• Live Feeds
    • Press Releases
    • Insider Trading
    • FDA Approvals
    • Analyst Ratings
    • Insider Trading
    • SEC filings
    • Market insights
  • Analyst Ratings
  • Alerts
  • Subscriptions
  • Settings
  • RSS Feeds
Quantisnow Logo
  • Live Feeds
    • Press Releases
    • Insider Trading
    • FDA Approvals
    • Analyst Ratings
    • Insider Trading
    • SEC filings
    • Market insights
  • Analyst Ratings
  • Alerts
  • Subscriptions
  • Settings
  • RSS Feeds
PublishGo to App
    Quantisnow Logo

    © 2026 quantisnow.com
    Democratizing insights since 2022

    Services
    Live news feedsRSS FeedsAlertsPublish with Us
    Company
    AboutQuantisnow PlusContactJobsAI superconnector for talent & startupsNEWLLM Arena
    Legal
    Terms of usePrivacy policyCookie policy

    Eco Wave Power Submits Final Project Completion Report to Shell International Exploration and Production Inc., Successfully Concluding Port of Los Angeles Pilot Program

    3/31/26 8:30:00 AM ET
    $WAVE
    Electric Utilities: Central
    Utilities
    Get the next $WAVE alert in real time by email

    Los Angeles, California--(Newsfile Corp. - March 31, 2026) - Eco Wave Power Global AB (NASDAQ:WAVE) ("Eco Wave Power" or the "Company"), a leading onshore wave energy technology company, today announced that it has submitted the final project completion report to Shell International Exploration and Production Inc. ("Shell"), marking the successful completion of the wave energy pilot objectives under a Pilot Test Agreement entered between the parties in 2024.

    Cannot view this image? Visit: https://images.newsfilecorp.com/files/11247/290459_909eeb3814c41b6c_001.jpg

    Eco Wave Power pilot in LA, by Erik Olsen

    To view an enhanced version of this graphic, please visit:
    https://images.newsfilecorp.com/files/11247/290459_909eeb3814c41b6c_001full.jpg

    The submission of the final report represents the completion of all contractual milestones and deliverables under the Pilot Test Agreement signed in 2024 between Eco Wave Power and Shell, concluding a structured development program that progressed from feasibility analysis through engineering design, system installation, operational testing, and final reporting.

    Strategic Collaboration and Project Background

    The collaboration between Eco Wave Power and Shell began with a comprehensive feasibility study of the U.S. coastline, aimed at assessing the technical and commercial potential of deploying wave energy systems along U.S. coastal infrastructure. The study identified 77 sites with favorable conditions for potential wave energy projects, providing a strategic and technical foundation for advancing to a physical pilot installation in the United States.

    Building on the findings of the feasibility study, Eco Wave Power and Shell entered into a Pilot Test Agreement in 2024 for the development, installation, testing and reporting of an onshore wave energy pilot project at AltaSea in the Port of Los Angeles.

    The agreement was structured as a phased, milestone-based program, under which funding tranches were released upon successful completion of predefined deliverables. These deliverables covered the full lifecycle of the project - from site approvals and engineering design through manufacturing, installation, operational testing and final reporting.

    Project Execution and Operational Results

    Eco Wave Power successfully executed all phases of the pilot program. The Company secured all required regulatory approvals and site permits, finalized the engineering design for the installation, manufactured the system's floaters and key mechanical components, and completed the full on-site installation of the wave energy system at AltaSea.

    The project progressed through the entire development lifecycle, including permitting, engineering design, fabrication, installation and an operational trial period under real marine conditions.

    During development and the operational trial period, the project achieved several key milestones:

    • Full development lifecycle completed, including permitting, engineering design, fabrication, installation and operational testing.

    • Successful integration with existing marine infrastructure, validating that wave energy systems can be deployed on coastal structures without seabed anchoring, offshore construction activities or subsea cabling.

    • Regulatory feasibility confirmed, with all required approvals obtained, including the U.S. Army Corps of Engineers Nationwide Permit (NWP 52) and the Port of Los Angeles Revocable Permit (RP25-05). Environmental reviews conducted under the National Environmental Policy Act (NEPA) and the California Environmental Quality Act (CEQA) determined that the installation would have no significant environmental impact.

    • Operational reliability demonstrated, with the system successfully operating under real marine conditions and tidal variations without structural degradation.

    • Cost and deployment advantages validated, with the total capital cost of the pilot project remaining below $1 million, demonstrating the economic advantages of Eco Wave Power's onshore configuration compared with offshore wave energy systems.

    In March 2026, Eco Wave Power submitted the final project completion report to Shell under the Pilot Test Agreement, confirming that the pilot successfully achieved its technical and operational objectives and thereby completing the full scope of the agreement.

    Industry Recognition

    Eco Wave Power's technology was also highlighted in a report by a U.S. Department of Energy National Laboratory, which emphasized the economic and deployment advantages of coastal-structure-integrated wave energy systems. The report noted that such systems may offer reduced installation complexity and lower infrastructure requirements by leveraging existing marine structures such as breakwaters and port infrastructure.

    Cannot view this image? Visit: https://images.newsfilecorp.com/files/11247/290459_909eeb3814c41b6c_002.jpg

    Inna Braverman, opening ceremony of LA pilot

    To view an enhanced version of this graphic, please visit:
    https://images.newsfilecorp.com/files/11247/290459_909eeb3814c41b6c_002full.jpg

    Inna Braverman, Founder and Chief Executive Officer of Eco Wave Power, commented:

    "This project followed a clear and disciplined development path — beginning with a comprehensive feasibility study of the U.S. coastline, advancing through engineering, installation and operational testing, and concluding with final delivery under the Pilot Test Agreement with Shell. Successfully completing the full scope of this program demonstrates Eco Wave Power's ability to execute complex wave energy projects together with leading global energy companies."

    Supporting the Future of Coastal Renewable Energy

    The Port of Los Angeles pilot serves as an important reference installation for Eco Wave Power's technology and demonstrates that wave energy systems can be deployed safely, cost-effectively and with minimal environmental impact using existing coastal infrastructure.

    By eliminating the need for seabed anchoring, offshore construction and subsea cabling, Eco Wave Power's onshore technology offers a simplified deployment pathway that may accelerate the commercialization of wave energy projects globally.

    The installation at AltaSea will continue to operate as an educational and demonstration facility, showcasing wave energy technology to policymakers, researchers, industry stakeholders and potential commercial partners.

    Eco Wave Power believes that the successful completion of the Port of Los Angeles pilot establishes a technical and regulatory foundation for future commercial-scale wave energy deployments on breakwaters, port structures and other coastal infrastructure worldwide.

    About Eco Wave Power Global AB (publ)

    Eco Wave Power Global (NASDAQ:WAVE) is a leading onshore wave energy company that converts ocean and sea waves into clean, reliable, and cost-efficient electricity using its patented and intelligent technology. By generating renewable power directly from existing coastal infrastructure such as breakwaters, jetties, and piers, Eco Wave Power enables sustainable electricity production in close proximity to coastal cities, ports, and energy-intensive infrastructure.

    As global electricity demand continues to rise with the growth of artificial intelligence, digital infrastructure, and next-generation data centers – often referred to as "AI factories" – Eco Wave Power's technology is designed to help provide renewable energy near shorelines where many data centers, industrial facilities, and population centers are located.

    With a mission to accelerate the global transition to renewable energy while supporting the next generation of digital and industrial infrastructure, Eco Wave Power developed and operates Israel's first grid-connected wave energy power station, recognized as a "Pioneering Technology" by the Israeli Ministry of Energy and co-funded by EDF Power Solutions. In the United States, the Company recently launched the first-ever onshore wave energy pilot station at the Port of Los Angeles, in collaboration with Shell Marine Renewable Energy.

    Eco Wave Power is expanding globally with projects planned in Portugal, Taiwan, and India, representing a project pipeline of 404.7 MW. The Company has received international recognition and support from organizations including the European Union Regional Development Fund, Innovate UK, and the EU Horizon 2020 program, and was honored with the United Nations Global Climate Action Award.

    Eco Wave Power's American Depositary Shares (ADSs) are traded on the Nasdaq Capital Market under the ticker symbol "WAVE."

    For more information, please visit:
    www.ecowavepower.com

    Press inquiries:
    [email protected]

    Note: Information available on or through the websites mentioned herein does not form part of this press release.

    For more information, please visit: www.ecowavepower.com.

    For press inquiries, please contact: [email protected].

    Forward-Looking Statements

    This press release contains forward-looking statements within the meaning of the "safe harbor" provisions of the U.S. Private Securities Litigation Reform Act of 1995 and other Federal securities laws. For example, the Company is using forward-looking statements in this press release when it discusses the belief that the successful completion of the Port of Los Angeles pilot establishes a technical and regulatory foundation for future commercial-scale wave energy deployments on breakwaters, port structures and other coastal infrastructure worldwide. Forward-looking statements can be identified by words such as: "anticipate," "intend," "plan," "goal," "seek," "believe," "project," "estimate," "expect," "strategy," "future," "likely," "may," "should," "will", or variations of such words, and similar references to future periods. These forward-looking statements and their implications are neither historical facts nor assurances of future performance and are based on the current expectations of the management of Eco Wave Power and are subject to a number of factors, uncertainties and changes in circumstances that are difficult to predict and may be outside of Eco Wave Power's control that could cause actual results to differ materially from those described in the forward-looking statements. Therefore, you should not rely on any of these forward-looking statements. Except as otherwise required by law, Eco Wave Power undertakes no obligation to publicly release any revisions to these forward-looking statements to reflect events or circumstances after the date hereof or to reflect the occurrence of unanticipated events. More detailed information about the risks and uncertainties affecting Eco Wave Power is contained under the heading "Risk Factors" in Eco Wave Power's Annual Report on Form 20-F for the fiscal year ended December 31, 2025 filed with the SEC on March 12, 2026, which is available on the on the SEC's website, www.sec.gov, and other documents filed or furnished to the SEC. Any forward-looking statement made in this press release speaks only as of the date hereof. References and links to websites have been provided as a convenience and the information contained on such websites is not incorporated by reference into this press release.

    Corporate Logo

    To view the source version of this press release, please visit https://www.newsfilecorp.com/release/290459

    Get the next $WAVE alert in real time by email

    Crush Q1 2026 with the Best AI Superconnector

    Stay ahead of the competition with Standout.work - your AI-powered talent-to-startup matching platform.

    AI-Powered Inbox
    Context-aware email replies
    Strategic Decision Support
    Get Started with Standout.work

    Recent Analyst Ratings for
    $WAVE

    DatePrice TargetRatingAnalyst
    3/11/2025$15.00Buy
    Maxim Group
    2/3/2025$14.00Buy
    Alliance Global Partners
    More analyst ratings

    $WAVE
    Insider Trading

    Insider transactions reveal critical sentiment about the company from key stakeholders. See them live in this feed.

    View All

    SEC Form 3 filed by new insider Amar Gilles

    3 - Eco Wave Power Global AB (publ) (0001846715) (Issuer)

    3/19/26 2:38:32 PM ET
    $WAVE
    Electric Utilities: Central
    Utilities

    SEC Form 3 filed by new insider Ackermann Hilary E.

    3 - Eco Wave Power Global AB (publ) (0001846715) (Issuer)

    3/18/26 4:15:11 PM ET
    $WAVE
    Electric Utilities: Central
    Utilities

    SEC Form 3 filed by new insider Braverman Inna Kanevsky

    3 - Eco Wave Power Global AB (publ) (0001846715) (Issuer)

    3/18/26 4:15:07 PM ET
    $WAVE
    Electric Utilities: Central
    Utilities

    $WAVE
    Press Releases

    Fastest customizable press release news feed in the world

    View All

    Eco Wave Power Submits Final Project Completion Report to Shell International Exploration and Production Inc., Successfully Concluding Port of Los Angeles Pilot Program

    Los Angeles, California--(Newsfile Corp. - March 31, 2026) - Eco Wave Power Global AB (NASDAQ:WAVE) ("Eco Wave Power" or the "Company"), a leading onshore wave energy technology company, today announced that it has submitted the final project completion report to Shell International Exploration and Production Inc. ("Shell"), marking the successful completion of the wave energy pilot objectives under a Pilot Test Agreement entered between the parties in 2024. Eco Wave Power pilot in LA, by Erik OlsenTo view an enhanced version of this graphic, please visit:https://images.newsfilecorp.com/files/11247/290459_909eeb3814c41b6c_001full.jpgThe submission of the final report represents the completi

    3/31/26 8:30:00 AM ET
    $WAVE
    Electric Utilities: Central
    Utilities

    Eco Wave Power Advances Taiwan Expansion as Partner Signs Land Lease for Suao Port Wave Energy Project

    TAIPEI, Taiwan, March 23, 2026 /PRNewswire/ -- Eco Wave Power Global AB (publ) ("Eco Wave Power" or the "Company") (NASDAQ:WAVE), a leading developer of onshore wave energy technology, today announced a key milestone in the development of its wave energy project in Suao Port, Taiwan. The Company's Taiwanese partner, I-Ke International Ocean Energy Co. ("I-Ke"), a subsidiary of Lian Tat Company, informed Eco Wave Power that in December 2025 it signed the land lease agreement with Suao Port for the designated wave energy project site. The agreement provides for a five-year lease t

    3/23/26 8:30:00 AM ET
    $WAVE
    Electric Utilities: Central
    Utilities

    Eco Wave Power Reports Strong Operational Progress and Files 2025 Annual Report on Form 20-F

    Company completes first U.S. wave energy pilot project, submits final report to Shell, records highest energy generation at Israeli project, advances megawatt-scale project in Portugal and supports Taiwan project development, while reducing Q4 operating expenses by 24%Stockholm, Sweden--(Newsfile Corp. - March 12, 2026) - Eco Wave Power Global AB (publ) (NASDAQ:WAVE) ("Eco Wave Power" or the "Company"), a leading onshore wave energy technology company, today announced that it has filed its annual report on Form 20-F for the fiscal year ended December 31, 2025 (the "Annual Report") with the U.S. Securities and Exchange Commission (the "SEC").The Annual Report, which includes the Company's aud

    3/12/26 8:30:00 AM ET
    $WAVE
    Electric Utilities: Central
    Utilities

    $WAVE
    SEC Filings

    View All

    SEC Form 6-K filed by Eco Wave Power Global AB

    6-K - Eco Wave Power Global AB (publ) (0001846715) (Filer)

    3/31/26 8:30:22 AM ET
    $WAVE
    Electric Utilities: Central
    Utilities

    SEC Form 6-K filed by Eco Wave Power Global AB

    6-K - Eco Wave Power Global AB (publ) (0001846715) (Filer)

    3/23/26 8:30:01 AM ET
    $WAVE
    Electric Utilities: Central
    Utilities

    SEC Form 6-K filed by Eco Wave Power Global AB

    6-K - Eco Wave Power Global AB (publ) (0001846715) (Filer)

    3/17/26 8:32:42 AM ET
    $WAVE
    Electric Utilities: Central
    Utilities

    $WAVE
    Analyst Ratings

    Analyst ratings in real time. Analyst ratings have a very high impact on the underlying stock. See them live in this feed.

    View All

    Maxim Group initiated coverage on Eco Wave Power Global AB with a new price target

    Maxim Group initiated coverage of Eco Wave Power Global AB with a rating of Buy and set a new price target of $15.00

    3/11/25 8:31:03 AM ET
    $WAVE
    Electric Utilities: Central
    Utilities

    Alliance Global Partners initiated coverage on Eco Wave Power Global AB with a new price target

    Alliance Global Partners initiated coverage of Eco Wave Power Global AB with a rating of Buy and set a new price target of $14.00

    2/3/25 8:35:02 AM ET
    $WAVE
    Electric Utilities: Central
    Utilities

    $WAVE
    Leadership Updates

    Live Leadership Updates

    View All

    Eco Wave Power Boosts Board Strength with Election of Renowned Risk & Sustainability Expert Hilary Ackermann, Strengthening U.S. Strategy Ahead of Port of LA Project Official Opening

    Stockholm, Sweden--(Newsfile Corp. - July 17, 2025) - Eco Wave Power Global AB (publ) (NASDAQ:WAVE) ("Eco Wave Power" or the "Company"), a leading onshore wave energy technology company, is pleased to announce the election of Hilary E. Ackermann to its Board of Directors, following approval at the Company's Annual General Meeting (AGM).Ms. Ackermann, who previously served on Eco Wave Power's Advisory Board, is a recognized leader in energy sustainability, corporate governance, and risk management. Her transition to the formal Board of Directors reflects the Company's commitment to strengthening its global leadership team as it accelerates commercialization—particularly in the United States.

    7/17/25 9:00:00 AM ET
    $WAVE
    Electric Utilities: Central
    Utilities

    Eco Wave Power Appoints Hilary E. Ackermann, Vistra Energy Board Member & Former Goldman Sachs Executive, to Advisory Board

    Stockholm, Sweden--(Newsfile Corp. - March 20, 2025) - Eco Wave Power Global AB (publ) (NASDAQ:WAVE) ("Eco Wave Power" or the "Company"), a leading onshore wave energy technology company, is pleased to announce the appointment of Hilary E. Ackermann to its Advisory Board.Hilary E. AckermannTo view an enhanced version of this graphic, please visit:https://images.newsfilecorp.com/files/11247/245400_e76cc887f44c29c6_001full.jpgAckermann, a recognized leader in energy sustainability and risk management, brings a wealth of expertise to Eco Wave Power. Since 2018, she has served on the Board of Directors of Vistra Energy, where she is Chair of the Sustainability and Risk Committee and a member of

    3/20/25 9:00:00 AM ET
    $WAVE
    Electric Utilities: Central
    Utilities

    Eco Wave Power Appoints Juan Jose Gomez as the Power Station Manager of its Portuguese Project

    PORTO, Portugal, Dec. 16, 2024 /PRNewswire/ -- Eco Wave Power Global AB (publ) (NASDAQ:WAVE) ("Eco Wave Power" or the "Company"), a leading innovator in onshore wave energy technology, is pleased to announce the appointment of Juan Jose Gomez to spearhead the execution of its ambitious wave energy project in Portugal. With his extensive expertise and proven leadership in renewable energy initiatives, Juan will also oversee the operation and maintenance (O&M) activities once the project becomes operational. Juan previously played a pivotal role in managing Eco Wave Power's pilot project in Gibraltar, where he demonstrated exceptional skill in project execution, technical management, and stak

    12/16/24 8:36:00 AM ET
    $WAVE
    Electric Utilities: Central
    Utilities

    $WAVE
    Financials

    Live finance-specific insights

    View All

    Eco Wave Power Reports Strong Operational Progress and Files 2025 Annual Report on Form 20-F

    Company completes first U.S. wave energy pilot project, submits final report to Shell, records highest energy generation at Israeli project, advances megawatt-scale project in Portugal and supports Taiwan project development, while reducing Q4 operating expenses by 24%Stockholm, Sweden--(Newsfile Corp. - March 12, 2026) - Eco Wave Power Global AB (publ) (NASDAQ:WAVE) ("Eco Wave Power" or the "Company"), a leading onshore wave energy technology company, today announced that it has filed its annual report on Form 20-F for the fiscal year ended December 31, 2025 (the "Annual Report") with the U.S. Securities and Exchange Commission (the "SEC").The Annual Report, which includes the Company's aud

    3/12/26 8:30:00 AM ET
    $WAVE
    Electric Utilities: Central
    Utilities

    Eco Wave Power Reports Q3 Results: Historic U.S. Launch and Global Milestones Achieved

    Q3 2025 marks significant progress with the launch of Eco Wave Power's first U.S. project, strategic advancements across Europe, Asia, and Africa, recognition by TIME as one of the Best Inventions of 2025, and a solid financial foundation to support ongoing global growth and commercialization of wave energy technologyStockholm, Sweden--(Newsfile Corp. - November 12, 2025) - Eco Wave Power Global AB (publ) (NASDAQ:WAVE) ("Eco Wave Power" or the "Company"), a global leader in onshore wave energy technology, today announced its financial results for the nine months ended September 30, 2025, along with an update on its rapidly expanding international project portfolio.Management CommentaryQ3 202

    11/12/25 8:30:00 AM ET
    $WAVE
    Electric Utilities: Central
    Utilities

    Eco Wave Power Reports H1 2025 Results, Showcasing Breakthroughs in U.S., Europe, Asia, and Africa as Global Wave Energy Demand Accelerates

    Major Milestones Include Completion of U.S. Installation Ahead of Launch, First MW-Scale Project in Portugal Advancing, Strategic Expansion into India and Taiwan, African Market Entry, and EU Grant Win for Atlantic Region Deployment and Strong Financial Position Supporting GrowthStockholm, Sweden--(Newsfile Corp. - August 14, 2025) - Eco Wave Power Global AB (publ) (NASDAQ:WAVE) ("Eco Wave Power" or the "Company"), a global leader in onshore wave energy technology, today announced its financial results for the six months ended June 30, 2025, along with an update on its rapidly expanding international project portfolio.Management CommentaryIn the first half of 2025, Eco Wave Power made signif

    8/14/25 7:00:00 AM ET
    $WAVE
    Electric Utilities: Central
    Utilities

    $WAVE
    Large Ownership Changes

    This live feed shows all institutional transactions in real time.

    View All

    SEC Form SC 13G filed by Eco Wave Power Global AB

    SC 13G - Eco Wave Power Global AB (publ) (0001846715) (Subject)

    3/15/22 4:25:20 PM ET
    $WAVE
    Electric Utilities: Central
    Utilities

    SEC Form SC 13G filed by Eco Wave Power Global AB

    SC 13G - Eco Wave Power Global AB (publ) (0001846715) (Subject)

    3/3/22 4:21:45 PM ET
    $WAVE
    Electric Utilities: Central
    Utilities

    SEC Form SC 13G/A filed by Eco Wave Power Global AB (Amendment)

    SC 13G/A - Eco Wave Power Global AB (publ) (0001846715) (Subject)

    1/31/22 5:20:28 PM ET
    $WAVE
    Electric Utilities: Central
    Utilities