• Live Feeds
    • Press Releases
    • Insider Trading
    • FDA Approvals
    • Analyst Ratings
    • Insider Trading
    • SEC filings
    • Market insights
  • Analyst Ratings
  • Alerts
  • Subscriptions
  • Settings
  • RSS Feeds
Quantisnow Logo
  • Live Feeds
    • Press Releases
    • Insider Trading
    • FDA Approvals
    • Analyst Ratings
    • Insider Trading
    • SEC filings
    • Market insights
  • Analyst Ratings
  • Alerts
  • Subscriptions
  • Settings
  • RSS Feeds
PublishGo to App
    Quantisnow Logo

    © 2026 quantisnow.com
    Democratizing insights since 2022

    Services
    Live news feedsRSS FeedsAlertsPublish with Us
    Company
    AboutQuantisnow PlusContactJobsAI superconnector for talent & startupsNEWLLM Arena
    Legal
    Terms of usePrivacy policyCookie policy

    Bitdeer Announces July 2024 Production and Operations Update

    8/5/24 8:00:00 AM ET
    $BTDR
    Finance: Consumer Services
    Finance
    Get the next $BTDR alert in real time by email

    - Engaged TLM Group, a leading consultant in HPC/AI datacenter engineering and construction, to accelerate monetization of Bitdeer's 2.5 GW power portfolio

    - Remains on track to deploy 3.4 EH/s of SEALMINER ASICs for self-mining by year-end

    SINGAPORE, Aug. 05, 2024 (GLOBE NEWSWIRE) -- Bitdeer Technologies Group (NASDAQ:BTDR) ("Bitdeer" or the "Company"), a world-leading technology company for blockchain and high-performance computing, today announced its unaudited mining and operations updates for July 2024.

    Operational Highlights

    • Self-mined Bitcoin: Mined 181 Bitcoins.
    • Mining Rigs R&D:
      • Mass production is on track for SEAL01 chips and SEALMINER A1 series mining rigs, including both air cooling and hydro cooling.
      • Taiwan Semiconductor Manufacturing Company (TSMC)'s delivery of SEAL02 initial tape-out wafers is anticipated for late September 2024. If the testing is successful, mass production is scheduled to commence by the end of 2024.
      • R&D of SEAL03, our third-generation chip, is ongoing.
    • HPC/AI:
      • AI cloud services powered by NVIDIA DGX SuperPOD with H100 system reached 100% utilization during the month of July. We will expand our AI cloud operation carefully to capture the opportunities while avoiding over investment.
      • Engaged with TLM Group, a leading consultant in HPC/AI datacenter engineering and construction, to conduct comprehensive research on Bitdeer's sites and advise on a broader datacenter strategy, including co-location, joint-ventures and other monetization options.
    • Mining datacenters
      • Tydal, Norway phase 1 and phase 2 site expansions remain on track to energize 40 MW in Q4 2024 and 135 MW by mid-2025.
      • Bhutan Jigmeling 500MW substation is expected to be completed by Q1 2025.
      • We commenced upgrading a portion of the Rockdale, Texas mining datacenter into hydro cooling, which we expect to be complete in Q4 2024. We believe such investment will not only benefit our Bitcoin mining business but also can be used for HPC/AI infrastructure in the future.
      • Ohio Edison 221MW project is in the design and long lead time equipment procurement stage.
      • Planning to deploy 3.4 EH/s of first generation Bitdeer SEALMINERs into Texas, U.S.A. and Tydal, Norway sites in Q4 2024, bringing total proprietary hashrate to 11.8 EH/s.

    Management Commentary

    "In July, we continued to advance our strategic initiatives in Bitcoin mining and HPC/AI," stated Linghui Kong, Chief Business Officer of Bitdeer. "Our first-generation SEALMINERs, energized last month, have been performing within our expectations and we remain on track to energize 3.4 EH/s by year end, bringing our total proprietary hashrate to 11.8 EH/s. For our second-generation chip, SEAL02, initial tape-out wafer delivery from TSMC remains on track for late September. Upon successful testing, we anticipate ramping mass production by the end of the year."

    Mr. Kong continued, "Building on our existing AI Cloud Services powered by NVIDIA GDX SuperPODs, in July, we engaged a leading consultant in HPC/AI datacenter engineering and construction, TLM Group, to conduct a comprehensive due diligence on all of our sites worldwide and to advise us on our global HPC/AI strategy. This assessment will determine the best monetization options of our massive 2.5 GW global power portfolio for HPC and AI applications."

    Production and Operations Summary

    MetricsJuly 2024June 2024July 2023
    Total hash rate under management1 (EH/s)21.222.320.6
    - Proprietary hash rate8.68.57.9
    • Self-mining7.57.33.8
    • Cloud Hash Rate1.11.21.6
    - Hosting12.613.812.7
    Mining machines under management212,000223,000215,000
    - Self-owned287,00086,00085,000
    - Hosted125,000137,000130,000
    Bitcoin mined (self-mining only)181179220



    1
    Total hash rate under management as of July 31, 2024 across the Company's three primary business lines: Self-mining, Cloud Hash Rate, and Hosting.

    • Self-mining refers to cryptocurrency mining for the Company's own account, which allows it to directly capture the high appreciation potential of cryptocurrency.
    • Cloud Hash Rate offers hash rate subscription plans and shares mining income with customers under certain arrangements. The Cloud Hash Rate stated above reflects the contracted hash rate with customers at month-end. However, throughout the month, the Cloud Hash Rate may transition to Self-mining hash rate if customers opt to not make their monthly electricity payments for various reasons.
    • Hosting encompasses a one-stop mining machine hosting solution including deployment, maintenance, and management services for efficient cryptocurrency mining.

    2 Self-owned mining machines are for the Company's self-mining business and Cloud Hash Rate business.

    Infrastructure Construction Update

    Rockdale, Texas - Hydro-cooling conversion

    Rockdale, Texas 100 MW hydro-cooling conversion key milestones achieved:

    • Demolition work started on August 1, 2024.
    • Cooling system design completed and waiting to begin construction.
    • Equipment procurement is ongoing.
    • Water Tower testing will begin in August 2024.
    • Energization timeline to occur in phases throughout Q4 2024.

    Tydal, Norway

    Tydal, Norway 175 MW site expansion is progressing well, with several key milestones achieved:

    • Buildings and groundwork have been completed, along with the construction of the transformer foundation and housing.
    • Orders for the procurement of the transformer and electrical equipment have been placed, with delivery and installation currently in progress. Additionally, the procurement and delivery of containers and hydro-cooling systems are underway, and the construction of drainage systems is ongoing.
    • Construction of the substation is ongoing and expected to be completed by the end of October 2024.
    • Energization timeline for the Tydal, Norway Expansion Phase 1 of 40 MW remains on track for Q4 2024.

    Massillon Ohio

    Ohio, U.S.A. 221 MW site is also making progress:

    • Substation conceptual design is complete and long lead-time electrical equipment for the substation has been ordered.
    • Engineering, Procurement, and Construction (EPC) contractor selected for the substation construction.
    • Civil work is ongoing, with the majority expected to be completed by the end of Q4 2024.
    • Building design is complete, and construction is anticipated to begin in Q1 2025.
    • Estimated energization timeline remains on track for mid-to-late 2025.

    Jigmeling, Bhutan

    Jigmeling, Bhutan 500MW site is progressing well, with the following key milestones achieved:

    • Civil work is nearly completed with an anticipated completion date by the end of September 2024. Construction of transformer and container foundations is in progress and will be completed in phases, with the last phase expected by the end of February 2025.
    • 132kv/140MW substation design completed, 220kv/360MW substation design in progress.
    • Construction of the substation is anticipated to be ready by the end of Q1 2025.
    • Procurement of transformers and electrical equipment has been completed, with delivery and installation to be completed in phases over the next two quarters.
    • Procurement and delivery of containers and hydro-cooling systems are in progress, with completion in phases by the end of Q1 2025.

    Power Infrastructure Summary

        
    Site / LocationCapacity (MW)StatusTiming3
    Energized capacity   
    Rockdale, Texas563OnlineCompleted
    Knoxville, Tennessee86OnlineCompleted
    Wenatchee, Washington13OnlineCompleted
    Molde, Norway84OnlineCompleted
    Tydal, Norway50OnlineCompleted
    Gedu, Bhutan100OnlineCompleted
    Total energized capacity895  
    Pipeline capacity   
    Tydal, Norway Phase 140In progressQ4 2024
    Tydal, Norway Phase 2135In progressMid 2025
    Massillon, Ohio221In progressMid-to-late 2025
    Clarington, Ohio Phase 1266In progressQ3 2025
    Clarington, Ohio Phase 2304Pending approvalEstimate 2026
    Jigmeling, Bhutan500In progressMid-Late 2025
    Rockdale, Texas179In planningEstimate 2026
    Total pipeline capacity1,645  
    Total global contracted capacity2,540  



    3
    Indicative timing. All timing references are to calendar quarters and years.

    Upcoming Conferences and Events

    • Aug 19 – 20: Rosenblatt 4th Annual Technology Summit: The Age of AI (Virtual)
    • Sep 9 – 11: H.C. Wainwright 26th Annual Global Investment Conference in New York City
    • Nov 14: Cantor Crypto, Digital Assets & AI Infrastructure Conference in Miami

    About Bitdeer Technologies Group

    Bitdeer is a world-leading technology company for blockchain and high-performance computing. Bitdeer is committed to providing comprehensive computing solutions for its customers. The Company handles complex processes involved in computing such as equipment procurement, transport logistics, datacenter design and construction, equipment management, and daily operations. The Company also offers advanced cloud capabilities to customers with high demand for artificial intelligence. Headquartered in Singapore, Bitdeer has deployed datacenters in the United States, Norway, and Bhutan. To learn more, visit https://ir.bitdeer.com/ or follow Bitdeer on X @ BitdeerOfficial and LinkedIn @ Bitdeer Group.

    Investors and others should note that Bitdeer may announce material information using its website and/or on its accounts on social media platforms, including X, formerly known as Twitter, Facebook, and LinkedIn. Therefore, Bitdeer encourages investors and others to review the information it posts on the social media and other communication channels listed on its website.

    Forward-Looking Statements

    Statements in this press release about future expectations, plans, and prospects, as well as any other statements regarding matters that are not historical facts, may constitute "forward-looking statements" within the meaning of The Private Securities Litigation Reform Act of 1995. The words "anticipate," "look forward to," "believe," "continue," "could," "estimate," "expect," "intend," "may," "plan," "potential," "predict," "project," "should," "target," "will," "would" and similar expressions are intended to identify forward-looking statements, although not all forward-looking statements contain these identifying words. Actual results may differ materially from those indicated by such forward-looking statements as a result of various important factors, including factors discussed in the section entitled "Risk Factors" in Bitdeer's annual report on Form 20-F, as well as discussions of potential risks, uncertainties, and other important factors in Bitdeer's subsequent filings with the U.S. Securities and Exchange Commission. Any forward-looking statements contained in this press release speak only as of the date hereof. Bitdeer specifically disclaims any obligation to update any forward-looking statement, whether due to new information, future events, or otherwise. Readers should not rely upon the information on this page as current or accurate after its publication date.

    For investor and media inquiries, please contact:

    Investor Relations

    Orange Group

    Yujia Zhai

    [email protected]

    Public Relations

    Wachsman

    Bee Shin

    [email protected]



    Primary Logo

    Get the next $BTDR alert in real time by email

    Crush Q1 2026 with the Best AI Superconnector

    Stay ahead of the competition with Standout.work - your AI-powered talent-to-startup matching platform.

    AI-Powered Inbox
    Context-aware email replies
    Strategic Decision Support
    Get Started with Standout.work

    Recent Analyst Ratings for
    $BTDR

    DatePrice TargetRatingAnalyst
    1/27/2026$14.00Outperform → Mkt Perform
    Keefe Bruyette
    4/21/2025$15.00 → $13.00Buy
    Needham
    3/19/2025$18.00 → $15.00Buy
    Needham
    1/27/2025$26.50Outperform
    Keefe Bruyette
    10/9/2024$13.00Outperform
    Northland Capital
    10/8/2024$14.00Buy
    Alliance Global Partners
    8/14/2024$9.00Buy
    Rosenblatt
    6/11/2024$13.00Overweight
    Cantor Fitzgerald
    More analyst ratings

    $BTDR
    Press Releases

    Fastest customizable press release news feed in the world

    View All

    Bitdeer Reports Unaudited Financial Results for the Fourth Quarter and Full Year of 2025

    SINGAPORE, Feb. 12, 2026 (GLOBE NEWSWIRE) -- Bitdeer Technologies Group (NASDAQ:BTDR) ("Bitdeer" or the "Company"), a world-leading technology company for Bitcoin mining and AI infrastructure, today released its unaudited financial results for the fourth quarter ended December 31, 2025. Q4 2025 Financial HighlightsAll amounts compared to Q4'24 unless otherwise noted Total revenue was US$224.8 million vs. US$69.0 million.Cost of revenue was US$214.3 million vs. US$63.9 million.Gross profit was US$10.6 million vs. US$5.1 million.Net profit was US$70.5 million vs. net loss of US$531.9 million.Adjusted EBITDA1 was positive US$31.2 million, vs. negative US$4.32 million.Cash and cash equivalen

    2/12/26 7:00:00 AM ET
    $BTDR
    Finance: Consumer Services
    Finance

    Bitdeer Announces January 2026 Production and Operations Update

          Monthly Highlights       Increased self-mining hashrate to 63.2 EH/s on continued deployment of SEALMINERs      Bitcoin production increased 430% year over year to 668 Bitcoin      Launch of NVIDIA GB200 NVL72 infrastructure in Malaysia      First design of Litecoin chip taped out and initial testing surpassed expectations        SINGAPORE, Feb. 10, 2026 (GLOBE NEWSWIRE) -- Bitdeer Technologies Group (NASDAQ:BTDR) ("Bitdeer" or the "Company"), a world-leading technology company for Bitcoin mining and AI infrastructure, today announced its unaudited mining and operations updates for January 2026. Operational Update Self-mining:  Mined 668 Bitcoins, an increase of approxi

    2/10/26 8:13:13 AM ET
    $BTDR
    Finance: Consumer Services
    Finance

    Bitdeer Announces Fourth Quarter 2026 Earnings Conference Call For February 12th 2026

    SINGAPORE, Feb. 04, 2026 (GLOBE NEWSWIRE) -- Bitdeer Technologies Group (NASDAQ:BTDR) ("Bitdeer" or the "Company"), a world-leading technology company for Bitcoin mining and AI infrastructure, today announced that it has scheduled its fourth quarter 2025 earnings conference call and webcast for Thursday, February 12, 2026 at 8:00 AM EST. During the call, Bitdeer management will discuss the unaudited financial and operational results for the quarter ended December 31, 2025, followed by a question-and-answer session. Bitdeer will release the fourth quarter results before the call at approximately 7:00 AM EST on February 12, 2026. A copy of the earnings release will be available on the Com

    2/4/26 5:12:48 PM ET
    $BTDR
    Finance: Consumer Services
    Finance

    $BTDR
    SEC Filings

    View All

    SEC Form 6-K filed by Bitdeer Technologies Group

    6-K - Bitdeer Technologies Group (0001899123) (Filer)

    2/12/26 9:17:41 AM ET
    $BTDR
    Finance: Consumer Services
    Finance

    SEC Form 6-K filed by Bitdeer Technologies Group

    6-K - Bitdeer Technologies Group (0001899123) (Filer)

    2/10/26 8:29:52 AM ET
    $BTDR
    Finance: Consumer Services
    Finance

    SEC Form 6-K filed by Bitdeer Technologies Group

    6-K - Bitdeer Technologies Group (0001899123) (Filer)

    2/5/26 4:01:28 PM ET
    $BTDR
    Finance: Consumer Services
    Finance

    $BTDR
    Analyst Ratings

    Analyst ratings in real time. Analyst ratings have a very high impact on the underlying stock. See them live in this feed.

    View All

    Bitdeer Technologies downgraded by Keefe Bruyette with a new price target

    Keefe Bruyette downgraded Bitdeer Technologies from Outperform to Mkt Perform and set a new price target of $14.00

    1/27/26 8:40:13 AM ET
    $BTDR
    Finance: Consumer Services
    Finance

    Needham reiterated coverage on Bitdeer Technologies with a new price target

    Needham reiterated coverage of Bitdeer Technologies with a rating of Buy and set a new price target of $13.00 from $15.00 previously

    4/21/25 7:41:36 AM ET
    $BTDR
    Finance: Consumer Services
    Finance

    Needham reiterated coverage on Bitdeer Technologies with a new price target

    Needham reiterated coverage of Bitdeer Technologies with a rating of Buy and set a new price target of $15.00 from $18.00 previously

    3/19/25 7:42:43 AM ET
    $BTDR
    Finance: Consumer Services
    Finance

    $BTDR
    Financials

    Live finance-specific insights

    View All

    Bitdeer Announces Fourth Quarter 2026 Earnings Conference Call For February 12th 2026

    SINGAPORE, Feb. 04, 2026 (GLOBE NEWSWIRE) -- Bitdeer Technologies Group (NASDAQ:BTDR) ("Bitdeer" or the "Company"), a world-leading technology company for Bitcoin mining and AI infrastructure, today announced that it has scheduled its fourth quarter 2025 earnings conference call and webcast for Thursday, February 12, 2026 at 8:00 AM EST. During the call, Bitdeer management will discuss the unaudited financial and operational results for the quarter ended December 31, 2025, followed by a question-and-answer session. Bitdeer will release the fourth quarter results before the call at approximately 7:00 AM EST on February 12, 2026. A copy of the earnings release will be available on the Com

    2/4/26 5:12:48 PM ET
    $BTDR
    Finance: Consumer Services
    Finance

    Bitdeer Announces Third Quarter 2025 Earnings Conference Call for November 10, 2025

    SINGAPORE, Oct. 30, 2025 (GLOBE NEWSWIRE) -- Bitdeer Technologies Group (NASDAQ:BTDR) ("Bitdeer" or the "Company"), a world-leading technology company for Bitcoin mining and AI cloud, today announced that it has scheduled its third quarter 2025 earnings conference call and webcast for Monday, November 10, 2025 at 8:00 AM EST. During the call, Bitdeer management will discuss the unaudited financial and operational results for the quarter ended September 30, 2025, followed by a question-and-answer session. Bitdeer will release the third quarter results before the call at approximately 7:00 AM EST on November 10, 2025. A copy of the earnings release will be available on Bitdeer's Investor Re

    10/30/25 7:00:00 AM ET
    $BTDR
    Finance: Consumer Services
    Finance

    Bitdeer Announces Second Quarter 2025 Earnings Conference Call for August 18, 2025

    SINGAPORE, Aug. 04, 2025 (GLOBE NEWSWIRE) -- Bitdeer Technologies Group (NASDAQ:BTDR) ("Bitdeer" or the "Company"), a world-leading technology company for Bitcoin mining, today announced that it has scheduled its second quarter 2025 earnings conference call and webcast for Monday, August 18, 2025 at 8:00 AM EST. During the call, Bitdeer management will discuss the unaudited financial and operational results for the quarter ended June 30, 2025, followed by a question-and-answer session. Bitdeer will release the second quarter results before the call at approximately 7:00 AM EST on August 18, 2025. A copy of the earnings release will be available on the Company's Investor Relations website

    8/4/25 7:00:00 AM ET
    $BTDR
    Finance: Consumer Services
    Finance

    $BTDR
    Large Ownership Changes

    This live feed shows all institutional transactions in real time.

    View All

    Amendment: SEC Form SC 13D/A filed by Bitdeer Technologies Group

    SC 13D/A - Bitdeer Technologies Group (0001899123) (Subject)

    11/7/24 6:39:53 PM ET
    $BTDR
    Finance: Consumer Services
    Finance

    Amendment: SEC Form SC 13G/A filed by Bitdeer Technologies Group

    SC 13G/A - Bitdeer Technologies Group (0001899123) (Subject)

    10/25/24 6:02:28 AM ET
    $BTDR
    Finance: Consumer Services
    Finance

    Amendment: SEC Form SC 13D/A filed by Bitdeer Technologies Group

    SC 13D/A - Bitdeer Technologies Group (0001899123) (Subject)

    9/13/24 5:14:28 PM ET
    $BTDR
    Finance: Consumer Services
    Finance

    $BTDR
    Leadership Updates

    Live Leadership Updates

    View All

    Bitdeer Announces January 2024 Operations Updates

    SINGAPORE, Feb. 06, 2024 (GLOBE NEWSWIRE) -- Bitdeer Technologies Group (NASDAQ:BTDR) ("Bitdeer" or the "Company"), a world-leading technology company for blockchain and high-performance computing, today announced its unaudited mining and operations updates for January 2024. Linghui Kong, Chief Executive Officer of Bitdeer, commented, "During January, we made important progress towards building for the future while delivering solid results in our core business. We mined 330 Bitcoins in total in January, an increase of 123.0% from the same period last year. At the same time, our month-over-month production declined as a result of lower average transaction fees and the curtailments at our G

    2/6/24 8:30:00 AM ET
    $BTDR
    Finance: Consumer Services
    Finance

    Bitdeer Announces Appointment of Jihan Wu as New Chief Executive Officer as Linghui Kong Transitions to Chief Business Officer

    SINGAPORE, Jan. 29, 2024 (GLOBE NEWSWIRE) -- Bitdeer Technologies Group (NASDAQ:BTDR) ("Bitdeer" or the "Company"), a world-leading technology company for blockchain and high-performance computing, today announced the appointment of Mr. Jihan Wu, the Company's Founder and Chairman of its Board of Directors (the "Board"), as Chief Executive Officer of the Company, effective on March 1, 2024. In addition to his new role as Chief Executive Officer, Mr. Jihan Wu will remain as Chairman of the Company's Board. The Company's current Chief Executive Officer Mr. Linghui Kong will transition to the role of Chief Business Officer and will continue to serve as a member of the Company's Board, also ef

    1/29/24 8:30:00 AM ET
    $BTDR
    Finance: Consumer Services
    Finance

    Bitdeer's (NASDAQ: BTDR) Eco-Friendly Bet On Bhutan: How Balancing Growth With Environmental Impact Is Paying Off For The Company

    SINGAPORE / ACCESSWIRE / January 23, 2024 / Singapore-based Bitdeer Technologies Group (NASDAQ:BTDR) reports having the largest global footprint of any publicly traded Bitcoin miner, but it is still making strides in its expansion. As just one facet of its growth, the company reported a threefold increase in Bitcoin mining activities in September 2023, a surge that was largely attributed to its newly operational mining data center in Gedu, Bhutan. This data center, while seen as an unconventional choice, has proven to be a substantial part of Bitdeer's success in expanding its mining operations. Surge in Mining ActivitiesBitdeer's mining ventures have seen growth over the past years, with t

    1/23/24 9:00:00 AM ET
    $BTDR
    Finance: Consumer Services
    Finance