• Live Feeds
    • Press Releases
    • Insider Trading
    • FDA Approvals
    • Analyst Ratings
    • Insider Trading
    • SEC filings
    • Market insights
  • Analyst Ratings
  • Alerts
  • Subscriptions
  • Settings
  • RSS Feeds
Quantisnow Logo
  • Live Feeds
    • Press Releases
    • Insider Trading
    • FDA Approvals
    • Analyst Ratings
    • Insider Trading
    • SEC filings
    • Market insights
  • Analyst Ratings
  • Alerts
  • Subscriptions
  • Settings
  • RSS Feeds
PublishGo to App
    Quantisnow Logo

    © 2026 quantisnow.com
    Democratizing insights since 2022

    Services
    Live news feedsRSS FeedsAlertsPublish with Us
    Company
    AboutQuantisnow PlusContactJobsAI superconnector for talent & startupsNEWLLM Arena
    Legal
    Terms of usePrivacy policyCookie policy

    i-80 Gold Announces Positive Updated Preliminary Economic Assessment on the Cove Project, Nevada; After-Tax NPV(5%) of $271 Million with an After-Tax IRR of 30% at US$2,175/oz Au

    2/12/25 5:05:00 PM ET
    $IAUX
    Precious Metals
    Basic Materials
    Get the next $IAUX alert in real time by email

    RENO, Nev., Feb. 12, 2025 /PRNewswire/ - i-80 GOLD CORP. (TSX:IAU) (NYSE:IAUX) ("i-80 Gold", or the "Company") is pleased to announce the results of an updated preliminary economic assessment (the "2025 PEA" or the "Study") for the Cove Project ("Cove" or the "Project"), an advanced underground exploration project located on the Battle Mountain-Eureka Trend in Northern Nevada, United States. The 2025 PEA confirms that the high-grade Cove Project has the potential to become a key component of the Company's regional "hub-and-spoke" mining and processing strategy.

    The 2025 PEA replaces the previous PEA for the Project completed in 2021 (the "2021 PEA"). The Study has been updated to reflect a remodeling of the deposit using a more confined mining geometry, further advancement of the hydrology model, as well as using updated precious metals prices, capital and  operating costs. All amounts are in United States dollars, unless otherwise stated.

    "The 2025 PEA for the Cove Project represents an important first step in delivering updated technical information across i-80 Gold's asset portfolio. The results validate our planned regional hub-and-spoke model of feeding a central processing plant with high-grade material from three underground mines, which is expected to form the production base for i-80 Gold moving forward. In the coming weeks, we look forward to releasing updated PEAs for Granite Creek (both open pit and underground) and the Ruby Hill Complex (Archimedes underground and Mineral Point open pit)," stated Richard Young, Chief Executive Officer of i-80 Gold.

    2025 PEA Highlights

    Mineral Estimates, Production and Mine Life

    • Underground gold mine with a life of mine ("LOM") of approximately 8 years.
    • Average annual gold production of approximately 100,000 ounces of gold following ramp up.
    • Estimated LOM cash costs(1) of $1,194 per ounce and all-in-sustaining costs(1) of $1,303 per ounce.
    • Updated mineral resource estimate resulting in an indicated gold mineral resource of 311,000 oz at 8.2 grams per tonne ("g/t") and an inferred gold mineral resource of 1.16 Moz at 8.9 g/t.
    • The current infill drill program conducted over the past two years is not included in the 2025 PEA, however, all drill results will be included in the feasibility study targeted for completion in the fourth quarter 2025.
    • Several underground exploration targets to be followed up in the coming years to potentially extend the mine life beyond the current 8 years.

    Project Economics

    • Based on a $2,175/oz gold price, the Project's undiscounted after-tax cash flows(2) total $397 million with an after-tax net present value ("NPV") of $271 million(2), assuming a 5% discount rate, generating a30% internal rate of return ("IRR").
    • Based on a spot gold price of $2,900/oz, the Project's undiscounted after-tax cash flows(2) total $793 million with an after-tax NPV of $582 million(2), assuming a 5% discount rate, generating a IRR of 52%.
    • Mine Construction capital estimated at $157 million, nearly 60% of which is earmarked for dewatering activities.
    • LOM sustaining capital estimated to total $49 million.
    • All operating, processing, pre-production, mine construction, and sustaining costs have been updated relative to the 2021 PEA to reflect current market pricing.

    Mining and Processing

    • Mining to use a combination of cut-and-fill and bench-and-fill methods unchanged from the previous study.
    • Nearly 60% of the material mined is anticipated to be processed at i-80 Gold's Lone Tree autoclave facility (see Figure 3) and the remainder processed at a third-party roasting facility with whom the Company has an established contract.
    • Average gold grade processed of 10.4 g/t with an average gold recovery of 86% (autoclave) and 79% (roaster).
    • A summary of key valuation, cost, and operating metrics is presented in Table 1 below. For more detailed metrics presented on an annual basis, see Cove Project Detailed Cash Flow Model in Appendix.

    Table 1: Summary of 2025 PEA Key Operating and Financial Metrics

    Project Economics

    Unit



    Gold Price

    $/oz

    $2,175

    Silver Price

    $/oz

    $27.25

    Pre-Tax NPV(5%)(2)  

    $M

    $337

    After-Tax Cash Flow(2)

    $M

    $397

    After-Tax NPV(5%)(2)

    $M

    $271

    After-Tax IRR

    %

    30 %

    Production Profile





    Mine Life

    years

    8

    Mineralized Material Mined

    000s

    tonnes

    2,675.6

    Gold Grade of Mineralized Material Mined

    g/t Au

    10.4

    Silver Grade of Mineralized Material Mined

    g/t Ag

    6.2

    Waste Tonnes Mined

    000s

    tonnes

    226.1

    Total Tonnes Mined

    000s

    tonnes

    2,901.8

    Total Mineralized Material Processed

    000s

    tonnes

    2,675.6

    Gold Grade Processed

    g/t Au

    10.4

    Silver Grade Processed

    g/t Ag

    6.2

    Average Gold Recovery

    %

    83 %

    Average Silver Recovery

    %

    24 %

    Total Gold Recovered

    000s oz

    739.6

    Total Silver Recovered

    000s oz

    114.5

    Average Annual Gold Production (LOM)

    000s oz

    92.4

    Average Annual Gold Production

    (following production ramp up)

    000s oz

    100

    Unit Operating Costs





    LOM Operating Cost





    Mineralized Material Mined

    $/t

    142.2

    Mineralized Material and Waste Mined

    $/t

    141.0

    Processed

    $/t milled

    80.0

    Transportation Costs

    $/t milled

    20.8

    Electricity Dewatering

    $/t milled

    26.5

    G&A

    $/t milled

    21.5

    LOM Total Cash Costs(1)

    (net of by-product credit)

    $/oz

    $1,194

    LOM All-in Sustaining Costs(1)

    (net of by-product credit)

    $/oz

    $1,303

    Total Capital Costs





    Pre-Development Capital

    $M

    $17.3

    Construction Capital

    $M

    $157.4

    LOM Sustaining Capital

    $M

    $49.1

    Closure Costs

    $M

    $31.3

    Total Capital & Closure Costs(3)

    $M

    $255.1

    "The Study highlights the value Cove brings to our gold portfolio, showcasing high-grade mineralization on a brownfield site in a top-tier mining jurisdiction, with low capital requirements and a high return on invested capital," added Matthew Gili, President and Chief Operating Officer of i-80 Gold. "The Study primarily updates the 2021 PEA's economic model and includes findings from hydrological studies, which have increased our understanding of the Project's dewatering needs. Additionally, the completion of an exploration decline has enabled infill resource drilling and advanced metallurgical test work, which will be included in a feasibility study planned for the fourth quarter of 2025."

    Mineral Resource Update

    The 2025 PEA is based on a revised resource model with no additional drilling results included, relative to the 2021 PEA. The updated resource estimate has been calculated using stope optimizer software, whereas the previous mineral resource was not. The new methodology generates optimal mineable stope geometries while considering several factors including geological constraints, grade distribution and stope dimensions. This significantly improves the accuracy of mineral resource estimates and has become an industry standard for underground deposits in Nevada.

    The updated mineral resource estimate includes a total of 311,000 ounces of gold at 8.2 g/t Au in the indicated category and 1,156,000 ounces of inferred resources at 8.9 g/t in the inferred category (see Table 2). The majority of the indicated resource is currently hosted in the Helen deposit (see Figure 1). The updated estimate resulted in additional mineralized body constraints resulting in indicated and inferred tonnes decreasing by 6% and 13% respectively. Moreover, gold ounces decreased by 20% in the indicated and inferred categories, however the updated mineral resource represents more mineable shapes than the prior resource estimate.

    The ongoing Cove drilling program has been designed to infill mineralization in the Helen and Gap zones ahead of a planned feasibility study in 2025. The Project offers substantial exploration potential as the bulk of the work completed to date has been focused on the main deposit areas only. Exploration from 2014 through 2019 resulted in the identification of several new zones of mineralization that have received minimal follow-up, including mineralization in the 2201 zone (153,000 tonnes at 26.7 g/t Au) beneath the Cove pit (see Figure 1).

    Figure 1: Cove Longitudinal Section of Mineralized Bodies and Drill Holes (Looking Northeast) (CNW Group/i-80 Gold Corp)

    Table 2: Cove Mineral Resource Estimate as at December 31, 2024



    Indicated Mineral Resources





    Tonnes

    Au

    Ag

    Au

    Ag





    (000)

    (g/t)

    (g/t)

    (000 oz)

    (000 oz)



    Helen

    674

    9.3

    2.6

    201

    55



    Gap

    254

    7.5

    8.9

    61

    72



    CSD

    249

    6.0

    55.0

    48

    441



    Total Indicated

    1,178

    8.2

    15.0

    311

    569













    Inferred Mineral Resources





    Tonnes

    Au

    Ag

    Au

    Ag





    (000)

    (g/t)

    (g/t)

    (000 oz)

    (000 oz)



    Helen

    1,582

    8.4

    2.9

    427

    146



    Gap

    2,022

    8.4

    9.0

    543

    585



    CSD

    290

    5.9

    57.8

    55

    538



    2201

    153

    26.7

    34.8

    131

    171



    Total Inferred

    4,046

    8.9

    11.1

    1,156

    1,439



    Notes to table above:

    I.

    Mineral resources have been estimated at a gold price of $2,175 per troy ounce and a silver price of $27.25 per troy ounce;

    II.

    Mineral resources have been estimated using gold metallurgical recoveries ranging from 73.2% to 93.3% for roasting and 78.5% to 95.1 % for pressure oxidation;

    III.

    Roaster cutoff grades range from 4.15 to 5.29 Au g/t (0.121 to 0.154 opt) and pressure oxidation cutoff grades range from 3.83 to 4.64 Au g/t (0.112 to 0.135 opt);  

    IV.

    The effective date of the mineral resource estimate is December 31, 2024;

    V.

    Mineral resources, which are not mineral reserves, do not have demonstrated economic viability. The estimate of mineral resources may be materially affected by environmental, permitting, legal, title, socio-political, marketing, or other relevant factors;

    VI.

    An inferred mineral resource is that part of a mineral resource for which quantity and grade or quality are estimated on the basis of limited geological evidence and sampling. Geological evidence is sufficient to imply but not verify geological and grade or quality continuity. An inferred mineral resource has a lower level of confidence than that applying to an indicated mineral resource and must not be converted to a mineral reserve. It is reasonably expected that the majority of Inferred Mineral Resources could be upgraded to Indicated Mineral Resources with continued exploration; and

    VII.

    The reference point for mineral resources is in situ.

    Economic Analysis

    Cove's NPV and IRR in relation to fluctuations in the long-term gold price are demonstrated in Table 3 and the Project's cost sensitivities are illustrated in Figure 2 below.

    Table 3: Cove Project Gold Price Sensitivity After-tax Analysis



    Gold Price ($/oz)



    $1,850

    $2,000

    $2,175

    $2,500

    $2,750

    $2,900

    $3,000

    NPV5%(2) ($M)

    $134

    $198

    $271

    $409

    $516

    $582

    $626

    IRR (%)

    19 %

    24 %

    30 %

    40 %

    47 %

    52 %

    54 %

     

    Figure 2: Cove Project Gold Price Sensitivity Cost Analysis (CNW Group/i-80 Gold Corp)

    Project Overview

    The Project is located 25 miles southwest of the town of Battle Mountain, in the McCoy mining district in the Fish Creek Mountains of Lander County, Nevada (see Figure 3). The Cove deposit was mined by Echo Bay Mines Ltd. (Echo Bay) between 1988 and 2000 during which period the Cove deposit produced 2.6 million ounces of gold and 100 million ounces of silver. Gold and silver production from heap leach pads continued until 2006. The Project benefits from extensive historical geological datasets, its location in a jurisdiction with deep mining pedigree, and access to both local and regional infrastructure, including proximity to paved highways, electrical power, pre-existing mine infrastructure, and a skilled labor force.

    i-80 Gold's predecessor purchased the Cove project in 2012 and has since conducted significant exploration and infill drilling, metallurgical testing, and has advanced the permitting process. The Company expects to begin expending development capital, primarily for dewatering activities in late 2027 or early 2028 and for production to ramp up during 2029.

    Figure 3: Cove Regional Map (CNW Group/i-80 Gold Corp)

    Geology and Mineralization

    The Cove deposit consists of Helen, Gap, CSD, and 2201 zones. They are located beneath the historically mined Cove open pit and extend approximately 2,000 feet northwest from the pit (see Figure 1). The current mine plan includes Helen and Gap while CSD and 2021 could be included in a future mine plan, subject to the completion of additional technical work.

    Three main types of mineralization occur at Cove. The Helen and Gap zones are Carlin-style disseminated refractory gold deposits. The Cove South Deep (CSD) gold and silver mineralization is similar in character to that at Helen and Gap but is characterized by silver to gold ratios of 50:1 to over 100:1. The 2201 zone is comprised of disseminated sulfides within sheeted stockwork veins and massive sulfide lenses replacing carbonate. Both styles of mineralization in the 2201 zone contain locally high concentrations of lead and zinc in addition to gold and silver. Structural controls on mineralization include the broad, gently southeast-plunging Cove anticline, several northeast striking dike-filled normal faults (Cay, Blasthole, Bay, 110, Gold Dome), mafic sills, and rheology contrasts.

    Although most well-known Carlin-type deposits are hosted in Paleozoic slope and shelf carbonates, host rocks at Cove are silty to massive limestones and dolomites of the Triassic Star Peak Group. Limestone and silty limestone of the Favret Formation (approximately 700 feet thick) are the primary host for Carlin-style mineralization, and the Dixie Valley Formation conglomerates are the primary host of polymetallic vein mineralization in the 2201 zone.

    Mining and Processing

    The Study demonstrates an initial 8-year mine life with average annual gold production of approximately 100,000 ounces of gold following ramp up. The Study represents a preliminary point-in-time estimate of the mine plan. Once underground infrastructure is constructed a significant exploration program is planned to follow up on earlier positive drill results in a more cost-effective manner with a goal of extending the mine life beyond the current 8 years.

    The high-grade mine will be accessed by a single ramp extending from the surface (elevation 4,625 ft) to the lowest extent of planned mining (elevation 3,430 ft). The access ramp will be large enough to accommodate 30-ton trucks. A series of raises will provide secondary egress and ventilation. A mining contractor will extract the mineralization using drift and fill mining methods at an average rate of approximately 1,100tonnes per day.

    Metallurgical testing has demonstrated that both Helen and Gap resources are generally refractory and require an oxidation process to increase gold extraction using whole cyanidation of mineralized material. Composite testing has shown that Helen samples are generally more amenable to roasting and carbon-in-leach ("CIL") processing, while the Gap zone is more amenable to an autoclave process followed by CIL. Upon the commencement of mining and processing, a detailed and systematic mineralized material control sampling program will be utilized to determine which of the two facilities (roaster vs. autoclave) the material should be routed to, to maximize recovery rates.

    The PEA incorporates toll-milling arrangements with associated over-the-road trucking costs for both process streams. The PEA contemplates the use of the Lone Tree autoclave (owned by the Company and in respect of which an autoclave refurbishment class 3 engineering study is expected to be completed in 2025) and a third-party roaster for which a toll-milling agreement has been negotiated for the treatment of that material.

    Figure 4: LOM Processing Schedule (CNW Group/i-80 Gold Corp)

    Capital Cost Summary

    Mine construction capital is estimated to be $157.4 million. Approximately 60% of capital expenditures is for dewatering activities with the balance to be used for portal and underground development to gain access to the mineralized bodies (see Table 4). The low development capital required to construct Cove is due in part to the existence of significant infrastructure, including a portal to the Helen deposit and 5,739 feet of development work already completed. Permitting activities are well underway (see Permitting section for more detail). The permitting process is expected to take approximately three years to complete followed by 18 months of construction which is primarily dewatering and underground development, as well as some light surface infrastructure work.

    Cove is expected to generate an estimated $379 million in net cash flow over the current 8-year mine life (see Figure 5).

    Table 4: Capital Cost Estimates



    Pre-

    Development

    Mine

    Construction

    Sustaining

    ($M)

    ($M)

    ($M)

    Environmental, Permitting and Feasibility

    $7.0

    -

    -

    Dewatering - Helen

    -

    $39.5

    -

    Dewatering - Gap

    -

    $48.4

    -

    Electrical Service and Powerline

    -

    $10.5

    -

    Mine Development - Helen

    -

    $24.8

    $21.0

    Mine Development - Gap

    -

    $0.4

    $20.3

    Mine Facilities

    -

    $2.2

    $1.3

    Pre-production Expense

    $5.0

    $3.6

    -

    Resource Conversion Drilling

    $2.0

    -

    -

    Contingency

    (15% Drilling and Development; 25% Facilities)

    $3.3

    $28.0

    $6.5

    Total Capital Cost(3)

    $17.3

    $157.4

    $49.1

     

    Figure 5: LOM Annual Cash Flow (CNW Group/i-80 Gold Corp)

    Operating Cost Summary

    The 2025 PEA estimates a cash cost(1) of $1,194 per ounce of gold and an all-in sustaining costs(1) of $1,303 per ounce of gold for the LOM (see Table 5). Figure 6 illustrates these operating costs over Cove's estimated production profile.  

    Table 5: Total and Unit Operating Costs



    Total Costs

    Unit Cost

    Cost per Ounce

    ($M)

    ($/t milled)

    ($/oz Au)

    Mining

    $408

    $152

    $552

    Transportation & Processing

    $270

    $101

    $365

    Electrical Power

    $71

    $26

    $96

    G&A, Royalties & Net Proceeds Tax

    $138

    $51

    $186

    By-Product Credits

    ($3)

    ($1)

    ($4)

    Total Operating Cost/Cash Cost

    $883

    $330

    $1,194

    Closure & Reclamation

    $31

    $12

    $42

    Sustaining Capital

    $49

    $18

    $66

    All-in Sustaining Costs(1)

    $963

    $360

    $1,303

     

    Figure 6: LOM Gold Production Profile vs Cost per Ounce (CNW Group/i-80 Gold Corp)

    Permitting

    National Environmental Policy Act (NEPA) associated permitting activities continue to progress with all baseline study reports and the Plan of Operations Amendment having been submitted to the Bureau of Land Management (BLM).  The permitting action is anticipated to require a Notice of Intent to Complete an Environmental Impact Statement (EIS).  Following the EIS notification process, a public scoping period will be completed and a draft EIS will be prepared and subsequently posted for public review and comment.  The public comments and associated responses will be incorporated into the Final EIS document for BLM acceptance.

    Nevada Division of Environmental Protection (NDEP) permitting activities are also in progress, focusing on the submittal and subsequent acceptance of modification applications to the site's Water Pollution Control Permits and Reclamation Permit, in addition to, a new Air Quality Operating Permit application, submittal, and issuance.

    These permitting activities are well underway and are expected to take approximately three years to complete from the effective date of the technical report, with permits anticipated by the end of 2027.

    Next Steps to Feasibility Study

    As stated earlier, a feasibility study under NI 43-101 with an updated mineral resource estimate is expected to be completed in the fourth quarter of 2025, in addition to a report prepared under S-K 1300. The updated resource will include 45,000 meters of drilling conducted since the completion of the exploration drift in the first quarter of 2023. Below is a summary of additional work to be conducted.

    Resource Delineation and Exploration

    • Complete the ongoing underground resource delineation drilling and incorporate this data into the updated resource model.

    Mining

    • A geotechnical characterization program is being implemented along with resource delineation for use in mine planning.
    • Complete additional testing of potential backfill sources to optimize the cemented rock fill mix design.
    • Complete a ventilation simulation to predict diesel particulate matter, carbon monoxide, and other contaminate concentrations.

    Metallurgical Testing

    The current resource delineation drilling program will provide samples needed for additional metallurgical testing to confirm the variability and viability of Helen and Gap resources to roasting and pressure oxidation (autoclave) with CIL. The objectives for the testing include:

    • Determine the location and number of samples required to represent the resources through geo-metallurgical analysis.
    • Assess the variability of the responses to roasting and calcine cyanidation across the resources.
    • Assess the variability of the responses to pressure oxidation (autoclave) and residue cyanidation across the resources.
    • Consider tests to optimize pressure oxidation (autoclave), such as temperature, retention time and acid strength.
    • Testing to establish head grade and extraction relations to support more detailed resource modelling.
    • Establish mineralogy impact and determine geologic domains.
    • Collect additional comminution data to assess hardness variability within the resources.

    Technical Disclosure and Qualified Persons

    The 2025 PEA was prepared in accordance with National Instrument 43-101 Standards of Disclosure for Mineral Projects ("NI 43-101"). The full 2025 PEA will be filed within 45 days under the Company's issuer profile on SEDAR+ at www.sedarplus.ca and on i-80 Gold's profile. An Initial Assessment for the Cove Project ("S-K 1300 Report") was also prepared in accordance with Subpart 1300 ("S-K 1300") and Item 601 of the Regulation S-K and the S-K 1300 Report will be filed on EDGAR at www.sec.gov. Both reports will be available on the Company's website at www.i80gold.com. The mineral estimates and project economics are the same under the 2025 PEA and the S-K 1300 Report.

    The technical information contained in this press release has been prepared under the supervision of, and has been reviewed and approved by Dagny Odell, P.E., (SME No. 2402150) Practical Mining LLC, and Tyler Hill CPG., Vice President Geology for the Company, who are all qualified persons within the meaning of NI 43-101 and S-K 1300.

    For a description of the data verification, assay procedures and the quality assurance program and quality control measures applied by the Company, please see the Company's Annual Information Form dated March 12, 2024 filed under the Company's profile on SEDAR+ at www.sedarplus.ca and filed with the Company's Form 40-F under the Company's profile on EDGAR at www.sec.gov. Further information about the 2025 PEA referenced in this news release, including information in respect of data verification, key assumptions, parameters, risks and other factors, will be contained in the 2025 PEA.

    The Study is preliminary in nature and includes an economic analysis that is based, in part, on inferred mineral resources. Inferred mineral resources that are considered too speculative geologically to have for the application of economic considerations applied to them that would enable them to be categorized as mineral reserves, and there is no certainty that the results of the Study will be realized. Mineral resources do not have demonstrated economic viability and are not mineral reserves.

    Endnotes

    (1)

    This is a non-IFRS/non-GAAP measure. Please see both sections titled "Non-IFRS Performance Measures/Non-GAAP Financial Performance Measures" below.

    (2)

    Cash flow and NPV are calculated as of the start of construction, which is anticipated to commence in January 2028.

    (3)

    Total Capital Cost in Table 4 excludes $7.2 million of contingent payments related to the acquisition of the property in 2012.  These amounts are anticipated to be incurred in 2033 and 2034 and are based on reaching production milestones of 250,000 and 500,000 gold ounces, respectively.

    About i-80 Gold Corp.

    i-80 Gold Corp. is a Nevada-focused mining company with the fourth largest gold mineral resources in the state of Nevada. The recapitalization plan underway is designed to unlock the value of the Company's high-grade gold deposits to create a Nevada mid-tier gold producer. i-80 Gold's common shares are listed on the TSX and the NYSE American under the trading symbol IAU:TSX and IAUX:NYSE. Further information about i-80 Gold's portfolio of assets and long-term growth strategy is available at www.i80gold.com or by email at [email protected].

    Forward-Looking Information

    Certain statements in this release constitute "forward-looking statements" or "forward-looking information" within the meaning of applicable securities laws, including but not limited to, statements regarding the updated results of the 2025 PEA  on the Project, such as future estimates of internal rates of return, net present value, future production, estimates of cash cost, proposed mining plans and methods, mine life estimates, cash flow forecasts, metal recoveries, estimates of capital and operating costs, timing for permitting and environmental assessments and the size and timing of phased development of the Project. Furthermore, forward-looking statements are necessarily based upon a number of estimates and assumptions that, while considered reasonable by the Company as of the date of such statements, are inherently subject to significant business, economic and competitive uncertainties and contingencies. With respect to this specific forward-looking information concerning the development of the Project, the Company has based its assumptions and analysis on certain factors that are inherently uncertain. Uncertainties include: (i) the adequacy of infrastructure; (ii) geological characteristics; (iii) metallurgical characteristics of the mineralization; (iv) the ability to develop adequate processing capacity; (v) the price of gold, silver and other commodities; (vi) the availability of equipment and facilities necessary to complete development; (vii) the cost of consumables and mining and processing equipment; (viii) unforeseen technological and engineering problems; (ix) natural disasters and/or accidents; * currency fluctuations; (xi) changes in regulations; (xii) the compliance by joint venture partners and/or key suppliers with terms of agreements; (xiii) the availability and productivity of skilled labour; (xiv) the regulation of the mining industry by various governmental agencies; (xv) the ability to raise sufficient capital to develop such projects; (xiv) changes in project scope or design; and (xv) political factors.

    Such statements can be identified by the use of words such as "may", "would", "could", "will", "intend", "expect", "believe", "plan", "anticipate", "estimate", "scheduled", "forecast", "predict" and other similar terminology, or state that certain actions, events or results "may", "could", "would", "might" or "will" be taken, occur or be achieved. These statements reflect the Company's current expectations regarding future events, performance and results and speak only as of the date of this release and are expressly qualified in their entirety by this cautionary statement. Subject to applicable securities laws, the Company does not assume any obligation to update or revise the forward-looking statements contained herein to reflect events or circumstances occurring after the date of this release.

    This release also contains references to estimates of mineral resources. The estimation of mineral resources is inherently uncertain and involves subjective judgments about many relevant factors. Mineral resources that are not mineral reserves do not have demonstrated economic viability. The accuracy of any such estimates is a function of the quantity and quality of available data, and of the assumptions made and judgments used in engineering and geological interpretation (including estimated future production from the Project, the anticipated tonnages and grades that will be mined and the estimated level of recovery that will be realized), which may prove to be unreliable and depend, to a certain extent, upon the analysis of drilling results and statistical inferences that may ultimately prove to be inaccurate. Mineral resource estimates may have to be re-estimated based on: (i) fluctuations in commodities prices; (ii) results of drilling, (iii) metallurgical testing and other studies; (iv) proposed mining operations, including dilution; (v) the evaluation of mine plans subsequent to the date of any estimates; and (vi) the possible failure to receive required permits, approvals and licenses or changes to existing mining licenses.

    Forward-looking statements and information involve significant known and unknown risks and uncertainties, should not be read as guarantees of future performance or results and will not necessarily be accurate indicators of whether or not such results will be achieved. A number of factors could cause actual results to differ materially from the results expressed or implied by such forward-looking statements or information, including, but not limited to: the Company's ability to finance the development of its mineral properties; assumptions and discount rates being appropriately applied to the Study and S-K 1300 Report, uncertainty as to whether there will ever be production at the Company's mineral exploration and development properties; risks related to the Company's ability to commence production at the Project and generate material revenues or obtain adequate financing for its planned exploration and development activities; uncertainties relating to the assumptions underlying resource and reserve estimates; mining and development risks, including risks related to infrastructure, accidents, equipment breakdowns, labour disputes, bad weather, non-compliance with environmental and permit requirements or other unanticipated difficulties with or interruptions in development, construction or production; the geology, grade and continuity of the Company's mineral deposits; the uncertainties involving success of exploration, development and mining activities; permitting timelines; government regulation of mining operations; environmental risks; unanticipated reclamation expenses; prices for energy inputs, labour, materials, supplies and services; uncertainties involved in the interpretation of drilling results and geological tests and the estimation of reserves and resources; unexpected cost increases in estimated capital and operating costs; the need to obtain permits and government approvals; material adverse changes, unexpected changes in laws, rules or regulations, or their enforcement by applicable authorities; the failure of parties to contracts with the company to perform as agreed; social or labour unrest; changes in commodity prices; and the failure of exploration programs or studies to deliver anticipated results or results that would justify and support continued exploration, studies, development or operations. For a more detailed discussion of such risks and other factors that could cause actual results to differ materially from those expressed or implied by such forward-looking statements, refer to i-80 Gold's filings with Canadian securities regulators, including the most recent Annual Information Form, available on SEDAR+ at www.sedarplus.ca.

    Non-IFRS/Non-GAAP Financial Performance Measures

    The Company has included certain terms or performance measures in this news release that commonly used in the gold mining industry that are not defined under International Financial Reporting Standards ("IFRS") or United States Generally Accepted Accounting Principles ("US GAAP"). This includes: all-in sustaining costs per ounce and cash cost per ounce. Non-IFRS/Non-GAAP financial performance measures do not have any standardized meaning prescribed under IFRS or US GAAP, and therefore, they may not be comparable to similar measures employed by other companies. The data presented is intended to provide additional information and should not be considered in isolation or as a substitute for measures prepared in accordance with IFRS US GAAP and should be read in conjunction with the Company's financial statements. Because the Company has provided these measures on a forward-looking basis, it is unable to present a quantitative reconciliation to the most directly comparable financial measure calculated and presented in accordance with IFRS or US GAAP without unreasonable efforts. This is due to the inherent difficulty of forecasting the timing or amount of various reconciling items that would impact the most directly comparable forward-looking IFRS or US GAAP measure that have not yet occurred, are outside of the Company's control and/or cannot be reasonably predicted. 

    Definitions

    "All-in sustaining costs" is a non-IFRS or US GAAP financial measure calculated based on guidance published by the World Gold Council ("WGC"). The WGC is a market development organization for the gold industry and is an association whose membership comprises leading gold mining companies. Although the WGC is not a mining industry regulatory organization, it worked closely with its member companies to develop these metrics. Adoption of the all-in sustaining cost metric is voluntary and not necessarily standard, and therefore, this measure presented by the Company may not be comparable to similar measures presented by other issuers. The Company believes that the all-in sustaining cost measure complements existing measures and ratios reported by the Company. All-in sustaining cost includes both operating and capital costs required to sustain gold production on an ongoing basis. Sustaining operating costs represent expenditures expected to be incurred at the Project that are considered necessary to maintain production. Sustaining capital represents expected capital expenditures comprising mine development costs, including capitalized waste, and ongoing replacement of mine equipment and other capital facilities, and does not include expected capital expenditures for major growth projects or enhancement capital for significant infrastructure improvements.

    "Cash cost per gold ounce" is a common financial performance measure in the gold mining industry but has no standard meaning under IFRS or US GAAP. The Company believes that, in addition to conventional measures prepared in accordance with IFRS or US GAAP, certain investors use this information to evaluate the Company's performance and ability to generate cash flow. Cash cost figures are calculated in accordance with a standard developed by The Gold Institute. The Gold Institute ceased operations in 2002, but the standard is considered the accepted standard of reporting cash cost of production in North America. Adoption of the standard is voluntary, and the cost measures presented may not be comparable to other similarly titled measures of other companies.

     For a more detailed breakdown on how these measures were calculated, please see the table below:



    Total Costs

    Unit Cost

    Cost per Ounce

    ($M)

    ($/t milled)

    ($/oz Au)

    Mining

    $408

    $152

    $552

    Transportation & Processing

    $270

    $101

    $365

    Electrical Power

    $71

    $26

    $96

    G&A, Royalties & Net Proceeds Tax

    $138

    $51

    $186

    By-Product Credits

    ($3)

    ($1)

    ($4)

    Total Operating Cost/Cash Cost

    $883

    $330

    $1,194

    Closure & Reclamation

    $31

    $12

    $42

    Sustaining Capital

    $49

    $18

    $66

    All-in Sustaining Costs(1)

    $963

    $360

    $1,303

    APPENDIX

    Cove Project Detailed Cash Flow Model

    All amounts are in United States dollars, unless otherwise stated.

    Cove Underground

    UNITS

    TOTAL LOM

    2025E

    2026E

    2027E

    2028E

    2029E

    2030E

    2031E

    2032E

    2033E

    2034E

    2035E

    2036E

    2037E

    2038E

    2039E

    2040+1







    Y -3

    Y -2

    Y -1

    Y 1

    Y 2

    Y 3

    Y 4

    Y 5

    Y 6

    Y 7

    Y 8

    Y 9

    Y 10

    Y 11

    Y 12

    Y 13

    +1

    MINING





































    Mine Life

    Years

    8

































    Mineralized Material Mined

    k tonnes

    2,676

    -

    -

    -

    -

    150.3

    156.8

    444.3

    429.9

    452.3

    383.7

    397.2

    261.0

    -

    -

    -

    -

    Waste Moved

    k tonnes

    226

    -

    -

    -

    -

    33.7

    12.2

    41.9

    41.0

    24.5

    29.1

    31.2

    12.5

    -

    -

    -

    -

    Total Moved

    k tonnes

    2,902

    -

    -

    -

    -

    184.1

    169.0

    486.1

    471.0

    476.8

    412.9

    428.4

    273.4

    -

    -

    -

    -

    Mineralized Material Moved Daily

    tpd

    916

    -

    -

    -

    -

    411.9

    429.7

    1,217.2

    1,177.9

    1,239.3

    1,051.3

    1,088.2

    715.0

    -

    -

    -

    -

    Backfill Placed

    k tonnes

    1,756

    -

    -

    -

    -

    98.7

    102.9

    291.5

    282.2

    296.8

    251.8

    260.7

    171.3

    -

    -

    -

    -

    Capitalized Mining

    k tonnes

    467

    -

    -

    -

    3.2

    190.8

    86.3

    39.1

    97.7

    4.4

    45.2

    -

    -

    -

    -

    -

    -







































    PROCESSING





































    Total Material for Processing

    k tonnes

    2,676

    -

    -

    -

    -

    150

    157

    245

    272

    594

    600

    397

    261

    -

    -

    -

    -

    Au Average Grade

    g/t Au

    10.4

    -

    -

    -

    -

    8.83

    10.06

    11.06

    11.71

    11.32

    9.44

    9.64

    10.78

    -

    -

    -

    -

    Contained Gold

    '000 oz Au

    894

    -

    -

    -

    -

    37.73

    42.73

    69.32

    80.83

    177.59

    151.09

    102.88

    77.39

    -

    -

    -

    -







































    Autoclave Processing





































    Total Tonnes Processed

    k tonnes

    1,518

    -

    -

    -

    -

    81

    85

    -

    86

    312

    342

    351

    261

    -

    -

    -

    -

    Gold Grade

    g/t Au

    10.02

    -

    -

    -

    -

    9.37

    10.06

    -

    12.26

    10.94

    9.20

    9.02

    10.78

    -

    -

    -

    -

    Silver Grade

    g/t Au

    8.40

    -

    -

    -

    -

    3.45

    3.50

    -

    4.58

    13.98

    9.43

    7.15

    6.42

    -

    -

    -

    -

    Contained Gold

    '000 oz Au

    489

    -

    -

    -

    -

    24.3

    27.3

    -

    34.1

    109.8

    101.1

    101.9

    90.4

    -

    -

    -

    -

    Contained Silver

    '000 oz Ag

    410

    -

    -

    -

    -

    9.0

    9.5

    -

    12.7

    140.4

    103.6

    80.7

    53.9

    -

    -

    -

    -

    Gold Average Recovery

    %

    86 %

    -

    -

    -

    -

    85.6 %

    85.6 %

    -

    85.6 %

    85.6 %

    85.6 %

    85.6 %

    85.6 %

    -

    -

    -

    -

    Silver Average Recovery

    %

    25 %

    -

    -

    -

    -

    25.0 %

    25.0 %

    -

    25.0 %

    25.0 %

    25.0 %

    25.0 %

    25.0 %

    -

    -

    -

    -

    Recovered Gold

    '000 oz Au

    418

    -

    -

    -

    -

    20.8

    23.4

    -

    29.1

    94.0

    86.5

    87.2

    77.4

    -

    -

    -

    -

    Recovered Silver

    '000 oz Ag

    102

    -

    -

    -

    -

    2.2

    2.4

    -

    3.2

    35.1

    25.9

    20.2

    13.5

    -

    -

    -

    -







































    Roaster Processing





































    Total Tonnes Processed

    k tonnes

    1,158

    -

    -

    -

    -

    70

    72

    245

    185

    282

    258

    46

    -

    -

    -

    -

    -

    Gold Grade

    g/t Au

    10.89

    -

    -

    -

    -

    8.20

    10.07

    11.06

    11.45

    11.74

    9.76

    14.37

    -

    -

    -

    -

    -

    Silver Grade

    g/t Ag

    3.23

    -

    -

    -

    -

    3.49

    4.20

    2.69

    3.26

    3.69

    2.66

    4.47

    -

    -

    -

    -

    -

    Contained Gold

    '000 oz Au

    406

    -

    -

    -

    -

    18.4

    23.4

    87.1

    68.2

    106.3

    81.0

    21.2

    -

    -

    -

    -

    -

    Contained Silver

    '000 oz Ag

    120

    -

    -

    -

    -

    7.8

    9.8

    21.2

    19.4

    33.4

    22.1

    6.6

    -

    -

    -

    -

    -

    Gold Average Recovery

    %

    79 %

    -

    -

    -

    -

    79.2 %

    79.2 %

    79.2 %

    79.2 %

    79.2 %

    79.2 %

    79.2 %

    -

    -

    -

    -

    -

    Silver Average Recovery

    %

    10 %

    -

    -

    -

    -

    10.0 %

    10.0 %

    10.0 %

    10.0 %

    10.0 %

    10.0 %

    10.0 %

    -

    -

    -

    -

    -

    Recovered Gold

    '000 oz Au

    321

    -

    -

    -

    -

    16.9

    19.3

    69.3

    51.7

    83.6

    64.6

    15.7

    -

    -

    -

    -

    -

    Recovered Silver

    '000 oz Au

    12

    -

    -

    -

    -

    0.8

    1.0

    2.1

    1.9

    3.3

    2.2

    0.7

    -

    -

    -

    -

    -







































    Total Tonnes Processed

    k tonnes

    2,675.6

    -

    -

    -

    -

    150.3

    156.8

    244.9

    271.6

    593.9

    599.9

    397.2

    261.0

    -

    -

    -

    -

    Total Gold Production

    '000 oz Au

    739.6

    -

    -

    -

    -

    37.7

    42.7

    69.3

    80.8

    177.6

    151.1

    102.9

    77.4

    -

    -

    -

    -

    Total Silver Production

    '000 oz Ag

    114.5

    -

    -

    -

    -

    3.0

    3.4

    2.1

    5.1

    38.4

    28.1

    20.8

    13.5

    -

    -

    -

    -

    Total Gold Equivalent Production

    '000 oz Au

    741.0

    -

    -

    -

    -

    37.8

    42.8

    69.3

    80.9

    178.1

    151.4

    103.1

    77.6

    -

    -

    -

    -

    REVENUE





































    Gold Price

    $/oz Au

    $2,175

    $2,175

    $2,175

    $2,175

    $2,175

    $2,175

    $2,175

    $2,175

    $2,175

    $2,175

    $2,175

    $2,175

    $2,175

    $2,175

    $2,175

    $2,175

    $2,175

    Silver Price

    $/oz Ag

    $27

    $27.25

    $27.25

    $27.25

    $27.25

    $27.25

    $27.25

    $27.25

    $27.25

    $27.25

    $27.25

    $27.25

    $27.25

    $27.25

    $27.25

    $27.25

    $27.25

    Revenues

    $M

    $1,612

    -

    -

    -

    -

    $82

    $93

    $151

    $176

    $387

    $329

    $224

    $169

    -

    -

    -

    -

    OPERATING COSTS





































    Mining Costs (incl. backfill)

    $M

    $381

    -

    -

    -

    -

    $21.6

    $22.4

    $62.4

    $61.9

    $64.2

    $54.7

    $57.1

    $36.2

    -

    -

    -

    -

    Mining Costs (waste)

    $M

    $27

    -

    -

    -

    -

    $4.1

    $1.5

    $5.1

    $5.0

    $3.0

    $3.6

    $3.7

    $1.5

    -

    -

    -

    -

    Autoclave Processing

    $M

    $118

    -

    -

    -

    -

    $6.3

    $6.6

    -

    $6.7

    $24.4

    $26.7

    $27.4

    $20.4

    -

    -

    -

    -

    Roaster Processing

    $M

    $96

    -

    -

    -

    -

    $5.8

    $6.0

    $20.3

    $15.3

    $23.3

    $21.3

    $3.8

    -

    -

    -

    -

    -

    Transportation

    $M

    $56

    -

    -

    -

    -

    $3.2

    $3.3

    $6.6

    $6.4

    $12.6

    $12.5

    $6.9

    $4.2

    -

    -

    -

    -

    Electrical Power

    $M

    $71

    -

    -

    -

    -

    $7.9

    $9.0

    $9.1

    $8.0

    $9.5

    $9.1

    $8.8

    $8.3

    $0.8

    $0.2

    -

    -

    G&A

    $M

    $58

    -

    -

    -

    -

    $7.2

    $7.2

    $7.2

    $7.2

    $7.2

    $7.2

    $7.2

    $7.2

    -

    -

    -

    -

    Total Operating Cost

    $M

    $806

    -

    -

    -

    -

    $56.1

    $56.0

    $110.6

    $110.5

    $144.1

    $135.0

    $114.9

    $77.8

    $0.8

    $0.2

    -

    -







































    Refining & Sales

    $M

    $1

    -

    -

    -

    -

    $0.1

    $0.1

    $0.1

    $0.2

    $0.3

    $0.3

    $0.2

    $0.1

    -

    -

    -

    -

    Royalties & State Taxes

    $M

    $79

    -

    -

    -

    -

    $3.3

    $4.2

    $4.2

    $8.1

    $21.8

    $17.0

    $11.7

    $8.4

    -

    -

    -

    -







































    Mining Costs

    (mineralized material)

    $/t mined

    $142.2

    -

    -

    -

    -

    $144

    $143

    $140

    $144

    $142

    $143

    $144

    $139

    -

    -

    -

    -

    Mining Costs (waste)

    $/t mined

    $121.4

    -

    -

    -

    -

    $122

    $122

    $121

    $121

    $122

    $122

    $120

    $122

    -

    -

    -

    -

    Autoclave Processing

    $/t milled

    $78.1

    -

    -

    -

    -

    $78

    $78

    -

    $78

    $78

    $78

    $78

    $78

    -

    -

    -

    -

    Roaster Processing

    $/t milled

    $82.7

    -

    -

    -

    -

    $83

    $83

    $83

    $83

    $83

    $83

    $83

    -

    -

    -

    -

    -

    Transportation

    $/t milled

    $20.8

    -

    -

    -

    -

    $21

    $21

    $27

    $23

    $21

    $21

    $17

    $16

    -

    -

    -

    -

    Electrical Power

    $/t milled

    $26.5

    -

    -

    -

    -

    $52

    $57

    $37

    $30

    $16

    $15

    $22

    $32

    -

    -

    -

    -

    G&A

    $/t milled

    $21.5

    -

    -

    -

    -

    $48

    $46

    $29

    $26

    $12

    $12

    $18

    $28

    -

    -

    -

    -







































    Total

    $/t milled

    $301.3

    -

    -

    -

    -

    $266

    $266

    $168

    $247

    $231

    $231

    $238

    $244

    -

    -

    -

    -







































    CAPITAL EXPENDITURES





































    Contingent Payments

    $M

    $7

    -

    -

    -

    -

    -

    -

    -

    -

    $3.6

    $3.6

    -

    -

    -

    -

    -

    -

    Pre-Development Capital

    $M

    $17

    $9.4

    $4.6

    $3.3

    -

    -

    -

    -

    -

    -

    -

    -

    -

    -

    -

    -

    -

    Capitalized Development & Construction

    $M

    $69

    -

    -

    -

    $35.3

    $34.2

    -

    -

    -

    -

    -

    -

    -

    -

    -

    -

    -

    Dewatering

    $M

    $88

    -

    -

    -

    $69.9

    $18.0

    -

    -

    -

    -

    -

    -

    -

    -

    -

    -

    -

    Sustaining Capital

    $M

    $49

    -

    -

    -

    -

    -

    $15.2

    $6.8

    $14.4

    $0.7

    $12.0

    -

    -

    -

    -

    -

    -

    Total Capital

    $M

    $231

    $9.4

    $4.6

    $3.3

    $105.2

    $52.2

    $15.2

    $6.8

    $14.4

    $4.3

    $15.6

    -

    -

    -

    -

    -

    -

    Reclamation

    $M

    $31

    $0.2

    $0.2

    $0.2

    $0.8

    $0.8

    $0.8

    $0.8

    $0.8

    $0.8

    $0.8

    $0.8

    $4.6

    $4.6

    $4.6

    $4.6

    $5.8







































    CASH COSTS & AISC





































    Total Cash Costs

    (Inc. Royalty)

    $/oz

    $1,194

    -

    -

    -

    -

    $1,573

    $1,408

    $1,658

    $1,467

    $930

    $1,003

    $1,227

    $1,112

    -

    -

    -

    -

    AISC(1)

    $/oz

    $1,303

    -

    -

    -

    -

    $1,595

    $1,782

    $1,768

    $1,656

    $938

    $1,088

    $1,235

    $1,171

    -

    -

    -

    -







































    CASH FLOW ANALYSIS





































    Revenue

    $M

    $1,612

    -

    -

    -

    -

    $82

    $93

    $151

    $176

    $387

    $329

    $224

    $169

    -

    -

    -

    -

    Operating Costs Gold & Royalties

    $M

    ($886)

    -

    -

    -

    -

    ($59)

    ($60)

    ($115)

    ($119)

    ($166)

    ($152)

    ($127)

    ($86)

    ($1)

    ($0)

    -

    -

    Reclamation Accrual

    $M

    ($31)

    -

    -

    -

    -

    ($2)

    ($2)

    ($3)

    ($3)

    ($8)

    ($6)

    ($4)

    ($3)

    -

    -

    -

    -

    Depreciation

    $M

    ($295)

    -

    -

    -

    -

    ($13)

    ($16)

    ($25)

    ($32)

    ($70)

    ($64)

    ($44)

    ($30)

    -

    -

    -

    -

    Net Operating Income

    (Pre-Tax)

    $M

    $400

    -

    -

    -

    -

    $8

    $15

    $8

    $22

    $143

    $107

    $50

    $49

    ($1)

    ($0)

    -

    -







































    Income Taxes

    $M

    ($84)

    -

    -

    -

    -

    ($3)

    ($5)

    ($2)

    ($6)

    ($33)

    ($23)

    ($11)

    ($7)

    $1

    $1

    $1

    $1







































    Net Income

    $M

    $315

    -

    -

    -

    -

    $5

    $10

    $6

    $16

    $111

    $84

    $39

    $42

    $0

    $1

    $1

    $1

    Depreciation

    $M

    $295

    -

    -

    -

    -

    $13.3

    $16.0

    $25.2

    $32.1

    $70.2

    $63.8

    $43.5

    $30.3

    -

    -

    -

    -

    Reclamation

    $M

    -

    ($0.2)

    ($0.2)

    ($0.2)

    ($0.8)

    $0.9

    $1.1

    $2.1

    $2.7

    $6.8

    $5.5

    $3.5

    ($1.6)

    ($4.6)

    ($4.6)

    ($4.6)

    ($5.8)

    Working Capital

    $M

    $0

    -

    -

    -

    -

    ($6.9)

    ($0.1)

    ($6.3)

    ($0.4)

    ($5.5)

    $1.6

    $2.9

    $4.7

    $9.9

    $0.1

    $0.0

    -

    Operating Cash Flow

    $M

    $610

    ($0)

    ($0)

    ($0)

    ($1)

    $12

    $27

    $27

    $50

    $182

    $155

    $89

    $75

    $6

    ($4)

    ($4)

    ($5)







































    Capital Expenditures

    $M

    ($231)

    ($9)

    ($5)

    ($3)

    ($105)

    ($52)

    ($15)

    ($7)

    ($14)

    ($4)

    ($16)

    -

    -

    -

    -

    -

    -

    NET CASH FLOW

    $M

    $379

    ($10)

    ($5)

    ($3)

    ($106)

    ($40)

    $12

    $20

    $36

    $178

    $139

    $89

    $75

    $6

    ($4)

    ($4)

    ($5)













































































    PROJECT ECONOMICS



    As of Q1/2025 



    As of Q1/2028 

























    After-tax NPV 5% discounting

    $M

    $214



    $271

























    Notes to table above: 

    (1) AISC annual calculations include reclamation costs on a cash basis rather than on an accrual basis. As such, the weighted average of the annual AISC amounts will not agree to the life of mine AISC.  

    i-80 Gold Corp logo (CNW Group/i-80 Gold Corp)

    Cision View original content to download multimedia:https://www.prnewswire.com/news-releases/i-80-gold-announces-positive-updated-preliminary-economic-assessment-on-the-cove-project-nevada-after-tax-npv5-of-271-million-with-an-after-tax-irr-of-30-at-us2-175oz-au-302375344.html

    SOURCE i-80 Gold Corp

    Get the next $IAUX alert in real time by email

    Crush Q1 2026 with the Best AI Superconnector

    Stay ahead of the competition with Standout.work - your AI-powered talent-to-startup matching platform.

    AI-Powered Inbox
    Context-aware email replies
    Strategic Decision Support
    Get Started with Standout.work

    Recent Analyst Ratings for
    $IAUX

    DatePrice TargetRatingAnalyst
    More analyst ratings

    $IAUX
    Insider Trading

    Insider transactions reveal critical sentiment about the company from key stakeholders. See them live in this feed.

    View All

    SEC Form 4 filed by Yopps Steven W.

    4 - i-80 Gold Corp. (0001853962) (Issuer)

    3/31/26 7:56:45 PM ET
    $IAUX
    Precious Metals
    Basic Materials

    SEC Form 4 filed by Jalonen Michael

    4 - i-80 Gold Corp. (0001853962) (Issuer)

    3/31/26 7:55:16 PM ET
    $IAUX
    Precious Metals
    Basic Materials

    SEC Form 4 filed by Joseph Cassandra Pulskamp

    4 - i-80 Gold Corp. (0001853962) (Issuer)

    3/31/26 7:54:00 PM ET
    $IAUX
    Precious Metals
    Basic Materials

    $IAUX
    Insider Purchases

    Insider purchases reveal critical bullish sentiment about the company from key stakeholders. See them live in this feed.

    View All

    Director Seaman John William bought $26,000 worth of shares (20,000 units at $1.30), increasing direct ownership by 6% to 346,942 units (SEC Form 4)

    4 - i-80 Gold Corp. (0001853962) (Issuer)

    12/12/25 2:37:56 PM ET
    $IAUX
    Precious Metals
    Basic Materials

    Director Seaman John William bought $30,900 worth of shares (30,000 units at $1.03), increasing direct ownership by 10% to 326,942 units (SEC Form 4)

    4 - i-80 Gold Corp. (0001853962) (Issuer)

    11/26/25 12:44:27 PM ET
    $IAUX
    Precious Metals
    Basic Materials

    SVP, General Counsel Savarie David Roger bought $5,250 worth of shares (5,000 units at $1.05), increasing direct ownership by 2% to 263,200 units (SEC Form 4)

    4 - i-80 Gold Corp. (0001853962) (Issuer)

    11/19/25 1:56:33 PM ET
    $IAUX
    Precious Metals
    Basic Materials

    $IAUX
    Press Releases

    Fastest customizable press release news feed in the world

    View All

    i-80 Gold Reports High-Grade Assay Results at Archimedes Underground Project Including 24.6 g/t Au Over 23.6 Meters; Development Advancing on Schedule

    TORONTO, April 8, 2026 /CNW/ - i-80 GOLD CORP. (TSX:IAU) (NYSE:IAUX) ("i-80 Gold", or the "Company") is pleased to announce assay results from its recent drilling campaign at the Archimedes Underground Project ("Archimedes" or the "Project"), located on the Company's Ruby Hill property at the southeastern end of the Battle Mountain-Eureka Trend in northeastern Nevada, United States (see Figure 1 in Appendix).The Company commenced construction of Archimedes, the Company's second underground project, in the third quarter of 2025. Material from Archimedes, in addition to Granite Creek underground, is expected to begin feeding the Company's Lone Tree processing plant by late 2027, subject to the

    4/8/26 6:05:00 AM ET
    $IAUX
    Precious Metals
    Basic Materials

    i-80 Gold Closes Gold Prepayment Facility for up to $250 Million; Completes Recapitalization Establishing a Fully Funded Development Plan

    All amounts referenced herein are expressed in United States dollars unless otherwise stated.TORONTO, March 24, 2026 /CNW/ - i-80 GOLD CORP. (TSX:IAU) (NYSE:IAUX) ("i-80 Gold" or the "Company") is pleased to announce the closing of its previously announced gold prepayment facility (the "Gold Prepay Facility") with National Bank of Canada and Macquarie Bank Limited. The Gold Prepay Facility includes an initial advance of $150 million and a $100 million accordion feature. With the closing of the Gold Prepay Facility, the Company has successfully completed its recapitalization plan. Through a combination of financing arrangements, i-80 Gold has raised over $1 billion in capital(1), which is exp

    3/24/26 6:11:00 AM ET
    $IAUX
    Precious Metals
    Basic Materials

    i-80 Gold Closes Upsized US$287.5 Million Offering of Convertible Senior Notes

    TORONTO, March 23, 2026 /CNW/ - i-80 GOLD CORP. (TSX:IAU) (NYSE:IAUX) ("i-80 Gold" or the "Company") is pleased to announce the closing of its previously announced offering (the "Offering") of 3.75% unsecured convertible senior notes due 2031 (the "Notes") for an aggregate principal amount of US$287.5 million, which includes the upsized Offering of US$250 million and the exercise in full of the US$37.5 million option granted to the initial purchasers of the Notes. The initial conversion rate for the Notes is 519.4805 common shares of the Company (the "Shares") per US$1,000 principal amount of Notes, equivalent to an initial conversion price of approximately US$1.93 per Share.

    3/23/26 11:40:00 AM ET
    $IAUX
    Precious Metals
    Basic Materials

    $IAUX
    SEC Filings

    View All

    i-80 Gold Corp. filed SEC Form 8-K: Regulation FD Disclosure

    8-K - i-80 Gold Corp. (0001853962) (Filer)

    4/14/26 1:59:02 PM ET
    $IAUX
    Precious Metals
    Basic Materials

    i-80 Gold Corp. filed SEC Form 8-K: Entry into a Material Definitive Agreement, Regulation FD Disclosure

    8-K - i-80 Gold Corp. (0001853962) (Filer)

    3/27/26 5:03:33 PM ET
    $IAUX
    Precious Metals
    Basic Materials

    i-80 Gold Corp. filed SEC Form 8-K: Entry into a Material Definitive Agreement

    8-K - i-80 Gold Corp. (0001853962) (Filer)

    3/24/26 5:05:28 PM ET
    $IAUX
    Precious Metals
    Basic Materials

    $IAUX
    Leadership Updates

    Live Leadership Updates

    View All

    i-80 Gold Strengthens Board of Directors with the Addition of Ronald Butler Jr., Michael Jalonen, and Steven Yopps

    TORONTO, Jan. 29, 2026 /PRNewswire/ - i-80 GOLD CORP. (TSX:IAU) (NYSE:IAUX) ("i-80 Gold", or the "Company") is pleased to announce the appointment of Ronald Butler Jr., Michael Jalonen and Steven Yopps to its Board as independent directors, effective February 1, 2026. These additions strengthen the Company's governance with deep experience in mining operations, finance, mineral processing, and capital markets. This collective experience will support i-80 Gold in achieving its growth strategy in Nevada. Following their appointments, the Board will be comprised of nine members.

    1/29/26 5:12:00 PM ET
    $IAUX
    Precious Metals
    Basic Materials

    i-80 Gold Announces Resignation of Eva Bellissimo from Board of Directors

    RENO, Nev., Oct. 23, 2025 /PRNewswire/ - i-80 GOLD CORP. (TSX:IAU) (NYSE:IAUX) ("i-80 Gold", or the "Company") announces that Eva Bellissimo has notified the Company of her intention to step down from its Board of Directors (the "Board") effective October 31, 2025, to focus on her expanded professional responsibilities following her appointment as National Practice Group Leader of the Business Law Group at McCarthy Tétrault LLP last year, where she also co-leads their Global Metals & Mining Group. Ms. Bellissimo has served as a Director of i-80 Gold since its inception in 2021

    10/23/25 6:00:00 AM ET
    $IAUX
    Precious Metals
    Basic Materials

    i-80 Gold Announces Voting Results From its 2025 Meeting of Shareholders

    RENO, Nev., June 17, 2025 /PRNewswire/ - i-80 GOLD CORP. (TSX:IAU) (NYSE:IAUX) ("i-80" or the "Company") is pleased to announce the results of its 2025 annual and special meeting of shareholders (the "Meeting") held on June 17, 2025. A total of 235,438,321 common shares, representing approximately 53.1% of the Company's outstanding common shares as at the April 23, 2025 record date, were voted by proxy at the Meeting. A summary of the results are as follows: 1.  Number for Directors  At the Meeting, shareholders approved setting the number of directors of the Company at seven.

    6/17/25 6:52:00 PM ET
    $IAUX
    Precious Metals
    Basic Materials

    $IAUX
    Financials

    Live finance-specific insights

    View All

    i-80 Gold Reports Fourth Quarter and Full Year 2025 Results; Continues to Advance Development Plan

    TORONTO, Feb. 19, 2026 /CNW/ - i-80 GOLD CORP. (TSX:IAU) (NYSE:IAUX) ("i-80 Gold" or the "Company") reports its operating and financial results, as well as development highlights, for the fourth quarter and full year ended December 31, 2025. "In 2025 we made significant progress in advancing our development plan and recapitalizing the Company's balance sheet," said Richard Young, President & CEO. We advanced technical and permitting work, as well as exploration and infill drilling programs across our gold projects in the development plan. We also completed the Lone Tree refurbis

    2/19/26 6:02:00 PM ET
    $IAUX
    Precious Metals
    Basic Materials

    i-80 Gold Announces Details for Q4 and Full Year 2025 Results Release and Conference Call

    TORONTO, Feb. 13, 2026 /PRNewswire/ - i-80 GOLD CORP. (TSX:IAU) (NYSE:IAUX) ("i-80 Gold" or the "Company") is scheduled to release its financial and operating results for the three and twelve months ended December 31, 2025, including development highlights, on Thursday, February 19, 2026, after market close. Management will host a conference call and audio webcast the following morning at 10:00 a.m. ET to discuss the Company's full year results and development progress. A question-and-answer session will follow. The conference call and webcast can be accessed as follows: Date:

    2/13/26 10:15:00 AM ET
    $IAUX
    Precious Metals
    Basic Materials

    Franco-Nevada Announces $250 Million Royalty Financing with i-80 Gold

    (in U.S. dollars unless otherwise noted) TORONTO, Feb. 12, 2026 /PRNewswire/ - Franco-Nevada Corporation ("Franco-Nevada" or the "Company") (TSX:FNV)(NYSE:FNV) is pleased to announce that, through a wholly-owned U.S. subsidiary, it has entered into an agreement to acquire a $250 million net smelter return royalty (the "Royalty") from i-80 Gold Corp. ("i-80 Gold") to support its recapitalization plan and strategy of creating a Nevada-focused mid-tier gold producer. The Royalty rate will initially be 1.5%, increasing to 3.0% beginning in 2031, and will apply to all of i-80 Gold's material properties including their six projects in various stages of development. These projects cover more than 2

    2/12/26 7:22:00 AM ET
    $FNV
    $IAUX
    Precious Metals
    Basic Materials

    $IAUX
    Large Ownership Changes

    This live feed shows all institutional transactions in real time.

    View All

    SEC Form SC 13G filed by i-80 Gold Corp.

    SC 13G - i-80 Gold Corp. (0001853962) (Subject)

    11/14/24 5:13:22 PM ET
    $IAUX
    Precious Metals
    Basic Materials

    Amendment: SEC Form SC 13G/A filed by i-80 Gold Corp.

    SC 13G/A - i-80 Gold Corp. (0001853962) (Subject)

    11/14/24 5:12:40 PM ET
    $IAUX
    Precious Metals
    Basic Materials

    Amendment: SEC Form SC 13G/A filed by i-80 Gold Corp.

    SC 13G/A - i-80 Gold Corp. (0001853962) (Subject)

    11/14/24 2:56:23 PM ET
    $IAUX
    Precious Metals
    Basic Materials