• Live Feeds
    • Press Releases
    • Insider Trading
    • FDA Approvals
    • Analyst Ratings
    • Insider Trading
    • SEC filings
    • Market insights
  • Analyst Ratings
  • Alerts
  • Subscriptions
  • Settings
  • RSS Feeds
Quantisnow Logo
  • Live Feeds
    • Press Releases
    • Insider Trading
    • FDA Approvals
    • Analyst Ratings
    • Insider Trading
    • SEC filings
    • Market insights
  • Analyst Ratings
  • Alerts
  • Subscriptions
  • Settings
  • RSS Feeds
PublishGo to App
    Quantisnow Logo

    © 2026 quantisnow.com
    Democratizing insights since 2022

    Services
    Live news feedsRSS FeedsAlertsPublish with Us
    Company
    AboutQuantisnow PlusContactJobsAI superconnector for talent & startupsNEWLLM Arena
    Legal
    Terms of usePrivacy policyCookie policy

    Hut 8 Operations Update for August 2024

    9/6/24 6:30:00 AM ET
    $HUT
    Finance: Consumer Services
    Finance
    Get the next $HUT alert in real time by email

    18.5 EH/s and 762 MW under management in mining

    Energized Building 1 at Cedarvale

    MIAMI, Sept. 06, 2024 (GLOBE NEWSWIRE) -- Hut 8 Corp. (Nasdaq | TSX: HUT) ("Hut 8" or the "Company"), a leading, vertically integrated operator of large-scale energy infrastructure and one of North America's largest Bitcoin miners, today released its operations update for August 2024.

    "During August, we maintained our focus on low-cost operations and unit economics," said Asher Genoot, CEO of Hut 8. "Maximizing returns from our current fleet remains a priority while we continue to plan a thoughtfully structured fleet upgrade to next-generation ASICs. Reactor, our curtailment software, enabled us to mine when profitable and keep energy costs low during what is typically the hottest month of the year."

    "We also advanced commercialization efforts for our 205-megawatt site in the Texas Panhandle, as well as large-scale opportunities in our development pipeline that are suitable for Bitcoin mining and AI. We look forward to sharing further updates on each of these growth vectors as they materialize."

    Highlights:

    • Advanced commercialization discussions for the Texas Panhandle site in parallel with ongoing engineering and procurement efforts, targeting energization in H1 2025

    • Energized Building 1 at Cedarvale during August and remain on track to bring the remaining three buildings online by December

    Operating Metrics

    Average during the period unless otherwise notedAugust 2024July 2024 
    Total energy capacity under management1,2,3762 MW762 MW 
    Total deployed miners under management4179.5K174.2K 
    Total hashrate under management518.5 EH/s18.0 EH/s 
        
    Self-Mining6   
    Deployed miners758.5K58.2K 
    Deployed hashrate85.6 EH/s5.5 EH/s 
    Bitcoin produced1,987 BTC105 BTC 
    Bitcoin on balance sheet19,105 BTC9,102 BTC 
        
    Managed Services2,10   
    Energy capacity under management1582 MW582 MW 
    Deployed miners under management130.5K125.4K 
    Hashrate under management13.9 EH/s13.4 EH/s 
        
    Hosting   
    Deployed miners under management11,1276.7K76.7K 
    Hashrate under management138.5 EH/s8.5 EH/s 
        

    Energy Infrastructure Platform1

        Current Revenue Stream(s)14

     
    SiteLocationOwnerPower CapacitySelf-

    Mining
    Managed ServicesHostingHPCPower Sales 
    Expansion Site 115Texas PanhandleHut 8205 MW      
    Medicine HatMedicine Hat, ABHut 867 MWYes     
    Salt CreekOrla, TXHut 863 MWYes     
    AlphaNiagara Falls, NYHut 850 MWYes Yes   
    Drumheller16Drumheller, ABHut 842 MW      
    KelownaKelowna, BCHut 81.1 MW   Yes  
    MississaugaMississauga, ONHut 80.9 MW   Yes  
    VaughanVaughan, ONHut 80.6 MW   Yes  
    Vancouver IIVancouver, BCHut 80.5 MW   Yes  
    Vancouver IVancouver, BCHut 80.3 MW   Yes  
    King Mountain17McCamey, TXHut 8 (JV)280 MWYesYesYes Yes 
    Iroquois Falls18Iroquois Falls, ONHut 8 (JV)120 MW    Yes 
    Kingston18Kingston, ONHut 8 (JV)110 MW    Yes 
    North Bay18North Bay, ONHut 8 (JV)40 MW    Yes 
    Kapuskasing18Kapuskasing, ONHut 8 (JV)40 MW    Yes 
    Cedarvale3Barstow, TXManaged215 MW Yes    
    East StilesMidland, TXManaged30 MW Yes    
    RebelMidland, TXManaged25 MW Yes    
    StilesMidland, TXManaged20 MW Yes    
    Garden CityMidland, TXManaged12 MW Yes    
    Total  1,322 MW      
              

    Upcoming Conferences & Events:

    • September 9-11, 2024: H.C. Wainwright 26th Annual Global Investment Conference
    • September 25-26, 2024: TMT M&A Forum USA 2024
    • September 25-26, 2024: infra/STRUCTURE 2024
    • September 26, 2024: ArcStone-Kingswood Growth Summit 2024

    Notes:

    1. As of the end of the period
    2. Includes all Self-Mining, Managed Services, and Hosting infrastructure, including 100% of the energy capacity at the King Mountain site, which is owned by the King Mountain JV in which the Company has a 50% membership interest and a Fortune 200 renewable energy producer has the remaining 50% membership interest (the "King Mountain JV").
    3. Includes 215 megawatts assuming full capacity at Cedarvale, which was first energized in April and is currently under construction.
    4. Includes all miners that are racked with power and networking, rounded to the nearest 100, in Self-Mining, Managed Services, and Hosting infrastructure with power and networking, including all miners at the King Mountain site.
    5. Includes all Self-Mining, Managed Services, and Hosting hashrate, including 100% of the hashrate at the King Mountain site.
    6. Self-Mining operations for Hut 8 include 100% of operations at the King Mountain site.
    7. Deployed miners are defined as those physically racked with power and networking, rounded to the nearest 100; deployed self-mining miners net of the 50% share of the King Mountain JV held by Hut 8's joint venture partner was 49.5K during August and 49.2K during July.
    8. Indicates the target hashrate of all deployed miners; deployed self-mining hashrate net of the 50% share of the King Mountain JV held by Hut 8's joint venture partner was 4.7 EH/s during both August and July.
    9. Bitcoin produced net of the 50% share of the King Mountain JV held by Hut 8's joint venture partner was 74 BTC during August and 88 during July.
    10. The Managed Services figures reflected in this table include the Self-Mining and Hosting metrics from the sites where Hut 8's Managed Services business is an additional service layer in the operation of the site (at King Mountain, Rebel, Stiles, East Stiles, and Garden City). As a result, the sum of the Self-Mining, Managed Services, and Hosting numbers will not add up to the "Total energy capacity under management", "Total deployed miners under management", and "Total hashrate under management" figures that are also reflected in the table.
    11. Miners are rounded to the nearest 100.
    12. 42.6K deployed miners under management net of the 50% share of the King Mountain JV held by Hut 8's joint venture partner during both August and July.
    13. 4.7 EH/s under management net of Hut 8's joint venture partner's 50% share of the King Mountain JV during both August and July, respectively.
    14. Reflects revenue sources to Hut 8, its subsidiaries, and/or joint ventures in which they participate.
    15. Site is currently under development.
    16. Site currently shut down; Hut 8 maintaining lease with option value of re-energizing site.
    17. Owned by a JV between Hut 8 and a Fortune 200 renewable energy producer in which Hut 8 has an approximately 50% membership interest.
    18. Owned by a JV between Hut 8 and Macquarie in which Hut 8 has an approximately 80% membership interest.

    About Hut 8 

    Hut 8 Corp. is an energy infrastructure operator and Bitcoin miner with self-mining, hosting, managed services, and traditional data center operations across North America. Headquartered in Miami, Florida, Hut 8 Corp. has a portfolio comprising twenty sites: ten Bitcoin mining, hosting, and Managed Services sites in Alberta, New York, and Texas, five high performance computing data centers in British Columbia and Ontario, four power generation assets in Ontario, and one newly announced site in the Texas Panhandle. For more information, visit www.hut8.com and follow us on X (formerly known as Twitter) at @Hut8Corp.

    Cautionary Note Regarding Forward–Looking Information

    This press release includes "forward-looking information" and "forward-looking statements" within the meaning of Canadian securities laws and United States securities laws, respectively (collectively, "forward-looking information"). All information, other than statements of historical facts, included in this press release that address activities, events or developments that Hut 8 expects or anticipates will or may occur in the future, including such things as future business strategy, competitive strengths, goals, expansion and growth of the business, operations, plans and other such matters is forward-looking information. Forward-looking information is often identified by the words "may", "would", "could", "should", "will", "intend", "plan", "anticipate", "allow", "believe", "estimate", "expect", "predict", "can", "might", "potential", "predict", "is designed to", "likely" or similar expressions. Specifically, such forward-looking information included in this press release includes statements relating to maximizing returns from the Company's current fleet, planning a thoughtfully structured fleet upgrade to next-generation ASICs, and energizing the remaining three buildings at Cedarvale by December 2024.

    Statements containing forward-looking information are not historical facts, but instead represent management's expectations, estimates and projections regarding future events based on certain material factors and assumptions at the time the statement was made. While considered reasonable by Hut 8 as of the date of this press release, such statements are subject to known and unknown risks, uncertainties, assumptions and other factors that may cause the actual results, level of activity, performance or achievements to be materially different from those expressed or implied by such forward-looking information, including but not limited to, security and cybersecurity threats and hacks; malicious actors or botnet obtaining control of processing power on the Bitcoin network; further development and acceptance of the Bitcoin network; changes to Bitcoin mining difficulty; loss or destruction of private keys; increases in fees for recording transactions in the Blockchain; erroneous transactions; reliance on a limited number of key employees; reliance on third party mining pool service providers; regulatory changes; classification and tax changes; momentum pricing risk; fraud and failure related to digital asset exchanges; difficulty in obtaining banking services and financing; difficulty in obtaining insurance, permits and licenses; internet and power disruptions; geopolitical events; uncertainty in the development of cryptographic and algorithmic protocols; uncertainty about the acceptance or widespread use of digital assets; failure to anticipate technology innovations; the COVID19 pandemic, climate change; currency risk; lending risk and recovery of potential losses; litigation risk; business integration risk; changes in market demand; changes in network and infrastructure; system interruption; changes in leasing arrangements; failure to achieve intended benefits of power purchase agreements; potential for interrupted delivery, or suspension of the delivery, of energy to mining sites and other risks related to the digital asset mining and data center business. For a complete list of the factors that could affect Hut 8, please see the "Risk Factors" section of Hut 8's Transition Report on Form 10-K, available under the Company's EDGAR profile at www.sec.gov, and Hut 8's other continuous disclosure documents which are available under the Company's SEDAR+ profile at www.sedarplus.ca and EDGAR profile at www.sec.gov.

    Hut 8 Corp. Investor Relations

    Sue Ennis

    [email protected]

    Hut 8 Corp. Media Relations

    [email protected]



    Primary Logo

    Get the next $HUT alert in real time by email

    Crush Q1 2026 with the Best AI Superconnector

    Stay ahead of the competition with Standout.work - your AI-powered talent-to-startup matching platform.

    AI-Powered Inbox
    Context-aware email replies
    Strategic Decision Support
    Get Started with Standout.work

    Recent Analyst Ratings for
    $HUT

    DatePrice TargetRatingAnalyst
    2/2/2026$80.00Buy
    H.C. Wainwright
    6/6/2025$25.00Buy
    Roth Capital
    5/22/2025$25.00Mkt Outperform
    Citizens JMP
    5/14/2025$25.00Buy
    B. Riley Securities
    5/1/2025$20.00Buy
    Maxim Group
    4/21/2025$20.00Outperform
    Northland Capital
    4/14/2025$18.00Buy
    BTIG Research
    3/7/2025$23.00Buy
    Rosenblatt
    More analyst ratings

    $HUT
    SEC Filings

    View All

    Amendment: SEC Form SCHEDULE 13G/A filed by Hut 8 Corp.

    SCHEDULE 13G/A - Hut 8 Corp. (0001964789) (Subject)

    2/2/26 4:35:09 PM ET
    $HUT
    Finance: Consumer Services
    Finance

    Hut 8 Corp. filed SEC Form 8-K: Entry into a Material Definitive Agreement, Creation of a Direct Financial Obligation, Financial Statements and Exhibits

    8-K - Hut 8 Corp. (0001964789) (Filer)

    12/31/25 4:15:12 PM ET
    $HUT
    Finance: Consumer Services
    Finance

    Hut 8 Corp. filed SEC Form 8-K: Other Events, Financial Statements and Exhibits

    8-K - Hut 8 Corp. (0001964789) (Filer)

    12/17/25 4:15:22 PM ET
    $HUT
    Finance: Consumer Services
    Finance

    $HUT
    Insider Trading

    Insider transactions reveal critical sentiment about the company from key stakeholders. See them live in this feed.

    View All

    SEC Form 4 filed by Chief Strategy Officer Ho Michael

    4 - Hut 8 Corp. (0001964789) (Issuer)

    11/4/25 7:58:35 PM ET
    $HUT
    Finance: Consumer Services
    Finance

    SEC Form 4 filed by Chief Executive Officer Genoot Asher

    4 - Hut 8 Corp. (0001964789) (Issuer)

    11/4/25 7:53:14 PM ET
    $HUT
    Finance: Consumer Services
    Finance

    SEC Form 3 filed by new insider Hut 8 Corp.

    3 - Hut 8 Corp. (0001964789) (Reporting)

    9/12/25 4:50:07 PM ET
    $HUT
    Finance: Consumer Services
    Finance

    $HUT
    Analyst Ratings

    Analyst ratings in real time. Analyst ratings have a very high impact on the underlying stock. See them live in this feed.

    View All

    H.C. Wainwright resumed coverage on Hut 8 Mining with a new price target

    H.C. Wainwright resumed coverage of Hut 8 Mining with a rating of Buy and set a new price target of $80.00

    2/2/26 6:51:37 AM ET
    $HUT
    Finance: Consumer Services
    Finance

    Roth Capital initiated coverage on Hut 8 Mining with a new price target

    Roth Capital initiated coverage of Hut 8 Mining with a rating of Buy and set a new price target of $25.00

    6/6/25 8:35:20 AM ET
    $HUT
    Finance: Consumer Services
    Finance

    Citizens JMP initiated coverage on Hut 8 Mining with a new price target

    Citizens JMP initiated coverage of Hut 8 Mining with a rating of Mkt Outperform and set a new price target of $25.00

    5/22/25 8:26:15 AM ET
    $HUT
    Finance: Consumer Services
    Finance

    $HUT
    Press Releases

    Fastest customizable press release news feed in the world

    View All

    Hut 8 Schedules Full-Year 2025 Earnings Release and Conference Call

    MIAMI, Jan. 30, 2026 /PRNewswire/ -- Hut 8 Corp. ((Nasdaq, TSX:HUT) ("Hut 8" or the "Company"), an energy infrastructure platform integrating power, digital infrastructure, and compute at scale to fuel next-generation, energy-intensive use cases, today announced it will release financial results for the full year of 2025 before the market opens on February 25, 2026. The Company will host a conference call and webcast to review the results on the same day at 8:30 a.m. ET. Conference Call and Webcast Details Date: Wednesday, February 25, 2026 Time: 8:30 a.m. ET To register for t

    1/30/26 6:30:00 AM ET
    $HUT
    Finance: Consumer Services
    Finance

    Digital Asset Treasury Strategy Positions Companies for Long-Term Shareholder Value

    Strategic allocation aims to hedge inflation risk while aligning with the future of digital finance NEW YORK  , Jan. 20, 2026 /PRNewswire/ -- Market News Updates News Commentary - More companies are starting to rethink how they manage their balance sheets, and digital asset treasury strategies are quickly moving into the spotlight. Instead of letting excess cash sit idle and lose purchasing power, some organizations are allocating a portion of their treasury into digital assets like Bitcoin and other blockchain-based instruments. For investors, this isn't about chasing hype — it's about companies taking a more active, modern approach to protecting and growing capital in a world where inflati

    1/20/26 8:45:00 AM ET
    $BMNR
    $CIFR
    $COIN
    Finance: Consumer Services
    Finance
    Durable Goods
    Consumer Discretionary

    Leverage Shares by Themes expand offering to include USAR, ONDS, PLUG, ALB, HUT, and UUUU as part of its single stock Leveraged ETF suite

    GREENWICH, Conn., Jan. 13, 2026 (GLOBE NEWSWIRE) -- Leverage Shares by Themes introduce six new single stock leveraged ETFs, available for trading starting January 13, 2026. These products are designed to empower investors to amplify returns (up and down) and actively engage with the performance of USA Rare Earth, Ondas Holdings, Plug Power, Albemarle, Hut 8, and Energy Fuels. The new ETFs are tailored to target a 200% exposure to the daily performance of their underlying stocks, offering sophisticated traders and the retail investor efficient tools to help capitalize on market movements at an industry-low management fee for single stock leveraged ETFs at .75%.* The new ETFs are: USGG –

    1/13/26 9:00:00 AM ET
    $ALB
    $HUT
    $ONDS
    Major Chemicals
    Industrials
    Finance: Consumer Services
    Finance

    $HUT
    Financials

    Live finance-specific insights

    View All

    Hut 8 Schedules Full-Year 2025 Earnings Release and Conference Call

    MIAMI, Jan. 30, 2026 /PRNewswire/ -- Hut 8 Corp. ((Nasdaq, TSX:HUT) ("Hut 8" or the "Company"), an energy infrastructure platform integrating power, digital infrastructure, and compute at scale to fuel next-generation, energy-intensive use cases, today announced it will release financial results for the full year of 2025 before the market opens on February 25, 2026. The Company will host a conference call and webcast to review the results on the same day at 8:30 a.m. ET. Conference Call and Webcast Details Date: Wednesday, February 25, 2026 Time: 8:30 a.m. ET To register for t

    1/30/26 6:30:00 AM ET
    $HUT
    Finance: Consumer Services
    Finance

    Hut 8 Signs 15-Year, 245 MW AI Data Center Lease at River Bend Campus with Total Contract Value of $7.0 Billion

    15-year 245 MW IT lease valued at $7.0 billion over the base term and up to $17.7 billion if all renewal options are exercised Google providing a financial backstop covering obligations for the 15-year base lease term Hut 8 to implement an institutional-grade execution model designed to de-risk project delivery with blue-chip counterparties—Entergy (NYSE:ETR), J.P. Morgan (NYSE:JPM), Goldman Sachs (NYSE:GS), Vertiv (NYSE:VRT), and Jacobs (NYSE:J) MIAMI, Dec. 17, 2025 /PRNewswire/ -- Hut 8 Corp. (NASDAQ:HUT) (TSX:HUT) ("Hut 8" or the "Company"), an energy infrastructure platform integrating power, digital infrastructure, and compute at scale to fuel next-generation, energy-intensive use cases

    12/17/25 6:15:00 AM ET
    $ETR
    $GS
    $HUT
    Electric Utilities: Central
    Utilities
    Investment Bankers/Brokers/Service
    Finance

    Hut 8 Announces AI Infrastructure Partnership with Anthropic and Fluidstack

    MIAMI, Dec. 17, 2025 /PRNewswire/ -- Hut 8 Corp. ((Nasdaq, TSX:HUT) ("Hut 8" or the "Company"), an energy infrastructure platform integrating power, digital infrastructure, and compute at scale to fuel next-generation, energy-intensive use cases, today announced a partnership with Anthropic and Fluidstack to accelerate the deployment of hyperscale AI infrastructure in the United States. As part of the partnership, Hut 8 will develop and deliver at least 245 megawatts (MW) and up to 2,295 MW of AI data center infrastructure for Anthropic, leveraging high-performance clusters operated by Fluidstack.

    12/17/25 6:00:00 AM ET
    $HUT
    Finance: Consumer Services
    Finance

    $HUT
    Leadership Updates

    Live Leadership Updates

    View All

    Riot Platforms Announces Changes to Its Board of Directors and Provides Update on Formal Evaluation of AI/HPC Uses

    Jaime Leverton, Doug Mouton and Michael Turner to Join the Board and Bring Directly Applicable AI/HPC Conversion, Data Center and Real Estate Experience Retains Evercore and Northland Capital to Lead Engagement with Potential AI/HPC Partners Following Increased Inbound Interest Riot Platforms, Inc. (NASDAQ:RIOT) ("Riot" or "the Company"), an industry leader in vertically integrated Bitcoin mining, today announced the appointment of Jaime Leverton, Doug Mouton and Michael Turner to its Board of Directors (the "Board"). The three new directors were selected through a comprehensive process conducted by the Board's Governance and Nominating Committee, with constructive, independent input fr

    2/12/25 7:15:00 PM ET
    $HUT
    $LINE
    $PCOR
    Finance: Consumer Services
    Finance
    Real Estate Investment Trusts
    Real Estate

    Hut 8 Announces New Chief Financial Officer

    Sean Glennan to join as CFO on August 21, 2024 Glennan most recently served as Managing Director in the Global Power, Utilities & Renewables group at Citigroup MIAMI, Aug. 06, 2024 (GLOBE NEWSWIRE) -- Hut 8 Corp. ((Nasdaq, TSX:HUT) ("Hut 8" or the "Company"), a leading, vertically integrated operator of large-scale energy infrastructure and one of North America's largest Bitcoin miners today announced that Sean Glennan will become the Company's new Chief Financial Officer (CFO), effective August 21, 2024. Shenif Visram will be stepping down from his role as CFO for personal, family-related reasons. Visram will remain with the Company until Glennan assumes his role to oversee an orderly t

    8/6/24 6:30:00 AM ET
    $HUT
    Finance: Consumer Services
    Finance

    Hut 8 Set to Join to Russell 3000® Index

    MIAMI, June 27, 2024 (GLOBE NEWSWIRE) -- Hut 8 Corp. (Nasdaq | TSX: HUT) ("Hut 8" or the "Company"), a leading, vertically integrated operator of large-scale energy infrastructure and one of North America's largest Bitcoin miners, is set to join the broad-market Russell 3000® Index at the conclusion of the 2024 Russell U.S. Indexes annual reconstitution, effective at the open of U.S. equity markets on Monday, July 1st, 2024, according to a preliminary list of additions posted June 21st, 2024. The annual Russell U.S. Indexes reconstitution captures the 4,000 largest U.S. stocks as of Tuesday, April 30th, 2024, ranking them by total market capitalization. Membership in the U.S. all-cap Ru

    6/27/24 6:30:00 AM ET
    $HUT
    Finance: Consumer Services
    Finance

    $HUT
    Large Ownership Changes

    This live feed shows all institutional transactions in real time.

    View All

    Amendment: SEC Form SC 13G/A filed by Hut 8 Corp.

    SC 13G/A - Hut 8 Corp. (0001964789) (Subject)

    11/12/24 3:58:19 PM ET
    $HUT
    Finance: Consumer Services
    Finance

    Amendment: SEC Form SC 13G/A filed by Hut 8 Corp.

    SC 13G/A - Hut 8 Corp. (0001964789) (Subject)

    11/4/24 11:55:46 AM ET
    $HUT
    Finance: Consumer Services
    Finance

    SEC Form SC 13G filed by Hut 8 Corp.

    SC 13G - Hut 8 Corp. (0001964789) (Subject)

    7/8/24 4:02:38 PM ET
    $HUT
    Finance: Consumer Services
    Finance