Caledonia Mining Reports 19% YoY Increase In Q2 2024 Gold Production At Blanket Mine
Production Summary
- Q2 2024 gold production at Blanket was 20,773 ounces, a 19% increase on the 17,436 ounces produced in the second quarter of 2023.
- H1 2024 gold production at Blanket was 37,823 ounces, a 13% increase on the 33,472 ounces produced in the first half of 2023.
- Caledonia reiterates 2024 gold production guidance at Blanket of 74,000 to 78,000 ounces.1