• Live Feeds
    • Press Releases
    • Insider Trading
    • FDA Approvals
    • Analyst Ratings
    • Insider Trading
    • SEC filings
    • Market insights
  • Analyst Ratings
  • Alerts
  • Subscriptions
  • Settings
  • RSS Feeds
Quantisnow Logo
  • Live Feeds
    • Press Releases
    • Insider Trading
    • FDA Approvals
    • Analyst Ratings
    • Insider Trading
    • SEC filings
    • Market insights
  • Analyst Ratings
  • Alerts
  • Subscriptions
  • Settings
  • RSS Feeds
PublishGo to App
    Quantisnow Logo

    © 2026 quantisnow.com
    Democratizing insights since 2022

    Services
    Live news feedsRSS FeedsAlertsPublish with Us
    Company
    AboutQuantisnow PlusContactJobsAI superconnector for talent & startupsNEWLLM Arena
    Legal
    Terms of usePrivacy policyCookie policy

    Caledonia Mining Corporation Plc: Encouraging Results From Deep Level Drilling at Blanket Mine

    4/7/26 2:00:00 AM ET
    $CMCL
    Precious Metals
    Basic Materials
    Get the next $CMCL alert in real time by email

    Better than expected grades and widths from deep level drilling at Blanket Mine supporting increased confidence in overall mineral resource

    (NYSE:CMCL)(AIM:CMCL)(VFEX:CMCL)

    SAINT HELIER, JE / ACCESS Newswire / April 7, 2026 / Caledonia Mining Corporation Plc ("Caledonia" or "the Company") is pleased to report further encouraging results from the deep level drilling programme at Blanket Mine, with the campaign proving the continuation of the main orebodies at depth.

    The drilling is intended to evaluate the continuity of the mineralised zones on the Blanket, Eroica and Lima ore bodies for the purposes of increasing confidence in the existing mineral resources and growing the mineral resource estimate beyond 34 level, which is at 1,110 metres below surface. These results follow the previously announced deep drilling results published on June 23, 2025.

    Highlights

    • 10,311.9 metres of deep level drilling completed between March and December 2025.

    • Blanket and Eroica orebodies returned grades and widths consistent with, or better than, expectations.

    • High grade intersections at depth, including multiple wide zones within the newly identified Blanket 7 ("BLK7") orebody.

    • Lima orebody confirmed to 34 level, supporting potential depth extensions.

    • Results expected to increase mineral resource confidence and support future life of mine planning.

    Highlights of the drill results are summarised in the table below.

    Hole Identifier

    Orebody 1 Name

    Orebody Intersection

    Core Length
    (m)

    True width (m)

    Grade
    (g/t)

    Orebody Intersection depth from surface (m)

    End of Hole Depth
    (m)

    From (m)

    To (m)

    ARS1110EX2401

    BLK7*

    6.4

    19.6

    13.20

    13.02

    9.24

    1045.3

    158.5

    * including

    6.4

    11.2

    4.80

    4.73

    17.15

    ARS1110EX2402

    BLK7*

    7.48

    48.8

    41.32

    40.42

    3.14

    1075.0

    158.2

    * including

    7.48

    14

    6.52

    6.38

    9.90

    * including

    17

    20

    3.00

    2.93

    6.58

    ARS1110EX2403

    BLK7*

    10.3

    58.3

    48.00

    46.28

    4.25

    1082.0

    158.2

    * including

    10.3

    11.5

    1.20

    1.16

    53.39

    * including

    19.9

    25.9

    6.00

    5.78

    7.45

    * including

    54.7

    58.3

    3.60

    3.47

    11.92

    ARS1110EX2404

    BLK7*

    7.7

    28.4

    20.70

    20.50

    3.98

    1054.1

    155.4

    * including

    7.7

    10.7

    3.00

    2.97

    6.15

    * including

    14.3

    17.3

    3.00

    2.97

    5.21

    ARS1110EX2503

    BQRHWN

    76.7

    80.8

    4.10

    3.65

    7.74

    1099.3

    377.2

    BLK1110EX2412

    BQR

    56.9

    64.7

    7.80

    7.17

    7.15

    1083.0

    242.2

    ERC750EX2404

    ERCN_HW*

    383.5

    396.1

    12.60

    10.80

    6.54

    994.3

    398.3

    * including

    385.3

    387.1

    1.80

    1.54

    8.62

    * including

    391.3

    393.1

    1.80

    1.54

    14.20

    LIM750EX2509

    LIMM

    70.1

    72.3

    2.20

    1.98

    15.33

    708.5

    386.2

    1 ERCN_HW - Eroica North Hanging Wall, BQR - Blanket Quartz Reef, BQRHWN - Blanket Quartz Reef Hanging Wall North, LIMM - Lima Main, BLK7 - Blanket 7.

    * including refers to a subset of the wider orebody intersection which may return a higher grade if mined to that width

    The complete long hole drilling results for March 2025 to end of December 2025 are provided in Appendix 1.

    Mark Learmonth, Caledonia's Chief Executive Officer, commented:

    "The latest results from our deep drilling programme reinforce the geological strength of Blanket Mine and demonstrate the continuity of mineralisation at depth across multiple orebodies. The consistency of grades and widths we are seeing, together with confirmation of the Lima orebody to 34 level, provides growing confidence in the scale and quality of the mineral resource below the current lowest levels of the mine.

    "These outcomes support our longer term planning efforts and highlight the value of the investments we have made, as we continue to improve mineral resource confidence and build a stronger foundation for the future of the mine and value creation for the business."

    Commentary

    The deep drilling at Blanket Mine continues to prove the continuation of the main orebodies at depths equivalent to the lowest levels of the mine and beyond. The density of drilling intersections is likely to upgrade inferred mineral resources to the indicated mineral resource category or better, providing a solid resource base for life of mine planning.

    As reported on June 23, 2025, a new orebody was intersected on the multiple horizons of the Blanket orebody. This orebody has been termed Blanket 7 ("BLK7") and the intersections reported here highlight the excellent grades and widths that Blanket Mine can deliver. Drilling into virgin areas of the mine, where the shear zone is developed but untested with drilling, remains an important focus for the on-mine geology team. Of note, in the drillhole location image, certain drillholes have intersected the BQR at a depth below the current orebody models which mark the limit of measured, indicated or inferred mineral resources currently declared for Blanket Mine.

    Deep drilling at Lima has shown the Lima orebodies extend to at least the 34-level horizon. The Lima orebody comprises up to 6 individual mineralised zones, not always developed together, and further infill drilling will delineate the spatial orientations of these orebodies.

    The deep drilling results are expected to be incorporated into an updated mineral resource and mineral reserve statement during 2026.

    Appendix 1

    Hole Identifier

    Orebody Name

    Orebody Intersection

    Core Length
    (m)

    True width
    (m)

    Grade
    (g/t)

    Orebody Intersection depth from surface (m)

    End of Hole Depth
    (m)

    From (m)

    To (m)

    ARS1110EX2401

    BLK7

    6.4

    19.6

    13.2

    13.0

    9.24

    1045

    159

    ARS1110EX2401

    BLK1HW

    46.0

    55.0

    9.0

    8.9

    6.28

    1080

    159

    ARS1110EX2401

    BQR

    129.4

    130.6

    1.2

    1.2

    18.53

    1155

    159

    ARS1110EX2401

    BLK1HW

    139.0

    140.2

    1.2

    1.2

    2.04

    1164

    159

    ARS1110EX2402

    BLK7

    7.5

    48.8

    41.3

    40.4

    3.14

    1075

    158

    ARS1110EX2402

    BLK1HW

    58.4

    70.4

    12.0

    11.7

    3.90

    1095

    158

    ARS1110EX2402

    BQR

    78.8

    83.4

    4.6

    4.5

    2.29

    1108

    158

    ARS1110EX2402

    BLK1HW

    111.8

    119.5

    7.7

    7.5

    10.40

    1143

    158

    ARS1110EX2403

    BLK7

    10.3

    58.3

    48.0

    46.3

    4.25

    1082

    158

    ARS1110EX2403

    BLK1HW

    79.6

    80.2

    0.7

    0.6

    31.53

    1103

    162

    ARS1110EX2403

    BQR

    114.7

    115.3

    0.6

    0.6

    11.07

    1137

    162

    ARS1110EX2403

    BLK1FW

    130.9

    131.5

    0.6

    0.6

    15.53

    1152

    162

    ARS1110EX2403

    BLK1FW

    138.7

    147.1

    8.4

    6.8

    3.99

    1167

    162

    ARS1110EX2403

    BLK1HW

    156.1

    157.9

    1.8

    1.5

    3.91

    1178

    162

    ARS1110EX2404

    BLK7

    7.7

    28.4

    20.7

    20.5

    3.98

    1054

    155

    ARS1110EX2404

    BLK1HW

    50.4

    58.2

    7.8

    7.7

    3.20

    1079

    155

    ARS1110EX2404

    BQR

    93.6

    96.6

    3.0

    3.0

    3.06

    1122

    155

    ARS1110EX2404

    BLK1FW

    128.4

    133.2

    4.8

    4.8

    3.09

    1158

    155

    ARS1110EX2502

    BLK7

    70.9

    72.7

    1.8

    1.7

    6.44

    1095

    347

    ARS1110EX2502

    BQRHWN

    76.6

    80.2

    3.6

    3.4

    2.21

    1102

    347

    ARS1110EX2502

    BLK1HWN

    91.7

    98.9

    7.2

    6.7

    4.29

    1120

    347

    ARS1110EX2502

    ARSEWL

    199.7

    201.5

    1.8

    1.6

    1.84

    1217

    347

    ARS1110EX2503

    BLK7

    63.2

    69.5

    6.3

    5.7

    3.39

    1085

    377

    ARS1110EX2503

    BQRHWN

    76.7

    80.8

    4.1

    3.7

    7.74

    1099

    377

    ARS1110EX2503

    BLK1HWN

    154.5

    156.9

    2.4

    2.0

    1.74

    1165

    377

    ARS1110EX2503

    ARSEWL

    222.7

    223.9

    1.2

    0.9

    4.45

    1219

    377

    BLK1110EX2405

    BQR

    101.9

    102.5

    0.6

    0.6

    2.04

    1128

    254

    BLK1110EX2406

    BLK7

    98.9

    100.1

    1.2

    1.1

    4.56

    1118

    281

    BLK1110EX2406

    BQRHWN

    105.5

    107.3

    1.8

    1.7

    3.58

    1126

    281

    BLK1110EX2406

    BLK1HWN

    210.5

    212.9

    2.4

    2.2

    1.85

    1224

    281

    BLK1110EX2406

    BQRHWN

    229.7

    230.9

    1.2

    1.7

    1.94

    1240

    281

    BLK1110EX2407

    BLK7

    101.4

    104.4

    3.0

    2.2

    2.25

    1115

    257

    BLK1110EX2407

    BQRHWN

    109.2

    113.4

    4.2

    3.6

    1.86

    1122

    257

    BLK1110EX2408

    BLK1HWN

    118.6

    157.0

    38.4

    36.1

    5.00

    1182

    293

    BLK1110EX2408

    BQRHWN

    239.2

    272.2

    33.0

    30.8

    2.48

    1286

    293

    BLK1110EX2409

    BLK7

    91.8

    95.4

    3.6

    3.1

    4.07

    1118

    287

    BLK1110EX2409

    BQRHWN

    236.2

    236.8

    0.6

    0.5

    2.07

    1240

    287

    BLK1110EX2409

    BLK1HWN

    259.6

    274.6

    15.0

    14.1

    2.31

    1286

    287

    BLK1110EX2410

    BQR

    67.5

    81.7

    14.2

    11.2

    6.25

    1096

    233

    BLK1110EX2411

    BQR

    60.5

    73.1

    12.6

    11.3

    2.46

    1090

    239

    BLK1110EX2412

    BQR

    56.9

    64.7

    7.8

    7.2

    7.15

    1083

    242

    BLK1110EX2413

    BLK7

    69.8

    74.3

    4.5

    3.6

    6.35

    1088

    230

    BLK1110EX2413

    BQRHWN

    202.6

    203.2

    0.6

    0.4

    3.88

    1185

    230

    BLK1110EX2413

    BLK1HWN

    228.4

    229.0

    0.6

    0.4

    4.42

    1204

    230

    BLK1110EX2414

    BQR

    84.0

    91.2

    7.2

    6.9

    7.17

    1108

    254

    BLK1110EX2415

    BLK7

    86.9

    87.5

    0.6

    0.5

    10.80

    1104

    254

    BLK1110EX2415

    BQRHWN

    177.7

    179.3

    1.6

    1.3

    4.39

    1182

    254

    BLK1110EX2416

    BLK7

    82.6

    83.8

    1.2

    1.0

    2.62

    1099

    239

    BLK1110EX2416

    BQRHWN

    166.1

    166.7

    0.6

    0.5

    14.67

    1167

    239

    BLK1110EX2416

    BLK1HWN

    170.3

    172.1

    1.8

    1.6

    3.10

    1171

    239

    BLK1110EX2416

    BLK1HWN

    220.5

    221.7

    1.2

    0.9

    5.45

    1210

    239

    BLK1110EX2417

    BLK7

    83.6

    84.8

    1.2

    1.0

    2.52

    1100

    247

    BLK1110EX2417

    BQRHWN

    96.8

    101.0

    4.2

    3.6

    2.07

    1113

    247

    BLK1110EX2417

    BLK1HWN

    194.3

    195.5

    1.2

    1.0

    4.30

    1192

    247

    BLK1110EX2417

    BLK1HWN

    204.5

    205.7

    1.2

    1.0

    3.03

    1200

    247

    ERC750EX2404

    ERCN_HW

    383.5

    396.1

    12.6

    10.8

    6.54

    994

    398

    ERC750EX2405

    ERCN_HW

    441.2

    441.8

    0.6

    0.5

    1.63

    1059

    454

    ERC750EX2407

    No intersection

    470

    ERC750EX2409

    ERCN_HW

    468.0

    472.1

    4.1

    3.6

    1.62

    1085

    482

    ERC750EX2409

    ERCNFW

    479.9

    482.8

    2.9

    2.5

    2.65

    1097

    482

    ERC750EX2411

    ERCN_HW

    No intersection

    96

    ERC750EX2501

    ERCN_HW

    No intersection

    458

    ERC750EX2502

    ERCN_HW

    399.1

    399.7

    0.6

    0.5

    2.02

    1008

    443

    ERC750EX2502

    ERCN_HW1

    424.8

    426.6

    1.8

    1.5

    3.67

    1021

    443

    ERC750EX2502

    ERCNFW

    432.8

    433.4

    0.6

    0.5

    2.03

    1036

    443

    ERC750EX2502

    ERCNFW1

    436.6

    437.2

    0.6

    0.5

    1.93

    1038

    443

    ERC750EX2503

    ERCN_HW

    No intersection

    330

    LIM750EX2401

    LIMM

    84.5

    88.1

    3.6

    3.3

    1.24

    716

    590

    LIM750EX2401

    LIME

    437.8

    438.3

    0.5

    0.4

    2.59

    893

    590

    LIM750EX2502

    LIMM

    107.0

    112.6

    5.6

    5.2

    3.72

    742

    605

    LIM750EX2502

    LIMI

    117.4

    122.2

    4.8

    4.4

    4.62

    753

    605

    LIM750EX2502

    LIME

    404.3

    406.1

    1.8

    1.5

    3.96

    1008

    605

    LIM750EX2503

    LIMI

    120.6

    129.9

    9.3

    6.8

    3.03

    741

    231

    LIM750EX2504

    LIMHW

    101.7

    107.1

    5.4

    4.9

    2.05

    743

    461

    LIM750EX2504

    LIMM

    112.9

    128.3

    15.4

    14.1

    2.47

    655

    461

    LIM750EX2504

    LIMI

    151.5

    152.1

    0.6

    0.5

    1.74

    784

    461

    LIM750EX2504

    LIME

    218.9

    219.5

    0.6

    0.5

    4.44

    844

    461

    LIM750EX2505

    LIMM

    166.7

    171.2

    4.5

    4.5

    2.70

    814

    462

    LIM750EX2505

    LIMI

    210.0

    211.8

    1.8

    1.8

    1.91

    855

    462

    LIM750EX2506

    LIMI

    140.7

    143.2

    2.5

    2.1

    2.22

    765

    254

    LIM750EX2507

    LIMHW

    75.9

    77.1

    1.2

    1.1

    3.71

    716

    440

    LIM750EX2507

    LIMM

    88.6

    94.0

    5.4

    5.0

    3.17

    731

    440

    LIM750EX2508

    LIMM

    80.1

    80.7

    0.6

    0.6

    7.28

    721

    440

    LIM750EX2508

    LIMI

    154.4

    154.7

    0.3

    0.3

    2.49

    792

    440

    LIM750EX2509

    LIMM

    70.1

    72.3

    2.2

    2.0

    15.33

    709

    386

    LIM750EX2510

    LIMI

    279.8

    285.8

    6.0

    4.9

    1.84

    892

    287

    LIM750EX2511

    LIMHW

    66.6

    67.2

    0.6

    0.5

    2.79

    704

    380

    LIM750EX2511

    LIMM

    72.3

    72.9

    0.6

    0.5

    2.86

    709

    380

    LIM750EX2511

    LIMI

    143.5

    144.0

    0.5

    0.4

    1.77

    771

    380

    LIM750EX2511

    LIME

    153.5

    155.3

    1.8

    1.5

    3.60

    778

    380

    LIM750EX2512

    LIMHW

    78.4

    79.0

    0.6

    0.6

    1.74

    720

    381

    LIM750EX2512

    LIMM

    110.5

    111.1

    0.6

    0.6

    1.66

    750

    381

    LIM750EX2514

    LIMHW

    76.5

    79.7

    3.2

    3.2

    3.27

    723

    344

    * ERCN_HW - Eroica North Hanging Wall, ERCN_HW1 - Eroica North Hanging Wall1, ERCNFW - Eroica North Foot Wall, ERCNFW1 - Eroica North Foot Wall 1, BQR - Blanket Quartz Reef, BQRHWN - Blanket Quartz Reef Hanging Wall North, BLK1HWN - Blanket 1 Hanging wall North, BLK1HW - Blanket 1 Hanging wall, BLK1FW - Blanket 1 Footwall, ARSEWL - AR South East - West Limb, LIMM - Lima Main, LIME - Lima East, LIMI - Lima Intermediate, LIMHW- Lima Hanging Wall, BLK7 - Blanket 7.

    Table 2

    Underground exploration drill hole; azimuth, dip, drilled length, and collar location (UTM NAD83)

    Hole Identifier

    Azimuth (°)

    Dip (°)

    Drilled Length (m)

    UTM Easting (m)

    UTM Northing (m)

    UTM Elevation (m)

    ARS1110EX2401

    99

    81

    158.5

    697764

    7693019

    23

    ARS1110EX2402

    114

    79

    158.2

    697764

    7693018

    23

    ARS1110EX2403

    126

    75

    163.9

    697764

    7693017

    21

    ARS1110EX2404

    122

    82

    155.4

    697764

    7693018

    22

    ARS1110EX2502

    352

    73

    347.3

    697679

    7693028

    24

    ARS1110EX2503

    354

    66

    377.2

    697679

    7693028

    24

    BLK1110EX2405

    101

    81

    254.3

    697681

    7693028

    24

    BLK1110EX2406

    119

    70

    281.3

    697681

    7693027

    24

    BLK1110EX2407

    139

    61

    257.4

    697681

    7693026

    24

    BLK1110EX2408

    85

    76

    293.2

    697682

    7693027

    24

    BLK1110EX2409

    84

    76

    287.4

    697681

    7693027

    24

    BLK1110EX2410

    50

    71

    233.3

    697683

    7693030

    16

    BLK1110EX2411

    37

    67

    239.3

    697681

    7693029

    24

    BLK1110EX2412

    50

    64

    242.8

    697681

    7693029

    24

    BLK1110EX2413

    48

    59

    230.2

    697682

    7693028

    24

    BLK1110EX2414

    70

    76

    254.4

    697684

    7693029

    13

    BLK1110EX2415

    79

    64

    254.3

    697686

    7693029

    14

    BLK1110EX2416

    88

    63

    239.3

    697682

    7693027

    24

    BLK1110EX2417

    103

    64

    247.3

    697682

    7693027

    24

    ERC750EX2404

    84

    81

    439.5

    697077

    7694527

    388

    ERC750EX2405

    108

    78

    454.4

    697077

    7694526

    388

    ERC750EX2407

    48

    84

    470.3

    697077

    7694526

    388

    ERC750EX2409

    94

    80

    482.3

    697079

    7694527

    375

    ERC750EX2411

    33

    84

    326.3

    697077

    7694527

    388

    ERC750EX2502

    94

    75

    443.3

    697077

    7694527

    388

    ERC750EX2503

    73

    85

    330.3

    697077

    7694526

    388

    LIM750EX2502

    336

    67

    605.3

    697294

    7694876

    387

    LIM750EX2503

    351

    50

    231.1

    697295

    7694877

    387

    LIM750EX2504

    350

    70

    461.3

    697295

    7694876

    387

    LIM750EX2505

    343

    86

    461.5

    697295

    7694876

    386

    LIM750EX2506

    341

    60

    440.2

    697294

    7694877

    387

    LIM750EX2507

    350

    70

    440.2

    697295

    7694876

    387

    LIM750EX2508

    50

    76

    440.3

    697298

    7694874

    387

    LIM750EX2509

    51

    65

    386.2

    697298

    7694875

    387

    LIM750EX2510

    110

    66

    287.3

    697302

    7694872

    375

    LIM750EX2511

    114

    66

    380.1

    697209

    7694824

    387

    LIM750EX2512

    112

    75

    381.3

    697297

    7694874

    386

    LIM750EX2514

    35

    84

    344.4

    697297

    7694875

    386

    Blanket Deep Drilling - Locality of Deep Drilling

    Blanket Orebodies - Drilling from 1,110 (34 level) metres below surface

    Eroica and Lima Orebody - Drilling from 750 metres (22 level) below surface

    Enquiries:

    Caledonia Mining Corporation Plc
    Mark Learmonth
    Camilla Horsfall


    Tel: +44 1534 679 800
    Tel: +44 7817 841 793

    Cavendish Capital Markets Limited (Nomad and Broker)
    Adrian Hadden
    Pearl Kellie

    Tel: +44 207 397 1965
    Tel: +44 131 220 9775

    Camarco, Financial PR (UK)
    Gordon Poole
    Elfie Kent


    Tel: +44 20 3757 4980

    Curate Public Relations (Zimbabwe)
    Debra Tatenda


    Tel: +263 77802131

    IH Securities (Private) Limited (VFEX Sponsor - Zimbabwe)
    Lloyd Mlotshwa


    Tel: +263 (242) 745 119/33/39

    Qualified Person

    Craig James Harvey, MGSSA, MAIG, Caledonia Vice President, Technical Services, has reviewed and approved the scientific and technical information contained in this news release. Craig James Harvey is a "Qualified Person" as defined by each of (i) the Canadian Securities Administrators' National Instrument 43-101 - Standards of Disclosure for Mineral Projects and (ii) sub-part 1300 of Regulation S-K of the U.S. Securities Act.

    Quality Assurance and Quality Control

    Access to Blanket Mine premises is controlled by security personnel on the first gate. On the second gate, in addition to security, entry is gained by biometric entry system. Diamond drilling is performed by qualified diamond drillers under the supervision of a diamond drill foreperson. Drilled core is routinely brought to surface to the core shed where it is received and laid down. A qualified geological technician performs geotechnical logging while a qualified geologist logs the core and marks the portions for splitting. The core is split in half along the core long axis using an electric core cutter equipped with a diamond saw cutter located on surface at the Blanket Mine coreyard. All safety procedures are documented in a Standard Operating Procedure which governs the activity undertaken by trained personnel. The geologist marks the sample intervals, put tickets, insert standards and blanks. One half of the sample is put into a plastic sample bag and sealed with cable ties. The sampling information is entered into the database. The other half of the core is marked with sample intervals and sample numbers and returned to the core box and retained for future reference. The samples are put in marked grain bags and tied with cable ties.

    Transportation is by road using a mine vehicle to a SADCAS accredited testing laboratory (accreditation number TEST-05 0030) in Kwekwe, some 330km from Blanket Mine. A delivery note is signed as proof of dispatch.

    Gold is analysed by a 50 grams fire assay with an Atomic Absorption (AA) finish. The laboratory also has internal quality control ("QC") programs that include insertion of reagent blanks, reference materials, and pulp duplicates.

    Blanket Mine inserts QC samples (blanks and reference materials) at regular intervals to monitor laboratory performance.

    When results are received, the assay results are painted against the sample numbers on the core retained.

    Once the assay results are validated as being representative, the complete drillhole location, survey, lithology, geotechnical and assay logs are added to the drillhole database by the Blanket Database Manager.

    Note: This announcement contains inside information which is disclosed in accordance with the Market Abuse Regulation (EU) No. 596/2014 ("MAR") as it forms part of UK domestic law by virtue of the European Union (Withdrawal) Act 2018 and is disclosed in accordance with the Company's obligations under Article 17 of MAR.

    Cautionary Note Concerning Forward-Looking Information

    Information and statements contained in this news release that are not historical facts are "forward-looking information" within the meaning of applicable securities legislation that involve risks and uncertainties relating, but not limited, to Caledonia's current expectations, intentions, plans, and beliefs. Forward-looking information can often be identified by forward-looking words such as "anticipate", "believe", "expect", "goal", "plan", "target", "intend", "estimate", "could", "should", "may" and "will" or the negative of these terms or similar words suggesting future outcomes, or other expectations, beliefs, plans, objectives, assumptions, intentions or statements about future events or performance. Examples of forward-looking information in this news release include: upgrading inferred mineral resources to indicated mineral resources, publication of a new mineral resource and reserve estimate, extending the life of mine and the confidence in the mineral resource base at depth. This forward-looking information is based, in part, on assumptions and factors that may change or prove to be incorrect, thus causing actual results, performance or achievements to be materially different from those expressed or implied by forward-looking information. Such factors and assumptions include, but are not limited to: failure to establish estimated resources and reserves, the grade and recovery of ore which is mined varying from estimates, success of future exploration and drilling programs, reliability of drilling, sampling and assay data, assumptions regarding the representativeness of mineralization being inaccurate, success of planned metallurgical test-work, capital and operating costs varying significantly from estimates, delays in obtaining or failures to obtain required governmental, environmental or other project approvals, inflation, changes in exchange rates, fluctuations in commodity prices, delays in the development of projects and other factors.

    Exploration results that include geophysics, sampling, and drill results on wide spacings may not be indicative of the occurrence of a mineral deposit. Such results do not provide assurance that further work will establish sufficient grade, continuity, metallurgical characteristics and economic potential to be classed as a category of mineral resource. A mineral resource that is classified as "inferred" or "indicated" has a great amount of uncertainty as to its existence and economic and legal feasibility. It cannot be assumed that any or part of an "indicated mineral resource" or "inferred mineral resource" will ever be upgraded to a higher category of mineral resource. Investors are cautioned not to assume that all or any part of mineral deposits in these categories will ever be converted into proven and probable mineral reserves.

    Security holders, potential security holders and other prospective investors should be aware that these statements are subject to known and unknown risks, uncertainties and other factors that could cause actual results to differ materially from those suggested by the forward-looking statements. Such factors include, but are not limited to: risks relating to estimates of mineral reserves and mineral resources proving to be inaccurate, fluctuations in gold price, risks and hazards associated with the business of mineral exploration, development and mining, risks relating to the credit worthiness or financial condition of suppliers, refiners and other parties with whom the Company does business; inadequate insurance, or inability to obtain insurance, to cover these risks and hazards, employee relations; relationships with and claims by local communities and indigenous populations; political risk; risks related to natural disasters, terrorism, civil unrest, public health concerns (including health epidemics or outbreaks of communicable diseases such as the coronavirus (COVID-19)); availability and increasing costs associated with mining inputs and labour; the speculative nature of mineral exploration and development, including the risks of obtaining or maintaining necessary licenses and permits, diminishing quantities or grades of mineral reserves as mining occurs; global financial condition, the actual results of current exploration activities, changes to conclusions of economic evaluations, and changes in project parameters to deal with unanticipated economic or other factors, risks of increased capital and operating costs, environmental, safety or regulatory risks, expropriation, the Company's title to properties including ownership thereof, increased competition in the mining industry for properties, equipment, qualified personnel and their costs, risks relating to the uncertainty of timing of events including targeted production rate increase and currency fluctuations. Security holders, potential security holders and other prospective investors are cautioned not to place undue reliance on forward-looking information. By its nature, forward-looking information involves numerous assumptions, inherent risks and uncertainties, both general and specific, that contribute to the possibility that the predictions, forecasts, projections and various future events will not occur. Caledonia undertakes no obligation to update publicly or otherwise revise any forward-looking information whether as a result of new information, future events or other such factors which affect this information, except as required by law.

    For a more detailed discussion of such risks and other factors that may affect the Company's ability to achieve the expectations set forth in the forward-looking statements contained in this news release, see the Company's latest 20-F and Management's Discussion and Analysis, each under the heading "Risk Factors", available on the SEDAR website at www.sedar.com or on EDGAR at www.sec.gov. The foregoing should be reviewed in conjunction with the information and risk factors and assumptions found in this news release.

    This news release is not an offer of the shares of Caledonia for sale in the United States or elsewhere. This news release shall not constitute an offer to sell or the solicitation of an offer to buy, nor shall there be any sale of the shares of Caledonia, in any province, state or jurisdiction in which such offer, solicitation or sale would be unlawful prior to registration or qualification under the securities laws of such province, state or jurisdiction.

    SOURCE: Caledonia Mining Corporation Plc



    View the original press release on ACCESS Newswire

    Get the next $CMCL alert in real time by email

    Crush Q1 2026 with the Best AI Superconnector

    Stay ahead of the competition with Standout.work - your AI-powered talent-to-startup matching platform.

    AI-Powered Inbox
    Context-aware email replies
    Strategic Decision Support
    Get Started with Standout.work

    Recent Analyst Ratings for
    $CMCL

    DatePrice TargetRatingAnalyst
    12/16/2024$17.00Buy
    Maxim Group
    7/6/2023Hold → Buy
    Liberum
    More analyst ratings

    $CMCL
    SEC Filings

    View All

    SEC Form 6-K filed by Caledonia Mining Corporation Plc

    6-K - Caledonia Mining Corp Plc (0000766011) (Filer)

    4/24/26 8:35:25 AM ET
    $CMCL
    Precious Metals
    Basic Materials

    SEC Form 20-F filed by Caledonia Mining Corporation Plc

    20-F - Caledonia Mining Corp Plc (0000766011) (Filer)

    4/23/26 4:30:53 PM ET
    $CMCL
    Precious Metals
    Basic Materials

    SEC Form 6-K filed by Caledonia Mining Corporation Plc

    6-K - Caledonia Mining Corp Plc (0000766011) (Filer)

    4/20/26 6:00:05 AM ET
    $CMCL
    Precious Metals
    Basic Materials

    $CMCL
    Insider Trading

    Insider transactions reveal critical sentiment about the company from key stakeholders. See them live in this feed.

    View All

    SEC Form 4 filed by Learmonth John Mark

    4 - Caledonia Mining Corp Plc (0000766011) (Issuer)

    4/2/26 8:17:06 PM ET
    $CMCL
    Precious Metals
    Basic Materials

    SEC Form 4 filed by Jerrard Ross Ian

    4 - Caledonia Mining Corp Plc (0000766011) (Issuer)

    4/2/26 8:08:35 PM ET
    $CMCL
    Precious Metals
    Basic Materials

    SEC Form 4 filed by Chester Adam David Mark

    4 - Caledonia Mining Corp Plc (0000766011) (Issuer)

    4/2/26 7:47:37 PM ET
    $CMCL
    Precious Metals
    Basic Materials

    $CMCL
    Press Releases

    Fastest customizable press release news feed in the world

    View All

    Smart Money Is Quietly Flooding Africa's Highest-Grade Gold Belt

    Issued on behalf of Lake Victoria Gold Ltd.VANCOUVER, BC, April 23, 2026 /CNW/ -- Equity-Insider.com News Commentary — The money pouring into African gold right now isn't speculative. It's structural. Exploration budgets across the continent climbed 11% to US$1.44 billion last year, and financing for junior miners more than doubled to a near-record level[1]. At the same time, central banks are forecast to buy roughly 850 tonnes of gold in 2026[2], keeping a firm floor under prices that already topped US$5,500 per ounce in January. That combination of rising capital flows and sustained institutional demand is creating a window for developers who can move quickly, and five companies are doing

    4/23/26 9:20:00 AM ET
    $CMCL
    $FSM
    Precious Metals
    Basic Materials

    Caledonia Mining Corporation Plc: Director/PDMR Shareholding Notification

    ST HELIER, Jersey, Dec. 23, 2025 (GLOBE NEWSWIRE) -- Caledonia Mining Corporation Plc ("Caledonia" or "the Company") (NYSE:CMCL, AIM: CMCL, VFEX: CMCL)) announces that it received notification on December 22, 2025 from Mr Victor Gapare, an executive director of Caledonia and the settlor of a discretionary trust which ultimately owns the shares in Toziyana Resources Limited, the largest shareholder in the Company, ("Toziyana") that Toziyana purchased 7,457 common shares in the Company on December 22, 2025 at a price of $26.83 per share (the "Purchase"). Following the Purchase, Mr Victor Gapare now holds an interest, as the settlor of that trust, in common shares representing 12.66 per cent

    12/23/25 2:00:00 AM ET
    $CMCL
    Precious Metals
    Basic Materials

    Caledonia Mining Corporation Plc: Zimbabwe government amends proposed changes to the royalty and tax regimes

    ST HELIER, Jersey, Dec. 19, 2025 (GLOBE NEWSWIRE) -- On December 1, 2025 Caledonia Mining Corporation Plc ("Caledonia" or "the Company") (NYSE AMERICAN, AIM and VFEX: CMCL) issued an announcement regarding proposed changes to the royalty and tax regimes, as they apply to gold miners, in the Republic of Zimbabwe's 2026 National Budget. The proposed changes related inter alia to royalties and tax deductibility of capital expenditure. Caledonia notes that, on December 17, 2025, the Zimbabwe Minister of Finance announced certain changes to these proposals in the second reading of the 2026 National Budget to the Zimbabwe parliament, specifically; The proposal to increase the royalty rate from

    12/19/25 2:00:00 AM ET
    $CMCL
    Precious Metals
    Basic Materials

    $CMCL
    Analyst Ratings

    Analyst ratings in real time. Analyst ratings have a very high impact on the underlying stock. See them live in this feed.

    View All

    Maxim Group initiated coverage on Caledonia Mining with a new price target

    Maxim Group initiated coverage of Caledonia Mining with a rating of Buy and set a new price target of $17.00

    12/16/24 7:49:07 AM ET
    $CMCL
    Precious Metals
    Basic Materials

    Caledonia Mining upgraded by Liberum

    Liberum upgraded Caledonia Mining from Hold to Buy

    7/6/23 8:56:08 AM ET
    $CMCL
    Precious Metals
    Basic Materials

    $CMCL
    Leadership Updates

    Live Leadership Updates

    View All

    Caledonia Mining Corporation Plc Appointment of July Ndlovu as Independent Non-Executive Director

    ST HELIER, Jersey, Nov. 05, 2025 (GLOBE NEWSWIRE) -- (NYSE AMERICAN, AIM and VFEX: CMCL) - Caledonia Mining Corporation Plc ("Caledonia" or "the Company") is pleased to announce the appointment of Mr July Ndlovu to the board of directors of the Company ("the Board") as an independent non-executive director. July Ndlovu is a highly accomplished executive with more than 28 years of leadership experience in the mining sector across Southern Africa. He most recently held the role of Chief Executive Officer of Thungela Resources Limited, a pure-play producer and exporter of thermal coal in South Africa. Throughout his career, July has demonstrated outstanding capabilities in strategic lea

    11/5/25 2:00:00 AM ET
    $CMCL
    Precious Metals
    Basic Materials

    Caledonia Mining Corporation Plc: Appointment of New Chief Financial Officer

    ST HELIER, Jersey, Feb. 19, 2025 (GLOBE NEWSWIRE) -- Caledonia Mining Corporation Plc ("Caledonia" or "the Company") (NYSE AMERICAN, AIM and VFEX: CMCL) announces that its Chief Financial Officer ("CFO"), Chester Goodburn, will step down from his role on 24 March 2025, following the publication of Caledonia's financial results for the year to December 31, 2024. He will be succeeded, with immediate effect, by Ross Jerrard, subject to satisfaction of standard checks. Mr Goodburn has served as Caledonia's CFO since July 1, 2022, prior to which he had been Caledonia's Group Financial Manager and Chief Information Officer. Mr Goodburn will be retained on a consultancy basis for a brief perio

    2/19/25 2:00:00 AM ET
    $CMCL
    Precious Metals
    Basic Materials

    Caledonia Mining Corporation Plc: Appointment of Chief Operating Officer

    ST HELIER, Jersey, April 08, 2024 (GLOBE NEWSWIRE) -- Caledonia Mining Corporation Plc ("Caledonia" or the "Company") (NYSE:CMCL, AIM: CMCL, VFEX: CMCL))) is pleased to announce that James Mufara (aged 49) has agreed to join the Caledonia group as Chief Operating Officer with effect from May 1, 2024. James was previously at Harmony Gold Mining Company Limited where, as Regional General Manager, he headed a complex portfolio of operations consisting of five mines and 15,000 staff, mining 450koz of gold per annum. James has over 25 years' experience in the mining sector in Southern Africa, including 13 years in leadership roles. His career has been primarily gold focused, but also with ex

    4/8/24 2:00:00 AM ET
    $CMCL
    Precious Metals
    Basic Materials

    $CMCL
    Financials

    Live finance-specific insights

    View All

    Caledonia Mining Corporation Plc: Publication and Highlights of the Feasibility Study for Bilboes Gold Project

    ST HELIER, Jersey, Nov. 25, 2025 (GLOBE NEWSWIRE) -- Caledonia Mining Corporation Plc ("Caledonia" or the "Company") (NYSE:CMCL, AIM: CMCL, VFEX: CMCL)) is pleased to announce the decision to proceed with the Bilboes Gold Project ("Bilboes" or the "Project") following completion and publication of the feasibility study (the "Feasibility Study")1. Highlights Single-phase development confirmed as the most economic development approach.Mineral reserves: Summary of proven and probable: 1.749 Moz of gold at 2.26 g/t. See Appendix for complete estimate, as extracted from the TRS. Mineral resources (excluding mineral reserves): Summary of measured and indicated: 532,000 oz of gold at 1.37 g/t.

    11/25/25 2:00:00 AM ET
    $CMCL
    Precious Metals
    Basic Materials

    Caledonia approves quarterly dividend

    ST HELIER, Jersey, Nov. 10, 2025 (GLOBE NEWSWIRE) -- As announced in the third quarter results this morning, Caledonia Mining Corporation Plc ("Caledonia" or "the Company") (NYSE:CMCL, AIM: CMCL, VFEX: CMCL)) has approved a quarterly dividend of 14 United States cents (US$0.14) on each of the Company's shares. The relevant dates relating to the dividend are as follows: Ex-dividend date VFEX: November 19, 2025Ex-dividend date AIM: November 21, 2025Ex-dividend date NYSE American: November 21, 2025Record date: November 21, 2025Payment date: December 5, 2025 Shareholders with a registered address in the UK will be paid in Sterling. Caledonia's Dividend PolicyCaledonia's strategy to maximis

    11/10/25 11:05:24 AM ET
    $CMCL
    Precious Metals
    Basic Materials

    Caledonia Mining Corporation Plc: Abridged Quarterly Results and Details of Management Conference Call for the three and nine months ended September 30, 2025 ("Q3 2025" or "the Quarter")

    Caledonia Delivers Strong Q3 2025 Revenue Amid Growth Plans ST HELIER, Jersey, Nov. 10, 2025 (GLOBE NEWSWIRE) -- Caledonia Mining Corporation Plc ("Caledonia" or "the Company", and, together with its subsidiaries, "the Group") NYSE AMERICAN, AIM, VFEX: CMCL. Consolidated statements of profit or loss and other comprehensive income, consolidated statements of financial position and consolidated statements of cash flows are included in the appendices at the end of this announcement. SUMMARY In September the Company announced a Blanket Mine ("Blanket") employee fatality following an accident related to secondary blasting. A comprehensive review of safety procedures and training is underway.

    11/10/25 2:00:00 AM ET
    $CMCL
    Precious Metals
    Basic Materials

    $CMCL
    Large Ownership Changes

    This live feed shows all institutional transactions in real time.

    View All

    SEC Form SC 13G filed by Caledonia Mining Corporation Plc

    SC 13G - Caledonia Mining Corp Plc (0000766011) (Subject)

    2/10/23 12:29:47 PM ET
    $CMCL
    Precious Metals
    Basic Materials

    SEC Form SC 13D filed by Caledonia Mining Corporation Plc

    SC 13D - Caledonia Mining Corp Plc (0000766011) (Subject)

    1/17/23 9:37:33 AM ET
    $CMCL
    Precious Metals
    Basic Materials

    SEC Form SC 13G/A filed by Caledonia Mining Corporation Plc (Amendment)

    SC 13G/A - Caledonia Mining Corp Plc (0000766011) (Subject)

    4/27/22 3:12:12 PM ET
    $CMCL
    Precious Metals
    Basic Materials