• Live Feeds
    • Press Releases
    • Insider Trading
    • FDA Approvals
    • Analyst Ratings
    • Insider Trading
    • SEC filings
    • Market insights
  • Analyst Ratings
  • Alerts
  • Subscriptions
  • AI SuperconnectorNEW
  • Settings
  • RSS Feeds
Quantisnow Logo
  • Live Feeds
    • Press Releases
    • Insider Trading
    • FDA Approvals
    • Analyst Ratings
    • Insider Trading
    • SEC filings
    • Market insights
  • Analyst Ratings
  • Alerts
  • Subscriptions
  • AI SuperconnectorNEW
  • Settings
  • RSS Feeds
PublishGo to AppAI Superconnector
    Quantisnow Logo

    © 2025 quantisnow.com
    Democratizing insights since 2022

    Services
    Live news feedsRSS FeedsAlertsPublish with Us
    Company
    AboutQuantisnow PlusContactJobsAI superconnector for talent & startupsNEW
    Legal
    Terms of usePrivacy policyCookie policy

    Anfield Provides Positive Update Regarding its Confirmation Drill Program at Its JD-7 Mine

    9/30/25 7:00:00 AM ET
    $AEC
    Real Estate Investment Trusts
    Real Estate
    Get the next $AEC alert in real time by email

    VANCOUVER, British Columbia, Sept. 30, 2025 (GLOBE NEWSWIRE) -- Anfield Energy Inc. (TSX.V: AEC, NASDAQ:AEC, FRANKFURT: 0AD) ("Anfield" or "the Company") is pleased to announce the completion of the first 12 holes of the Company's ongoing 20-hole, 8,000-foot confirmation drill program at its JD-7 mine, an existing uranium and vanadium open pit mine in Montrose County, Colorado. This program, announced on August 25, 2025, aims to 1) collect geologic information related to uranium mineralization in multiple sandstone hosted deposits throughout the area; 2) confirm the existing pit resources; 3) confirm the extent and location of underground uranium and vanadium resources; and 4) consider potential uranium and vanadium resource expansion. The drill program – consisting primarily of air rotary with a subset of split barrel core drilling – is being conducted by Tri-Park Drilling.

    Significant intercepts of mineralization from the program include:

    • 17.0 ft grading 5,190 ppm (0.519%) eU3O8 (GT of 8.82) in Hole JD7-25-004B, with a peak of 14,850 ppm (1.485%) eU3O8 at 153.5 ft;



    • 19.0 ft grading 2,380 ppm (0.238%) eU3O8 (GT of 4.52) in Hole JD7-25-005, with a peak of 9,240 ppm (0.924%) eU3O8 at 170.0 ft; and



    • 17.0 ft grading 1,620 ppm (0.162%) eU3O8 (GT of 2.75) in Hole JD7-25-012, with a peak of 5,990 ppm (0.599%) eU3O8 at 185.0 ft.



    Corey Dias, Anfield's CEO, commented: "We are very pleased with the interim drill results as they both underscore the potential for resource confirmation – and possible expansion – at JD-7 and align with Anfield's broader strategy to advance its portfolio of near-term uranium and vanadium projects toward production. The Company remains on track to complete the remaining holes in the coming weeks, with full results expected to inform future development plans, including integration into Anfield's hub-and-spoke production model centered around the Shootaring Canyon Mill in Utah."

    Figure 1: Drilling Underway at JD-7 Open Pit mine:

    Drilling Underway at JD-7 Open Pit mine

    Drilling commenced on September 15th, 2025, and initial results have been highly encouraging, with 12 out of the planned 20 drilling targets completed to date. Gamma ray logging results indicate elevated uranium mineralization exceeding the minimum cutoff grade of 200 ppm eU3O8 and minimum Grade Thickness (GT) of 0.2 in 10 of the 12 drill holes completed so far. These findings confirm the presence of uranium mineralization at depths and locations consistent with the historical drilling dataset for the JD-7 mine.

    The drilling results demonstrate robust uranium mineralization across the targeted areas, with seven holes yielding a Grade Thickness (GT) over 0.5, indicating high-potential zones; three holes showing GT values between 0.1 and 0.5, reflecting moderate mineralization; and two holes containing only trace mineralization. The lower-strength intercepts are associated with the program's objective to delineate the outer boundaries of the mineralized resource, providing valuable data for refining resource models and supporting future mine planning and development at JD-7.

    Figure 2: JD-7 Drill Collar Location Map

    JD-7 Drill Collar Location Map

    Figure 3: Drill results

    Hole IDDate CompletedTotal Depth* DrilledDrift Distance (ft)Drift Azimuth (Degrees)Top Intercept Depth*Bottom Intercept Depth*Intercept Thickness (ft)Grade %eU3O8GT**Total Hole GT**
    JD7-25-0099/16/202550011.0152.5221.5222.00.50.0260.0130.0
    JD7-25-0019/16/20253207.7114.741.546.04.50.1010.4550.6
    49.552.53.00.0570.171
    JD7-25-0059/17/20254006.0221.7159.5178.519.00.2384.5224.5
    JD7-25-0199/18/20254002.2196.8271.0279.08.00.2291.8321.8
    JD7-25-0179/19/20254007.0138.2163.5164.00.50.0200.0100.0
    180.5181.51.00.0220.022
    JD7-25-0189/20/20254002.999.2234.5252.518.00.0601.0801.3
    253.0258.55.50.0350.193
    JD7-25-0209/21/20254406.1204.4339.0342.03.00.1160.3480.3
    JD7-25-002B9/23/2025740.1208.357.060.03.00.0560.1680.2
    JD7-25-0039/21/20253202.6200.565.569.54.00.1230.4920.5
    JD7-25-004B9/24/20251852.0204.2149.0166.017.00.5198.8239.7
    174.0179.05.00.1690.845
    JD7-25-0139/22/20254004.6149.6256.0257.51.50.0570.0860.9
    258.5265.06.50.0890.579
    272.0275.03.00.0390.117
    276.0279.03.00.0280.084
    313.0315.02.00.0290.058
    JD7-25-0129/22/20254003.3117.5180.0197.017.00.1622.7543.3
    198.5201.53.00.0230.069
    204.0207.03.00.0310.093
    208.0216.08.00.0520.416
    Intercepts are reported at a 0.02 eU308% (200 ppm) grade cut-off

    *All depth units are Feet below drill hole collar. **GT is calculated as: Grade x Thickness (ft)



    Figure 4: Mineralized Core Samples
    Recovered from JD7-25-004

    Mineralized Core Samples Recovered from JD7-25-004

    Two of the drill holes were completed with cored intervals to obtain physical samples of mineralized material. Cored intervals were completed using split-barrel core drilling through the mineralized zones. A subset of the remaining drill holes will also be drilled with core intervals. The core samples will be analyzed by two laboratories: Pace Analytical of Sheridan, Wyoming and Hazen Research of Golden, Colorado. These labs will use chemical methods to: 1) determine both uranium and vanadium content to evaluate the vanadium-to-uranium ratio of the mineralization; 2) to provide data to validate the uranium gamma ray logging results; and 3) further refine the uranium and vanadium resource estimates for JD-7 lease. The cores can also be used for mineralogical and metallurgical testing. This data will enhance the accuracy of the geological model and supports Anfield's efforts to advance the project toward production readiness.

    Qualified Persons

    Douglas L. Beahm, P.E., P.G., principal engineer at BRS Inc., is a Qualified Person as defined in NI 43-101 and has reviewed and approved the technical content of this news release.

    About Anfield

    Anfield is a uranium and vanadium development company that is committed to becoming a top-tier energy-related fuels supplier by creating value through sustainable, efficient growth in its assets. Anfield is a publicly traded corporation listed on the NASDAQ (AEC-Q), the TSX-Venture Exchange (AEC-V) and the Frankfurt Stock Exchange (0AD).

    On behalf of the Board of Directors

    ANFIELD ENERGY INC.

    Corey Dias, Chief Executive Officer

    Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

    Contact:

    Anfield Energy, Inc.

    Corporate Communications

    604-669-5762

    [email protected]

    www.anfieldenergy.com

    Safe Harbor Statement

    THIS NEWS RELEASE CONTAINS "FORWARD-LOOKING STATEMENTS" and "FORWARD-LOOKING INFORMATION" WITHIN THE MEANING OF APPLICABLE SECURITIES LEGISLATION (COLLECTIVELY, "FORWARD-LOOKING STATEMENTS"). STATEMENTS IN THIS NEWS RELEASE THAT ARE NOT PURELY HISTORICAL ARE FORWARD-LOOKING STATEMENTS AND INCLUDE ANY STATEMENTS REGARDING BELIEFS, PLANS, EXPECTATIONS OR INTENTIONS REGARDING THE FUTURE. FORWARD-LOOKING STATEMENTS IN THIS PRESS RELEASE INCLUDE, WITHOUT LIMITATION, STATEMENTS RELATING TO THE TIMING OF COMPLETION OF THE DRILL PROGRAM.

    EXCEPT FOR THE HISTORICAL INFORMATION PRESENTED HEREIN, MATTERS DISCUSSED IN THIS NEWS RELEASE CONTAIN FORWARD-LOOKING STATEMENTS THAT ARE SUBJECT TO CERTAIN RISKS AND UNCERTAINTIES THAT COULD CAUSE ACTUAL RESULTS TO DIFFER MATERIALLY FROM ANY FUTURE RESULTS, PERFORMANCE OR ACHIEVEMENTS EXPRESSED OR IMPLIED BY SUCH STATEMENTS. STATEMENTS THAT ARE NOT HISTORICAL FACTS, INCLUDING STATEMENTS THAT ARE PRECEDED BY, FOLLOWED BY, OR THAT INCLUDE SUCH WORDS AS "ESTIMATE," "ANTICIPATE," "BELIEVE," "PLAN" OR "EXPECT" OR SIMILAR STATEMENTS ARE FORWARD-LOOKING STATEMENTS. RISKS AND UNCERTAINTIES FOR THE COMPANY INCLUDE, BUT ARE NOT LIMITED TO, THE RISKS ASSOCIATED WITH MINERAL EXPLORATION AND FUNDING AS WELL AS THE RISKS SHOWN IN THE COMPANY'S MOST RECENT ANNUAL AND QUARTERLY REPORTS AND FROM TIME-TO-TIME IN OTHER PUBLICLY AVAILABLE INFORMATION REGARDING THE COMPANY. OTHER RISKS INCLUDE RISKS ASSOCIATED FUTURE CAPITAL REQUIREMENTS AND THE COMPANY'S ABILITY AND LEVEL OF SUPPORT FOR ITS EXPLORATION AND DEVELOPMENT ACTIVITIES. THERE CAN BE NO ASSURANCE THAT THE COMPANY'S EXPLORATION EFFORTS WILL SUCCEED OR THE COMPANY WILL ULTIMATELY ACHIEVE COMMERCIAL SUCCESS. THESE FORWARD-LOOKING STATEMENTS ARE MADE AS OF THE DATE OF THIS NEWS RELEASE, AND THE COMPANY ASSUMES NO OBLIGATION TO UPDATE THE FORWARD-LOOKING STATEMENTS, OR TO UPDATE THE REASONS WHY ACTUAL RESULTS COULD DIFFER FROM THOSE PROJECTED IN THE FORWARD-LOOKING STATEMENTS. ALTHOUGH THE COMPANY BELIEVES THAT THE BELIEFS, PLANS, EXPECTATIONS AND INTENTIONS CONTAINED IN THIS NEWS RELEASE ARE REASONABLE, THERE CAN BE NO ASSURANCE THOSE BELIEFS, PLANS, EXPECTATIONS OR INTENTIONS WILL PROVE TO BE ACCURATE. INVESTORS SHOULD CONSIDER ALL OF THE INFORMATION SET FORTH HEREIN AND SHOULD ALSO REFER TO THE RISK FACTORS DISCLOSED IN THE COMPANY'S PERIODIC REPORTS FILED FROM TIME-TO-TIME.

    THIS NEWS RELEASE HAS BEEN PREPARED BY MANAGEMENT OF THE COMPANY WHO TAKES FULL RESPONSIBILITY FOR ITS CONTENTS.

    Photos accompanying this announcement are available at:

    https://www.globenewswire.com/NewsRoom/AttachmentNg/e74572f2-349b-4fa8-b8f5-f4701216fd2a

    https://www.globenewswire.com/NewsRoom/AttachmentNg/6b7ef9d1-eb4f-4d10-9b61-046f10ecadf4

    https://www.globenewswire.com/NewsRoom/AttachmentNg/c40b8e77-9ef5-43ab-acc1-065bd3687b4c



    Primary Logo

    Get the next $AEC alert in real time by email

    Crush Q3 2025 with the Best AI Superconnector

    Stay ahead of the competition with Standout.work - your AI-powered talent-to-startup matching platform.

    AI-Powered Inbox
    Context-aware email replies
    Strategic Decision Support
    Get Started with Standout.work

    Recent Analyst Ratings for
    $AEC

    DatePrice TargetRatingAnalyst
    More analyst ratings

    $AEC
    Press Releases

    Fastest customizable press release news feed in the world

    View All

    Anfield Provides Positive Update Regarding its Confirmation Drill Program at Its JD-7 Mine

    VANCOUVER, British Columbia, Sept. 30, 2025 (GLOBE NEWSWIRE) -- Anfield Energy Inc. (TSX.V: AEC, NASDAQ:AEC, FRANKFURT: 0AD) ("Anfield" or "the Company") is pleased to announce the completion of the first 12 holes of the Company's ongoing 20-hole, 8,000-foot confirmation drill program at its JD-7 mine, an existing uranium and vanadium open pit mine in Montrose County, Colorado. This program, announced on August 25, 2025, aims to 1) collect geologic information related to uranium mineralization in multiple sandstone hosted deposits throughout the area; 2) confirm the existing pit resources; 3) confirm the extent and location of underground uranium and vanadium resources; and 4) consider pot

    9/30/25 7:00:00 AM ET
    $AEC
    Real Estate Investment Trusts
    Real Estate

    Former U.S. Congressman to Join Anfield Board

    VANCOUVER, British Columbia, Sept. 23, 2025 (GLOBE NEWSWIRE) -- Anfield Energy Inc. (NASDAQ:AEC, TSX.V: AEC, FRANKFURT: 0AD)) ("Anfield" or the "Company") is pleased to announce that the Honourable Jeff Duncan, former U.S. House Representative of South Carolina, has agreed to join Anfield's Board as a Director. Mr. Duncan is a graduate of Clemson University and served as Representative of South Carolina's 3rd District from 2010 until his retirement in 2024. A critical achievement during his tenure in the House was the passage of the Advance Act, aimed at fostering a nuclear renaissance in the U.S. During his tenure in the U.S. House of Representatives, Mr. Duncan served as a key member of

    9/23/25 7:00:00 AM ET
    $AEC
    Real Estate Investment Trusts
    Real Estate

    $AEC
    SEC Filings

    View All

    SEC Form 6-K filed by Anfield Energy Inc.

    6-K - ANFIELD ENERGY INC. (0001519469) (Filer)

    9/23/25 7:20:13 PM ET
    $AEC
    Real Estate Investment Trusts
    Real Estate

    $AEC
    Leadership Updates

    Live Leadership Updates

    View All

    Former U.S. Congressman to Join Anfield Board

    VANCOUVER, British Columbia, Sept. 23, 2025 (GLOBE NEWSWIRE) -- Anfield Energy Inc. (NASDAQ:AEC, TSX.V: AEC, FRANKFURT: 0AD)) ("Anfield" or the "Company") is pleased to announce that the Honourable Jeff Duncan, former U.S. House Representative of South Carolina, has agreed to join Anfield's Board as a Director. Mr. Duncan is a graduate of Clemson University and served as Representative of South Carolina's 3rd District from 2010 until his retirement in 2024. A critical achievement during his tenure in the House was the passage of the Advance Act, aimed at fostering a nuclear renaissance in the U.S. During his tenure in the U.S. House of Representatives, Mr. Duncan served as a key member of

    9/23/25 7:00:00 AM ET
    $AEC
    Real Estate Investment Trusts
    Real Estate