USA, with earn-in up to a 75% project interest
    Brixton USA Corp. (joint venture company), a subsidiary of Brixton
    Copper
    Silver
    Gold
    Fee simple mineral rights, owned and leased, fee simple surfacen/aNot in production
    Javelina
    Arizona, USA 17.34 km2
    Exploration
    100% Ownership
    Diamondback Copper, LLC., a wholly owned subsidiary
    Copper
    Unpatented mining claims; Arizona State exploration permits
    n/a
    Not in production
    White Hill
    Nevada, USA 86.12 km 2
    Exploration
    0% current ownership interest;
    Option to acquire 80% of the mineral title1
    Bluebird Copper LLC / Ivanhoe Electric Nevada Holding Inc.Copper Zinc Silver Gold MolybdenumUnpatented mining claimsn/aNot in production
    BHP Alliance
    New Mexico, USA 43.36 km2 Arizona, USA 46.21 km2
    Exploration
    100% Ownership
    Sand Hill Exploration, Inc., a wholly owned subsidiary
    Copper
    Unpatented mining claims
    n/a
    Not in production
    Bitter Creek
    Arizona, USA
    36.54 km2
    Exploration100% OwnershipBitter Creek Exploration Inc., a wholly-owned subsidiary
    Copper
    Gold
    Unpatented mining claims
    n/aNot in production
    Grasshopper
    Montana, USA 7.19 kmw
    Exploration100% Ownership
    IE Montana Holdings Corp., a wholly-owned subsidiary
    CopperUnpatented mining claimsn/aNot in production
    Bristol
    Nevada, USA 11.37 km2
    Exploration100% Ownership
    Ivanhoe Electric Nevada Holdings Inc., a wholly owned subsidiary
    CopperUnpatented mining claimsn/aNot in production
    Delamar
    Nevada, USA 16.64 km2
    Exploration100% OwnershipIvanhoe Electric Nevada Holdings Inc., a wholly-owned subsidiaryCopperUnpatented mining claimsn/aNot in production



    Project Name
    Location and
    Project Size
    Stage of
    Development
    Ivanhoe Electric Interest
    and Nature of
    Interest
    Title Holders /
    Operator
    Primary
    Minerals
    Nature of
    Mineral Title
    Mineral
    Resources/
    Reserves
    Aggregate Annual
    Production –
    Last 3
    Fiscal Years
    New York Canyon
    Nevada, USA 30.62 km2
    Exploration
    0% current ownership interest;
    Option to acquire 100% of the mineral title
    Golden Arrow Mining Corp. / Ivanhoe Electric Nevada Holding Inc.
    Copper
    Patented and unpatented mining claims
    n/z
    Not in production
    Perseverance
    Arizona, USA 116.23 km2
    Exploration
    62.5% shareholder in Cordoba, which has 51% ownership - 31.8% ownership interest
    MMDEX LLC a joint venture company between Cordoba and Bell Copper Corp.CopperFee simple, Arizona State Mineral Exploration Permitsn/aNot in production
    1 On January 16, 2025, the Company provided notice to Exiro Minerals USA Corp. of its election to terminate the earn-in agreement relating to the White Hills Project, which was effective in February 2025. As a result, the Company will not earn or vest any interest in the White Hills Project.

    Table: International Mineral Exploration Projects as of December 31, 2024.
    Project Name
    Location and
    Project Size
    Stage of
    Development
    Ivanhoe Electric Interest
    and Nature of
    Interest
    Title Holders /
    Operator
    Primary
    Minerals
    Nature of
    Mineral Title
    Mineral
    Resources/
    Reserves
    Aggregate Annual
    Production –
    Last 3
    Fiscal Years
    Saudi Arabia
    Saudi Arabia 48,500 km2
    Exploration50% ownership of Joint Venture with Ma’aden
    Ma’aden/Ivanhoe Electric
    Base Metals Precious Metals
    Exploration license or application
    n/aNot in production
    Alacran
    Colombia 104.6 km2
    DevelopmentShareholder in CordobaCordoba
    Copper
    Gold
    Silver
    Construction and Assembly; Exploration licensesMineral Resource & Mineral ReserveNot in production
    Ivory Coast Project
    Ivory Coast
    1,125 km2
    Exploration
    60% ownership of the
    Ivory Coast Project;
    Shareholder in Sama
    Société pour le Développement Minier de la Côte d’Ivoire
    Nickel
    Copper
    Cobalt
    PGE
    Exploration licenseMineral ResourceNot in production
    Pinaya
    Peru 100.65 km2
    Exploration
    100% ownership
    Canper Exploraciones S.A.C.Copper GoldConcessionMineral ResourceNot in production
    Mineral Project Obligations and Payments
    As described above, for many of our mineral projects, we do not own the underlying mineral titles or rights but maintain an option or a right to acquire such titles or rights. Such options or rights may be held through an option arrangement, an earn-in, or through the payment of deferred consideration.
    The table below summarizes the cash payments that may be made in respect of each project. Commitments that are non-discretionary are payments we are required to make. Payments that are discretionary are payments that we are not required to make, but if we fail to make the payment in the amounts and when due, we will lose the rights associated with the project.
    Table: Mineral Project Obligations and Payments 2025 - 2032, as at December 31, 2024 ($ thousands)
    Mineral ProjectCommitment2025202620272028-20322025-2032 Total
    Santa Cruz (Wolff Harvard)Non-discretionary$12,081 $12,081 $12,081 $— $36,243 
    Santa Cruz (Other)Discretionary$596 $— $— $— $596 
    Santa Cruz (Total)12,677 12,081 12,081 — 36,839 
    Hog Heaven (Montana)Discretionary$500 $1,000 $1,000 $18,567 $21,067 
    New York Canyon (Nevada)Discretionary1,700 — — — 1,700 
    White Hill (Nevada) 1
    Discretionary525 700 750 9,779 11,754 
    Total15,402 13,781 13,831 28,346 71,360 
    1 On January 16, 2025, the Company provided notice to Exiro Minerals USA Corp. of its election to terminate the earn-in agreement relating to the White Hill Project, which was effective February 15, 2025.





    Mineral Resources and Reserves
    Below is a summary table of estimated in situ Mineral Resources as at December 31, 2024, which are presented on a 100% project basis, exclusive of Mineral Reserves.
    CompanyDepositCategoryTonnes
    Total
    Cu (%)
    Ni (%)Au (g/t)Ag (g/t)Contained
    Cu (tonnes)
    Contained
    Ni (tonnes)
    Contained
    Au (oz)
    Contained
    Ag (oz)
    Geographic
    Area
    Resource
    Category
    100% Project Basis
    Ivanhoe Electric1
    Santa CruzIndicated226,715,0001.24———2,807,000———
    Arizona, U.S.
    Copper
    Inferred148,998,0001.24———1,847,000———
    Kaizen Discovery Inc.2
    PinayaMeasured8,204,0000.326—0.600—27,000— 158,000— 
    Peru
    Copper
    Gold
    Indicated33,487,0000.324—0.462—108,000—497,000— 
    Inferred40,216,0000.360—0.300—145,000—388,000— 
    Sama Nickel Corporation Inc.3,4
    Samapleu Main
    Indicated15,248,0000.220.260.04—34,00040,00019,000—
    Ivory Coast
    Nickel
    Copper
    Inferred21,342,0000.210.250.04—44,00053,00025,000—
    Samapleu Extension
    Indicated514,0000.160.250.02—1,0001,000400—
    Inferred10,885,0000.220.280.02—24,00031,0009,000—
    Grata
    Indicated3,645,0000.290.280.04—11,00010,0005,000—
    Inferred67,272,0000.250.240.04—166,000164,00083,000—
    Sipilou Sud
    Inferred
    2,095,000—1.75——— 37,000— — 
    Cordoba Mineral Corp.5
    AlacranIndicated1,522,000——0.280.88— —14,00043,000
    Colombia
    Copper
    Gold
    Silver
    Inferred31,839,0000.20—0.251.1064,000—259,0001,101,000
    Total6
    Measured8,204,000————27,000— 158,000— ——
    Indicated281,131,000————2,961,00051,000 535,00043,000——
    Inferred322,647,000————2,290,000285,000 764,0001,101,000——
    Below is a summary table of estimated in situ Mineral Reserves as at December 31, 2024, which are presented on a 100% project basis.
    CompanyDepositCategoryTonnes
    Total
    Cu (%)
    Ni (%)Au (g/t)Ag (g/t)
    Contained
    Cu (tonnes)
    Contained
    Ni (tonnes)
    Contained
    Au (oz)
    Contained
    Ag (oz)
    Geographic
    Area
    Resource
    Category
    Cordoba Mineral Corp.7
    AlacranProbable97,950,0000.41—0.232.63403,000—739,0008,289,000
    Colombia
    Copper
    Gold
    Silver
    1S-K 1300 Initial Assessment & Technical Report Summary, Santa Cruz Project, Arizona, dated September 6, 2023 - Santa Cruz Deposit 0.70% TCu cut-off, Texaco Deposit 0.80% TCu cut-off, and East Ridge 0.90% TCu cut-off; $3.70/lb Cu. Underground mineable shape optimization parameters include a long-term copper price of US$3.70/lb, process recovery of 94% and a mining recovery of 100%. Nordmin, our independent Qualified Person, reviewed and confirmed that the Mineral Resource estimates presented in the table above remained accurate as of December 31, 2024.
    2Kaizen Discovery Inc. NI 43-101 Technical Report Pinaya Gold-Copper Project, Caylloma and Lampa Provinces, Peru - Copper‐equivalent grade estimate based on $2.84/lb copper and $1,236/oz gold. Mineral Resources are reported at cut‐off grades of 0.25 g/t Au and 0.3% Cu Equivalent and average metallurgical recoveries of 80%. Ronald G. Simpson, P.Geo., an independent Qualified Person, reviewed and confirmed that the Mineral Resource estimates presented in the table above satisfy S-K 1300 standards and remained accurate as of December 31, 2024.

    3Sama Nickel Corporation Inc. Assumptions include NSR Cut-off grade of $16.34/t milled; long-term metal prices of $3.75/lb Cu, $8.70/lb Ni, and $1,690/oz Au; mining costs of $1.68/t Saprolite, $2.26/t Fresh, $0.05/t incremental and $0.09/t sustaining capital, $13.02/t milled processing cost, $.3.32/t milled G&A, treatment charge of $105/t Cu conc. and $346/t conc. Ni; and metallurgical recoveries varied based on concentration and grade. Glen Kuntz, P.Geo., our non-independent Qualified Person, reviewed and confirmed that the Mineral Resource estimates presented in the table above and in footnote 4 satisfy S-K 1300 standards remained accurate as of December 31, 2024.




    4Sama Nickel Corporation Inc. The Mineral Resource Estimate includes an inferred estimate for the Sipilou Sud laterite deposit including 2,095,000 tonnes of laterite at 1.75% nickel and 0.05% cobalt at a cut-off grade of 1.10% nickel. The deposit has an estimated 37,000 tonnes of nickel and 1,000 tonnes of cobalt.
    5Cordoba Minerals Corp. NSR cut-off grade varied from $2.08/t to $9.88/t milled based on processing, and G&A costs as well as the recoveries in different unit, long term metal prices of $3.80/lb Cu, $1,690/oz Au, and $22.50/oz Ag. Glen Kuntz, P.Geo., our non-independent Qualified Person, reviewed and confirmed that the Mineral Resource estimates presented in the table above satisfy S-K 1300 standards remained accurate as of December 31, 2024.
    6Total Mineral Resources include an inferred estimate for the Sama Nickel Corporation Inc. Sipilou Sud laterite deposit including 2,095,000 tonnes of laterite at 1.75% nickel and 0.05% cobalt at a cut-off grade of 1.10% nickel. The deposit has an estimated 37,000 tonnes of nickel and 1,000 tonnes of cobalt.
    7Cordoba Minerals Corp. Open pit cut-off value varied from $2.07/t to $10.26/t milled based on processing, and G&A costs as well as the recoveries in different units. Long term metal prices of $3.80/lb Cu, $1,690/oz Au, and $22.50/oz Ag. Colin Shaw, P.E., our non-independent Qualified Person, reviewed and confirmed that the Mineral Reserve estimates presented in the table above satisfy S-K 1300 standards remained accurate as of December 31, 2024.



    Below is a summary table of estimated in situ Mineral Resources as at December 31, 2024, which are presented on an attributable basis, exclusive of Mineral Reserves.
    CompanyDepositAttributable
    Ownership of Deposit
    CategoryAttributable
    Tonnes
    Total
    Cu (%)
    Ni (%)Au (g/t)Ag (g/t)Attributable
    Contained
    Cu (tonnes)
    Attributable
    Contained
    Ni (tonnes)
    Attributable
    Contained
    Au (oz)
    Attributable
    Contained
    Ag (oz)
    Geographic
    Area
    Resource
    Category
    Attributable Basis
    Ivanhoe Electric1
    Santa Cruz100.0 %Indicated226,715,0001.24———2,807,000———
    Arizona,U.S.
    Copper
    Inferred148,998,0001.24———1,847,000———
    Kaizen Discovery Inc.2*
    Pinaya100.0 %Measured8,204,0000.326—0.600—27,000— 158,000— 
    Peru
    Copper
    Gold
    Indicated33,487,0000.324—0.462—108,000—497,000— 
    Inferred40,216,0000.360—0.300—145,000—388,000— 
    Sama Nickel Corporation Inc.3,4
    Samapleu Main
    69.1 %Indicated10,536,0000.220.260.04—24,00027,00013,000—
    Ivory Coast
    Nickel
    Copper
    Inferred14,747,0000.210.250.04—30,00037,00017,000—
    Samapleu Extension
    Indicated355,0000.160.250.02—6001,000300— 
    Inferred7,522,0000.220.280.02—17,00021,0006,000— 
    Grata
    Indicated2,519,0000.290.280.04—7,0007,0004,000— 
    Inferred46,485,0000.250.240.04—115,000113,00058,000— 
    Sipilou Sud
    Inferred
    1,448,000—1.75——— 25,000— — 
    Cordoba Mineral Corp.5
    Alacran31.2 %Indicated475,000——0.280.88— —4,00013,000
    Colombia
    Copper
    Gold
    Silver
    Inferred9,934,0000.20—0.210.9420,000—81,000343,000
    Total6
    Measured8,204,000————27,000— 158,000— ——
    Indicated274,087,000————3,095,00035,000518,00013,000——
    Inferred269,350,000————2,174,000196,000549,240343,000——
    Below is a summary table of estimated in situ Mineral Reserves as at December 31, 2024, which are presented on an attributable basis.
    CompanyDepositAttributable Ownership of DepositCategoryTonnes
    Total
    Cu (%)
    Ni (%)Au (g/t)Ag (g/t)
    Attributable
    Contained
    Cu (tonnes)
    Attributable
    Contained
    Ni (tonnes)
    Attributable
    Contained
    Au (oz)
    Attributable
    Contained
    Ag (oz)
    Geographic
    Area
    Resource
    Category
    Cordoba Mineral Corp.7
    Alacran31.2%Probable30,560,0000.41—0.232.63126,000—230,0002,586,000
    Colombia
    Copper
    Gold
    Silver
    1S-K 1300 Initial Assessment & Technical Report Summary, Santa Cruz Project, Arizona, dated September 6, 2023 - Santa Cruz Deposit 0.70% TCu cut-off, Texaco Deposit 0.80% TCu cut-off, and East Ridge 0.90% TCu cut-off; $3.70/lb Cu. Underground mineable shape optimization parameters include a long-term copper price of US$3.70/lb, process recovery of 94% and a mining recovery of 100%. Nordmin, our independent Qualified Person, reviewed and confirmed that the Mineral Resource estimates presented in the table above remained accurate as of December 31, 2024.
    2Kaizen Discovery Inc. Copper‐equivalent grade estimate based on $2.84/lb copper and $1,236/oz gold. Mineral Resources are reported at cut‐off grades of 0.25 g/t Au and 0.3% Cu Equivalent and average metallurgical recoveries of 80%. Ronald G. Simpson, P.Geo., an independent Qualified Person, reviewed and confirmed that the Mineral Resource estimates presented in the table above satisfy S-K 1300 standards and remained accurate as of December 31, 2024.
    3Sama Nickel Corporation Inc. Assumptions include NSR Cut-off grade of $16.34/t milled; long-term metal prices of $3.75/lb Cu, $8.70/lb Ni, and $1,690/oz Au; mining costs of $1.68/t Saprolite, $2.26/t Fresh, $0.05/t incremental and $0.09/t sustaining capital, $13.02/t milled processing cost, $.3.32/t milled G&A, treatment charge of $105/t Cu conc. and $346/t conc. Ni; and metallurgical recoveries varied based on concentration and grade. Glen Kuntz, P.Geo., our non-independent Qualified Person, reviewed and confirmed that the Mineral Resource estimates presented in the table above and in footnote 4 satisfy S-K 1300 standards remained accurate as of December 31, 2024.
    4Sama Nickel Corporation Inc. The Mineral Resource Estimate includes an inferred estimate for the Sipilou Sud laterite deposit including 2,095,000 tonnes of laterite at 1.75% nickel and 0.05% cobalt at a cut-off grade of 1.10% nickel. The deposit has an estimated 37,000 tonnes of nickel and 1,000 tonnes of cobalt.



    5Cordoba Minerals Corp. NI 43-101 Technical Report & Feasibility Study, Alacran Project, in Colombia, Mineral Resource effective December 18, 2023 - NSR cut-off grade varied from $2.08/t to $9.88/t milled based on processing, and G&A costs as well as the recoveries in different unit, long term metal prices of $3.80/lb Cu, $1,690/oz Au, and $22.50/oz Ag. Glen Kuntz, P.Geo., our non-independent Qualified Person, reviewed and confirmed that the Mineral Resource estimates presented in the table above satisfy S-K 1300 standards remained accurate as of December 31, 2024.
    6Total Mineral Resources include an inferred estimate for the Sama Nickel Corporation Inc. Sipilou Sud laterite deposit including 2,095,000 tonnes of laterite at 1.75% nickel and 0.05% cobalt at a cut-off grade of 1.10% nickel. The deposit has an estimated 37,000 tonnes of nickel and 1,000 tonnes of cobalt.
    7Cordoba Minerals Corp. NI 43-101 Technical Report & Feasibility Study, Alacran Project, in Colombia, Mineral Reserve effective October 21, 2021 - Open pit cut-off value varied from $2.07/t to $10.26/t milled based on processing, and G&A costs as well as the recoveries in different units. Long term metal prices of $3.80/lb Cu, $1,690/oz Au, and $22.50/oz Ag. Colin Shaw, P.E., our non-independent Qualified Person, reviewed and confirmed that the Mineral Reserve estimates presented in the table above satisfy S-K 1300 standards remained accurate as of December 31, 2024.



    Typhoon™

    We own, through a wholly-owned subsidiary, patents to a proprietary exploration technology known as Typhoon™. When we reference “our” Typhoon™ technology, we mean the technology that is covered by patents owned by our wholly-owned subsidiary Geo27, Inc. (“Geo27”). We also are the exclusive worldwide licensee of certain technology in the field of geological survey for mineral exploration from I-Pulse Inc. (“I-Pulse”). I-Pulse is the parent of our predecessor company, HPX.
    Typhoon™ is the brand name for our proprietary electrical geophysical surveying transmitter, which can detect the presence of sulfide minerals containing copper, nickel, gold and silver, as well as water and oil (although the Company does not hold any rights to water and oil exploration). The technology was developed by I-Pulse to unlock exploration in areas where potential deposits are hidden by cover, where target depths exceed the range of conventional geophysical surveying systems, or where the scale and topography of an exploration target area prevents efficient and cost-effective conventional work. Typhoon™ allows us to potentially discover deposits otherwise thought to be undetectable through conventional survey methods and technology.
    We own the issued patents shown below. These patents cover certain aspects of our Typhoon™ technology. The actual protection afforded by these patents varies depending on the scope of coverage of each individual patent as well as the availability of legal remedies in each jurisdiction.
    TypeShort titleCountryGrant DateGrant Number
    Expiration
    Date
    PatentCurrent signal generator and method of implementing such a generatorFrance16/02/2018FR298065322/09/2031
    Australia05/01/2017AU201231142921/09/2032
    Brazil19/01/2021BR11201400627621/09/2032
    Canada22/05/2018CA284955821/09/2032
    IndonesiaPending 
    Turkey21/04/2015TR201403350B21/09/2032
    USA28/02/2017US958403718/09/2033
    PatentCurrent generator and method for generating current pulsesFrance04/04/2014FR298893330/03/2032
    Australia02/02/2017AU201324167529/03/2033
    Canada08/09/2020CA286917029/03/2033
    Chile30/10/2018CL5664929/03/2033
    Peru20/05/2019PE948929/03/2033
    USA28/06/2016US937963603/06/2033
    PatentSwitch and system to inject currentFrance28/01/2022FR3105446
    20/12/2039
    We believe the following specifications differentiate Typhoon™ from conventional geophysical systems:
    •high current that is adjustable according to the depth and scale of the exploration target;
    •high voltages that are also adjustable to overcome near-surface resistance;
    •the ability to transmit both electromagnetic and direct current signals;
    •extremely clean signal, which yields a high signal to noise ratio in recorded data;
    •the ability to synchronize with multiple types of data receivers, so that the user can choose the receiver system most appropriate for the exploration environment; and
    •three deployment configurations, from a large containerized system to a smaller lightweight system that is helicopter portable.





    Figure: Schematic of Typhoon™ at work.
    Image_19.jpg
    We currently have four 1st Generation Typhoon™ units and six 2nd Generation Typhoon™ units, which allow us to evaluate multiple prospects at any given time. Three of the 2nd Generation units are owned by the Saudi JVCo and used under license. One 2nd Generation unit is dedicated to the Exploration Alliance with BHP.
    The data processing and artificial intelligence software developed by our subsidiary CGI complements our Typhoon™ technology and represents the only software product that can efficiently process the full spectrum of geophysical data produced by Typhoon™.
    Computational Geosciences

    CGI is headquartered in Vancouver, British Columbia, Canada. It was founded in 2010 in order to capitalize on advanced software technology developed at the University of British Columbia that was designed to improve mineral exploration. The technology has undergone significant improvements over the years and extended its market reach into the oil & gas sector as well as water exploration activities. As of December 31, 2024, we owned 94.3% of CGI’s outstanding shares while 5.6% are equally held by CGI’s two co-founders. CGI was co-founded by Livia Mahler B.Sc., MBA, who currently serves as CGI’s Interim Chief Executive Officer, and Dr. Eldad Haber Ph.D., who currently serves as CGI’s Chief Technology Officer, and is a professor at the University of British Columbia.
    CGI’s technology consists of sophisticated software codes and artificial intelligence tools (“AI”). The software codes are used to process geophysical data (including that generated by Typhoon™) in order to build accurate 3D subsurface images that indicate the presence of various metals and minerals, as well as water and oil. The AI tools are used to generate prospectivity maps for specific minerals, based on deep learning algorithms analyzing vast amounts of geoscience data.
    CGI provides fee-for-service and software licensing agreements to customers in the area of critical minerals, energy and water exploration. CGI’s services apply its geophysical data inversion codes on geophysical data (included that of Typhoon™) collected by third party data acquirers as well as other sources such as public or private libraries, in order to construct and refine 3D subsurface images. These services help CGI’s customers in geophysical survey design through more accurately identifying potential resource targets for exploration while minimizing the operational footprint of those exploration activities. CGI also offers mineral prospectivity mapping services which are based on deep learning AI algorithms to help identify and rank prospective areas for critical minerals. In order to prepare diverse layers for AI algorithms, CGI uses unique tools such as data augmentation for sparse, unstructured data which enhance the results and provide critical knowledge of the subsurface for clients.
    CGI applies its services to not only mineral projects but also to the global energy industry and in the search for underground water resources. In the energy sector, CGI has independently developed and collaborated to deploy a real-time 3D inversion service for resistivity logging-while-drilling (“LWD”) data, significantly optimizing well placement and well completion designs to maximize reservoir productivity. CGI is also able to monitor fluid substitution within reservoirs, whether for enhanced oil recovery or carbon capture and storage. CGI has entered into a non-exclusive licensing agreement with a major oilfield service provider for the worldwide license of the LWD code. With respect to the identification of underground water resources, CGI’s technology can also be deployed to predict prospective areas or delineate known water aquifers.
    CGI does not patent its software codes. CGI owns codes for magnetics, gravity, DC/IP and electromagnetics.



    CGI’s intention is to grow its client base in the mining sector for existing geophysical inversion and AI based services in order to increase its revenue from third party sources. CGI is currently developing two new geophysical modelling products and has identified another solution for the AI-based platform digitization application. CGI is also building large geoscience databases from vast amounts of publicly available data in various countries and regions of the world in order to use these datasets to map minerals, water, geothermal and other targets. CGI competes with geophysical data processors, airborne and ground surveyors, off-shore surveyors, and AI service providers. These include companies such as TechnoImaging, LLC, Geotech Ltd., KoBold Metals and Quantec Geoscience.
    VRB Energy - Vanadium Redox Flow Technology

    In October 2024, VRB Energy Inc. (“VRB Energy”), a 90% owned subsidiary of Ivanhoe Electric, entered into definitive agreements providing for the creation of a 49%/51% joint venture (“VRB Transaction”) between VRB Energy and China Energy Storage Industry Co., Ltd. (“Red Sun”), a subsidiary of privately held Shanxi Red Sun Co., Ltd. Following the VRB Transaction, VRB Energy owns a 49% interest in the joint venture (“VRB China Joint Venture”), which manufactures, develops and sells vanadium redox flow batteries for Asian, African and Middle Eastern markets. The VRB China Joint Venture agreement provides for funding of the VRB China Joint Venture after the VRB Transaction to be pro rata and subject to a customary dilution formula. Certain matters may not be taken by the VRB China Joint Venture without the affirmative vote or consent of the shareholder holding, or the shareholders collectively holding, at least two-thirds (2/3) of the equity interest. The board will be set at six directors, with two nominees from VRB Energy. So long as VRB Energy owns 20% of the share capital of the VRB China Joint Venture, it shall be entitled to designate two of six directors on the board. From the date that VRB Energy has less than 20% of the share capital of the VRB China Joint Venture but more than 10%, it shall be entitled to designate only one of six directors. Should VRB Energy come to own less than 10% of the share capital of the VRB China Joint Venture, it shall not be entitled to designate any nominees on the Board. Subject to certain exceptions, the Board shall operate by majority vote. A cooperation agreement provides for certain allocations of business opportunities, supply arrangements, technical assistance and intellectual property arrangements as between the businesses of the VRB China Joint Venture and VRB Energy USA, Inc.
    VRB Energy also owns 100% of VRB Energy USA, Inc. (“VRB USA”), an Arizona-based business focused on the development and manufacture of advanced grid-scale energy storage systems utilizing vanadium redox flow batteries for integration with renewable power sources. Pursuant to the VRB Transaction, the VRB China Joint Venture will receive approximately $35.2 million from Red Sun in tranches to be fully received by the end of 2025, with $12.7 million of those payments having been received to date. In addition, VRB Energy will receive $20 million from Red Sun in two tranches, to be completed by June 30, 2025, which will be used to advance VRB USA. On October 28, 2024, the first $10.0 million was deposited to an account in China jointly controlled by Red Sun and VRB Energy. Following receipt of several regulatory approvals required to transfer the funds outside of China, on February 12, 2025 VRB received the first tranche payment with the second tranche payment being due in June 2025.

    The current commercial platform of both VRB China Joint Venture and VRB USA is the Third Generation Vanadium Redox Battery Energy Storage System (“Gen3 VRB-ESS”). The Gen3 VRB-ESS is a commercially validated system that presents a superior solution for grid-scale utility storage compared to existing lithium-ion batteries. We believe VRB-ESS® batteries deliver better levelized cost of storage with superior safety characteristics compared to lithium-ion battery systems. In 2023 VRB’s 1MW power module and 60kW cell stacks were certified to Underwriters Laboratories (“UL”) UL1973 product safety standards. UL 1973 is recognized as a global standard for commercially available battery energy storage.
    The growing demand for renewable energy sources is expected to drive the demand for long-duration, long-lasting, safe and reliable vanadium flow batteries as a superior solution to lithium-ion batteries for grid scale energy storage.

    We believe VRB-ESS® batteries can be charged and discharged over an almost unlimited number of cycles without wearing out and causing deterioration of the vanadium electrolyte, providing the lowest lifecycle cost of energy of any type of grid scale energy storage. In addition, VRB Energy’s proprietary electrolyte formula contains no heavy metals and the water-based electrolyte is non-flammable and 100% reusable.




    Figure: VRB-ESS® System Overview
    tm224101d1-pht_tank4c.jpg



    Corporate Governance, ESG and Leadership
    Longstanding Leadership Commitment to ESG Principles
    The leadership team at Ivanhoe Electric has a proven track record of implementing environmental, social and governance (“ESG”) focused policies and strategies pertaining to community engagement, diversity, safety, environmental standards and clean energy. This has been a focus of Robert Friedland from his work in other ventures, including at Ivanhoe Mines.
    Ivanhoe Electric is advancing ESG initiatives as it continues to explore the Company’s assets and move into mineral production. As part of its ongoing commitment to good corporate stewardship, in 2023 the Company hired a full-time senior leader to focus on its ESG initiatives. The new role leads cross-functional efforts to coordinate, execute, and communicate the Company’s ESG efforts and to integrate ESG policies, frameworks, goals, and metrics into the Company’s business risk and opportunity strategies.
    Additionally, in 2024, the Board of Directors created a Health, Safety and Environmental (HS&E) Committee to oversee the Company’s key health, safety, environmental and social policies and related risks, opportunities and matters affecting the Company’s business. The HS&E and Audit Committees will ensure accurate reporting of ESG matters of the Company.
    Environmental, Health, and Safety Matters
    We are required to comply with numerous environmental laws, regulations and permits in addition to those discussed above. These additional requirements include, for example, various permits regulating road construction and drilling at our mineral projects. We endeavor to conduct our mining operations in compliance with all applicable laws and regulations. However, because of extensive and comprehensive regulatory requirements, violations during mining operations occur from time to time in the industry.
    Human Capital
    We are committed to promoting the health, safety and well-being of our workforce and striving to further strengthen our commitment to promoting an inclusive and diverse workplace. We believe our workforce is the foundation of our success. Our Board of Directors oversees our policies and implementation programs that govern our approach to management of our human capital, with the HS&E and Compensation and Nominating Committees having oversight of human capital matters, including those relating to health and safety, executive recruitment, retention and development, pay equity, and inclusion and diversity.
    As of December 31, 2024, Ivanhoe Electric and its subsidiaries had 240 full time employees. We consider our relationship with our employees to be strong. None of our employees are represented by a labor union or party to a collective bargaining agreement.
    History
    2021 Reorganization and Financing
    We were incorporated in Delaware on July 14, 2020, as a wholly-owned subsidiary of Ivanhoe Atlantic Inc. (which was then called HPX). On April 30, 2021, HPX completed a restructuring whereby HPX contributed (i) all of the issued and outstanding shares of HPX’s subsidiaries, other than those holding direct or indirect interests in its Nimba Iron Ore Project; (ii) certain property, plant and equipment; and (iii) certain financial assets, in exchange for shares of our common stock. HPX then distributed the shares common stock to HPX stockholders by way of a dividend, with each HPX stockholder receiving one share of our common stock for each HPX share of common stock then held by the stockholder.
    On April 30, 2021 we also entered into an intellectual property assignment and novation agreement with HPX, I-Pulse, and several subsidiary companies by which the rights to certain technology and patent license agreements previously held by HPX or a subsidiary, as licensee, were assigned to us.
    Stapled Offering of Equity and Series 1 Convertible Notes
    Between August 3, 2021 and November 17, 2021, we and I-Pulse, issued and sold “bundles” of securities comprised of (i) an aggregate of 4,015,990 shares of our common stock at $2.49 per share, (ii) $49,999,200 aggregate principal amount of promissory notes convertible into shares of our common stock (“Convertible Notes”), and (iii) $19,999,680 aggregate principal amount of promissory notes issued by I-Pulse convertible into shares of our common stock held by I-Pulse (“I-



    Pulse Convertible PIK Notes”). The securities comprising the bundles were immediately separable. As a result, we raised gross proceeds of $59,999,040. We did not receive any proceeds from the issuance of the I-Pulse Convertible PIK Notes.
    Upon the consummation of our initial public offering, the Convertible Notes, including any accrued but unpaid interest, automatically converted into 5,419,923 shares of our common stock at a price per share equal to $9.39 per share of common stock.
    Pursuant to the terms of the I-Pulse Convertible PIK Notes, upon the consummation of our initial public offering, the I-Pulse Convertible PIK Notes, including any accrued but unpaid interest, were able to be exchanged, in whole or in part, at the option of the holder, into shares of our common stock then held by I-Pulse at a price per share equal to $4.6929 per share of common stock, subject in each case to adjustment for any stock split, stock dividend, reverse stock split, or similar transactions. The I-Pulse Convertible PIK Notes were also convertible at the option of the holder at any time prior to maturity into shares of I-Pulse common stock. The I-Pulse Convertible PIK Notes matured on July 31, 2023.
    Series 2 Convertible Notes
    On April 5, 2022, we issued and sold an aggregate principal amount of $86,200,000 of our Series 2 Convertible Notes.
    Upon the consummation of our initial public offering, the Series 2 Convertible Notes, including any accrued but unpaid interest thereon, automatically converted into 8,209,035 shares of our common stock at a price per share equal to $10.58 per share.

    Reverse Stock Split

    On June 16, 2022, we effected a reverse stock split of our outstanding common stock at a ratio of 3-for-1 (the “Reverse Stock Split”). The number of authorized shares and the par value of the common stock were not adjusted as a result of the Reverse Stock Split. All references to common stock, options to purchase common stock, per share data and related information have been retrospectively adjusted to reflect the effect of the Reverse Stock Split for all periods presented.
    Initial Public Offering
    On June 30, 2022, we completed an initial public offering of 14,388,000 shares of our common stock at a price of $11.75 per share, resulting in gross proceeds from the offering of $169.1 million. The Company’s shares were listed on the NYSE American and the Toronto Stock Exchange under the ticker symbol “IE”.
    Corporate Information
    We were incorporated in the State of Delaware in July 2020. Our principal executive offices are located at 450 E. Rio Salado Parkway, Suite 130, Tempe, Arizona, and our telephone number is (480) 656-5821. Our website address is ivanhoeelectric.com.
    Available Information
    We make available, free of charge, on our website at ivanhoeelectric.com our annual reports on Form 10-K, quarterly reports on Form 10-Q, current reports on Form 8-K and any amendments to such reports, as soon as reasonably practicable after such reports are electronically filed with, or furnished to, the SEC. We do not incorporate the information on or accessible through our website into this Annual Report, and you should not consider any information on, or that can be accessed through, our website a part of this Annual Report or any other filing we make with the SEC.

    All such reports are also available free of charge via EDGAR through the SEC website at www.sec.gov.






    Part IV
    Item 15. Exhibits and Financial Statement Schedules
    The following documents are filed as part of this Annual Report on Form 10-K:
    (1)    Financial Statements. See Item 8 “Financial Statements and Supplemental Information” elsewhere in this Annual Report on Form 10-K.
    (2)    Financial Statement Schedules. None. Financial statement schedules have been omitted because they are not applicable.
    (3)    Exhibits. The following exhibits are filed (or incorporated by reference herein) as part of this Annual Report on Form 10-K:
    Incorporated by Reference
    Exhibit
    Number
    DescriptionForm
    File No.
    Exhibit
    Filing Date
    Filed / Furnished Herewith
    2.1
    Contribution Agreement dated as of April 30, 2021, between the High Power Exploration Inc. and the RegistrantS-1333-2651752.1May 24, 2022
    3.1
    Amended and Restated Certificate of Incorporation of the Registrant as currently in effect8-K001-414363.1June 30, 2022
    3.2
    Second Amended and Restated By-Laws of the Registrant as currently in effect
    8-K/A
    001-414363.1February 24, 2025
    4.1
    Description of Registrant’s Securities
    *
    4.2
    Stockholders Agreement dated as of April 30, 2021, by and among the Registrant, I-Pulse Inc., Ivanhoe Industries, LLC, Point Piper, LLC, Century Vision Holdings Limited and Iridium Opportunity Fund A LPS-1333-2651754.4May 24, 2022
    4.3
    First Amendment dated as of June 28, 2021 to the Stockholders Agreement dated as of April 30, 2021, by and among the Registrant, I-Pulse Inc., Ivanhoe Industries, LLC, Point Piper, LLC, Century Vision Holdings Limited and Iridium Opportunity Fund A LPS-1333-2651754.5May 24, 2022
    4.4
    Second Amended and Restated Stockholders Agreement dated as of April 5, 2022, by and among the Registrant, I-Pulse Inc., Castelnau LLC, Robert Friedland, and each of the investors signatory thereto
    S-1333-2651754.6May 24, 2022
    4.5
    Amended and Restated Registration Rights Agreement dated as of April 5, 2022, by and among the Registrant and the investors signatory theretoS-1333-2651754.7May 24, 2022
    4.6^##**
    Warrant Agent Agreement including form of Warrant
    10.1
    Assignment Agreement dated as of October 27, 2021 by and among the Registrant, Mesa Cobre Holding Corporation, Central Arizona Resources, LLC, Presidio Group Inc., Russell Mining Corp., and Gold Coast Mining Inc.S-1333-26517510.1May 24, 2022
    10.2
    Purchase and Sale Agreement between Mesa Cobre Holding Corporation and Wolff-Harvard Ventures, LLC dated May 10, 2023.8-K/A001-4143610.1May 11, 2023
    10.3
    Secured Promissory Note between Mesa Cobre Holding Corporation and Wolff-Harvard Ventures, LP dated May 23, 20238-K001-4143610.1May 24, 2023
    10.4
    Deed of Trust and Assignment of Rents between Mesa Cobre Holding Corporation and First American Title Insurance Company for the benefit of Wolff-Harvard Ventures, LP dated May 23, 20238-K001-4143610.2May 24, 2023
    10.5
    Technology License Agreement dated as of March 23, 2012, between High Power Exploration Inc. and I-Pulse IncS-1333-26517510.3May 24, 2022
    10.6
    Technology License Agreement dated as of March 23, 2012, between High Power Exploration Inc. and HPX TechCo Inc. and GEO27 S.a.r.lS-1333-26517510.4May 24, 2022
    10.7
    Patent License Agreement Amendment and Novation dated as of March 23, 2012, between High Power Exploration Inc. and GEO27 S.a.r.l.S-1333-26517510.5May 24, 2022
    10.8
    Assignment and Novation Agreement, dated as of April 30, 2021, between High Power Exploration Inc. and each of I-Pulse Inc., HPX TechCo Inc. and GEO27 S.a.r.l.S-1333-26517510.6May 24, 2022



    10.9
    Option Agreement for Purchase and Sale, dated August 16, 2021, by and between Central Arizona Resources, LLC and DRH Energy, Inc.S-1333-26517510.7May 24, 2022
    10.10
    Amended and Restated Shareholders’ Corporate Management and Cost Sharing Agreement dated as of December 4, 2013, as amended as of January 1, 2016, among the shareholders of Global Mining Management (BVI) Corp., Global Mining Management (BVI) Corp. and Global Mining Management CorporationS-1333-26517510.9May 24, 2022
    10.11#
    Purchase and Sale Agreement dated as of October 19, 2017S-1333-26517510.10June 21, 2022
    10.12#
    Purchase and Sale Agreement dated as of October 4, 2018S-1333-26517510.11June 21, 2022
    10.13#
    Purchase and Sale Agreement dated as of October 4, 2018S-1333-26517510.12June 21, 2022
    10.14#
    Purchase and Sale Agreement dated as of October 4, 2018S-1333-26517510.13June 21, 2022
    10.15#
    Purchase and Sale Agreement dated as of June 14, 2019S-1333-26517510.14June 21, 2022
    10.16##
    Common Stock Subscription Agreement between Ivanhoe Electric Inc. and Saudi Arabian Mining Company (Ma’aden) dated May 15, 20238-K001-4143610.1May 15, 2023
    10.17
    Investor Rights Agreement between Ivanhoe Electric Inc. and Saudi Arabian Mining Company (Ma’aden) dated July 6, 202310-Q001-4143610.9August 14, 2023
    10.18
    Shareholders Agreement by and among Ivanhoe Electric Inc., Ivanhoe Electric Mena Holdings Ltd., Ma’aden Ivanhoe Electric Exploration and Development Limited Company and Saudi Arabian Mining Company (Ma’aden) dated July 6, 202310-Q001-4143610.10August 14, 2023
    10.19
    Amendment to Shareholders’ Agreement in Respect of Ma’aden Ivanhoe Electric Exploration and Development Company dated November 1, 2023
    10-K
    001-4143610.20
    February, 26, 2024

    10.20##
    Purchase, Sale and Investment Agreement
    8-K001-4143610.1October 15, 2024
    10.21##
    VRB China Joint Venture Agreement8-K001-4143610.2October 15, 2024
    10.22
    Cooperation Agreement 8-K001-4143610.3October 15, 2024
    10.23##
    Exploration Alliance Agreement dated May 7, 20248-K001-4143610.1May 8, 2024
    10.24^
    Common Stock Subscription Agreement between Ivanhoe Electric Inc. and Saudi Arabian Mining Company (Ma’aden) dated October 23, 20238-K/A001-4143610.1October 24, 2023
    10.25=
    Ivanhoe Electric Inc. Equity Incentive PlanS-1333-26517510.15May 24, 2022
    10.26=
    Long Term Incentive PlanS-1333-26517510.16June 21, 2022
    10.27=
    Form of Stock Option Agreement (Employees) pursuant to the Ivanhoe Electric, Inc. 2022 Long Term Incentive Plan
    10-K
    001-41436
    10.24March 14, 2023
    10.28=
    Form of Stock Option Agreement (CEO) pursuant to the Ivanhoe Electric, Inc. 2022 Long Term Incentive Plan
    10-K
    001-41436
    10.25March 14, 2023
    10.29=
    Form of Stock Option Agreement (Executive, 4-year vesting) pursuant to the Ivanhoe Electric, Inc. 2022 Long Term Incentive Plan
    10-K
    001-41436
    10.26March 14, 2023
    10.30=
    Form of Stock Option Agreement (Executive, 3-year vesting) pursuant to the Ivanhoe Electric, Inc. 2022 Long Term Incentive Plan
    10-K
    001-41436
    10.27March 14, 2023
    10.31=
    Form of Restricted Stock Unit Award Agreement (4-year vesting) pursuant to the Ivanhoe Electric, Inc. 2022 Long Term Incentive Plan
    10-K
    001-41436
    10.28March 14, 2023
    10.32=
    Form of Restricted Stock Unit Award Agreement (3-year vesting) pursuant to the Ivanhoe Electric, Inc. 2022 Long Term Incentive Plan
    10-K
    001-41436
    10.29March 14, 2023
    10.33=
    Form of Restricted Stock Unit Award Agreement (5-year vesting) pursuant to the Ivanhoe Electric, Inc. 2022 Long Term Incentive Plan
    10-K
    001-4143610.31February 26, 2024

    10.34=
    Form of Non-Employee Director Deferred Stock Unit Award Agreement (3-year grant)
    10-K
    001-41436
    10.30March 14, 2023
    10.35=
    Form of Non-Employee Director Deferred Stock Unit Award Agreement (annual grant)
    10-K
    001-41436
    10.31March 14, 2023
    10.36=
    Form of Non-Employee Director Deferred Share Unit Award Agreement10-Q001-4143699.1August 14, 2023
    10.37=
    Form of Non-Employee Director Deferred Share Unit Award Agreement (without election) 10-K001-4143610.35February 26, 2024



    10.38=**
    Form of Performance Share Unit Award Agreement (3-year cliff vesting) pursuant to the Ivanhoe Electric, Inc. 2022 Long Term Incentive Plan
    10.39=
    Cordoba Minerals Corp. Amended Long Term Incentive Plan
     
     
     

    *
    10.40=
    Cordoba Minerals Corp. Amended Stock Option Plan
     
     
     

    *
    10.41=
    VRB Energy Inc. (formerly JD Holding Inc.) Stock Option Plan 10-K001-4143610.38February 26, 2024
    10.42=
    Computational Geosciences Inc. Amended & Restated 2011 Incentive Stock Option Plan
    10-Q
    001-41436
    10.3August 7, 2024
    10.43
    Form of Indemnification AgreementS-1333-26517510.19June 21, 2022
    10.44
    Form of Director Indemnification Agreement8-K001-41436Schedule 6 of 10.1May 15, 2023
    10.45=
    Employment Agreement between the Ivanhoe Electric Inc. and Taylor Melvin dated October 21, 2022
    10-Q001-4143610.1November 14, 2022
    10.46=
    Employment Agreement between Ivanhoe Electric Inc. and Jordan Neeser dated November 17, 2022
    8-K001-4143610.2November 21, 2022
    10.47=
    Executive Employment Agreement dated December 30, 2022 between the Company and Stephani Terhorst
    10-K
    001-41436
    10.43February 26, 2024
    10.48=
    Executive Employment Agreement dated January 4, 2023 between the Company and Cassandra Joseph10-Q001-4143610.2May 15, 2023
    10.49=**
    Amended Executive Employment Agreement dated February 25, 2025 between the Company and Mark Gibson
    10.50=**
    Second Amended and Restated Executive Employment Agreement dated February 25, 2025 between the Company and Glen Kuntz
    10.51=
    Amended and Restated Executive Employment Agreement dated August 7, 2023 between the Company and Quentin Markin 10-Q001-4143610.3August 14, 2023
    10.52=**
    Amended Executive Employment Agreement dated February 25, 2025 between the Company and Graham Boyd
    10.55=
    Annual Compensation Letter- Robert Friedland
    8-K
    001-41436
    10.1May 9, 2024
    10.54=
    Strategic Advisory Services Agreement between Cordoba Minerals Corp. and Robert Friedland dated December 3, 2020
    10-K
    001-41436
    10.49February 26, 2024
    10.55
    Underwriting Agreement dated as of September 14, 20238-K001-414361.1September 14, 2023
    10.56
    Underwriting Agreement dated as of February 12, 2025
    8-K
    001-41436
    1.1February 12, 2025
    14.1**
    Code of Ethics




    19.1**
    Insider Trading Policy
    21.1**
    Subsidiaries of the Registrant
    23.1
    Consent of Deloitte LLP
    *
    23.2**
    Qualified Person Consent SRK for report titled “S-K 1300 Technical Report Summary & Exploration Results Report, Tintic Project, Utah” dated February 23, 2024
    23.3**
    Qualified Person Consent Leslie Cole NI 43-101 Technical Report titled “Pinaya Gold- Copper Project Technical Report” with an effective date of April 26, 2016
    23.4**
    Qualified Person Consent Simpson NI 43-101 Technical Report titled “Pinaya Gold-Copper Project Technical Report” with an effective date of April 26, 2016
    23.5**
    Qualified Person Consent SRK Consulting (U.S.), Inc. for report titled “S-K 1300 Initial Assessment & Technical Report Summary, Santa Cruz Project, Arizona” dated September 6, 2023
    23.6**
    Qualified Person Consent of KCB Consultants Ltd. for report titled “S-K 1300 Initial Assessment & Technical Report Summary, Santa Cruz Project, Arizona” dated September 6, 2023
    23.7**
    Qualified Person Consent of Life Cycle Geo, LLC for report titled “S-K 1300 Initial Assessment & Technical Report Summary, Santa Cruz Project, Arizona” dated September 6, 2023
    23.8**
    Qualified Person Consent of M3 Engineering and Technology Corp. for report titled “S-K 1300 Initial Assessment & Technical Report Summary, Santa Cruz Project, Arizona” dated September 6, 2023



    23.9**
    Qualified Person Consent of Nordmin Engineering Ltd. for report titled “S-K 1300 Initial Assessment & Technical Report Summary, Santa Cruz Project, Arizona” dated September 6, 2023
    23.10**
    Qualified Person Consent of Call & Nicholas, Inc. for report titled “S-K 1300 Initial Assessment & Technical Report Summary, Santa Cruz Project, Arizona” dated September 6, 2023
    23.11**
    Qualified Person Consent of Tetra Tech, Inc. for report titled “S-K 1300 Initial Assessment & Technical Report Summary, Santa Cruz Project, Arizona” dated September 6, 2023
    23.12**
    Qualified Person Consent of INTERA Incorporated for report titled “S-K 1300 Initial Assessment & Technical Report Summary, Santa Cruz Project, Arizona” dated September 6, 2023
    23.13**
    Qualified Person Consent of Haley & Aldrich, Inc. for report titled “S-K 1300 Initial Assessment & Technical Report Summary, Santa Cruz Project, Arizona” dated September 6, 2023
    23.14**
    Qualified Person Consent of Met Engineering, LLC for report titled “S-K 1300 Initial Assessment & Technical Report Summary, Santa Cruz Project, Arizona” dated September 6, 2023
    23.15
    Qualified Person Consent of Glen Kuntz
    *
    23.16**
    Qualified Person Consent of Colin Shaw
    31.1
    Certification of Principal Executive Officer Pursuant to Rules 13a-14(a) and 15d-14(a) under the Securities Exchange Act of 1934, as Adopted Pursuant to Section 302 of the Sarbanes-Oxley Act of 2002*
    31.2
    Certification of Principal Financial Officer Pursuant to Rules 13a-14(a) and 15d-14(a) under the Securities Exchange Act of 1934, as Adopted Pursuant to Section 302 of the Sarbanes-Oxley Act of 2002*
    32.1+**
    Certification of Principal Executive Officer Pursuant to 18 U.S.C. Section 1350, as Adopted Pursuant to Section 906 of the Sarbanes-Oxley Act of 2002
    32.2+**
    Certification of Principal Financial Officer Pursuant to 18 U.S.C. Section 1350, as Adopted Pursuant to Section 906 of the Sarbanes-Oxley Act of 2002
    96.1
    Technical Report Summary on the Santa Cruz Project, Arizona, U.S.A., SRK Consulting (U.S.), Inc., KCB Consultants Ltd., Life Cycle Geo, LLC, M3 Engineering and Technology Corp., Nordmin Engineering Ltd., Call & Nicholas, Inc., Tetra Tech, Inc., INTERA Incorporated, Haley & Aldrich, Inc., and Met Engineering, LLC, dated of September 6, 2023
    8-K
    001-41436
    96.1September 6, 2023
    97.1**
    Ivanhoe Electric Inc. Clawback Policy
    99.1
    S-K 1300 Technical Report Summary & Exploration Results Report, Tintic Project, Utah, prepared by SRK Consulting (U.S.) Inc., dated February 23, 202410-K001-4143696.2February 26, 2024
    101.INS**
    Inline XBRL Instance Document – the instance document does not appear in the Interactive Data File because XBRL tags are embedded within the Inline XBRL document.
    101.SCH**
    Inline XBRL Taxonomy Extension Schema Document
    101.CAL**
    Inline XBRL Taxonomy Extension Calculation Linkbase Document
    101.DEF**
    Inline XBRL Taxonomy Extension Definition Linkbase Document
    101.LAB**
    Inline XBRL Taxonomy Extension Label Linkbase Document
    101.PRE**
    Inline XBRL Taxonomy Extension Presentation Linkbase Document
    104**
    Cover Page Interactive Data File (embedded within the Inline XBRL document)




    + The information contained in Exhibits 32.1 and 32.2 shall not be deemed “filed” for purposes of Section 18 of the Exchange Act of 1934, as amended, or the Exchange Act, or otherwise subject to the liabilities of that section, nor shall it be deemed incorporated by reference in any filing under the Securities Act or the Exchange Act (including this Annual Report on Form 10-K), unless the Registrant specifically incorporates the foregoing information into those documents by reference.
    # Portions of this exhibit have been omitted because they are both (i) not material and (ii) would likely cause competitive harm to the Company if publicly disclosed.
    ## Certain schedules or portions thereof are omitted pursuant to Item 601(a)(5) of Regulation S-K. The Company agrees to provide on a supplemental basis a copy of any omitted schedule to the U.S. Securities and Exchange Commission or its staff upon request.
    ^ Certain schedules or portions thereof are omitted pursuant to Item 601(a)(6) of Regulation S-K. The Company agrees to provide on a supplemental basis a copy of any omitted schedule or portion to the U.S. Securities and Exchange Commission or its staff upon request.
    = Indicates management contract or compensatory plan.
    ** Previously filed with the Original 10-K.




    Signatures
    Pursuant to the requirements of Section 13 or 15(d) of the Securities Exchange Act of 1934, as amended, the Registrant has duly caused this Report to be signed on its behalf by the undersigned, thereunto duly authorized.


    Ivanhoe Electric Inc.
    Date: February 28, 2025
    /s/ Taylor Melvin
    Taylor Melvin
    Chief Executive Officer, President and Director


    Get the next $IE alert in real time by email

    Chat with this insight

    Save time and jump to the most important pieces.

    Recent Analyst Ratings for
    $IE

    DatePrice TargetRatingAnalyst
    10/17/2023$18.00Overweight
    JP Morgan
    12/22/2022$14.00Sector Perform
    Scotiabank
    9/28/2022$12.00Outperform
    Raymond James
    8/18/2022$12.00Neutral
    JP Morgan
    More analyst ratings

    $IE
    Insider Trading

    Insider transactions reveal critical sentiment about the company from key stakeholders. See them live in this feed.

    See more
    • President and CEO Melvin Joseph Taylor bought $288,000 worth of shares (50,000 units at $5.76), increasing direct ownership by 7% to 730,753 units (SEC Form 4)

      4 - Ivanhoe Electric Inc. (0001879016) (Issuer)

      3/11/25 9:01:58 AM ET
      $IE
      Metal Mining
      Basic Materials
    • Director Bianchi Sofia was granted 23,116 shares, increasing direct ownership by 758% to 26,167 units (SEC Form 4)

      4 - Ivanhoe Electric Inc. (0001879016) (Issuer)

      3/10/25 8:02:51 PM ET
      $IE
      Metal Mining
      Basic Materials
    • Vice President Human Resources Terhorst Stephani was granted 18,699 shares (SEC Form 4)

      4 - Ivanhoe Electric Inc. (0001879016) (Issuer)

      3/10/25 4:01:43 PM ET
      $IE
      Metal Mining
      Basic Materials

    $IE
    Analyst Ratings

    Analyst ratings in real time. Analyst ratings have a very high impact on the underlying stock. See them live in this feed.

    See more
    • JP Morgan initiated coverage on Ivanhoe Electric with a new price target

      JP Morgan initiated coverage of Ivanhoe Electric with a rating of Overweight and set a new price target of $18.00

      10/17/23 7:48:40 AM ET
      $IE
      Metal Mining
      Basic Materials
    • Scotiabank initiated coverage on Ivanhoe Electric with a new price target

      Scotiabank initiated coverage of Ivanhoe Electric with a rating of Sector Perform and set a new price target of $14.00

      12/22/22 7:48:58 AM ET
      $IE
      Metal Mining
      Basic Materials
    • Raymond James initiated coverage on Ivanhoe Electric with a new price target

      Raymond James initiated coverage of Ivanhoe Electric with a rating of Outperform and set a new price target of $12.00

      9/28/22 9:13:23 AM ET
      $IE
      Metal Mining
      Basic Materials

    $IE
    Large Ownership Changes

    This live feed shows all institutional transactions in real time.

    See more
    • Amendment: SEC Form SC 13G/A filed by Ivanhoe Electric Inc.

      SC 13G/A - Ivanhoe Electric Inc. (0001879016) (Subject)

      11/14/24 1:22:40 PM ET
      $IE
      Metal Mining
      Basic Materials
    • Amendment: SEC Form SC 13G/A filed by Ivanhoe Electric Inc.

      SC 13G/A - Ivanhoe Electric Inc. (0001879016) (Subject)

      11/12/24 10:32:13 AM ET
      $IE
      Metal Mining
      Basic Materials
    • SEC Form SC 13G/A filed by Ivanhoe Electric Inc. (Amendment)

      SC 13G/A - Ivanhoe Electric Inc. (0001879016) (Subject)

      5/8/24 2:27:27 PM ET
      $IE
      Metal Mining
      Basic Materials

    $IE
    Insider Purchases

    Insider purchases reveal critical bullish sentiment about the company from key stakeholders. See them live in this feed.

    See more
    • President and CEO Melvin Joseph Taylor bought $288,000 worth of shares (50,000 units at $5.76), increasing direct ownership by 7% to 730,753 units (SEC Form 4)

      4 - Ivanhoe Electric Inc. (0001879016) (Issuer)

      3/11/25 9:01:58 AM ET
      $IE
      Metal Mining
      Basic Materials
    • Senior VP, Exploration Boyd Graham Richard Thomas bought $29,150 worth of shares (5,000 units at $5.83) and was granted 33,442 shares, increasing direct ownership by 591% to 44,952 units (SEC Form 4)

      4 - Ivanhoe Electric Inc. (0001879016) (Issuer)

      3/10/25 3:48:16 PM ET
      $IE
      Metal Mining
      Basic Materials
    • Chief Financial Officer Neeser Jordan bought $58,775 worth of shares (10,000 units at $5.88), increasing direct ownership by 25% to 50,000 units (SEC Form 4)

      4 - Ivanhoe Electric Inc. (0001879016) (Issuer)

      3/7/25 3:41:55 PM ET
      $IE
      Metal Mining
      Basic Materials

    $IE
    SEC Filings

    See more
    • Ivanhoe Electric Inc. filed SEC Form 8-K: Leadership Update

      8-K - Ivanhoe Electric Inc. (0001879016) (Filer)

      5/9/25 4:40:09 PM ET
      $IE
      Metal Mining
      Basic Materials
    • Ivanhoe Electric Inc. filed SEC Form 8-K: Entry into a Material Definitive Agreement, Regulation FD Disclosure, Financial Statements and Exhibits

      8-K - Ivanhoe Electric Inc. (0001879016) (Filer)

      5/8/25 7:21:42 AM ET
      $IE
      Metal Mining
      Basic Materials
    • SEC Form 10-Q filed by Ivanhoe Electric Inc.

      10-Q - Ivanhoe Electric Inc. (0001879016) (Filer)

      5/6/25 4:40:24 PM ET
      $IE
      Metal Mining
      Basic Materials

    $IE
    Press Releases

    Fastest customizable press release news feed in the world

    See more
    • XtremeX Mining Technology Announces Plans for First Deployment of Its Revolutionary Mineral Drilling Rig with Ivanhoe Electric Following an $11M Series-A Financing Led by GoGreen Partners

      XtremeX Mining Technology Inc. (XMT), a leader in innovative drilling solutions, is excited to announce its cutting-edge AC-electric automated coiled tubing and electric top-drive diamond core drilling rig. This state-of-the-art technology will perform a funded field trial with Ivanhoe Electric (NYSE:IE, TSX:IE) at the Santa Cruz copper project in Arizona, targeting depths of up to 2,000 meters by twinning historic holes. Under the agreement, Ivanhoe Electric secures exclusivity on three XMT rigs for contracts lasting up to five years. The XMT rig adapts proven oil and gas technology for the mining sector, enabling faster, safer, and more sustainable drilling. This patented hybrid drillin

      1/14/25 12:00:00 AM ET
      $IE
      $PDS
      Metal Mining
      Basic Materials
      Oil & Gas Production
      Energy
    • Brixton Metals Provides Results from Ivanhoe Electric's 2024 Drilling at the Hog Heaven Project, Montana, USA

      VANCOUVER, British Columbia, Jan. 07, 2025 (GLOBE NEWSWIRE) -- Brixton Metals Corporation (TSXV:BBB, OTCQB:BBBXF) (the "Company" or "Brixton") is pleased to announce exploration results provided by operator Ivanhoe Electric Inc. ("Ivanhoe Electric") (NYSE:IE, TSX:IE), on the Hog Heaven Project. The road-accessible project is located in Flathead County, 50 miles southwest of the town of Kalispell, northwestern Montana, USA. Highlights below are sourced and further defined by Ivanhoe Electric's press release dated January 6, 2025. Highlights Exploration drilling at the Hog Heaven Project in Montana included approximately 14,000 meters in eleven drill holes (Figure 1). E

      1/7/25 3:55:50 PM ET
      $IE
      Metal Mining
      Basic Materials
    • Ivanhoe Electric and Ma'aden Joint Venture Commences Drilling Activities in Saudi Arabia

      Initial Program Testing Chargeability Anomaly Identified by Typhoon™ and Computational Geosciences' Inversion SoftwareTyphoon™ Survey Near Ma'aden's Al Amar Gold-Copper-Zinc Mine Now Exceeds 155 km2RIYADH, SAUDI ARABIA / ACCESSWIRE / August 19, 2024 / Ivanhoe Electric Inc. ("Ivanhoe Electric") (NYSE:IE)(TSX:IE) Executive Chairman Robert Friedland, and President and Chief Executive Officer Taylor Melvin, are pleased to announce the commencement of drilling in Saudi Arabia by the Joint Venture established between Ivanhoe Electric and Saudi Arabian Mining Company Ma'aden ("Ma'aden") (1211). Ivanhoe Electric's Founder and Executive Chairman Robert Friedland commented: "Today's announcement ma

      8/19/24 7:00:00 AM ET
      $IE
      Metal Mining
      Basic Materials

    $IE
    Leadership Updates

    Live Leadership Updates

    See more
    • LithiumBank Announces Intellectual Property License Agreement with G2L Greenview Resources Inc. for Direct Lithium Extraction Technology, Pilot Plant Testing and Commercialization

      Exclusive Access to One of the Largest DLE Pilot Plants in North America Updated Boardwalk PEA for Q4 2023 CALGARY, Alberta, Sept. 11, 2023 (GLOBE NEWSWIRE) -- LithiumBank Resources Corp. (TSXV:LBNK) (OTCQX:LBNKF) ("LithiumBank'' or the "Company") is pleased to announce it has entered into an intellectual property license agreement on September 8th 2023 (the "Agreement") with G2L Greenview Resources Inc. ("G2L"), a subsidiary of Go2Lithium Inc., whereby G2L shall grant to the Company a license (the "License") in Alberta and Saskatchewan for a full suite of continuous ion exchange technologies (the "Licensed Technology"). The Direct Lithium Extraction ("DLE") technology will be used to ex

      9/11/23 10:35:05 AM ET
      $IE
      Metal Mining
      Basic Materials
    • Ivanhoe Electric Announces the Election of Directors at its Annual Meeting of Stockholders

      PHOENIX, AZ / ACCESSWIRE / June 8, 2023 / Ivanhoe Electric Inc. ("Ivanhoe Electric") (NYSE:IE)(TSX:IE) announces the results of voting by shareholders at its 2023 Annual Meeting of Stockholders (the "Annual Meeting") held today in Tempe, Arizona. The election of the director nominees was confirmed with voting results as follows:Director Nominee Votes For % For Against % Against Withheld % Withheld Robert Friedland 73,927,159 98.00% 1,510,836 2.00% 580 0.00%Taylor Melvin 75,340,904 99.87% 97,061 0.13% 610 0.00%Russell Ball 68,258,527 90.48% 7,179,438 9.52% 610 0.00%Hirofumi Katase 74,221,317 98.39% 1,216,648 1.61% 610 0.00%Patrick Loftus-Hills 75,414,

      6/8/23 4:40:00 PM ET
      $IE
      Metal Mining
      Basic Materials
    • Brixton Metals Drills 262m of 1.04 g/t Gold Including 75.49m of 2.35 g/t Gold Including 6.93m of 7.16 g/t Gold at its Trapper Target on the Thorn Project

      VANCOUVER, British Columbia, Dec. 20, 2022 (GLOBE NEWSWIRE) -- Brixton Metals Corporation (TSXV:BBB, OTCQB:BBBXF) (the "Company" or "Brixton") is pleased to announce additional drill results from its wholly owned Thorn Project. The project is located in Northwest British Columbia within the Taku River Tlingit and Tahltan First Nations' traditional territory. Highlights Hole THN22-255 returned 262m of 1.04 g/t Au from 12m depth Including 147.19m of 1.59 g/t AuIncluding 75.49m of 2.35 g/t AuIncluding 6.93m of 7.16 g/t Au Hole THN22-254 yielded 102m of 1.02 g/t Au from 4m depth Including 39.00m of 2.11 g/t AuIncluding 8.00m of 5.60 g/t Au Vice Pre

      12/20/22 7:30:00 AM ET
      $IE
      Metal Mining
      Basic Materials

    $IE
    Financials

    Live finance-specific insights

    See more
    • Ivanhoe Electric Provides Update on Activities at its Santa Cruz Copper Project in Arizona

      37 Drill Holes Totaling 25,176 Meters of Development Drilling Completed Since Release of the September 2023 Initial AssessmentOngoing Technical Work is Advancing to Support a Preliminary Feasibility Study Expected to be Completed by the End of Q2 2025Recent Infill Drilling Has Delineated a High-Grade Oxide Copper Domain at Santa Cruz; Drill Hole SCC-125 Intersected 66 Meters at 2.85% Total Copper14 Drill Holes Totaling 12,510 Meters of Exploration Drilling Completed in 2023Recent Assays at Texaco Ridge Confirm Step-out Mineralization; Drill Hole SCC-122 Intersected 327 Meters Grading 0.81% Total Copper, Southwest of the Existing Texaco Mineral ResourceRecent Acquisition of Approximately 6,90

      1/8/24 7:00:00 AM ET
      $IE
      Metal Mining
      Basic Materials
    • CORRECTING AND REPLACING: Ivanhoe Electric Announces Completion of the Initial Assessment for the Santa Cruz Copper Project in Arizona

      The Initial Assessment Focuses on a Small Surface Footprint, 5.9 Million Tonnes per Year High Grade Underground Copper Mining Operation Supported Solely by the High-Grade Exotic, Oxide and Enriched Domains of the Santa Cruz and East Ridge DepositsAdditional Resources at the Texaco Deposit and the Large, Primary Sulfide Resources at Santa Cruz Provide Potential for Future GrowthLife of Mine ("LOM") Copper Production Estimated to be 1.6 Million Tonnes over a 20-Year Mine Life, with an Average Grade of 1.58% Total Copper and C1 Cash Costs[1] of $1.36 per PoundEstimated LOM Copper Production Includes 1.0 Million Tonnes of 99.99% Pure Copper Cathode and 0.6 Million Tonnes of Copper Contained in a

      9/6/23 11:35:00 AM ET
      $IE
      Metal Mining
      Basic Materials
    • Ivanhoe Electric Announces Completion of the Initial Assessment for the Santa Cruz Copper Project in Arizona

      The Initial Assessment Focuses on a Small Surface Footprint, 5.9 Million Tonnes per Year High Grade Underground Copper Mining Operation Supported Solely by the High-Grade Exotic, Oxide and Enriched Domains of the Santa Cruz and East Ridge DepositsAdditional Resources at the Texaco Deposit and the Large, Primary Sulfide Resources at Santa Cruz Provide Potential for Future GrowthLife of Mine ("LOM") Copper Production Estimated to be 1.6 Million Tonnes over a 20-Year Mine Life, with an Average Grade of 1.58% Total Copper and C1 Cash Costs[1] of $1.36 per PoundEstimated LOM Copper Production Includes 1.0 Million Tonnes of 99.99% Pure Copper Cathode and 0.6 Million Tonnes of Copper Contained in a

      9/6/23 6:50:00 AM ET
      $IE
      Metal Mining
      Basic Materials