• Live Feeds
    • Press Releases
    • Insider Trading
    • FDA Approvals
    • Analyst Ratings
    • Insider Trading
    • SEC filings
    • Market insights
  • Analyst Ratings
  • Alerts
  • Subscriptions
  • Settings
  • RSS Feeds
Quantisnow Logo
  • Live Feeds
    • Press Releases
    • Insider Trading
    • FDA Approvals
    • Analyst Ratings
    • Insider Trading
    • SEC filings
    • Market insights
  • Analyst Ratings
  • Alerts
  • Subscriptions
  • Settings
  • RSS Feeds
PublishGo to App
    Quantisnow Logo

    © 2026 quantisnow.com
    Democratizing insights since 2022

    Services
    Live news feedsRSS FeedsAlertsPublish with Us
    Company
    AboutQuantisnow PlusContactJobsAI superconnector for talent & startupsNEWLLM Arena
    Legal
    Terms of usePrivacy policyCookie policy

    Endeavour Silver Provides Q1 2024 Construction Progress Update on Terronera; Construction Progress Reaches 53% Completion

    4/23/24 5:00:00 PM ET
    $EXK
    Precious Metals
    Basic Materials
    Get the next $EXK alert in real time by email

    VANCOUVER, British Columbia, April 23, 2024 (GLOBE NEWSWIRE) -- Endeavour Silver Corp. ("Endeavour" or the "Company") (NYSE:EXK, TSX:EDR) is pleased to provide a Q1 2024 construction progress update for its Terronera Project in Jalisco state, Mexico. A photo gallery presentation accompanies this news release and can be found here or on the Company website at Terronera Project Progress Photos. All dollar ($) references in this news release are United States dollars.

    The Terronera project made significant progress in the first quarter, as concrete work was nearly complete on the Upper Plant Platform and erection of structural steel advanced for areas including crushing, coarse-ore storage, grinding, flotation, and thickening. Mechanical installation of major equipment continued to advance on schedule and the project remains on track for commissioning in Q4 2024.

    "Site activities ramped up rapidly, as overall construction surpassed the halfway milestone," commented Don Gray, Chief Operating Officer. "We've been very pleased with progress of structural steel erection and major equipment installation including the semi-autogenous grinding ("SAG") and ball mills, apron feeders and flotation cells. Our procurement and materials management planning has been effective in keeping pace with site construction. We've been able to install many components upon immediate arrival to site, while making use of the limited laydown area. Underground mine development continues advancing very well, and we anticipate initial ore access in Q2. We are exceptionally pleased with the progress our Terronera team is making and remain committed to successfully completing and operating Endeavour's next core asset."

    Q1 2024 Construction and Development Highlights

    As of March 31, 2024, site works and activities included:

    • Safety – A strong onsite safety focus has enabled a notable 60% reduction in the lost-time injury frequency rate since Q2 2023, during a substantial increase in the workforce. Ongoing initiatives such as mandatory certification for working-at-heights, frequent field audits and inspections, rescue-team training, and regular emergency drills continue.

    • Progress – Overall project progress reached 53% completion, with more than $158 million (1) of the project's budget spent to date. Project commitments total $225 million (1,2) which is 83% of the $271 million capital budget.

    • Engineering – Efforts have been transitioning over to construction support. Detail design was completed for the Tailing Storage Facility ("TSF"), Portal 2 waste dump, and Lower Platform excavation.

    • Mine Development – During the quarter, over 1,000 metres of underground mine development was completed, bringing the total to over 3,200 metres. Mine crews continue working in Portal 1, 2, and 4 declines with excavations well advanced for the explosives magazines and the main pump-station sump system.

    • Upper Platform Plant Site – Surface mill and infrastructure construction is 56% complete and progressing on schedule. Concrete work is 83% complete, and structural steel erection is 80% complete.

      • Primary Crusher – Structural and mechanical construction was initiated on the conveyor and apron feeder support steel, and the apron feeder was placed in position.

      • Course Ore Stockpile and Reclaim ("COS") Tunnel – Two apron feeders were installed in the COS tunnel along with structural steel support, which opened the area to install the SAG feed conveyor.  

      • Grinding – All major SAG and Ball Mill components were assembled. The high-pressure hydraulic pump was used for mounting the main bearings (spherical roller bearings), and all four bearings were installed under vendor supervision. Structural steel and pump installations continued.

      • Flotation – All flotation cell tanks were set in place and installation of the drive decks and structural steel installation continued. Several drive decks were assembled on the ground and lifted as complete units for each flotation cell tank. The regrind mill was set in place.

      • Tailing Thickener – The floor foundation and wall concrete were completed and erection of steel commenced together with the installation of the thickener tank floor.

    • Lower Facilities Platform and TSF – Excavation for the TSF embankment key trench was nearly 60% complete, and the lower platform area was nearly 45% complete, with the excavated material suitable to use in the TSF key trench and as embankment fill. Concrete work on the lower platform is anticipated to start in Q2.

    • Procurement – Bulk materials procurement purchase orders have been released and lead times are aligned with the current schedule. The Procurement team has focused on critical path purchases, such as electrical components and transfer chutes, and reducing bulk material lead times to increase schedule float.

    • Onsite Personnel – The workforce increased to 150 employees and over 400 contractor workers.

    • Community Relations – Supporting the local municipality continues to be a major commitment. A new miner training program for local community members was established to provide training and employment. The Company also sponsored English and computer skills for local communities.

    • Environmental – Environmental and social assessment initiatives continue according to schedule as outlined under the Equator Principal requirements for project loan financing.

    Next Steps and Planning

    The Terronera Project is on track for commissioning in Q4 2024.

    For Q2 2024, surface construction will continue focusing on mechanical installations and initial electrical work for the crushing, coarse-ore stockpile, grinding, flotation and tailing thickener areas. Excavation of the Lower Platform is anticipated to be complete in the coming months. Concrete work is expected to be initiated for the LNG and power generation and concentrate and tailing filtration. Concentrate and tailing filtration structural, mechanical, and electrical installations will commence in early Q3.

    Mine development in Portal 1, 2 and 4 declines will continue with first ore development anticipated in Q2. Initial long-hole mining is planned for Q3 followed by cut-and-fill mining; ore will be stockpiled for mill ramp up. Development activities at La Luz are anticipated to begin in Q2 with portal construction and ramp advance to ore access anticipated in Q4. The critical path remains the TSF and lower platform construction and advancing underground mine, where development is meeting expectations.

    Visit www.terronera.com, our dedicated project website, to stay informed on the ongoing development at Terronera. Explore updates, learn about our commitment to environmental stewardship, and discover the positive impacts on local communities.

    About Endeavour Silver: Endeavour is a mid-tier precious metals company with a strong commitment to sustainable and responsible mining practices. With operations in Mexico and the development of the new cornerstone mine in Jalisco state, the Company aims to contribute positively to the mining industry and the communities in which it operates. In addition, Endeavour has a portfolio of exploration projects in Mexico, Chile and the United States to facilitate its goal to become a premier senior silver producer. 

    Contact Information

    Galina Meleger, VP, Investor Relations

    Email: [email protected]

    Website: www.edrsilver.com

    Follow Endeavour Silver on Facebook, X, Instagram and LinkedIn

    Footnote:

    1. Financial figures are based on a preliminary estimate. Final audited figures will be released with the Q1 2024 financial statements on May 9, 2024.
    2. Project commitments are inclusive of total project expenditures.

    Cautionary Note Regarding Forward-Looking Statements

    This news release contains "forward-looking statements" within the meaning of the United States private securities litigation reform act of 1995 and "forward-looking information" within the meaning of applicable Canadian securities legislation. Such forward-looking statements and information herein include but are not limited to statements regarding the development and financing of the Terronera Project including: capital cost estimates, anticipated timing of the project construction; anticipated timing of drawdown under the project loan debt facility, Terronera's forecasted operations, costs and expenditures, and the timing and results of various related activities. The Company does not intend to and does not assume any obligation to update such forward-looking statements or information, other than as required by applicable law.

    Forward-looking statements or information involve known and unknown risks, uncertainties and other factors that may cause the actual results, level of activity, production levels, performance or achievements of Endeavour and its operations to be materially different from those expressed or implied by such statements. Such factors include but are not limited changes in production and costs guidance; the ongoing effects of inflation and supply chain issues on mine economics; national and local governments, legislation, taxation, controls, regulations and political or economic developments in Canada, Chile, the U.S.A and Mexico; financial risks due to precious metals prices; operating or technical difficulties in mineral exploration, development and mining activities; risks and hazards of mineral exploration, development and mining; the speculative nature of mineral exploration and development; risks in obtaining necessary licenses and permits; satisfaction of conditions precedent to drawdown under the project loan debt facility; the ongoing effects of inflation and supply chain issues on the Terronera Project economics; fluctuations in the prices of silver and gold, fluctuations in the currency markets (particularly the Mexican peso, Chilean peso, Canadian dollar and U.S. dollar); and challenges to the Company's title to properties; as well as those factors described in the section "risk factors" contained in the Company's most recent form 40F/Annual Information Form filed with the S.E.C. and Canadian securities regulatory authorities.

    Forward-looking statements are based on assumptions management believes to be reasonable, including but not limited to: the continued operation of the Company's mining operations, no material adverse change in the market price of commodities, forecasted Terronera mine economics as of 2024, mining operations will operate and the mining products will be completed in accordance with management's expectations and achieve their stated production outcomes, and such other assumptions and factors as set out herein. Although the Company has attempted to identify important factors that could cause actual results to differ materially from those contained in forward-looking statements or information, there may be other factors that cause results to be materially different from those anticipated, described, estimated, assessed or intended. There can be no assurance that any forward-looking statements or information will prove to be accurate as actual results and future events could differ materially from those anticipated in such statements or information. Accordingly, readers should not place undue reliance on forward-looking statements or information.



    Primary Logo

    Get the next $EXK alert in real time by email

    Crush Q1 2026 with the Best AI Superconnector

    Stay ahead of the competition with Standout.work - your AI-powered talent-to-startup matching platform.

    AI-Powered Inbox
    Context-aware email replies
    Strategic Decision Support
    Get Started with Standout.work

    Recent Analyst Ratings for
    $EXK

    DatePrice TargetRatingAnalyst
    11/3/2025Neutral → Sector Outperform
    CIBC
    3/21/2025Outperform
    Raymond James
    11/29/2024Buy
    TD Securities
    6/17/2024$6.00Outperform
    BMO Capital Markets
    1/9/2024Hold → Buy
    TD Securities
    3/22/2022Market Perform
    BMO Capital Markets
    3/11/2022$8.00 → $8.50Buy
    HC Wainwright & Co.
    11/10/2021$7.00 → $8.00Buy
    HC Wainwright & Co.
    More analyst ratings

    $EXK
    SEC Filings

    View All

    Amendment: SEC Form 6-K/A filed by Endeavour Silver Corporation

    6-K/A - ENDEAVOUR SILVER CORP (0001277866) (Filer)

    1/16/26 3:34:18 PM ET
    $EXK
    Precious Metals
    Basic Materials

    SEC Form 6-K filed by Endeavour Silver Corporation

    6-K - ENDEAVOUR SILVER CORP (0001277866) (Filer)

    1/16/26 6:51:04 AM ET
    $EXK
    Precious Metals
    Basic Materials

    SEC Form 6-K filed by Endeavour Silver Corporation

    6-K - ENDEAVOUR SILVER CORP (0001277866) (Filer)

    1/15/26 5:21:05 PM ET
    $EXK
    Precious Metals
    Basic Materials

    $EXK
    Analyst Ratings

    Analyst ratings in real time. Analyst ratings have a very high impact on the underlying stock. See them live in this feed.

    View All

    Endeavour Silver upgraded by CIBC

    CIBC upgraded Endeavour Silver from Neutral to Sector Outperform

    11/3/25 9:52:35 AM ET
    $EXK
    Precious Metals
    Basic Materials

    Raymond James initiated coverage on Endeavour Silver

    Raymond James initiated coverage of Endeavour Silver with a rating of Outperform

    3/21/25 8:10:54 AM ET
    $EXK
    Precious Metals
    Basic Materials

    TD Securities resumed coverage on Endeavour Silver

    TD Securities resumed coverage of Endeavour Silver with a rating of Buy

    11/29/24 7:44:37 AM ET
    $EXK
    Precious Metals
    Basic Materials

    $EXK
    Press Releases

    Fastest customizable press release news feed in the world

    View All

    UPDATE – Endeavour Silver Provides 2026 Guidance

    NOTE TO READER – The news release of Endeavour Silver Corp. dated January 16, 2026, (the "News Release") has been re-filed on SEDAR. The previously filed News Release had a typographical error on page 3 with respect to the AISC for Terronera. The consolidated AISC remains the same as the previously filed News Release. This news release replaces the previously filed News Release. VANCOUVER, British Columbia, Jan. 16, 2026 (GLOBE NEWSWIRE) -- Endeavour Silver Corp. ("Endeavour" or the "Company") (NYSE:EXK, TSX:EDR) announces its consolidated production and cost guidance for the Terronera, Guanaceví, and Kolpa mines, along with its capital and exploration budgets for 2026. All dollar amounts

    1/16/26 3:16:05 PM ET
    $EXK
    Precious Metals
    Basic Materials

    Endeavour Silver Provides 2026 Guidance

    VANCOUVER, British Columbia, Jan. 16, 2026 (GLOBE NEWSWIRE) -- Endeavour Silver Corp. ("Endeavour" or the "Company") (NYSE:EXK, TSX:EDR) announces its consolidated production and cost guidance for the Terronera, Guanaceví, and Kolpa mines, along with its capital and exploration budgets for 2026. All dollar amounts are in US dollars (US$) and ounces are troy ounces. 2026 Production and Cost Guidance Highlights In 2026, silver production from Terronera, Guanaceví, and Kolpa is projected to range between 8.3 and 8.9 million ounces (oz), while gold output from Terronera and Guanaceví is expected to range between 46,000 and 48,000 oz. Kolpa is anticipated to contribute significant base metal

    1/16/26 6:50:00 AM ET
    $EXK
    Precious Metals
    Basic Materials

    Endeavour Silver Completes Sale of Bolañitos Mine

    VANCOUVER, British Columbia, Jan. 15, 2026 (GLOBE NEWSWIRE) -- Endeavour Silver Corp. ("Endeavour" or the "Company") (NYSE:EXK, TSX:EDR) is pleased to announce the completion of the sale of the Bolañitos silver and gold mine (the "Bolañitos Mine") to Guanajuato Silver Company Ltd. ("Guanajuato Silver") (TSXV:GSVR) pursuant to a share purchase agreement (the "Agreement") previously announced on November 24, 2025 (the "Sale"). "The sale of the Bolañitos Mine marks an exciting milestone for Endeavour as we continue to focus our resources on our core silver assets and strategic growth," said Dan Dickson, Chief Executive Officer. "We are pleased that Guanajuato Silver is well-positioned to fu

    1/15/26 5:20:00 PM ET
    $EXK
    Precious Metals
    Basic Materials

    $EXK
    Leadership Updates

    Live Leadership Updates

    View All

    Endeavour Silver Announces Appointment of Chief Financial Officer

    VANCOUVER, British Columbia, Dec. 05, 2023 (GLOBE NEWSWIRE) -- Endeavour Silver Corp. ("Endeavour" or the "Company") (TSX:EDR, NYSE:EXK) is pleased to announce the appointment of Elizabeth Senez as the Company's Chief Financial Officer ("CFO"), effective January 1, 2024. Ms. Senez brings over 20 years of extensive experience in accounting, corporate finance, and corporate treasury to her new role. Concurrent with Ms. Senez's appointment, Christine West, the current CFO, will be transitioning to retirement. Ms. West will step down as CFO but will continue to support the Company through a transition period and retain her position on the Board of Directors until her retirement, a testament

    12/5/23 6:50:00 AM ET
    $EXK
    Precious Metals
    Basic Materials

    Endeavour Silver Appoints Vice President, Operations

    VANCOUVER, British Columbia, June 14, 2023 (GLOBE NEWSWIRE) -- Endeavour Silver Corp. ("Endeavour" or the "Company") (NYSE:EXK, TSX:EDR) announces, effective today, the appointment of Greg Blaylock as the new Vice President, Operations to oversee the Company's underground mining operations in Mexico. Greg Blaylock is a senior mining executive who brings to Endeavour over 35 years' hands-on experience in mining operations, mine planning and project development as well as related executive and technical expertise. Greg is fluent in both English and Spanish. Dan Dickson, Endeavour CEO, commented, "I am pleased to welcome Greg Blaylock to the Endeavour management team. Greg brings a wealth o

    6/14/23 6:50:00 AM ET
    $EXK
    Precious Metals
    Basic Materials

    Endeavour Silver Appoints Rex McLennan as Chairman

    VANCOUVER, British Columbia, Aug. 29, 2022 (GLOBE NEWSWIRE) -- Endeavour Silver Corp. ("Endeavour" or the "Company") (NYSE:EXK, TSX:EDR) announces that its Board of Directors (the "Board") has appointed the Company's Lead Director, Rex McLennan, as Chairman of the Board. Mr. McLennan steps into the Chairman position to replace former Executive Chairman, Bradford Cooke, who passed away suddenly and unexpectedly last week (see news releases dated August 18 and August 24, 2022). Rex McLennan joined the Company as an Independent Director in June 2007, appointed as Chair of the Audit Committee. As an Independent Corporate Director, he has chaired the audit committees of a number of publicl

    8/29/22 6:50:00 AM ET
    $EXK
    Precious Metals
    Basic Materials

    $EXK
    Financials

    Live finance-specific insights

    View All

    Endeavour Silver Produces 6,486,661 Oz Silver and 37,164 Oz Gold, for a total of 11.2 Million Silver Equivalent Oz in 2025

    VANCOUVER, British Columbia, Jan. 08, 2026 (GLOBE NEWSWIRE) -- Endeavour Silver Corp. ("Endeavour" or the "Company") (NYSE:EXK, TSX:EDR)  reports full year 2025 production of 6,486,661 silver ounces ("oz") and 37,164 gold oz, and in combination with base metal production, a silver equivalent ( 1) ("AgEq") production of 11.2 million oz. Fourth quarter 2025 production was 2,030,206 silver ounces, 13,785 gold oz, and AgEq production of 3.8 million oz. All dollar amounts are in US dollars ($). "Endeavour delivered another year of strong growth in 2025, highlighted by record silver equivalent production and the successful ramp-up at Terronera," commented Dan Dickson, Chief Executive Officer.

    1/8/26 6:50:00 AM ET
    $EXK
    Precious Metals
    Basic Materials

    Endeavour Silver Announces Q3 2025 Financial Results; Earnings Call at 10AM PDT (1PM EDT) Today

    VANCOUVER, British Columbia, Nov. 07, 2025 (GLOBE NEWSWIRE) -- Endeavour Silver Corp. ("Endeavour" or the "Company") (NYSE:EXK, TSX:EDR) announces its financial and operating results for the three and nine months ended September 30, 2025. All dollar amounts are in US dollars ($). "Endeavour Silver delivered a strong third quarter, highlighted by a significant increase in production and robust revenue growth," commented Dan Dickson, Chief Executive Officer. "With silver equivalent production up 88% year-over-year and operating cash flow more than doubling, we continue to demonstrate the strength of our mining operations and our team's commitment to operational excellence. With the recent a

    11/7/25 6:50:00 AM ET
    $EXK
    Precious Metals
    Basic Materials

    Endeavour Silver Produces 1,766,926 Oz Silver and 7,286 Oz Gold (3.0 Million Silver Equivalent Oz) in Q3 2025 and Provides an Update on Terronera

    VANCOUVER, British Columbia, Oct. 08, 2025 (GLOBE NEWSWIRE) -- Endeavour Silver Corp. ("Endeavour" or the "Company") (NYSE:EXK, TSX:EDR) reports third quarter 2025 production of 1,766,926 silver ounces (oz), 7,286 gold oz, and in combination with base metal production, a silver equivalent(1) ("AgEq") total production of 3.0 million oz. All dollar amounts are in US dollars ($). All production amounts exclude Terronera pre-operating production. "We are pleased to deliver another strong quarter, marked by consistent performance across our portfolio," said Dan Dickson, Chief Executive Officer. "Our legacy mines continue to provide steady results, Kolpa is meeting expectations and integrating

    10/8/25 6:50:00 AM ET
    $EXK
    Precious Metals
    Basic Materials

    $EXK
    Large Ownership Changes

    This live feed shows all institutional transactions in real time.

    View All

    Amendment: SEC Form SC 13G/A filed by Endeavour Silver Corporation

    SC 13G/A - ENDEAVOUR SILVER CORP (0001277866) (Subject)

    10/8/24 11:51:00 AM ET
    $EXK
    Precious Metals
    Basic Materials

    SEC Form SC 13G/A filed by Endeavour Silver Corporation (Amendment)

    SC 13G/A - ENDEAVOUR SILVER CORP (0001277866) (Subject)

    2/14/23 11:57:02 AM ET
    $EXK
    Precious Metals
    Basic Materials

    SEC Form SC 13G/A filed by Endeavour Silver Corporation (Amendment)

    SC 13G/A - ENDEAVOUR SILVER CORP (0001277866) (Subject)

    2/11/22 11:48:56 AM ET
    $EXK
    Precious Metals
    Basic Materials