• Live Feeds
    • Press Releases
    • Insider Trading
    • FDA Approvals
    • Analyst Ratings
    • Insider Trading
    • SEC filings
    • Market insights
  • Analyst Ratings
  • Alerts
  • Subscriptions
  • AI SuperconnectorNEW
  • Settings
  • RSS Feeds
Quantisnow Logo
  • Live Feeds
    • Press Releases
    • Insider Trading
    • FDA Approvals
    • Analyst Ratings
    • Insider Trading
    • SEC filings
    • Market insights
  • Analyst Ratings
  • Alerts
  • Subscriptions
  • AI SuperconnectorNEW
  • Settings
  • RSS Feeds
PublishGo to AppAI Superconnector
    Quantisnow Logo

    © 2025 quantisnow.com
    Democratizing insights since 2022

    Services
    Live news feedsRSS FeedsAlertsPublish with Us
    Company
    AboutQuantisnow PlusContactJobsAI superconnector for talent & startupsNEWLLM Arena
    Legal
    Terms of usePrivacy policyCookie policy

    Investing in Power Grid Reliability for Toledo Edison Families and Businesses in Northwest Ohio

    10/22/25 12:05:00 PM ET
    $FE
    Electric Utilities: Central
    Utilities
    Get the next $FE alert in real time by email

    Construction recently kicked off on new substation and backup power lines

    TOLEDO, Ohio, Oct. 22, 2025 /PRNewswire/ -- A major reliability project is transforming electric service in Fulton County, delivering stronger, more resilient power to thousands of residents and businesses in the greater Toledo area, including customers of Toledo Edison, a FirstEnergy (NYSE:FE) electric company.

    Led by American Transmission Systems, Inc. (ATSI), a FirstEnergy Transmission company, the project includes a new substation and nine-mile-long 345-kilovolt (kV) transmission line to help prevent or minimize the impact of power outages in and around Delta Village, Fulton, Pike, Swan Creek and York townships and support continued future growth in northwest Ohio.

    Led by American Transmission Systems, Inc. (ATSI), a FirstEnergy Transmission company, the project includes a new substation and nine-mile-long 345-kilovolt (kV) transmission line to help prevent or minimize the impact of power outages in and around Delta Village, Fulton, Pike, Swan Creek and York townships and support continued future growth in northwest Ohio.

    Faster Fixes, Fewer Outages

    A new electric substation is planned to be up and running by December 2026. It will be connected to the existing Sydney Substation by two new half-mile power lines. These additions will bring more electricity to the area, making the system more flexible if a customer's main power line is taken out of service and will help crews restore power more quickly during outages.

    It's like upgrading your neighborhood's power grid from a two-lane road to a multi-lane highway. More lanes mean more capacity, smoother traffic flow and fewer bottlenecks—especially during rush hour when energy demand is high. Just like a well-designed highway system, it's built to grow with the community, keeping pace as more homes and businesses come online.

    Since 2014, FirstEnergy's transmission companies have collectively reduced outages by 50% on high-voltage power lines exceeding 100-kVs – proof that the companies' strategic infrastructure investments, like this work in northwest Ohio, are making the grid more reliable for customers.

    Why this Project Matters to You

    If you live in Fulton County, this project is all about helping your lights stay on, especially when demand is high, like during heat waves or cold snaps and during storms. If you do experience an outage, this upgrade adds back up power sources and smarter equipment that can reroute electricity. That means:

    • Fewer outages.
    • Faster restoration.
    • More reliable service for homes, businesses and companies looking to start or expand here.

    Mark Mroczynski, President of Transmission for FirstEnergy: "Northwest Ohio has seen tremendous industrial growth in recent years, bringing new jobs, families and opportunities to the region. We're proud to support that momentum by investing in the power infrastructure needed to meet today's demand and tomorrow's potential."

    View or download a video series on "Why a Modern Transmission System Matters to You" on FirstEnergy's YouTube channel.

    Built for Today – and Tomorrow

    This work is part of Energize365, FirstEnergy's $28 billion investment program to modernize the electric grid between 2025 and 2029. In northwest Ohio alone, ATSI is investing more than $200 million in high-voltage grid enhancements over the next few years. The goal: a smarter, more secure grid that meets the needs of today's customers and tomorrow's growth.

    View or download video of this grid enhancement work underway in Fulton County.

    FirstEnergy is dedicated to integrity, safety, reliability and operational excellence. Its electric distribution companies form one of the nation's largest investor-owned electric systems, serving customers in Ohio, Pennsylvania, New Jersey, West Virginia, Maryland and New York. The company's transmission subsidiaries operate approximately 24,000 miles of transmission lines that connect the Midwest and Mid-Atlantic regions. Visit FirstEnergy online at firstenergycorp.com and follow FirstEnergy on X @FirstEnergyCorp. 

    Cision View original content to download multimedia:https://www.prnewswire.com/news-releases/investing-in-power-grid-reliability-for-toledo-edison-families-and-businesses-in-northwest-ohio-302591709.html

    SOURCE FirstEnergy Corp.

    Get the next $FE alert in real time by email

    Crush Q3 2025 with the Best AI Superconnector

    Stay ahead of the competition with Standout.work - your AI-powered talent-to-startup matching platform.

    AI-Powered Inbox
    Context-aware email replies
    Strategic Decision Support
    Get Started with Standout.work

    Recent Analyst Ratings for
    $FE

    DatePrice TargetRatingAnalyst
    10/15/2025Overweight → Sector Weight
    KeyBanc Capital Markets
    10/8/2025$53.00Buy
    Citigroup
    8/25/2025$49.00Equal Weight → Overweight
    Barclays
    4/23/2025$45.00Underperform → Neutral
    BofA Securities
    1/23/2025Outperform → Peer Perform
    Wolfe Research
    12/12/2024$50.00Sector Perform → Sector Outperform
    Scotiabank
    10/31/2024Buy → Neutral
    Seaport Research Partners
    10/14/2024$46.00Hold
    Jefferies
    More analyst ratings

    $FE
    Press Releases

    Fastest customizable press release news feed in the world

    View All

    Stronger, More Reliable Power Coming to Trumbull and Ashtabula Counties

    Upgraded power line expected to be energized by the end of this month AKRON, Ohio, Oct. 23, 2025 /PRNewswire/ -- Nearly 10,000 residents and businesses in rural Trumbull and Ashtabula counties will soon experience improved electric service as a major grid upgrade nears completion in northeast Ohio. American Transmission Systems, Inc. (ATSI), a FirstEnergy (NYSE:FE) company, has rebuilt an 11.5-mile high-voltage transmission line to reduce outages and speed up restoration times when service is disrupted. Built to Withstand the Elements The project replaces aging infrastructure

    10/23/25 9:54:00 AM ET
    $FE
    Electric Utilities: Central
    Utilities

    FirstEnergy Announces Third Quarter 2025 Financial Results

    Reports GAAP earnings of $0.76 per share for the third quarter, $1.85 per share year to date Delivers Core Earnings (non-GAAP) of $0.83 per share for the third quarter and $2.02 per share year to date; improvements of 9% and 15%, respectively, compared to the same periods of 2024 Narrows full-year 2025 Core Earnings guidance range to $2.50 to $2.56 per share, in the upper half of original range Deployed over $4 billion in capital investments through September to support grid reliability and resiliency; increases 2025 investment program by 10% to $5.5 billion Projects 30% increase in future transmission investments driven by industry transformation Affirms 6-8% compounded annual Core Earning

    10/22/25 4:20:00 PM ET
    $FE
    Electric Utilities: Central
    Utilities

    Investing in Power Grid Reliability for Toledo Edison Families and Businesses in Northwest Ohio

    Construction recently kicked off on new substation and backup power lines TOLEDO, Ohio, Oct. 22, 2025 /PRNewswire/ -- A major reliability project is transforming electric service in Fulton County, delivering stronger, more resilient power to thousands of residents and businesses in the greater Toledo area, including customers of Toledo Edison, a FirstEnergy (NYSE:FE) electric company. Led by American Transmission Systems, Inc. (ATSI), a FirstEnergy Transmission company, the project includes a new substation and nine-mile-long 345-kilovolt (kV) transmission line to help prevent

    10/22/25 12:05:00 PM ET
    $FE
    Electric Utilities: Central
    Utilities

    $FE
    SEC Filings

    View All

    FirstEnergy Corp. filed SEC Form 8-K: Results of Operations and Financial Condition, Regulation FD Disclosure, Financial Statements and Exhibits

    8-K - FIRSTENERGY CORP (0001031296) (Filer)

    10/22/25 4:26:53 PM ET
    $FE
    Electric Utilities: Central
    Utilities

    FirstEnergy Corp. filed SEC Form 8-K: Leadership Update, Financial Statements and Exhibits

    8-K - FIRSTENERGY CORP (0001031296) (Filer)

    9/29/25 4:37:31 PM ET
    $FE
    Electric Utilities: Central
    Utilities

    SEC Form 10-Q filed by FirstEnergy Corp.

    10-Q - FIRSTENERGY CORP (0001031296) (Filer)

    7/30/25 5:19:58 PM ET
    $FE
    Electric Utilities: Central
    Utilities

    $FE
    Analyst Ratings

    Analyst ratings in real time. Analyst ratings have a very high impact on the underlying stock. See them live in this feed.

    View All

    FirstEnergy downgraded by KeyBanc Capital Markets

    KeyBanc Capital Markets downgraded FirstEnergy from Overweight to Sector Weight

    10/15/25 8:13:39 AM ET
    $FE
    Electric Utilities: Central
    Utilities

    Citigroup initiated coverage on FirstEnergy with a new price target

    Citigroup initiated coverage of FirstEnergy with a rating of Buy and set a new price target of $53.00

    10/8/25 8:34:03 AM ET
    $FE
    Electric Utilities: Central
    Utilities

    FirstEnergy upgraded by Barclays with a new price target

    Barclays upgraded FirstEnergy from Equal Weight to Overweight and set a new price target of $49.00

    8/25/25 8:08:17 AM ET
    $FE
    Electric Utilities: Central
    Utilities

    $FE
    Insider Trading

    Insider transactions reveal critical sentiment about the company from key stakeholders. See them live in this feed.

    View All

    SEC Form 4 filed by Director Williams Melvin D.

    4 - FIRSTENERGY CORP (0001031296) (Issuer)

    10/3/25 8:50:15 AM ET
    $FE
    Electric Utilities: Central
    Utilities

    Director Turner Leslie M was granted 925 shares, increasing direct ownership by 14% to 7,533 units (SEC Form 4)

    4 - FIRSTENERGY CORP (0001031296) (Issuer)

    10/3/25 8:49:11 AM ET
    $FE
    Electric Utilities: Central
    Utilities

    Director Somerhalder John W Ii was granted 925 shares, increasing direct ownership by 0.59% to 158,129 units (SEC Form 4)

    4 - FIRSTENERGY CORP (0001031296) (Issuer)

    10/3/25 8:48:03 AM ET
    $FE
    Electric Utilities: Central
    Utilities

    $FE
    Financials

    Live finance-specific insights

    View All

    FirstEnergy Announces Third Quarter 2025 Financial Results

    Reports GAAP earnings of $0.76 per share for the third quarter, $1.85 per share year to date Delivers Core Earnings (non-GAAP) of $0.83 per share for the third quarter and $2.02 per share year to date; improvements of 9% and 15%, respectively, compared to the same periods of 2024 Narrows full-year 2025 Core Earnings guidance range to $2.50 to $2.56 per share, in the upper half of original range Deployed over $4 billion in capital investments through September to support grid reliability and resiliency; increases 2025 investment program by 10% to $5.5 billion Projects 30% increase in future transmission investments driven by industry transformation Affirms 6-8% compounded annual Core Earning

    10/22/25 4:20:00 PM ET
    $FE
    Electric Utilities: Central
    Utilities

    FirstEnergy to Webcast Third Quarter Earnings Teleconference

    AKRON, Ohio, Sept. 29, 2025 /PRNewswire/ -- FirstEnergy Corp. (NYSE: FE) will release financial results for the third quarter and first nine months of 2025 after markets close on Wednesday, October 22. These results will be discussed by FirstEnergy management during a conference call with financial analysts at 9 a.m. EDT on Thursday, October 23. A question-and-answer session will follow.    Investors, customers and other interested parties are invited to listen to a live webcast of the call and view presentation slides via FirstEnergy's Investor Information website, www.firste

    9/29/25 4:20:00 PM ET
    $FE
    Electric Utilities: Central
    Utilities

    FirstEnergy Corp. Declares Common Stock Dividend of 44.5 Cents Per Share

    AKRON, Ohio, Sept. 23, 2025 /PRNewswire/ -- The Board of Directors of FirstEnergy Corp. (NYSE:FE) today declared a quarterly dividend of 44.5 cents per share of outstanding common stock payable December 1, 2025, to shareholders of record at the close of business on November 7, 2025. FirstEnergy is dedicated to integrity, safety, reliability and operational excellence. Its electric distribution companies form one of the nation's largest investor-owned electric systems, serving more than six million customers in Ohio, Pennsylvania, New Jersey, West Virginia, Maryland and New Yor

    9/23/25 4:20:00 PM ET
    $FE
    Electric Utilities: Central
    Utilities

    $FE
    Leadership Updates

    Live Leadership Updates

    View All

    FirstEnergy Names Christopher Lopez as Vice President of Labor Relations

    AKRON, Ohio, July 22, 2025 /PRNewswire/ -- FirstEnergy Corp. (NYSE:FE) today announced the appointment of Christopher (Chris) Lopez as Vice President of Labor Relations, effective July 28. Lopez brings more than 30 years of experience in labor and employment law, litigation and corporate legal strategy to the role. He will report to Karen McClendon, FirstEnergy Senior Vice President and Chief Human Resources Officer. Lopez has held senior leadership positions across a range of industries, including energy, manufacturing and packaging where he navigated complex labor environmen

    7/22/25 11:01:00 AM ET
    $FE
    Electric Utilities: Central
    Utilities

    FirstEnergy Holds 2025 Annual Meeting

    Board Chair, President and CEO Brian X. Tierney highlights company's progress Preliminary voting results announced AKRON, Ohio, May 21, 2025 /PRNewswire/ -- In his address at the FirstEnergy Corp. (NYSE:FE) 2025 Annual Meeting of Shareholders today, Board Chair, President and Chief Executive Officer Brian X. Tierney said FirstEnergy has made significant progress toward its goal of becoming a premier electric company. "This is a new FirstEnergy – optimized for performance, growth and financial strength, to deliver value to our investors and superior service to the 6 million cus

    5/21/25 9:48:00 AM ET
    $FE
    Electric Utilities: Central
    Utilities

    FirstEnergy Ohio Utilities' Competitive Bidding Process Auction: Information Session for Prospective Bidders on Wednesday, May 7, 2025

    CRA International, Inc. (NASDAQ:CRAI), a worldwide leader in providing economic, financial, and management consulting services, today announced that an auction process will be conducted for FirstEnergy Corp.'s (NYSE:FE) Ohio subsidiaries – Ohio Edison, The Illuminating Company and Toledo Edison – to procure full requirements service for their Standard Service Offer customers. The auction process will lead up to the auction scheduled for June 24, 2025. The bidding process will use a descending-price clock auction format. The auction will be managed by the Auction Manager, CRA International, Inc. The auction is being conducted pursuant to approval from the Public Utilities Commission of Ohio

    4/29/25 8:30:00 AM ET
    $CRAI
    $FE
    Other Consumer Services
    Consumer Discretionary
    Electric Utilities: Central
    Utilities

    $FE
    Large Ownership Changes

    This live feed shows all institutional transactions in real time.

    View All

    Amendment: SEC Form SC 13G/A filed by FirstEnergy Corp.

    SC 13G/A - FIRSTENERGY CORP (0001031296) (Subject)

    11/13/24 12:54:34 PM ET
    $FE
    Electric Utilities: Central
    Utilities

    Amendment: SEC Form SC 13G/A filed by FirstEnergy Corp.

    SC 13G/A - FIRSTENERGY CORP (0001031296) (Subject)

    10/23/24 7:27:21 PM ET
    $FE
    Electric Utilities: Central
    Utilities

    SEC Form SC 13G/A filed by FirstEnergy Corp. (Amendment)

    SC 13G/A - FIRSTENERGY CORP (0001031296) (Subject)

    2/13/24 4:55:49 PM ET
    $FE
    Electric Utilities: Central
    Utilities