Granite Awarded $25M Bridge Replacement Project In Everett, Washington
Granite (NYSE:GVA) has been awarded an approximately $25 million contract by the City of Everett to remove and replace the Edgewater Creek Bridge. The project will be funded by federal grants and local funds, and will be included in Granite's second-quarter CAP.
Project scope includes the removal of the existing bridge, originally built in 1946, and the construction of a new bridge over the Edgewater Creek Basin. The project presents engineering challenges due to the steep and unstable soils of the ravine. To overcome these, a trestle will be constructed to facilitate access for the work.