• Live Feeds
    • Press Releases
    • Insider Trading
    • FDA Approvals
    • Analyst Ratings
    • Insider Trading
    • SEC filings
    • Market insights
  • Analyst Ratings
  • Alerts
  • Subscriptions
  • AI Executive AssistantNEW
  • Settings
  • RSS Feeds
Quantisnow Logo
  • Live Feeds
    • Press Releases
    • Insider Trading
    • FDA Approvals
    • Analyst Ratings
    • Insider Trading
    • SEC filings
    • Market insights
  • Analyst Ratings
  • Alerts
  • Subscriptions
  • AI Executive AssistantNEW
  • Settings
  • RSS Feeds
PublishGo to AppAI Helper
    Quantisnow Logo

    © 2025 quantisnow.com
    Democratizing insights since 2022

    Services
    Live news feedsRSS FeedsAlertsPublish with Us
    Company
    AboutQuantisnow PlusContactJobsAI employees for your businessNEW
    Legal
    Terms of usePrivacy policyCookie policy

    Hut 8 Energizes Vega Data Center

    6/30/25 6:30:00 AM ET
    $HUT
    Finance: Consumer Services
    Finance
    Get the next $HUT alert in real time by email

    205 MW facility will support up to ~15 EH/s of next-generation rack-based ASIC compute with direct-to-chip liquid cooling

    Believed to be the largest single-building Bitcoin mining facility by nameplate hashrate

    MIAMI, June 30, 2025 (GLOBE NEWSWIRE) -- Hut 8 Corp. (Nasdaq | TSX: HUT) ("Hut 8" or the "Company"), an energy infrastructure platform integrating power, digital infrastructure, and compute at scale to fuel next-generation, energy-intensive use cases such as Bitcoin mining and high-performance computing, today announced the initial energization of Vega. Based on publicly available information, we believe Vega to be the largest single-building Bitcoin mining facility by nameplate hashrate. Spanning the equivalent of five football fields and covering 162,000 square feet, Vega is powered by 205 megawatts ("MW") of nameplate energy capacity and at full energization will support up to ~15 exahash per second ("EH/s") of BITMAIN U3S21EXPH servers for Bitcoin mining ASIC compute, or nearly 2.0% of current global Bitcoin network hashrate.

    Hut 8 - Vega (June 2025)

    Vega debuts a new Tier I data center form factor that narrows the gap between legacy air-cooled ASIC infrastructure and liquid-cooled GPU infrastructure. Unlike traditional mining facilities that rely on forced-air cooling and shelving systems that constrain compute density, Vega features a proprietary, rack-based, direct-to-chip liquid cooling system designed in-house by Hut 8. The architecture supports ASIC deployments at densities of up to 180 kilowatts ("kW") per rack.

    The system's modular architecture—including pump skids, fluid distribution networks, server racks, switchboards, and smart power distribution units—was designed by Hut 8's in-house development organization to optimize thermal efficiency, miner stability, and operational reliability. The result is materially higher compute density, greater thermal control, and improved uptime in high-ambient environments like Texas. Initial customer discussions support the potential viability of this architecture for future iterations of high-density, direct-to-chip liquid cooled infrastructure to support emerging HPC workloads and customer needs.

    Hut 8 - Vega Module Rendering (June 2025)

    "Vega exemplifies our innovation-driven approach to digital infrastructure design," said Asher Genoot, CEO of Hut 8. "We built it for where we believe the market is going, using modular architecture and adaptive thermal systems designed to scale and evolve as workload requirements grow more complex. Over the past several weeks, as we've brought the site online, it has become clear how well this architecture performs under real-world conditions."

    "Vega's design is particularly relevant for AI training and other non-customer-facing HPC workloads, where we believe speed, density, and cost efficiency will increasingly take precedence over traditional redundancy standards," said Jake Palmer, Senior Vice President of Development at Hut 8. "The project represents a design philosophy we intend to scale, refine, and deploy as we continue to bridge the gap between high-cost, high-redundancy builds and lower-cost, application-optimized infrastructure."

    Hut 8 - Vega Rack (June 2025)

    BITMAIN is the client for the full ~15 EH/s deployment at Vega under an ASIC colocation agreement. Based on ERCOT forward energy prices, the agreement is expected to generate between $110 million and $120 million in annualized revenue upon full energization, subject to factors including ERCOT energy pricing and facility uptime. The agreement also includes a purchase option that allows Hut 8 to acquire all or part of the hosted fleet in up to three tranches at a fixed price, exercisable within six months of each tranche's energization. This structure gives Hut 8 the ability to convert the deployment into self-mining capacity for its Bitcoin mining subsidiary, American Bitcoin Corp., supporting growth in its scale from 10 EH/s to 25 EH/s.

    "We are proud to have partnered with Hut 8 to successfully develop and commercialize the next generation of ASIC compute technology," said Irene Gao, Vice President of Mining at BITMAIN. "Vega demonstrates what is possible when two industry leaders with deep technical expertise come together to push the boundaries of performance, efficiency, and design. We believe this collaboration has set a new benchmark for the industry, and we look forward to expanding on this success in the coming years."

    Project Highlights

    • Industrial scale: 205 MW of nameplate capacity with a power usage effectiveness ("PUE") of 1.06, powered behind-the-meter by a wind farm and front-of-the-meter by the ERCOT grid
    • Rack-based architecture: Proprietary rack-based architecture supports 180 kilowatts per rack, 50% higher than the 120-kW requirement of NVIDIA Blackwell HGX GPUs
    • Next-generation ASIC compute technology: Site will host up to 17,280 BITMAIN U3S21EXPH servers (at full energization), the first ASIC miner mass-commercialized by BITMAIN with direct liquid-to-chip cooling within a U form factor, each delivering up to 860 terahash per second ("TH/s") at 13 joules per terahash ("J/TH")
    • Direct-to-chip liquid cooling: 96 custom-designed cooling modules circulate 120,000 gallons of glycol-water solution through a closed-loop, reverse return system designed to reduce water consumption versus conventional high-density cooling systems
    • Capital efficiency: Estimated all-in cost of approximately $430,000 to $450,000 per MW of nameplate capacity
    • Time to market: From site acquisition in July 2024 to initial energization in June 2025, Vega was brought online in under a year, demonstrating Hut 8's ability to use Bitcoin mining infrastructure development to rapidly monetize power assets
    • Commercialization through ASIC Colocation: BITMAIN will consume the full ~15 EH/s deployment at full energization pursuant to a colocation agreement that will generate revenue for Hut 8's Digital Infrastructure segment and includes a purchase option that, if exercised, would enable American Bitcoin to scale its self-mining capacity from 10 to ~25 EH/s

    About Hut 8 

    Hut 8 Corp. is an energy infrastructure platform integrating power, digital infrastructure, and compute at scale to fuel next-generation, energy-intensive use cases such as Bitcoin mining and high-performance computing. We take a power-first, innovation-driven approach to developing, commercializing, and operating the critical infrastructure that underpins the breakthrough technologies of today and tomorrow. Our platform spans 1,020 megawatts of energy capacity under management across 15 sites in the United States and Canada: five Bitcoin mining, hosting, and Managed Services sites in Alberta, New York, and Texas, five high performance computing data centers in British Columbia and Ontario, four power generation assets in Ontario, and one non-operational site in Alberta. For more information, visit www.hut8.com and follow us on X at @Hut8Corp.

    Cautionary Note Regarding Forward–Looking Information

    This press release includes "forward-looking information" and "forward-looking statements" within the meaning of Canadian securities laws and United States securities laws, respectively (collectively, "forward-looking information"). All information, other than statements of historical facts, included in this press release that address activities, events, or developments that Hut 8 expects or anticipates will or may occur in the future, including statements relating to the ability of the Vega facility to support up to ~15 EH/s of next-generation rack-based ASIC compute with direct-to-chip liquid cooling, the ability of Vega's new Tier I data center form factor to narrow the gap between legacy air-cooled ASIC infrastructure and liquid-cooled GPU infrastructure, the ability of the infrastructure at the Vega facility to support ASIC deployments at densities of up to 180 kW per rack, the ability of the facility's modular infrastructure to scale and evolve as workload requirements grow more complex, the performance of the infrastructure deployed at the Vega facility under real-world conditions, the relevance of the Vega design to AI training and other non-customer-facing HPC workloads, Hut 8's intention to scale, refine, and deploy its design philosophy to bridge the gap between high-cost, high-redundancy builds and lower-cost, application-optimized infrastructure, the estimated revenues from the Bitmain colocation agreement and the factors impacting such revenues, the potential exercise of the ASIC purchase option and the benefits thereof to Hut 8 and American Bitcoin Corp., the total all-in cost to develop the Vega facility, and other such matters is forward-looking information. Forward-looking information is often identified by the words "may", "would", "could", "should", "will", "intend", "plan", "anticipate", "allow", "believe", "estimate", "expect", "predict", "can", "might", "potential", "predict", "is designed to", "likely," or similar expressions.

    Statements containing forward-looking information are not historical facts, but instead represent management's expectations, estimates, and projections regarding future events based on certain material factors and assumptions at the time the statement was made. While considered reasonable by Hut 8 as of the date of this press release, such statements are subject to known and unknown risks, uncertainties, assumptions and other factors that may cause the actual results, level of activity, performance, or achievements to be materially different from those expressed or implied by such forward-looking information, including, but not limited to, failure of critical systems; geopolitical, social, economic, and other events and circumstances; competition from current and future competitors; risks related to power requirements; cybersecurity threats and breaches; hazards and operational risks; changes in leasing arrangements; Internet-related disruptions; dependence on key personnel; having a limited operating history; attracting and retaining customers; entering into new offerings or lines of business; price fluctuations and rapidly changing technologies; construction of new data centers, data center expansions, or data center redevelopment; predicting facility requirements; strategic alliances or joint ventures; operating and expanding internationally; failing to grow hashrate; purchasing miners; relying on third-party mining pool service providers; uncertainty in the development and acceptance of the Bitcoin network; Bitcoin halving events; competition from other methods of investing in Bitcoin; concentration of Bitcoin holdings; hedging transactions; potential liquidity constraints; legal, regulatory, governmental, and technological uncertainties; physical risks related to climate change; involvement in legal proceedings; trading volatility; and other risks described from time to time in Company's filings with the U.S. Securities and Exchange Commission. In particular, see the Company's recent and upcoming annual and quarterly reports and other continuous disclosure documents, which are available under the Company's EDGAR profile at www.sec.gov and SEDAR+ profile at www.sedarplus.ca.

    Hut 8 Corp. Investor Relations

    Sue Ennis

    [email protected]

    Hut 8 Corp. Public Relations

    Gautier Lemyze-Young

    [email protected]

    Photos accompanying this announcement are available at

    https://www.globenewswire.com/NewsRoom/AttachmentNg/99a463ce-e274-4ee7-a8e4-e134abc19825

    https://www.globenewswire.com/NewsRoom/AttachmentNg/30d0ece1-8f33-4444-b754-a4c5f49538e5

    https://www.globenewswire.com/NewsRoom/AttachmentNg/33bbd349-a468-455f-b11a-8cbaaad40232



    Primary Logo

    Get the next $HUT alert in real time by email

    Crush Q3 2025 with the Best AI Executive Assistant

    Stay ahead of the competition with Tailforce.ai - your AI-powered business intelligence partner.

    AI-Powered Inbox
    Context-aware email replies
    Strategic Decision Support
    Get Started with Tailforce.ai

    Recent Analyst Ratings for
    $HUT

    DatePrice TargetRatingAnalyst
    6/6/2025$25.00Buy
    Roth Capital
    5/22/2025$25.00Mkt Outperform
    Citizens JMP
    5/14/2025$25.00Buy
    B. Riley Securities
    5/1/2025$20.00Buy
    Maxim Group
    4/21/2025$20.00Outperform
    Northland Capital
    4/14/2025$18.00Buy
    BTIG Research
    3/7/2025$23.00Buy
    Rosenblatt
    1/8/2025Outperform
    Keefe Bruyette
    More analyst ratings

    $HUT
    Analyst Ratings

    Analyst ratings in real time. Analyst ratings have a very high impact on the underlying stock. See them live in this feed.

    See more
    • Roth Capital initiated coverage on Hut 8 Mining with a new price target

      Roth Capital initiated coverage of Hut 8 Mining with a rating of Buy and set a new price target of $25.00

      6/6/25 8:35:20 AM ET
      $HUT
      Finance: Consumer Services
      Finance
    • Citizens JMP initiated coverage on Hut 8 Mining with a new price target

      Citizens JMP initiated coverage of Hut 8 Mining with a rating of Mkt Outperform and set a new price target of $25.00

      5/22/25 8:26:15 AM ET
      $HUT
      Finance: Consumer Services
      Finance
    • B. Riley Securities initiated coverage on Hut 8 Mining with a new price target

      B. Riley Securities initiated coverage of Hut 8 Mining with a rating of Buy and set a new price target of $25.00

      5/14/25 9:00:36 AM ET
      $HUT
      Finance: Consumer Services
      Finance

    $HUT
    SEC Filings

    See more
    • Hut 8 Corp. filed SEC Form 8-K: Unregistered Sales of Equity Securities

      8-K - Hut 8 Corp. (0001964789) (Filer)

      6/30/25 4:45:16 PM ET
      $HUT
      Finance: Consumer Services
      Finance
    • Hut 8 Corp. filed SEC Form 8-K: Entry into a Material Definitive Agreement, Creation of a Direct Financial Obligation, Submission of Matters to a Vote of Security Holders, Financial Statements and Exhibits

      8-K - Hut 8 Corp. (0001964789) (Filer)

      6/23/25 4:30:36 PM ET
      $HUT
      Finance: Consumer Services
      Finance
    • SEC Form S-8 filed by Hut 8 Corp.

      S-8 - Hut 8 Corp. (0001964789) (Filer)

      6/18/25 5:04:30 PM ET
      $HUT
      Finance: Consumer Services
      Finance

    $HUT
    Press Releases

    Fastest customizable press release news feed in the world

    See more
    • Hut 8 Schedules Second Quarter 2025 Earnings Release and Conference Call

      MIAMI, July 07, 2025 (GLOBE NEWSWIRE) -- Hut 8 Corp. ((Nasdaq, TSX:HUT) ("Hut 8" or the "Company"), an energy infrastructure platform integrating power, digital infrastructure, and compute at scale to fuel next-generation, energy-intensive use cases such as Bitcoin mining and high-performance computing, today announced it will release financial results for the second quarter of 2025 before the market opens on August 7, 2025. The Company will host a conference call and webcast to review the results on the same day at 8:30 a.m. ET. Conference Call and Webcast Details Date: Thursday, August 7, 2025Time: 8:30 a.m. ET Investors can join the live webcast here. Analysts can register here. Sup

      7/7/25 5:30:00 PM ET
      $HUT
      Finance: Consumer Services
      Finance
    • Hut 8 Secures Five-Year Capacity Contracts with IESO for 310 MW of Power Generation Assets

      MIAMI, July 02, 2025 (GLOBE NEWSWIRE) -- Hut 8 Corp. (Nasdaq | TSX: HUT) ("Hut 8" or the "Company"), an energy infrastructure platform integrating power, digital infrastructure, and compute at scale to fuel next-generation, energy-intensive use cases such as Bitcoin mining and high-performance computing, today announced that each of its four natural gas-fired power plants in Ontario (collectively, the "Portfolio") has been awarded a five-year capacity contract with the Ontario Independent Electricity System Operator ("IESO"). The Portfolio is owned and operated by Far North Power Corp. ("Far North"), an entity formed by Hut 8 and Macquarie Equipment Finance Ltd. ("Macquarie"), a subsidiary

      7/2/25 6:30:00 AM ET
      $HUT
      Finance: Consumer Services
      Finance
    • Hut 8 Energizes Vega Data Center

      205 MW facility will support up to ~15 EH/s of next-generation rack-based ASIC compute with direct-to-chip liquid cooling Believed to be the largest single-building Bitcoin mining facility by nameplate hashrate MIAMI, June 30, 2025 (GLOBE NEWSWIRE) -- Hut 8 Corp. (Nasdaq | TSX: HUT) ("Hut 8" or the "Company"), an energy infrastructure platform integrating power, digital infrastructure, and compute at scale to fuel next-generation, energy-intensive use cases such as Bitcoin mining and high-performance computing, today announced the initial energization of Vega. Based on publicly available information, we believe Vega to be the largest single-building Bitcoin mining facility by nameplate h

      6/30/25 6:30:00 AM ET
      $HUT
      Finance: Consumer Services
      Finance

    $HUT
    Financials

    Live finance-specific insights

    See more
    • Hut 8 Schedules Second Quarter 2025 Earnings Release and Conference Call

      MIAMI, July 07, 2025 (GLOBE NEWSWIRE) -- Hut 8 Corp. ((Nasdaq, TSX:HUT) ("Hut 8" or the "Company"), an energy infrastructure platform integrating power, digital infrastructure, and compute at scale to fuel next-generation, energy-intensive use cases such as Bitcoin mining and high-performance computing, today announced it will release financial results for the second quarter of 2025 before the market opens on August 7, 2025. The Company will host a conference call and webcast to review the results on the same day at 8:30 a.m. ET. Conference Call and Webcast Details Date: Thursday, August 7, 2025Time: 8:30 a.m. ET Investors can join the live webcast here. Analysts can register here. Sup

      7/7/25 5:30:00 PM ET
      $HUT
      Finance: Consumer Services
      Finance
    • Hut 8 Reports First Quarter 2025 Results

      ASIC fleet upgrade drives 79% increase in hashrate and 37% improvement in fleet efficiency quarter-over-quarter Launch of American Bitcoin accelerates Hut 8's evolution as an integrated energy infrastructure platform Earnings Release Highlights Revenue of $21.8 million, net loss of $134.3 million, and Adjusted EBITDA of ($117.7) million.Total energy capacity under management of 1,020 megawatts ("MW") as of March 31, 2025.~10,800 MW development pipeline with ~2,600 MW of capacity under exclusivity as of March 31, 2025.Strategic Bitcoin reserve of 10,264 Bitcoin with a market value of $847.2 million as of March 31, 2025. MIAMI, May 08, 2025 (GLOBE NEWSWIRE) -- Hut 8 Corp. ((Nasdaq, TSX:

      5/8/25 6:30:00 AM ET
      $HUT
      Finance: Consumer Services
      Finance
    • Hut 8 Schedules First Quarter 2025 Earnings Release and Conference Call

      MIAMI, April 10, 2025 (GLOBE NEWSWIRE) -- Hut 8 Corp. ((Nasdaq, TSX:HUT) ("Hut 8" or the "Company"), an energy infrastructure platform integrating power, digital infrastructure, and compute at scale to fuel next-generation, energy-intensive use cases such as Bitcoin mining and high-performance computing, today announced it will release financial results for the first quarter of 2025 before the market opens on May 8, 2025. The Company will host a conference call and webcast to review the results on the same day at 8:30 a.m. ET. Conference Call and Webcast Details Date: Thursday, May 8, 2025Time: 8:30 a.m. ET Investors can join the live webcast here. Analysts can register here. Supplemen

      4/10/25 5:30:00 PM ET
      $HUT
      Finance: Consumer Services
      Finance

    $HUT
    Insider Trading

    Insider transactions reveal critical sentiment about the company from key stakeholders. See them live in this feed.

    See more
    • Director Oneal E Stanley converted options into 18,396 shares, increasing direct ownership by 9% to 225,112 units (SEC Form 4)

      4 - Hut 8 Corp. (0001964789) (Issuer)

      6/23/25 8:10:00 PM ET
      $HUT
      Finance: Consumer Services
      Finance
    • Director Flinn Joseph converted options into 18,999 shares and sold $174,585 worth of shares (11,069 units at $15.77), increasing direct ownership by 67% to 19,791 units (SEC Form 4)

      4 - Hut 8 Corp. (0001964789) (Issuer)

      6/23/25 8:01:35 PM ET
      $HUT
      Finance: Consumer Services
      Finance
    • Director Rickertsen Rick converted options into 17,491 shares, increasing direct ownership by 106% to 33,987 units (SEC Form 4)

      4 - Hut 8 Corp. (0001964789) (Issuer)

      6/23/25 7:40:40 PM ET
      $HUT
      Finance: Consumer Services
      Finance

    $HUT
    Leadership Updates

    Live Leadership Updates

    See more
    • Riot Platforms Announces Changes to Its Board of Directors and Provides Update on Formal Evaluation of AI/HPC Uses

      Jaime Leverton, Doug Mouton and Michael Turner to Join the Board and Bring Directly Applicable AI/HPC Conversion, Data Center and Real Estate Experience Retains Evercore and Northland Capital to Lead Engagement with Potential AI/HPC Partners Following Increased Inbound Interest Riot Platforms, Inc. (NASDAQ:RIOT) ("Riot" or "the Company"), an industry leader in vertically integrated Bitcoin mining, today announced the appointment of Jaime Leverton, Doug Mouton and Michael Turner to its Board of Directors (the "Board"). The three new directors were selected through a comprehensive process conducted by the Board's Governance and Nominating Committee, with constructive, independent input fr

      2/12/25 7:15:00 PM ET
      $HUT
      $LINE
      $PCOR
      $RIOT
      Finance: Consumer Services
      Finance
      Real Estate Investment Trusts
      Real Estate
    • Hut 8 Announces New Chief Financial Officer

      Sean Glennan to join as CFO on August 21, 2024 Glennan most recently served as Managing Director in the Global Power, Utilities & Renewables group at Citigroup MIAMI, Aug. 06, 2024 (GLOBE NEWSWIRE) -- Hut 8 Corp. ((Nasdaq, TSX:HUT) ("Hut 8" or the "Company"), a leading, vertically integrated operator of large-scale energy infrastructure and one of North America's largest Bitcoin miners today announced that Sean Glennan will become the Company's new Chief Financial Officer (CFO), effective August 21, 2024. Shenif Visram will be stepping down from his role as CFO for personal, family-related reasons. Visram will remain with the Company until Glennan assumes his role to oversee an orderly t

      8/6/24 6:30:00 AM ET
      $HUT
      Finance: Consumer Services
      Finance
    • Hut 8 Set to Join to Russell 3000® Index

      MIAMI, June 27, 2024 (GLOBE NEWSWIRE) -- Hut 8 Corp. (Nasdaq | TSX: HUT) ("Hut 8" or the "Company"), a leading, vertically integrated operator of large-scale energy infrastructure and one of North America's largest Bitcoin miners, is set to join the broad-market Russell 3000® Index at the conclusion of the 2024 Russell U.S. Indexes annual reconstitution, effective at the open of U.S. equity markets on Monday, July 1st, 2024, according to a preliminary list of additions posted June 21st, 2024. The annual Russell U.S. Indexes reconstitution captures the 4,000 largest U.S. stocks as of Tuesday, April 30th, 2024, ranking them by total market capitalization. Membership in the U.S. all-cap Ru

      6/27/24 6:30:00 AM ET
      $HUT
      Finance: Consumer Services
      Finance

    $HUT
    Large Ownership Changes

    This live feed shows all institutional transactions in real time.

    See more
    • Amendment: SEC Form SC 13G/A filed by Hut 8 Corp.

      SC 13G/A - Hut 8 Corp. (0001964789) (Subject)

      11/12/24 3:58:19 PM ET
      $HUT
      Finance: Consumer Services
      Finance
    • Amendment: SEC Form SC 13G/A filed by Hut 8 Corp.

      SC 13G/A - Hut 8 Corp. (0001964789) (Subject)

      11/4/24 11:55:46 AM ET
      $HUT
      Finance: Consumer Services
      Finance
    • SEC Form SC 13G filed by Hut 8 Corp.

      SC 13G - Hut 8 Corp. (0001964789) (Subject)

      7/8/24 4:02:38 PM ET
      $HUT
      Finance: Consumer Services
      Finance