• Live Feeds
    • Press Releases
    • Insider Trading
    • FDA Approvals
    • Analyst Ratings
    • Insider Trading
    • SEC filings
    • Market insights
  • Analyst Ratings
  • Alerts
  • Subscriptions
  • Settings
  • RSS Feeds
Quantisnow Logo
  • Live Feeds
    • Press Releases
    • Insider Trading
    • FDA Approvals
    • Analyst Ratings
    • Insider Trading
    • SEC filings
    • Market insights
  • Analyst Ratings
  • Alerts
  • Subscriptions
  • Settings
  • RSS Feeds
PublishGo to App
    Quantisnow Logo

    © 2026 quantisnow.com
    Democratizing insights since 2022

    Services
    Live news feedsRSS FeedsAlertsPublish with Us
    Company
    AboutQuantisnow PlusContactJobsAI superconnector for talent & startupsNEWLLM Arena
    Legal
    Terms of usePrivacy policyCookie policy

    SEC Form 10-Q filed by Ivanhoe Electric Inc.

    8/7/24 8:53:14 AM ET
    $IE
    Metal Mining
    Basic Materials
    Get the next $IE alert in real time by email
    ie-20240630
    2024Q212-310001879016falsehttp://fasb.org/us-gaap/2024#PrimeRateMember.33.33.33xbrli:sharesiso4217:USDiso4217:USDxbrli:sharesxbrli:pureie:installmentie:trancheie:transmitterie:segment00018790162024-01-012024-06-3000018790162024-08-0700018790162024-06-3000018790162023-12-310001879016us-gaap:RelatedPartyMember2024-06-300001879016us-gaap:RelatedPartyMember2023-12-3100018790162024-04-012024-06-3000018790162023-04-012023-06-3000018790162023-01-012023-06-300001879016us-gaap:CommonStockMember2024-03-310001879016us-gaap:AdditionalPaidInCapitalMember2024-03-310001879016us-gaap:RetainedEarningsMember2024-03-310001879016us-gaap:AociIncludingPortionAttributableToNoncontrollingInterestMember2024-03-310001879016us-gaap:NoncontrollingInterestMember2024-03-3100018790162024-03-310001879016us-gaap:RetainedEarningsMember2024-04-012024-06-300001879016us-gaap:NoncontrollingInterestMember2024-04-012024-06-300001879016us-gaap:AociIncludingPortionAttributableToNoncontrollingInterestMember2024-04-012024-06-300001879016us-gaap:CommonStockMember2024-04-012024-06-300001879016us-gaap:AdditionalPaidInCapitalMember2024-04-012024-06-300001879016us-gaap:CommonStockMember2024-06-300001879016us-gaap:AdditionalPaidInCapitalMember2024-06-300001879016us-gaap:RetainedEarningsMember2024-06-300001879016us-gaap:AociIncludingPortionAttributableToNoncontrollingInterestMember2024-06-300001879016us-gaap:NoncontrollingInterestMember2024-06-300001879016us-gaap:CommonStockMember2023-12-310001879016us-gaap:AdditionalPaidInCapitalMember2023-12-310001879016us-gaap:RetainedEarningsMember2023-12-310001879016us-gaap:AociIncludingPortionAttributableToNoncontrollingInterestMember2023-12-310001879016us-gaap:NoncontrollingInterestMember2023-12-310001879016us-gaap:RetainedEarningsMember2024-01-012024-06-300001879016us-gaap:NoncontrollingInterestMember2024-01-012024-06-300001879016us-gaap:AociIncludingPortionAttributableToNoncontrollingInterestMember2024-01-012024-06-300001879016us-gaap:CommonStockMember2024-01-012024-06-300001879016us-gaap:AdditionalPaidInCapitalMember2024-01-012024-06-300001879016us-gaap:CommonStockMember2023-03-310001879016us-gaap:AdditionalPaidInCapitalMember2023-03-310001879016us-gaap:RetainedEarningsMember2023-03-310001879016us-gaap:AociIncludingPortionAttributableToNoncontrollingInterestMember2023-03-310001879016us-gaap:NoncontrollingInterestMember2023-03-3100018790162023-03-310001879016us-gaap:RetainedEarningsMember2023-04-012023-06-300001879016us-gaap:NoncontrollingInterestMember2023-04-012023-06-300001879016us-gaap:AociIncludingPortionAttributableToNoncontrollingInterestMember2023-04-012023-06-300001879016us-gaap:CommonStockMember2023-04-012023-06-300001879016us-gaap:AdditionalPaidInCapitalMember2023-04-012023-06-300001879016us-gaap:CommonStockMember2023-06-300001879016us-gaap:AdditionalPaidInCapitalMember2023-06-300001879016us-gaap:RetainedEarningsMember2023-06-300001879016us-gaap:AociIncludingPortionAttributableToNoncontrollingInterestMember2023-06-300001879016us-gaap:NoncontrollingInterestMember2023-06-3000018790162023-06-300001879016us-gaap:CommonStockMember2022-12-310001879016us-gaap:AdditionalPaidInCapitalMember2022-12-310001879016us-gaap:RetainedEarningsMember2022-12-310001879016us-gaap:AociIncludingPortionAttributableToNoncontrollingInterestMember2022-12-310001879016us-gaap:NoncontrollingInterestMember2022-12-3100018790162022-12-310001879016us-gaap:RetainedEarningsMember2023-01-012023-06-300001879016us-gaap:NoncontrollingInterestMember2023-01-012023-06-300001879016us-gaap:AociIncludingPortionAttributableToNoncontrollingInterestMember2023-01-012023-06-300001879016us-gaap:CommonStockMember2023-01-012023-06-300001879016us-gaap:AdditionalPaidInCapitalMember2023-01-012023-06-300001879016ie:MaadenMember2024-06-300001879016ie:VRBEnergyIncMembersrt:SubsidiariesMember2024-06-300001879016ie:VRBEnergyIncMembersrt:SubsidiariesMember2023-12-310001879016srt:SubsidiariesMemberie:ComputationalGeosciencesIncMember2024-06-300001879016srt:SubsidiariesMemberie:ComputationalGeosciencesIncMember2023-12-310001879016ie:CordobaMineralsCorpMembersrt:SubsidiariesMember2024-06-300001879016ie:CordobaMineralsCorpMembersrt:SubsidiariesMember2023-12-310001879016us-gaap:ShortTermInvestmentsMember2024-06-300001879016us-gaap:ShortTermInvestmentsMember2023-12-310001879016ie:MaadenMember2023-12-310001879016ie:SamaNickelCorporationSNCMember2023-12-310001879016ie:Go2LithiumMember2023-12-310001879016ie:OtherEquityMethodMember2023-12-310001879016ie:SamaResourcesIncMember2023-12-310001879016ie:SamaResourcesIncMember2024-01-012024-06-300001879016ie:SamaNickelCorporationSNCMember2024-01-012024-06-300001879016ie:OtherEquityMethodMember2024-01-012024-06-300001879016ie:MaadenMember2024-01-012024-06-300001879016ie:Go2LithiumMember2024-01-012024-06-300001879016ie:SamaNickelCorporationSNCMember2024-06-300001879016ie:Go2LithiumMember2024-06-300001879016ie:OtherEquityMethodMember2024-06-300001879016ie:SamaResourcesIncMember2024-06-300001879016ie:SamaNickelCorporationSNCMember2024-03-110001879016us-gaap:VariableInterestEntityPrimaryBeneficiaryMemberie:SamaNickelCorporationSNCMember2024-03-110001879016ie:SantaCruzProjectMember2023-12-310001879016ie:TinticProjectMember2023-12-310001879016ie:SanMatiasProjectMember2023-12-310001879016ie:OtherProjectMember2023-12-310001879016ie:SantaCruzProjectMember2024-01-012024-06-300001879016ie:TinticProjectMember2024-01-012024-06-300001879016ie:SanMatiasProjectMember2024-01-012024-06-300001879016ie:OtherProjectMember2024-01-012024-06-300001879016ie:SantaCruzProjectMember2024-06-300001879016ie:TinticProjectMember2024-06-300001879016ie:SanMatiasProjectMember2024-06-300001879016ie:OtherProjectMember2024-06-300001879016ie:SantaCruzProjectPromissoryNoteMemberie:SantaCruzUSAMember2023-05-310001879016ie:SantaCruzProjectPromissoryNoteMember2023-05-012023-05-310001879016ie:SantaCruzProjectPromissoryNoteMember2023-11-012023-11-300001879016ie:SantaCruzProjectPromissoryNoteMember2023-05-310001879016ie:ConvertibleBondsMember2023-12-310001879016ie:ConvertibleBondsMember2024-01-012024-06-300001879016ie:ConvertibleBondsMember2024-06-300001879016ie:VRBConvertibleBondMember2021-07-082021-07-080001879016ie:VRBConvertibleBondMember2021-07-080001879016ie:VRBConvertibleBondMembersrt:MaximumMember2021-07-082021-07-080001879016srt:SubsidiariesMemberie:KaizenMember2024-02-050001879016srt:SubsidiariesMemberie:KaizenMember2024-02-060001879016srt:SubsidiariesMemberie:KaizenMember2024-02-062024-02-060001879016us-gaap:GeneralAndAdministrativeExpenseMember2024-04-012024-06-300001879016us-gaap:GeneralAndAdministrativeExpenseMember2023-04-012023-06-300001879016us-gaap:GeneralAndAdministrativeExpenseMember2024-01-012024-06-300001879016us-gaap:GeneralAndAdministrativeExpenseMember2023-01-012023-06-300001879016ie:ExplorationExpenseMember2024-04-012024-06-300001879016ie:ExplorationExpenseMember2023-04-012023-06-300001879016ie:ExplorationExpenseMember2024-01-012024-06-300001879016ie:ExplorationExpenseMember2023-01-012023-06-300001879016us-gaap:ResearchAndDevelopmentExpenseMember2024-04-012024-06-300001879016us-gaap:ResearchAndDevelopmentExpenseMember2023-04-012023-06-300001879016us-gaap:ResearchAndDevelopmentExpenseMember2024-01-012024-06-300001879016us-gaap:ResearchAndDevelopmentExpenseMember2023-01-012023-06-300001879016us-gaap:CostOfSalesMember2024-04-012024-06-300001879016us-gaap:CostOfSalesMember2023-04-012023-06-300001879016us-gaap:CostOfSalesMember2024-01-012024-06-300001879016us-gaap:CostOfSalesMember2023-01-012023-06-300001879016us-gaap:EmployeeStockOptionMember2024-01-012024-06-300001879016us-gaap:EmployeeStockOptionMember2024-03-112024-03-110001879016us-gaap:EmployeeStockOptionMember2024-04-082024-04-080001879016us-gaap:ShareBasedCompensationAwardTrancheTwoMemberus-gaap:EmployeeStockOptionMember2024-01-012024-06-300001879016us-gaap:ShareBasedCompensationAwardTrancheThreeMemberus-gaap:EmployeeStockOptionMember2024-01-012024-06-300001879016us-gaap:EmployeeStockOptionMemberus-gaap:ShareBasedCompensationAwardTrancheOneMember2024-01-012024-06-300001879016ie:SoftwareLicensingMember2024-04-012024-06-300001879016ie:SoftwareLicensingMember2023-04-012023-06-300001879016ie:SoftwareLicensingMember2024-01-012024-06-300001879016ie:SoftwareLicensingMember2023-01-012023-06-300001879016ie:DataProcessingServicesMember2024-04-012024-06-300001879016ie:DataProcessingServicesMember2023-04-012023-06-300001879016ie:DataProcessingServicesMember2024-01-012024-06-300001879016ie:DataProcessingServicesMember2023-01-012023-06-300001879016ie:RenewableEnergyStorageSystemsMember2024-04-012024-06-300001879016ie:RenewableEnergyStorageSystemsMember2023-04-012023-06-300001879016ie:RenewableEnergyStorageSystemsMember2024-01-012024-06-300001879016ie:RenewableEnergyStorageSystemsMember2023-01-012023-06-300001879016ie:SantaCruzUSAMember2024-04-012024-06-300001879016ie:SantaCruzUSAMember2023-04-012023-06-300001879016ie:SantaCruzUSAMember2024-01-012024-06-300001879016ie:SantaCruzUSAMember2023-01-012023-06-300001879016ie:TinticUSAMember2024-04-012024-06-300001879016ie:TinticUSAMember2023-04-012023-06-300001879016ie:TinticUSAMember2024-01-012024-06-300001879016ie:TinticUSAMember2023-01-012023-06-300001879016ie:SanMatiasColombiaMember2024-04-012024-06-300001879016ie:SanMatiasColombiaMember2023-04-012023-06-300001879016ie:SanMatiasColombiaMember2024-01-012024-06-300001879016ie:SanMatiasColombiaMember2023-01-012023-06-300001879016ie:HogHeavenUSAMember2024-04-012024-06-300001879016ie:HogHeavenUSAMember2023-04-012023-06-300001879016ie:HogHeavenUSAMember2024-01-012024-06-300001879016ie:HogHeavenUSAMember2023-01-012023-06-300001879016ie:UnityUSAMember2024-04-012024-06-300001879016ie:UnityUSAMember2023-04-012023-06-300001879016ie:UnityUSAMember2024-01-012024-06-300001879016ie:UnityUSAMember2023-01-012023-06-300001879016ie:SamapleuProjectIvoryCoastMember2024-04-012024-06-300001879016ie:SamapleuProjectIvoryCoastMember2023-04-012023-06-300001879016ie:SamapleuProjectIvoryCoastMember2024-01-012024-06-300001879016ie:SamapleuProjectIvoryCoastMember2023-01-012023-06-300001879016ie:CarolinaUSAMember2024-04-012024-06-300001879016ie:CarolinaUSAMember2023-04-012023-06-300001879016ie:CarolinaUSAMember2024-01-012024-06-300001879016ie:CarolinaUSAMember2023-01-012023-06-300001879016ie:BitterCreekUSAMember2024-04-012024-06-300001879016ie:BitterCreekUSAMember2023-04-012023-06-300001879016ie:BitterCreekUSAMember2024-01-012024-06-300001879016ie:BitterCreekUSAMember2023-01-012023-06-300001879016ie:WhiteHillUSAMember2024-04-012024-06-300001879016ie:WhiteHillUSAMember2023-04-012023-06-300001879016ie:WhiteHillUSAMember2024-01-012024-06-300001879016ie:WhiteHillUSAMember2023-01-012023-06-300001879016ie:LincolnUSAMember2024-04-012024-06-300001879016ie:LincolnUSAMember2023-04-012023-06-300001879016ie:LincolnUSAMember2024-01-012024-06-300001879016ie:LincolnUSAMember2023-01-012023-06-300001879016ie:ProjectGenerationAndOtherMember2024-04-012024-06-300001879016ie:ProjectGenerationAndOtherMember2023-04-012023-06-300001879016ie:ProjectGenerationAndOtherMember2024-01-012024-06-300001879016ie:ProjectGenerationAndOtherMember2023-01-012023-06-300001879016ie:GlobalMiningMemberus-gaap:RelatedPartyMember2024-06-300001879016ie:GlobalMiningMemberus-gaap:RelatedPartyMember2023-12-310001879016ie:GlobalMiningMemberus-gaap:RelatedPartyMember2024-04-012024-06-300001879016ie:GlobalMiningMemberus-gaap:RelatedPartyMember2023-04-012023-06-300001879016ie:GlobalMiningMemberus-gaap:RelatedPartyMember2024-01-012024-06-300001879016ie:GlobalMiningMemberus-gaap:RelatedPartyMember2023-01-012023-06-300001879016ie:IvanhoeCapitalAviationMemberus-gaap:RelatedPartyMember2024-06-300001879016ie:IvanhoeCapitalAviationMemberus-gaap:RelatedPartyMember2023-12-310001879016ie:IvanhoeCapitalAviationMemberus-gaap:RelatedPartyMember2024-04-012024-06-300001879016ie:IvanhoeCapitalAviationMemberus-gaap:RelatedPartyMember2023-04-012023-06-300001879016ie:IvanhoeCapitalAviationMemberus-gaap:RelatedPartyMember2024-01-012024-06-300001879016ie:IvanhoeCapitalAviationMemberus-gaap:RelatedPartyMember2023-01-012023-06-300001879016us-gaap:RelatedPartyMemberie:IPulseIncMember2024-06-300001879016us-gaap:RelatedPartyMemberie:IPulseIncMember2023-12-310001879016us-gaap:RelatedPartyMemberie:IPulseIncMember2024-04-012024-06-300001879016us-gaap:RelatedPartyMemberie:IPulseIncMember2023-04-012023-06-300001879016us-gaap:RelatedPartyMemberie:IPulseIncMember2024-01-012024-06-300001879016us-gaap:RelatedPartyMemberie:IPulseIncMember2023-01-012023-06-300001879016us-gaap:RelatedPartyMember2024-04-012024-06-300001879016us-gaap:RelatedPartyMember2023-04-012023-06-300001879016us-gaap:RelatedPartyMember2024-01-012024-06-300001879016us-gaap:RelatedPartyMember2023-01-012023-06-300001879016ie:MaadenMemberus-gaap:RelatedPartyMember2024-06-300001879016ie:MaadenMemberus-gaap:RelatedPartyMember2023-12-310001879016ie:MaadenMemberus-gaap:RelatedPartyMember2024-04-012024-06-300001879016ie:MaadenMemberus-gaap:RelatedPartyMember2023-04-012023-06-300001879016ie:MaadenMemberus-gaap:RelatedPartyMember2024-01-012024-06-300001879016ie:MaadenMemberus-gaap:RelatedPartyMember2023-01-012023-06-300001879016us-gaap:RelatedPartyMemberie:JCHXMiningManagementCoLtdMember2024-06-300001879016us-gaap:RelatedPartyMemberie:JCHXMiningManagementCoLtdMember2023-12-310001879016ie:GlobalMiningMemberus-gaap:RelatedPartyMemberie:GlobalMiningMember2024-06-300001879016ie:GlobalMiningMemberus-gaap:RelatedPartyMemberie:GlobalMiningMember2023-12-310001879016us-gaap:RelatedPartyMemberie:IPulseIncMember2022-10-242022-10-240001879016ie:PurchasePriceOfTransmittersMemberie:IPulseIncMember2022-10-242022-10-240001879016us-gaap:RelatedPartyMemberie:IPulseIncMember2022-10-012022-10-310001879016ie:CordobaMemberie:CordobaMemberie:JCHXMiningManagementCoLtdMemberus-gaap:RelatedPartyMember2024-06-300001879016ie:CordobaMemberie:CordobaMemberie:JCHXMiningManagementCoLtdMemberus-gaap:RelatedPartyMember2023-12-310001879016ie:JCHXBridgeLoanMemberus-gaap:RelatedPartyMemberie:CordobaMember2023-11-300001879016ie:JCHXBridgeLoanMemberus-gaap:RelatedPartyMemberie:CordobaMemberie:SecondInstallmentMember2023-11-300001879016ie:JCHXBridgeLoanMemberus-gaap:RelatedPartyMemberie:CordobaMember2024-01-012024-06-300001879016us-gaap:FairValueMeasurementsRecurringMemberus-gaap:FairValueInputsLevel1Member2024-06-300001879016us-gaap:FairValueInputsLevel2Memberus-gaap:FairValueMeasurementsRecurringMember2024-06-300001879016us-gaap:FairValueInputsLevel3Memberus-gaap:FairValueMeasurementsRecurringMember2024-06-300001879016us-gaap:FairValueMeasurementsRecurringMemberus-gaap:FairValueInputsLevel1Member2023-12-310001879016us-gaap:FairValueInputsLevel2Memberus-gaap:FairValueMeasurementsRecurringMember2023-12-310001879016us-gaap:FairValueInputsLevel3Memberus-gaap:FairValueMeasurementsRecurringMember2023-12-310001879016us-gaap:OperatingSegmentsMemberie:CriticalMetalsMember2024-04-012024-06-300001879016us-gaap:OperatingSegmentsMemberie:DataProcessingMember2024-04-012024-06-300001879016us-gaap:OperatingSegmentsMemberie:EnergyStorageMember2024-04-012024-06-300001879016us-gaap:OperatingSegmentsMember2024-04-012024-06-300001879016us-gaap:OperatingSegmentsMemberie:CriticalMetalsMember2024-01-012024-06-300001879016us-gaap:OperatingSegmentsMemberie:DataProcessingMember2024-01-012024-06-300001879016us-gaap:OperatingSegmentsMemberie:EnergyStorageMember2024-01-012024-06-300001879016us-gaap:OperatingSegmentsMember2024-01-012024-06-300001879016us-gaap:IntersegmentEliminationMemberie:CriticalMetalsMember2024-04-012024-06-300001879016us-gaap:IntersegmentEliminationMemberie:DataProcessingMember2024-04-012024-06-300001879016us-gaap:IntersegmentEliminationMemberie:EnergyStorageMember2024-04-012024-06-300001879016us-gaap:IntersegmentEliminationMember2024-04-012024-06-300001879016us-gaap:IntersegmentEliminationMemberie:CriticalMetalsMember2024-01-012024-06-300001879016us-gaap:IntersegmentEliminationMemberie:DataProcessingMember2024-01-012024-06-300001879016us-gaap:IntersegmentEliminationMemberie:EnergyStorageMember2024-01-012024-06-300001879016us-gaap:IntersegmentEliminationMember2024-01-012024-06-300001879016us-gaap:OperatingSegmentsMemberie:CriticalMetalsMember2024-06-300001879016us-gaap:OperatingSegmentsMemberie:DataProcessingMember2024-06-300001879016us-gaap:OperatingSegmentsMemberie:EnergyStorageMember2024-06-300001879016us-gaap:OperatingSegmentsMember2024-06-300001879016us-gaap:OperatingSegmentsMemberie:CriticalMetalsMember2023-04-012023-06-300001879016us-gaap:OperatingSegmentsMemberie:DataProcessingMember2023-04-012023-06-300001879016us-gaap:OperatingSegmentsMemberie:EnergyStorageMember2023-04-012023-06-300001879016us-gaap:OperatingSegmentsMember2023-04-012023-06-300001879016us-gaap:OperatingSegmentsMemberie:CriticalMetalsMember2023-01-012023-06-300001879016us-gaap:OperatingSegmentsMemberie:DataProcessingMember2023-01-012023-06-300001879016us-gaap:OperatingSegmentsMemberie:EnergyStorageMember2023-01-012023-06-300001879016us-gaap:OperatingSegmentsMember2023-01-012023-06-300001879016us-gaap:IntersegmentEliminationMemberie:CriticalMetalsMember2023-04-012023-06-300001879016us-gaap:IntersegmentEliminationMemberie:DataProcessingMember2023-04-012023-06-300001879016us-gaap:IntersegmentEliminationMemberie:EnergyStorageMember2023-04-012023-06-300001879016us-gaap:IntersegmentEliminationMember2023-04-012023-06-300001879016us-gaap:IntersegmentEliminationMemberie:CriticalMetalsMember2023-01-012023-06-300001879016us-gaap:IntersegmentEliminationMemberie:DataProcessingMember2023-01-012023-06-300001879016us-gaap:IntersegmentEliminationMemberie:EnergyStorageMember2023-01-012023-06-300001879016us-gaap:IntersegmentEliminationMember2023-01-012023-06-300001879016us-gaap:OperatingSegmentsMemberie:CriticalMetalsMember2023-06-300001879016us-gaap:OperatingSegmentsMemberie:DataProcessingMember2023-06-300001879016us-gaap:OperatingSegmentsMemberie:EnergyStorageMember2023-06-300001879016us-gaap:OperatingSegmentsMember2023-06-300001879016ie:IPulseIncMember2024-01-012024-06-30
    Table of Contents

    UNITED STATES
    SECURITIES AND EXCHANGE COMMISSION
    WASHINGTON, DC 20549
    FORM 10-Q
    (Mark One)
    xQUARTERLY REPORT PURSUANT TO SECTION 13 OR 15(d) OF THE SECURITIES EXCHANGE ACT OF 1934
    For the quarterly period ended June 30, 2024
    OR
    oTRANSITION REPORT PURSUANT TO SECTION 13 OR 15(d) OF THE SECURITIES EXCHANGE ACT OF 1934
    For the transition period from to
    Commission File Number: 001-41436
    Ivanhoe Electric Inc.
    (Exact Name of Registrant as Specified in its Charter)
    Delaware32-0633823
    (State or other jurisdiction of
    incorporation or organization)
    (I.R.S. Employer Identification No.)
    450 E Rio Salado Parkway, Suite 130
    Tempe, Arizona
    85281
    (Address of principal executive offices)(Zip Code)
    Registrant’s telephone number, including area code: (480) 656-5821
    Securities registered pursuant to Section 12(b) of the Act:
    Title of each classTrading Symbol(s)Name of each exchange on which registered
    Common Stock, par value $0.0001 per shareIE
    NYSE American
    Indicate by check mark whether the registrant (1) has filed all reports required to be filed by Section 13 or 15(d) of the Securities Exchange Act of 1934 during the preceding 12 months (or for such shorter period that the registrant was required to file such reports), and (2) has been subject to such filing requirements for the past 90 days. Yes x     No o
    Indicate by check mark whether the registrant has submitted electronically every Interactive Data File required to be submitted pursuant to Rule 405 of Regulation S-T (§232.405 of this chapter) during the preceding 12 months (or for such shorter period that the registrant was required to submit such files). Yes x    No o
    Indicate by check mark whether the registrant is a large accelerated filer, an accelerated filer, a non-accelerated filer, smaller reporting company, or an emerging growth company. See the definitions of “large accelerated filer,” “accelerated filer,” “smaller reporting company,” and “emerging growth company” in Rule 12b-2 of the Exchange Act.
    Large accelerated filerxAccelerated filero
    Non-accelerated fileroSmaller reporting companyo
    Emerging growth companyo
    If an emerging growth company, indicate by check mark if the registrant has elected not to use the extended transition period for complying with any new or revised financial accounting standards provided pursuant to Section 13(a) of the Exchange Act. o
    Indicate by check mark whether the registrant is a shell company (as defined in Rule 12b-2 of the Exchange Act). Yes o    No x
    As of August 7, 2024, the registrant had 120,397,648 shares of common stock, $0.0001 par value per share, outstanding.


    Table of Contents
    Table of Contents
    IVANHOE ELECTRIC INC. Form 10-Q
    For the Quarter Ended June 30, 2024
    Page
    PART I. FINANCIAL INFORMATION
    3
    Item 1.
    Condensed Interim Consolidated Financial Statements
    3
    Condensed Interim Consolidated Balance Sheets
    3
    Condensed Interim Consolidated Statements of Loss and Comprehensive Loss
    4
    Condensed Interim Consolidated Statements of Changes in Equity
    5
    Condensed Interim Consolidated Statements of Cash Flows
    6
    Notes to Condensed Interim Consolidated Financial Statements
    7
    Item 2.
    Management’s Discussion and Analysis of Financial Condition and Results of Operations
    15
    Item 3.
    Quantitative and Qualitative Disclosures About Market Risk
    25
    Item 4.
    Controls and Procedures
    25
    PART II. OTHER INFORMATION
    26
    Item 1.
    Legal Proceedings
    26
    Item 1A.
    Risk Factors
    26
    Item 2.
    Unregistered Sales of Equity Securities and Use of Proceeds from Registered Securities
    26
    Item 6.
    Exhibits
    27
    Signatures
    28


    Table of Contents
    PART I—FINANCIAL INFORMATION
    Item 1. Financial Statements.
    IVANHOE ELECTRIC INC.
    Condensed Interim Consolidated Balance Sheets (Unaudited)
    (Expressed in thousands of U.S. dollars)
    June 30,
    2024
    December 31,
    2023
    Assets
    Current assets:
    Cash and cash equivalents$133,811 $205,043 
    Accounts receivable2,618 3,326 
    Inventory5,507 5,013 
    Prepaid expenses and deposits5,070 3,104 
    147,006 216,486 
    Non-current assets:
    Investments subject to significant influence35,251 39,130 
    Other investments2,198 2,989 
    Exploration mineral interests217,166 216,290 
    Property, plant and equipment8,955 6,645 
    Other non-current assets5,697 5,686 
    Total assets$416,273 $487,226 
    Liabilities and Equity
    Current liabilities:
    Accounts payable and accrued liabilities$21,411 $19,948 
    Note payable, current14,962 12,672 
    Due to related party— 4,000 
    Lease liabilities, current1,136 699 
    Contract liability2,691 2,404 
    40,200 39,723 
    Non-current liabilities:
    Note payable36,244 36,244 
    Convertible debt29,596 28,372 
    Deferred income taxes4,478 4,845 
    Lease liabilities, net of current portion2,037 1,199 
    Other non-current liabilities594 562 
    Total liabilities113,149 110,945 
    Commitments and contingencies (Note 15)
    Equity:
    Common stock, par value $0.0001; 700,000,000 shares authorized;120.4 million shares issued and outstanding as of June 30, 2024 (December 31, 2023 - 700,000,000 authorized; 120.0 million issued and outstanding)
    12 12 
    Additional paid-in capital795,502 777,816 
    Accumulated deficit(503,798)(401,504)
    Accumulated other comprehensive income(2,561)(2,073)
    Equity attributable to common stockholders289,155 374,251 
    Non-controlling interests13,969 2,030 
    Total equity303,124 376,281 
    Total liabilities and equity$416,273 $487,226 
    3

    Table of Contents
    IVANHOE ELECTRIC INC.
    Condensed Interim Consolidated Statements of Loss and Comprehensive Loss (Unaudited)
    (Expressed in thousands of U.S. dollars, except for share and per share amounts)
    Three Months Ended
    June 30,
    Six months ended
    June 30,
    2024202320242023
    Revenue$538 $1,314 $898 $1,993 
    Cost of sales(192)(1,256)(292)(1,440)
    Gross profit346 58 606 553 
    Operating expenses:    
    Exploration expenses37,254 32,551 80,897 59,110 
    General and administrative expenses10,694 12,658 23,295 23,291 
    Research and development expenses842 2,138 1,652 3,981 
    Selling and marketing expenses102 96 189 145 
    Loss from operations48,546 47,385 105,427 85,974 
    Other expenses (income):    
    Interest expense, net387 713 352 681 
    Foreign exchange loss (gain)692 (1,312)687 (1,473)
    Loss (gain) on revaluation of investments431 (1,321)702 (946)
    Share of loss of equity method investees1,453 606 4,465 1,228 
    Other expense (income), net12 (1,096)9 (1,837)
    Loss before income taxes51,521 44,975 111,642 83,627 
    Income tax recovery— (128)(26)(200)
    Net loss51,521 44,847 111,616 83,427 
    Less loss attributable to non-controlling interests(4,738)(6,584)(9,322)(9,090)
    Net loss attributable to common stockholders or parent46,783 38,263 102,294 74,337 
    Net loss51,521 44,847 111,616 83,427 
    Other comprehensive loss , net of tax:
    Foreign currency translation adjustments329 1,271 721 1,339 
    Other comprehensive loss 329 1,271 721 1,339 
    Comprehensive loss$51,850 $46,118 $112,337 $84,766 
    Comprehensive loss attributable to:
    Common stockholders or parent47,021 39,086 102,782 75,206 
    Non-controlling interests4,829 $7,032 9,555 $9,560 
    $51,850 $46,118 $112,337 $84,766 
    Net loss per share attributable to common stockholders
    Basic and diluted$0.39 $0.41 $0.85 $0.80 
    Weighted-average common shares outstanding
    Basic and diluted120,337,64293,124,994120,292,03693,045,066
    4

    Table of Contents
    IVANHOE ELECTRIC INC.
    Condensed Interim Consolidated Statements of Changes in Equity (Unaudited)
    (Expressed in thousands of U.S. dollars, except share amounts)
    Additional
    paid-in
    capital
    Accumulated
    deficit
    Accumulated
    other
    comprehensive
    loss
    Non-controlling
    interest
    Total
    Common Stock
    Three months ended June 30, 2024SharesAmount
    Balance at April 1, 2024120,306,414$12 $790,824 $(457,015)$(2,323)$18,234 $349,732 
    Net loss—— — (46,783)— (4,738)(51,521)
    Other comprehensive loss—— — — (238)(91)(329)
    Stock options exercised82,187— 694 — — — 694 
    Stock-based compensation—— 3,969 — — 100 4,069 
    Non-controlling interests investment in subsidiary—— 15 — — 364 379 
    Other changes in non-controlling interests—— — — — 100 100 
    Balance at June 30, 2024120,388,601$12 $795,502 $(503,798)$(2,561)$13,969 $303,124 
    Six months ended June 30, 2024
    Balance at January 1, 2024120,025,264$12 $777,816 $(401,504)$(2,073)$2,030 $376,281 
    Net loss—— — (102,294)— (9,322)(111,616)
    Other comprehensive loss—— — — (488)(233)(721)
    Issuance of common stock; Kaizen arrangement116,413— 952 — — — 952 
    Issuance of common stock; earn-in payment12,765— 95 — — — 95 
    Settlement of restricted share units150,000— — — — — — 
    Settlement of deferred share units1,972— — — — — — 
    Stock options exercised82,187— 694 — — — 694 
    Stock-based compensation—— 7,284 — — 130 7,414 
    Non-controlling interests investment in subsidiary—— 9,387 — — 20,992 30,379 
    Other changes in non-controlling interests—— (726)— — 372 (354)
    Balance at June 30, 2024120,388,601$12 $795,502 $(503,798)$(2,561)$13,969 $303,124 









    IVANHOE ELECTRIC INC.
    Condensed Interim Consolidated Statements of Changes in Equity (Unaudited)
    (Expressed in thousands of U.S. dollars, except share amounts)
    Additional
    paid-in
    capital
    Accumulated
    deficit
    Accumulated
    other
    comprehensive
    loss
    Non-controlling
    interest
    Total
    Common Stock
    Three months ended June 30, 2023SharesAmount
    Balance at April 1, 202392,971,865$9 $414,897 $(238,202)$(1,235)$(6,387)$169,082 
    Net loss—— — (38,263)— (6,584)(44,847)
    Other comprehensive loss—— — — (823)(448)(1,271)
    Stock options exercised479,909— 1,194 — — — 1,194 
    Stock-based compensation—— 5,365 — — 66 5,431 
    Settlement of deferred share units11,990— — — — — — 
    Non-controlling interests investment in subsidiary—— 17,979 — — 19,174 37,153 
    Other changes in non-controlling interests—— 7 — — (1)6 
    Balance at June 30, 202393,463,764$9 $439,442 $(276,465)$(2,058)$5,820 $166,748 
    Six months ended June 30, 2023
    Balance at January 1, 202392,960,584$9 $409,683 $(202,128)$(1,189)$(3,928)$202,447 
    Net loss—— — (74,337)— (9,090)(83,427)
    Other comprehensive loss—— — — (869)(470)(1,339)
    Issuance of common stock; earn-in payment10,281— 150 — — — 150 
    Stock options exercised480,909 — 1,197 — — — 1,197 
    Stock-based compensation—— 10,432 — — 131 10,563 
    Settlement of deferred share units11,990— — — — — — 
    Non-controlling interests investment in subsidiary—— 17,979 — — 19,174 37,153 
    Other changes in non-controlling interests—— 1 — — 3 4 
    Balance at June 30, 202393,463,764$9 $439,442 $(276,465)$(2,058)$5,820 $166,748 

    5

    Table of Contents
    IVANHOE ELECTRIC INC.
    Condensed Interim Consolidated Statements of Cash Flows (Unaudited)
    (Expressed in thousands of U.S. dollars)
    Six months ended June 30, 2024 and 2023
    20242023
    Operating activities
    Net loss$(111,616)$(83,427)
    Adjustments to reconcile net loss to cash provided by used in operating activities:
    Depreciation and amortization1,335 1,714 
    Stock-based compensation7,414 10,563 
    Non-cash exploration expense95 1,003 
    Non-cash research and development expense565 1,290 
    Unrealized foreign exchange loss (gain)689 (1,494)
    Interest expense3,631 2,374 
    Income taxes— (200)
    Loss (gain) on revaluation of investments702 (946)
    Share of loss of equity method investees4,465 1,228 
    Other233 (752)
    Changes in other operating assets and liabilities:
    Trade accounts receivable805 (633)
    Inventory(527)845 
    Operating lease liabilities(634)(468)
    Accounts payable and accrued liabilities383 6,372 
    Other operating assets and liabilities(2,041)(3,299)
    Net cash used in operating activities(94,501)(65,830)
    Investing activities
    Purchase of mineral interests(640)(39,157)
    Purchase of property, plant and equipment and intangible assets(1,176)(557)
    Purchase of investments subject to significant influence(1,127)(1,158)
    Cash acquired on acquisition of subsidiary 227 — 
    Net cash used in investing activities(2,716)(40,872)
    Financing activities
    Non-controlling interests investment in subsidiary26,380 29,454 
    Proceeds from exercise of stock options694 1,197 
    Net cash provided by financing activities27,074 30,651 
    Effect of foreign exchange rate changes on cash and cash equivalents(1,089)192 
    Decrease in cash and cash equivalents(71,232)(75,859)
    Cash and cash equivalents, beginning of the year205,043 139,660 
    Cash and cash equivalents, end of the period$133,811 $63,801 
    Supplemental cash flow information
    Cash paid for income taxes$1,143 $1,166 
    Supplemental disclosure of non-cash investing and financing activities
    Note payable issued as consideration for land purchase$— $82,590 
    Issuance of common stock; Kaizen arrangement952 — 
    Issuance of common stock; earn-in payment95 — 
    Non-controlling interests investment in subsidiary4,000 10,546 
    Settlement of loan upon issuance of shares of subsidiary— (10,546)
    Settlement of related party loan$(4,000)$— 
    6

    Table of Contents
    IVANHOE ELECTRIC INC.
    Notes to the Condensed Interim Consolidated Financial Statements
    (Unaudited - Tabular amounts expressed in thousands of U.S. dollars, unless otherwise indicated)

    1. Background and basis of preparation:
    Ivanhoe Electric Inc. (“Ivanhoe Electric” or “the Company”) is a United States domiciled company that combines advanced mineral exploration technologies with electric metals exploration projects predominantly located in the United States. The Company’s mineral exploration efforts focus on copper as well as other metals including nickel, vanadium, cobalt, platinum group elements, gold and silver. The Company’s portfolio of electric metals exploration projects include the Santa Cruz Project in Arizona and the Tintic Project in Utah, as well as other exploration projects in the United States.
    In addition to mineral projects in the United States, the Company also holds direct and indirect ownership interests, and in some cases controlling financial interests, in other non-U.S. mineral projects, and in proprietary mineral exploration and minerals-based technologies.
    The Company holds a 50% interest in a joint venture with Saudi Arabian Mining Company Ma’aden (“Ma’aden”) to explore prospective land in Saudi Arabia.
    The Company conducts the following business activities through certain subsidiaries:
    •VRB Energy Inc. (“VRB”), develops, manufactures and installs vanadium flow batteries for grid-scale energy storage. Ivanhoe Electric had an ownership interest in VRB of 90.0% as at June 30, 2024 (December 31, 2023 — 90.0%).
    •Computational Geosciences Inc. (“CGI”), provides data analytics, geophysical modeling, software licensing and artificial intelligence services for the mineral, oil & gas and water exploration industries. Ivanhoe Electric had an ownership interest in CGI of 94.3% as at June 30, 2024 (December 31, 2023 — 94.3%).
    •Cordoba Minerals Corp. (“Cordoba”) holds the San Matias copper-gold-silver project in northern Colombia. Ivanhoe Electric had an ownership interest in Cordoba of 62.8% as at June 30, 2024 (December 31, 2023 — 62.8%).
    The accompanying unaudited consolidated financial statements have been prepared in accordance with the instructions to Form 10-Q and do not include all information and disclosures required by generally accepted accounting principles in the United States. Therefore, this information should be read in conjunction with the Company's consolidated financial statements and notes contained on its Form 10-K for the year ended December 31, 2023. The information furnished herein reflects all normal recurring entries, that are in the opinion of management, necessary for a fair statement of the results for the interim periods reported. Operating results for the six months ended June 30, 2024, are not necessarily indicative of the results that may be expected for the year ending December 31, 2024.
    The condensed interim consolidated financial statements have been prepared on a going concern basis, which presumes the realization of assets and satisfaction of liabilities in the normal course of business.
    References to “$” refer to United States dollars and “Cdn$” to Canadian dollars.
    2. Significant accounting policies:
    The Company discloses in its consolidated financial statements for the year ended December 31, 2023, those accounting policies that it considers significant in determining its results of operations and financial position. There have been no material changes to, or in the application of, the accounting policies previously identified and described in the Company’s consolidated financial statements for the year ended December 31, 2023.
    Recent accounting pronouncements not yet adopted:
    In August 2023, the FASB issued ASU 2023-05 Business Combinations—Joint Venture Formations (Subtopic 805-60): Recognition and Initial Measurement. The update was issued to address the accounting for contributions made to a joint venture, upon formation, in a joint venture’s separate financial statements. Upon formation, a joint venture will recognize and initially measure its assets and liabilities at fair value (with exceptions to fair value measurement that are consistent with the business combinations guidance). This update is effective prospectively for all joint venture formations with a formation date on or after January 1, 2025.
    7

    Table of Contents
    IVANHOE ELECTRIC INC.
    Notes to the Condensed Interim Consolidated Financial Statements
    (Unaudited - Tabular amounts expressed in thousands of U.S. dollars, unless otherwise indicated)
    In November 2023, the FASB issued ASU 2023-07 Segment Reporting (Topic 280): Improvements to Reportable Segment Disclosures. The update was issued to improve reportable segment disclosure requirements, primarily through enhanced disclosures about significant segment expenses. The Company is required to adopt ASU 2023-07 on January 1, 2025 and is currently evaluating the expected impact on the consolidated financial statements.
    In December 2023, the FASB issued ASU 2023-09 Income Taxes (Topic 740): Improvements to Income Tax Disclosures. This update was issued to enhance the transparency and decision usefulness of income tax disclosures primarily related to the rate reconciliation and income taxes paid information. The Company is required to adopt ASU 2023-09 on January 1, 2025 and is currently evaluating the expected impact on the consolidated financial statements.
    3. Use of estimates:
    The preparation of consolidated financial statements requires management of the Company to make estimates and assumptions that affect the reported amounts of assets and liabilities, the related disclosure of contingent assets and liabilities, and the reported amounts of revenues and expenses. Actual results may differ from these estimates.
    The significant judgments made by management in applying the Company’s accounting policies and the key sources of estimation uncertainty were the same as those applied to the consolidated financial statements for the year ended December 31, 2023.
    4. Cash and cash equivalents:
    Of the total cash and cash equivalents at June 30, 2024 and December 31, 2023, $20.8 million and $15.0 million, respectively, was not available for the general corporate purposes of the Company as it was held by non-wholly-owned subsidiaries.
    At June 30, 2024, the Company has $1.7 million in cash equivalents in the form of redeemable short-term investments (December 31, 2023 - $0.0 million).
    5. Investments subject to significant influence:
    The Company’s principal investment subject to significant influence is its investment in Ma'aden Ivanhoe Electric Exploration and Development Limited Company ("Ma'aden Joint Venture"). Others include its investments in Sama Resources Inc. (“Sama”) and Go2Lithium Inc. ("Go2Lithium").
    Equity MethodCarried at fair value
    Ma'aden Joint Venture SNC
    (Note a)
    Go2Lithium OtherSama Total
    Balance at December 31, 2023$31,606 $896 $2,469 $— $4,159 $39,130 
    Change in fair value— — — — 42 42 
    Investment— 440 — 687 — 1,126 
    Share of loss(3,188)(827)(419)(30)— (4,465)
    Acquisition— (489)— — — (489)
    Foreign currency translation— (20)(75)— — (95)
    Balance at June 30, 2024$28,418 $— $1,975 $657 $4,201 $35,251 
    (a) Acquisition of Sama Nickel Corporation:
    On March 11, 2024, the Company completed its earn-in and acquired an additional 30% in Sama Nickel Corporation ("SNC") bringing its total ownership interest in SNC to 60% . SNC owns the Samapleu-Grata Nickel-Copper Project ("Samapleu Project") in the Ivory Coast. The Company determined that it acquired control of SNC and commenced consolidating the results of SNC from March 11, 2024 under the voting interest entity model. The acquisition was accounted for as an asset acquisition as SNC did not meet the definition of a business. The cost of the acquisition has been allocated to the assets and liabilities of SNC, including its exploration property in the Ivory Coast.
    8

    Table of Contents
    IVANHOE ELECTRIC INC.
    Notes to the Condensed Interim Consolidated Financial Statements
    (Unaudited - Tabular amounts expressed in thousands of U.S. dollars, unless otherwise indicated)
    6. Exploration properties:
    Santa
    Cruz
    Tintic San MatiasOtherTotal
    Balance at December 31, 2023$166,492 $30,663 $15,315 $3,820 $216,290 
    Acquisition costs300 40 — 529 869 
    Foreign currency translation— — — 7 7 
    Balance at June 30, 2024$166,792 $30,703 $15,315 $4,356 $217,166 

    7. Note payable:
    Note payable
    Balance at December 31, 2023$48,916 
    Interest expense2,290 
    Balance at June 30, 2024$51,206 
    Current portion14,962 
    Non-current portion36,244 
    Balance at June 30, 2024$51,206 
    In May 2023, the Company issued a secured promissory note in the amount of $82.6 million as part of a land acquisition at its Santa Cruz project. The promissory note includes an annual interest rate of prime plus 1% and is to be paid in installments, as follows:
    •$34.3 million, plus accrued interest, paid in November 2023;
    •four equal principal payments of $12.1 million on the first, second, third and fourth anniversaries of the November 2023 payment, plus applicable accrued interest.
    8. Convertible debt:
    VRB
    Convertible
    Bond
    Balance at December 31, 2023$28,372 
    Interest expense1,224 
    Balance at June 30, 2024$29,596 
    On July 8, 2021, VRB issued a convertible bond for gross proceeds of $24.0 million. The bond has a five-year term and interest accrues at a rate of 8% per annum.
    Prior to the maturity date, the convertible bond is automatically converted into equity of VRB upon an equity financing or sale event, at a price per share equal to the lower of:
    •the transaction price of the equity financing or sale event; and
    •the valuation cap price of $158.0 million divided by the total shares outstanding at the time of the event.
    If no equity financing or sale event occurs, VRB must repay the outstanding principal and interest on maturity.
    The Company has accounted for the convertible bond, including its embedded features, as a debt instrument accounted at amortized cost, as it was determined the embedded features are not required to be bifurcated.
    9

    Table of Contents
    IVANHOE ELECTRIC INC.
    Notes to the Condensed Interim Consolidated Financial Statements
    (Unaudited - Tabular amounts expressed in thousands of U.S. dollars, unless otherwise indicated)

    9. Equity:
    (a) Common stock transactions:
    On February 6, 2024, Ivanhoe Electric acquired all of the issued and outstanding common shares of Kaizen Discovery Inc. (“Kaizen”) not already beneficially owned by Ivanhoe Electric pursuant to a plan of arrangement under the Business Corporations Act (British Columbia) (the “Arrangement”).
    Immediately prior to the closing of the Arrangement, Ivanhoe Electric beneficially owned 82.5% of the issued and outstanding common shares of Kaizen on a non-diluted basis. Following the closing of the Arrangement, Ivanhoe Electric beneficially owns 100% of the issued and outstanding common shares of Kaizen on a fully diluted basis.
    Ivanhoe Electric acquired the common shares in consideration for the issuance of one share of common stock of Ivanhoe Electric for every 127 Common Shares issued and outstanding immediately prior to the closing of the Arrangement. A total of 116,413 shares of Ivanhoe Electric were issued.
    (b) Stock-based compensation:
    Stock-based payment compensation was allocated to operations as follows:
    Three Months Ended June 30,Six months ended June 30,
    2024202320242023
    General and administrative expenses$2,987 $4,759 $5,677 $8,958 
    Exploration expenses1,082 667 1,737 1,595 
    Research and development expenses— 5 — 5 
    Cost of sales— — — 5 
    $4,069 $5,431 $7,414 $10,563 
    (i) Stock options:
    During the six months ended June 30, 2024 Company granted stock options to certain directors, officers and employees of the Company. The options have a seven-year term and comprise three equal tranches vesting in one-third annual increments beginning one year from the grant date.
    Information related to stock options granted during the six months ended June 30, 2024 is presented below.
    Grant date:
    March 11, 2024April 8, 2024
    Exercise price$13.50 $13.50 
    Number of options granted1,801,234 415,170 
    Weighted average assumptions used to value stock option awards:
    Expected volatility61.6 %60.1 %
    Expected life of options (in years)44
    Expected dividend rate0 %0 %
    Risk-free interest rate4.23 %4.56 %
    Weighted average grant-date fair value (per option)$3.46 $4.72 

    10

    Table of Contents
    IVANHOE ELECTRIC INC.
    Notes to the Condensed Interim Consolidated Financial Statements
    (Unaudited - Tabular amounts expressed in thousands of U.S. dollars, unless otherwise indicated)
    10. Revenue:
    The Company recognized revenue from the following sources:
    Three Months Ended June 30,Six months ended June 30,
    Revenue type2024202320242023
    Software licensing$— $— $— $400 
    Data processing services538 42 898 321 
    Renewable energy storage systems (Note a)— 1,272 — 1,272 
    Total$538 $1,314 $898 $1,993 
    (a)At June 30, 2024, the Company had a contract liability of $2.7 million (December 31, 2023 — $2.4 million) relating to the sale of renewable energy storage systems.
    11. Exploration expense:
    Three Months Ended June 30,Six months ended June 30,
    Project2024202320242023
    Santa Cruz, USA $20,478 $15,043 $48,315 $29,725 
    Tintic, USA3,681 1,954 7,201 3,075 
    San Matias, Colombia (Cordoba)3,236 10,109 6,754 14,767 
    Hog Heaven, USA2,530 416 5,837 1,054 
    Unity, USA1,552 — 1,650 21 
    Samapleu Project, Ivory Coast (Note 5(a))1,414 — 1,414 — 
    Carolina, USA300 790 1,195 1,028 
    Bitter Creek, USA528 15 1,186 42 
    White Hill, USA 94 259 331 750 
    Lincoln, USA8 182 138 477 
    Generative exploration and other3,433 3,783 6,876 8,171 
    Total$37,254 $32,551 $80,897 $59,110 
    12. Related party transactions:
    Related parties include entities with common direct or indirect shareholders and/or directors. Parties are considered to be related if one party has the ability, directly or indirectly, to control the other party or exercise significant influence over the other party in making financial and operating decisions.
    11

    Table of Contents
    IVANHOE ELECTRIC INC.
    Notes to the Condensed Interim Consolidated Financial Statements
    (Unaudited - Tabular amounts expressed in thousands of U.S. dollars, unless otherwise indicated)
    The following table summarizes transactions between the Company and significant related parties.
    Balance outstanding as atTransactions for the
    three months ended
    June 30,
    Transactions for the
    six months ended
    June 30,
    June 30,
    2024
    December 31,
    2023
    2024202320242023
    Total expenses and accounts payable
    Global Mining (Note a)239 224 1,018 4,897 2,381 9,213 
    Ivanhoe Capital Aviation (Note b)— — 250 250 500 500 
    I-Pulse (Note c)1,046 1,395 430 1,158 826 2,315 
    Total1,285 1,619 1,698 6,305 3,707 12,028 
    Revenue and accounts receivable
    Ma'aden Joint Venture (Note d)100 — 363 — 663 — 
    Advances
    Global Mining (Note a)1,009 1,169 — — — — 
    Ma'aden Joint Venture (Note d)948 1,254 — — — — 
    Deposit
    I-Pulse (Note c)4,165 4,233 — — — — 
    Loan
    JCHX Mining Management Co., Ltd (Note e)— 4,000 — — — — 
    Transactions for the
    three months ended
    June 30,
    Transactions for the six
    months ended
    June 30,
    2024202320242023
    Expense classification
    Exploration expenses370 3,290 789 6,332 
    General and administrative expenses1,021 2,357 2,328 4,388 
    Research and development expenses307 658 590 1,308 
    1,698 6,305 3,707 12,028 
    (a)Global Mining Management Corp. (“Global Mining”) is a private company based in Vancouver, Canada, that provides administration, accounting, and other office services to the Company on a cost-recovery basis. The Company held 6.7% of Global Mining’s outstanding common stock at June 30, 2024 (December 31, 2023 — 7.1%). The advance provided to Global Mining is included in other non-current assets.
    (b)Ivanhoe Capital Aviation (“ICA”) is an entity beneficially owned by the Company’s Executive Chairman. ICA provides use of its aircraft to the Company.
    (c)I-Pulse is a shareholder of the Company. On October 24, 2022, the Company entered into an agreement with I-Pulse, to purchase six Typhoon™ transmitters to be delivered in stages over approximately three years. The total purchase price for the six Typhoon™ transmitters is $12.4 million, which includes research and development costs of $2.8 million. The agreement also includes maintenance costs of $1.7 million. The Company is recognizing the research and development costs and annual maintenance costs on a straight line basis in the consolidated statement of loss over the applicable term. In October 2022, the Company made deposit payments totaling $7.1 million, representing 50% of each component of the agreement and recorded in other non-current assets. The remaining payments will be made as each Typhoon™ transmitter system is
    12

    Table of Contents
    IVANHOE ELECTRIC INC.
    Notes to the Condensed Interim Consolidated Financial Statements
    (Unaudited - Tabular amounts expressed in thousands of U.S. dollars, unless otherwise indicated)
    delivered. In December 2023, the Company received the first Typhoon™ transmitter that was deliverable under the agreement.
    (d)The Company's majority owned subsidiary, CGI, provides geophysical data processing services to the Ma'aden joint venture and recognized revenue totaling $0.7 million.
    At June 30, 2024 the Company has $0.9 million in accounts receivable owed by the Ma'aden joint venture for costs that the Company incurred on behalf of the Ma’aden Joint Venture related to exploration work in Saudi Arabia.
    (e)JCHX Mining Management Co., Ltd (“JCHX") held 19.8% of Cordoba’s issued and outstanding common stock as at June 30, 2024 (December 31, 2023 - 19.8%).
    In November 2023, $4.0 million was advanced to Cordoba by JCHX. In January 2024, Cordoba announced receipt of the second installment of $40.0 million relating to the strategic arrangement entered into with JCHX in May 2023. The $4.0 million loan was settled in full by applying it towards the second installment received as a payment in kind.

    13. Fair value measurement:
    The following table provides the valuation hierarchy classification of assets and liabilities that are recorded at fair value and measured on a recurring basis in the combined balance sheets:
    June 30, 2024December 31, 2023
    Level 1Level 2Level 3Level 1Level 2Level 3
    Financial assets:
    Investments subject to significant influence4,201 — — 4,159 — — 
    Other investments1,448 750 — 2,239 750 — 
    Total financial assets$5,649 $750 $— $6,398 $750 $— 
    Financial liabilities:     
    Total financial liabilities$— $— $— $— $— $— 
    There were no movements in level three instruments for the three months ended June 30, 2024.
    14. Segment reporting:
    The Company’s President & Chief Executive Officer is the Chief Operating Decision Maker (“CODM”) of the Company. The CODM evaluates how the Company allocates resources, assesses performance and makes strategic and operational decisions. Based upon such evaluation, the Company has determined that it has three reportable segments. The Company’s reportable segments are critical metals, data processing and energy storage.
    Critical metals is focused on mineral project exploration and development with a focus on identifying and developing mineral projects, and ultimately mines, associated with the metals necessary for electrification.
    The data processing segment provides data analytics, geophysical modeling and artificial intelligence services for the mineral, oil & gas and water exploration industries.
    The energy storage segment develops, manufactures and installs vanadium flow batteries for grid-scale energy storage.
    13

    Table of Contents
    IVANHOE ELECTRIC INC.
    Notes to the Condensed Interim Consolidated Financial Statements
    (Unaudited - Tabular amounts expressed in thousands of U.S. dollars, unless otherwise indicated)
    Segment information for the periods presented is as follows:
    Three Months Ended June 30, 2024Six months ended June 30, 2024
    Critical
    Metals
    Data
    Processing
    Energy
    Storage
    TotalCritical
    Metals
    Data
    Processing
    Energy
    Storage
    Total
    Revenue$— $538 $— $538 $— $898 $— $898 
    Intersegment revenues— 29 — 29 — 148 — 148 
    Loss (income) from operations46,742 (67)1,871 48,546 101,807 (124)3,744 105,427 
    Segment assets398,774 4,777 12,722 416,273 398,774 4,777 12,722 416,273 
    Three Months Ended June 30, 2023Six months ended June 30, 2023
    Critical
    Metals
    Data
    Processing
    Energy
    Storage
    TotalCritical
    Metals
    Data
    Processing
    Energy
    Storage
    Total
    Revenue$— $42 $1,272 $1,314 $— $721 $1,272 $1,993 
    Intersegment revenues— 15 — 15 — 63 — 63 
    Loss (income) from operations44,648 746 1,991 47,385 80,807 1,145 4,022 85,974 
    Segment assets293,234 4,253 12,274 309,761 293,234 4,253 12,274 309,761 
    15. Commitments and contingencies:
    The Company has entered into a contractual arrangement to purchase six Typhoon™ transmitters from I-Pulse (Note 12).
    In the ordinary course of business, the Company may be involved in various legal proceedings and subject to claims that arise. Although the results of litigation and claims are inherently unpredictable and uncertain, the Company is not currently a party to any legal proceedings the outcome of which, if determined adversely to it, are believed to, either individually or taken together, have a material adverse effect on the Company’s business, financial condition or results of operations.


    14


    Item 2. Management's Discussion and Analysis of Financial Condition and Results of Operations
    You should read the following discussion and analysis of our financial condition and results of operations together with the condensed interim consolidated financial statements and related notes included in Item 1 of Part I of this Quarterly Report on Form 10-Q (this “Quarterly Report”) and with our audited consolidated financial statements and the related notes for the fiscal year ended December 31, 2023 included in Part II of our Annual Report on Form 10-K for the year ended December 31, 2023 filed with the Securities and Exchange Commission (the “SEC”) on February 26, 2024 (the “2023 Form 10-K”).

    Special Note Regarding Forward-Looking Statements
    This Quarterly Report contains forward-looking statements within the meaning of Section 27A of the Securities Act of 1933, as amended, (the "Securities Act"), and Section 21E of the Securities Exchange Act of 1934, as amended, (the "Exchange Act"), that involve risks and uncertainties, including statements based on our current expectations, assumptions, estimates and projections about future events, our business, our financial condition, results of operations and prospects, our industry and the regulatory environment in which we operate. Any statements contained herein that are not statements of historical facts may be deemed to be forward-looking statements. Those statements include, but are not limited to, statements with respect to: estimated calculations of mineral reserves and resources at our properties including changes in those estimated calculations, anticipated results and timing of exploration activities, timing of studies for advancing or developing our properties, plans and objectives, industry trends, our requirements for additional capital, treatment under applicable government regimes for permitting or attaining approvals, government regulation, environmental risks, title disputes or claims, synergies of potential future acquisitions, the projected, forecast or anticipated economic parameters of our mineral projects (including capital cost, operating cost, net present value, internal rate of return and other parameters), and our anticipated uses of the net proceeds from our initial public offering or other offerings of our securities. In some cases, you can identify these statements by forward-looking words such as “may,” “might,” “could,” “should,” “would,” “achieve,” “budget,” “scheduled,” “forecasts,” “expects,” “plans,” “anticipates,” “believes,” “estimates,” “predicts,” “potential” or “continue,” the negative of these terms and other comparable terminology. These forward-looking statements may include projections of our future financial performance, our anticipated growth strategies and anticipated trends in our industry. All forward-looking statements speak only as of the date on which they are made. These statements are not guarantees of future performance and involve certain risks, uncertainties and assumptions concerning future events that are difficult to predict. Therefore, actual future events or results may differ materially from these statements. We believe that the factors that could cause our actual results to differ materially from those expressed or implied by forward-looking statements include the following: our mineral projects are all at the exploration stage and are subject to the significant risks and uncertainties associated with mineral exploration; the initial assessment for our Santa Cruz Project is only an early stage study of its potential economic viability and future studies and actual economic outcomes may vary greatly from those set forth in the initial assessment; we have no mineral reserves, other than at the San Matias project; we have a limited operating history on which to base an evaluation of our business and prospects; we depend on our material projects for our future operations; our mineral resource and reserve calculations and economic projections relating to our properties are only estimates; actual capital costs, operating costs, production and economic returns at any future mine may differ significantly from those we have anticipated or projected; the title to some of the mineral properties may be uncertain or defective; our business is subject to changes in the prices of copper, gold, silver, nickel, cobalt, vanadium and platinum group metals; we have claims and legal proceedings against one of our subsidiaries; our business is subject to significant risk and hazards associated with future mining operations; we may fail to identify attractive acquisition candidates or joint ventures with strategic partners or be unable to successfully integrate acquired mineral properties; we may fail to successfully manage joint ventures and are reliant on our joint venture partners to comply with their obligations; our business is extensively regulated by the United States and foreign governments as well as local governments; the requirements that we obtain, maintain and renew environmental, construction and mining permits are often a costly and time-consuming process; our non-U.S. operations are subject to additional political, economic and other uncertainties not generally associated with domestic operations; and our activities may be hindered, delayed or have to cease as a result of climate change effects, including increased and excessive heating and the potential for forest fires at many of our properties.
    You should carefully consider these risks, as well as the additional risks described in other documents we file with the SEC. We also operate in a very competitive and rapidly changing industry. New risks emerge from time to time and it is not possible for our management to predict all risks, nor can we assess the impact of all factors on our business or the extent to which any factor, or combination of factors, may cause actual results to differ materially from those contained in, or implied by, any forward-looking statements.

    15


    These factors should not be construed as exhaustive and should be read in conjunction with the risks described under the heading “Risk Factors” in our 2023 Form 10-K. Important factors that could cause actual results to differ materially from our expectations, or cautionary statements, are disclosed under “Risk Factors” in the 2023 Form 10-K. These risks and uncertainties, as well as other risks of which we are not aware or which we currently do not believe to be material, may cause our actual future results to be materially different than those expressed in our forward-looking statements. We caution you not to place undue reliance on these forward-looking statements. We do not undertake any obligation to make any revisions to these forward-looking statements to reflect events or circumstances after the date of this report or to reflect the occurrence of unanticipated events, except as required by law.
    Business Overview
    We are a United States domiciled company that combines advanced mineral exploration technologies with electric metals exploration projects predominantly located in the United States. We use our powerful Typhoon™ geophysical surveying system, together with advanced data analytics provided by our 94.3% owned subsidiary, Computational Geosciences Inc. (“CGI”), to accelerate and de-risk the mineral exploration process as we seek to discover new deposits of critical metals that may otherwise be undetectable by traditional exploration technologies. We believe the United States is significantly underexplored and has the potential to yield major new discoveries of critical metals. Our mineral exploration efforts focus on copper as well as other metals including nickel, vanadium, cobalt, platinum group elements, gold and silver. Through the advancement of our portfolio of electric metals exploration projects, headlined by the Santa Cruz Project in Arizona and the Tintic Project in Utah, as well as other exploration projects in the United States, we intend to support the United States' supply chain independence by finding and delivering critical metals necessary for the electrification of the economy. We also operate a 50/50 joint venture with Saudi Arabian Mining Company Ma’aden ("Ma'aden") to explore for minerals on ~48,500 km2 of underexplored Arabian Shield in Saudi Arabia.
    Finally, in addition to our mineral projects, we also own a 90.0% controlling interest in VRB Energy Inc. ("VRB") which is primarily engaged in the design, manufacture, installation, and operation of vanadium redox flow energy storage systems.
    At our Santa Cruz Project in Arizona, we are evaluating the potential for a high-grade modern underground copper mining operation. In September 2023, we completed the Initial Assessment & Technical Report Summary for the Santa Cruz Project (the "IA"), which outlines a potential 5.9 million tonnes per year underground mining operation, supported by 105.2 million tonnes of modeled mill feed with an average grade of 1.58% copper from the Santa Cruz and East Ridge Deposits, resulting in an estimated 20-year mine life. We are advancing further studies for an underground copper mining operation with a focus on minimizing the surface footprint of the mine while at the same time incorporating leading technologies to improve efficiencies and costs. We are designing a technologically advanced mine that we expect to result in low carbon dioxide emissions per pound of copper produced and be a leading example of responsibly produced domestic copper. Key considerations that will influence our decision making include, but are not limited to, using clean and renewable energy in our future mining operations, optimizing and minimizing our water utilization, minimizing our environmental footprint, ensuring workforce diversity and hiring from local communities, health, safety and environmental performance, support of local cultural heritage and biodiversity protection.
    On May 7, 2024, we entered into an Exploration Alliance Agreement with BHP Mineral Resources Inc. (“BHP”), which sets out the framework for BHP and the Company to explore mutually agreed “Areas of Interest” in the United States to identify copper and other critical metal exploration opportunities within those Areas of Interest that may become 50/50 owned joint ventures following a discovery. The Agreement is for a term of three years, which may be extended upon mutual agreement. BHP will provide the initial funding of $15 million and thereafter the Company and BHP would provide funding on a 50/50 basis. The Company will provide access to one Typhoon™ system for use pursuant to the Exploration Alliance Agreement.
    References to our mineral projects refers to our interests in such projects which may be a direct ownership interest in mineral titles (including through subsidiary entities), a right to acquire mineral titles through an earn-in or option agreement, or, in the case of our investments in publicly listed companies in Canada, through our ownership of the equity of those companies that have an interest in such mineral projects.
    Our shares of common stock are listed on the NYSE American and the TSX under the ticker symbol “IE”.
    Segments
    We account for our business in three business segments – (i) critical metals, (ii) data processing and software licensing services and (iii) energy storage systems.
    16


    Significant Components of Results of Operations
    Revenue, Cost of Sales and Gross Profit
    We have not generated any revenue from our mining projects because they are in the exploration stage. We do not expect to generate any revenue from our mining projects for the foreseeable future.
    We generate revenue from our technology businesses CGI and VRB, which are included in the data processing and energy storage systems business segments, respectively.
    CGI generates revenue from the sale of data processing services to the mining and oil and gas industries. In prior years, CGI has also generated revenue from software licensing.
    VRB generates revenue from developing, manufacturing and selling vanadium redox flow energy storage systems.
    Exploration Expenses
    Exploration expenses include topographical, geological, geochemical and geophysical studies, exploratory drilling, trenching, sampling and activities in relation to identifying a mineral resource and then evaluating the technical feasibility and commercial viability of extracting the mineral resource, as well as value-added taxes in relation to these direct exploration and evaluation costs incurred in foreign jurisdictions where recoverability of those taxes is uncertain. Exploration expenses also include salaries, benefits and non-cash stock-based compensation expenses of the employees performing these activities.
    Exploration expenses also include payments under earn-in and option agreements where the option right is with respect to ownership interests in legal entities owning the underlying mineral project in the exploration project phase. Through our earn-in and option agreements, we have the right (and in some cases, the obligation) to fund and conduct exploration on the underlying mineral project prior to determining whether to acquire a minority or majority ownership interest through further funding the costs of such exploration and, in some cases, through direct payments to the owners of the project. In the event we cease making expenditures on an exploration mineral project or fail to incur the agreed level of exploration expenditures, we will not obtain an ownership right beyond any which may have been acquired as of the date of termination.
    Included in exploration expenses are exploration costs that we incur in relation to generating new projects. These activities may or may not proceed to earn-in agreements depending on our evaluation. These are categorized as “Project generation and other”.
    General and Administrative Expenses
    Our general and administrative expenses consist of salaries and benefits, stock-based compensation, professional and consultant fees, insurance and other general administration costs.
    Three Months Ended June 30, 2024 Compared to the Three Months Ended June 30, 2023
    For the three months ended June 30, 2024 we recorded a net loss attributable to common stockholders of $46.8 million ($0.39 per share), compared to $38.3 million ($0.41 per share) for the three months ended June 30, 2023, which was an increase of $8.5 million. Significant contributors to this increase for the three months ended June 30, 2024 included an increase of $4.7 million in exploration expenditures, an increase of $0.8 million in the share of loss of equity method investees and a decrease of $0.8 million in revenue, partially offset by a decrease of $2.0 million in general and administrative expenses compared to the three months ended June 30, 2023.
    Exploration expenses were $37.3 million for the three months ended June 30, 2024, an increase of $4.7 million from $32.6 million for the three months ended June 30, 2023. Exploration expenses consisted of the following:
    17


    Three months ended
    June 30,
    (In thousands)20242023
    Exploration Expenses:
    Santa Cruz, USA $20,478 $15,043 
    Tintic, USA3,681 1,954 
    San Matias, Colombia (Cordoba)3,236 10,109 
    Hog Heaven, USA2,530 416 
    Unity, USA1,552 — 
    Samapleu Project, Ivory Coast1,414 — 
    Carolina, USA300 790 
    Bitter Creek, USA528 15 
    White Hill, USA 94 259 
    Lincoln, USA8 182 
    Generative exploration and other3,433 3,783 
    Total$37,254 $32,551 
    During the three months ended June 30, 2024, exploration expenditures largely focused on activities at:
    •the Santa Cruz Project where $20.5 million of exploration expenditure was incurred in the three months ended June 30, 2024 compared to $15.0 million incurred in the three months ended June 30, 2023. Activities during the three months ended June 30, 2024 at Santa Cruz were focused on a program of infill resource drilling, geotechnical, hydrological, and metallurgical drilling/laboratory testing along with advancing permitting and technical studies required to support a prefeasibility study;
    •the Tintic Project where $3.7 million of exploration expenditure was incurred in the three months ended June 30, 2024 compared to $2.0 million incurred in the three months ended June 30, 2023. Activities during the three months ended June 30, 2024 were focused on diamond drilling in the Mammoth area;
    •the San Matias Project where $3.2 million of exploration expenditure was incurred by Cordoba Minerals for the three months ended June 30, 2024 focused on preparations for detailed engineering design of the Alacran mine; and
    •the Hog Heaven Project where $2.5 million of exploration expenditure was incurred in the three months ended June 30, 2024 compared to $0.4 million incurred in the three months ended June 30, 2023. Activities during the three months ended June 30, 2024 were focused on diamond drilling in the west Flathead and Battle Butte areas.
    General and administrative expenses were $10.7 million for the three months ended June 30, 2024, a decrease of $2.0 million from $12.7 million for the three months ended June 30, 2023. The decrease was largely a result of a $1.8 million decrease in non-cash stock-based compensation expense from $4.8 million for the three months ended June 30, 2023 to $3.0 million for the three months ended June 30, 2024.
    Share of loss of equity method investees was $1.5 million for the three months ended June 30, 2024, an increase of $0.8 million from $0.6 million for the three months ended June 30, 2023. The increase in loss was largely due to our $1.1 million share of the loss from the Ma'aden joint venture three months ended June 30, 2024. The Ma'aden joint venture was formed in July 2023.
    Revenue for the three months ended June 30, 2024 was $0.5 million a decrease of $0.8 million from $1.3 million for three months ended June 30, 2023. The sources of revenue for the periods changed significantly. CGI’s software licensing and data processing services to the mining and oil and gas industries represented 100.0% of our revenue for the three months ended June 30, 2024 and 3.2% of our revenue for three months ended June 30, 2023 ($0.0 million). VRB generated no revenue during the three months ended June 30, 2024 and represented 96.8% three months ended June 30, 2023 ($1.3 million).
    Due to the nature of VRB's contracts, revenue is typically recognized when an energy storage system is installed and commissioned. VRB did not complete any installations and commissionings during three months ended June 30, 2024 and therefore recorded no revenue during this period. During the three months ended June 30, 2023, the majority of our
    18


    revenue came from VRB as it delivered, installed and commissioned a 1MW/2MWh energy storage system to a customer in China, which resulted in $1.3 million of revenue being recognized.
    Three Months Ended
    June 30, 2024
    Three Months Ended
    June 30, 2023
    Percentage Change
    (In thousands)
    CGI: Software licensing and data processing services:
    Revenue$538 $42 1177 %
    Cost of sales(192)(21)811 %
    Gross profit346 21 1543 %
    VRB: Energy storage systems:
    Revenue$— $1,272 (100)%
    Cost of sales— (1,235)(100)%
    Gross profit— 37 (100)%
    Total
    Revenue$538 $1,314 (59)%
    Cost of sales(192)(1,256)(85)%
    Gross profit346 58 496 %
    CGI’s revenue for the three months ended June 30, 2024 was $0.5 million, an increase of $0.5 million from $0.0 million for the three months ended June 30, 2023. The increase in CGI’s revenue was a result of more data processing services being contracted for by customers than the prior period in 2023.
    CGI’s gross profit for the three months ended June 30, 2024 was $0.3 million, an increase of $0.3 million from $0.0 million for the three months ended June 30, 2023. The increase in CGI's gross profit was consistent with the increase in revenue.
    Six Months Ended June 30, 2024 Compared to the Six Months Ended June 30, 2023
    For the six months ended June 30, 2024 we recorded a net loss attributable to common stockholders of $102.3 million ($0.85 per share), compared to $74.3 million ($0.80 per share) for the six months ended June 30, 2023, which was an increase of $28.0 million. Significant contributors to this increase for the six months ended June 30, 2024 included an increase of $21.8 million in exploration expenditures and an increase of $3.2 million in the share of loss of equity method compared to the six months ended June 30, 2023.
    Exploration expenses were $80.9 million for the six months ended June 30, 2024, an increase of $21.8 million from $59.1 million for the six months ended June 30, 2023. Exploration expenses consisted of the following:
    Six months ended June 30,
    (In thousands)20242023
    Exploration Expenses:
    Santa Cruz, USA $48,315 $29,725 
    Tintic, USA7,201 3,075 
    San Matias, Colombia (Cordoba)6,754 14,767 
    Hog Heaven, USA5,837 1,054 
    Unity, USA1,650 21 
    Samapleu Project, Ivory Coast1,414 — 
    Carolina, USA1,195 1,028 
    Bitter Creek, USA1,186 42 
    White Hill, USA 331 750 
    Lincoln, USA138 477 
    Generative exploration and other6,876 8,171 
    Total$80,897 $59,110 
    19


    During the six months ended June 30, 2024, exploration expenditures largely focused on activities at:
    •the Santa Cruz Project where $48.3 million of exploration expenditure was incurred in the six months ended June 30, 2024 compared to $29.7 million incurred in the six months ended June 30, 2023. Activities during the six months ended June 30, 2024 at Santa Cruz were focused on a program of infill resource drilling, geotechnical, hydrological, and metallurgical drilling/laboratory testing along with advancing permitting and technical studies required to support a prefeasibility study;
    •the Tintic Project where $7.2 million of exploration expenditure was incurred in the six months ended June 30, 2024 compared to $3.1 million incurred in the six months ended June 30, 2023. Activities during the six months ended June 30, 2024 were focused on diamond drilling in the Mammoth area;
    •the San Matias Project where $6.8 million of exploration expenditure was incurred by Cordoba Minerals for the six months ended June 30, 2024 compared to $14.8 million incurred in the six months ended June 30, 2023. Activities during the six months ended June 30, 2024 were focused on preparations for detailed engineering design of the Alacran mine; and
    •the Hog Heaven Project where $5.8 million of exploration expenditure was incurred in the six months ended June 30, 2024 compared to $1.1 million incurred in the six months ended June 30, 2023. Activities during the six months ended June 30, 2024 were focused on diamond drilling in the Flathead Mine, West Flathead and Battle Butte areas.
    General and administrative expenses were $23.3 million for the six months ended June 30, 2024, which was consistent with the $23.3 million incurred for the six months ended June 30, 2023.
    Share of loss of equity method investees was $4.5 million for the six months ended June 30, 2024, an increase of $3.2 million from $1.2 million for the six months ended June 30, 2023. The increase in loss was due to our $3.2 million share of the loss from the Ma'aden joint venture six months ended June 30, 2024. The Ma'aden joint venture was formed in July 2023.
    Revenue for the six months ended June 30, 2024 was $1.1 million a decrease of $0.8 million from $2.0 million for six months ended June 30, 2023. The sources of revenue for the periods changed significantly. CGI’s software licensing and data processing services to the mining and oil and gas industries represented 100.0% of our revenue for the six months ended June 30, 2024 ($0.9 million) and 36.2% for the six months ended June 30, 2023 ($0.7 million). VRB generated no revenue during the six months ended June 30, 2024 and 63.8% of the revenue for the six months ended June 30, 2023 ($1.3 million.
    Due to the nature of VRB's contracts, revenue is typically recognized when an energy storage system is installed and commissioned. VRB did not complete any installations and commissionings during six months ended June 30, 2024 and therefore recorded no revenue during this period. During the six months ended June 30, 2023, $1.3 million of our revenue came from VRB as it delivered, installed and commissioned a 1MW/2MWh energy storage system to a customer in China.
    Six months ended
    June 30, 2024
    Six months ended
    June 30, 2023
    Percentage Change
    (In thousands)
    CGI: Software licensing and data processing services:
    Revenue$898 $721 25 %
    Cost of sales(292)(205)43 %
    Gross profit606 516 17 %
    VRB: Energy storage systems:
    Revenue$— $1,272 (100)%
    Cost of sales— (1,235)(100)%
    Gross profit— 37 (100)%
    Total
    Revenue$898 $1,993 (55)%
    Cost of sales(292)(1,440)(80)%
    Gross profit606 553 9 %
    20



    CGI’s revenue for the six months ended June 30, 2024 was $0.9 million, an increase of $0.2 million from $0.7 million for the six months ended June 30, 2023. The increase in CGI’s revenue was a result of more data processing services being contracted for by customers than the prior period in 2023. CGI’s gross profit for the six months ended June 30, 2024 was $0.6 million, an increase of $0.1 million from $0.5 million for the six months ended June 30, 2023. The increase in CGI's gross profit was consistent with the increase in revenue.
    Stock-Based Compensation
    During the six months ended June 30, 2024, we granted the following stock options to certain directors, officers and employees of the Company:
    •1.8 million stock options issued on March 11, 2024 at an exercise price of $13.50. The fair value of the option grant was determined using the Black-Scholes option-pricing model as $3.46 per share; and
    •0.4 million stock options issued on April 8, 2024 at an exercise price of $13.50. The fair value of the option grant was determined using the Black-Scholes option-pricing model as $4.72 per share.
    Liquidity, Capital Resources and Capital Requirements
    Cash Resources
    We have recurring net losses and negative operating cash flows and we expect that we will continue to operate at a loss for the foreseeable future.
    We generate revenue from our technology businesses. We have not generated any revenue from our mining projects and do not expect to generate any revenue from our mining projects for the foreseeable future.
    We have funded our operations primarily through the sale of our equity and convertible securities.
    At June 30, 2024 and December 31, 2023, we had cash and cash equivalents of $133.8 million and $205.0 million, respectively, and a working capital of $106.8 million and $176.8 million, respectively. Of the total cash and cash equivalents at June 30, 2024 and December 31, 2023, $20.8 million and $15.0 million, respectively, was not available for the general corporate purposes of the Company as these amounts were held by non-wholly-owned subsidiaries.
    As at August 7, 2024, we believe that we will have sufficient cash resources to carry out our business plans for at least the next 12 months, after which we expect to need additional financing to further advance our projects and conduct our business. We have based these estimates on our current assumptions which may require future adjustments based on our ongoing business decisions as well as, in particular, exploration success at our mineral projects. Accordingly, we may require additional cash resources earlier than we currently expect or we may need to curtail currently planned activities.
    Our significant operational expenses include the payments that we anticipate making under the various earn-in and option agreements to which we are a party. These agreements are structured to provide us with flexibility whereby our ability to continue to explore on a mineral project is contingent on funding agreed specified levels over specified time intervals.
    We may seek additional financing at any time through debt, equity, project specific debt, and/or other means, including asset sales. Our continued operations are dependent on our ability to obtain additional financing or to generate future cash flows. However, there can be no assurance that we will be successful in our efforts to raise additional capital on terms favorable to us, or at all.
    Cash Balances as of June 30, 2024
    The table below discloses the amounts of cash disaggregated by currency denomination as of June 30, 2024 in each jurisdiction that our affiliated entities are domiciled.
    21


    Currency by Denomination (in USD Equivalents)
    US dollars
    Canadian
    dollars
    Chinese
    Renminbi
    Colombian PesosOtherTotal
    (In thousands)
    Jurisdiction of Entity:
    USA$106,402 $647 $— $— $— $107,049 
    Colombia— — — 14,878 — 14,878 
    France4,403 — — — 1 4,404 
    Canada2,135 1,875 — — — 4,010 
    Singapore1,793 — — — — 1,793 
    China— — 770 — — 770 
    British Virgin Islands363 — — — — 363 
    Other 97 299 — — 149 545 
    Total$115,192 $2,821 $770 $14,878 $150 $133,811 
    Our subsidiary VRB, domiciled in the Cayman Islands, is subject to certain foreign exchange restrictions with respect to its People's Republic of China ("PRC") subsidiaries. There are foreign exchange policies in the PRC that limit the amount of capital that can be directly transmitted offshore from VRB’s PRC subsidiaries to VRB. Since their incorporation, these PRC subsidiaries have had accumulated losses and have not declared or paid any dividends or made any distribution of earnings.
    There were no cash transfers to or from our PRC subsidiaries in the form of intercompany loans during the six months ended June 30, 2024.
    Refer to Note 17 of our consolidated financial statements in our 2023 Form 10-K which outlines other restrictions on transfers of net assets from our consolidated subsidiaries to the Company.
    Convertible Bond — VRB
    In 2021, VRB issued a convertible bond for gross proceeds of $24.0 million. The bond has a five-year term and interest accrues at a rate of 8% per annum. Prior to the maturity date, the convertible bond will be automatically converted into equity of VRB upon an equity financing or sale event, at a price per share equal to the lower of (A) the transaction price of the equity financing or sale event, and (B) the valuation cap price of $158.0 million divided by the total shares outstanding at the time of the event. If no equity financing or sale event occurs, VRB must repay the outstanding principal and interest on maturity.
    Cash Flows
    The following table presents our sources and uses of cash for the periods indicated:
    Six months ended June 30, 2024
    20242023
    Net cash (used in) provided by:
    Operating activities(94,501)(65,830)
    Investing activities(2,716)(40,872)
    Financing activities27,074 30,651 
    Effect of foreign exchange on cash(1,089)192 
    Total change in cash(71,232)(75,859)
    Operating activities
    Net cash used in operating activities for all periods presented largely was spent on our exploration expenses and our general and administrative costs. We do not generate adequate cash from operations to cover our operating expenses and therefore rely on our financing activities to provide the cash resources to fund our operating and investing activities.
    The net cash used in operating activities for the six months ended June 30, 2024 of $94.5 million primarily was the result of $78.8 million of cash exploration expenditures and $17.0 million of cash general and administrative costs. The net
    22


    cash used in operating activities for the six months ended June 30, 2023 of $65.8 million primarily was the result of $57.4 million of cash exploration expenditures and $14.0 million of cash general and administrative costs.
    Investing activities
    Our investing activities generally relate to acquisitions of mineral property interests, purchases of public company shares in companies that we may partner with and capital expenditures at our projects. To date, due to our mining projects being in the exploration stage we have not incurred material capital expenditures.
    Net cash used in investing activities for the six months ended June 30, 2024 of $2.7 million was mainly attributable to $0.6 million related to payments for mineral interests, $1.1 million for the purchases of property, plant and equipment and $1.1 million for the purchase of investments that are subject to significant influence. In addition, we acquired cash of $0.2 million when we commenced consolidating SNC in March 2024.
    Financing activities
    During the six months ended June 30, 2024, there were no significant financing activities as we continued to fund our operations with the proceeds from our September 2023 public offering. Our subsidiary, Cordoba raised $26 million during six months ended June 30, 2024 in relation to financing its Alacran project through its strategic arrangement with JCHX.
    Contractual Obligations
    As of June 30, 2024, there have been no material changes, outside the ordinary course of business, in our contractual obligations since December 31, 2023. Refer to Part II, Item 7 of our Annual Report on Form 10-K for the year ended December 31, 2023, filed with the SEC on February 26, 2024, for information regarding our contractual obligations.
    Off Balance Sheet Arrangements
    As of June 30, 2024, we were not involved in any off-balance sheet arrangements that have or are reasonably likely to have a material effect on our financial condition, results of operations, or liquidity.
    Related Party Transactions
    See Note 12 of our consolidated financial statements for the three and six months June 30, 2024.
    Critical Accounting Estimates
    Our management’s discussion and analysis of our financial condition and results of operations is based on our consolidated financial statements which have been prepared in accordance with U.S. GAAP. The preparation of these financial statements requires us to make estimates and assumptions that affect the reported amounts of assets, liabilities, revenues and expenses, as well as the disclosure of contingent assets and liabilities as of the date of our financial statements.
    Below are the accounting matters that we believe are critical to our financial statements due to the degree of uncertainty regarding the estimates or assumptions involved and the magnitude of the asset, liability, revenue, expense, gain or loss being reported. Actual results may vary from our estimates in amounts that may be material to the financial statements. An accounting estimate is deemed to be critical if it requires an accounting estimate to be made based on assumptions about matters that are highly uncertain at the time the estimate is made, and if different estimates that reasonably could have been used or changes in the accounting estimates that are reasonably likely to occur periodically, could materially impact our financial statements.
    We base our assumptions and estimates on historical experience and various other sources that we believe to be reasonable under the circumstances. Actual results may differ from the estimates we calculate due to changes in circumstances, global economics and politics and general business conditions. A summary of our significant accounting policies are detailed in Note 3 to our consolidated financial statements included in our 2023 Form 10-K. We have outlined below those policies identified as being critical to the understanding of our business and results of operations and that require the application of significant management judgment in developing estimates.
    Recoverable value of exploration mineral interests
    We review and evaluate exploration mineral interests for impairment when events or changes in circumstances indicate that the carrying amount of an asset may not be recoverable. The recoverability of our exploration mineral interests and intangible assets did not involve significant estimation in the periods presented as circumstances did not indicate the
    23


    carrying amount of our assets may not be recoverable. However, the recoverability of our recorded mineral interests is subject to market factors that could significantly affect the recoverability of our assets, such as commodity prices, results of exploration activities that may affect our intentions to continue under option or earn-in agreements and geopolitical circumstances, particularly in Colombia. By nature, significant changes in these factors are reasonably possible to occur periodically, which could materially impact our financial statements.
    Stock-based compensation
    Compensation expense for options granted to employees, directors and certain service providers is determined based on estimated fair values of the options at the time of grant using the Black-Scholes option pricing model, which takes into account, as of the grant date, the fair market value of the shares, expected volatility, expected life, expected dividend yield and the risk-free interest rate over the expected life of the option. The use of the Black-Scholes option pricing model requires input estimation of the expected life of the option and volatility, which can have a significant impact on the valuation model and resulting expense recorded.
    In March 2024 and April 2024, we granted 1.8 million stock options and 0.4 million stock options, respectively, to certain directors, officers and employees of the Company at an exercise price of $13.50 per share. The fair value of the option grants was determined using the Black-Scholes option-pricing model as $3.46 and $4.72, respectively. The following assumptions were used to compute the fair value of the options granted:
    March 11, 2024 Grant DateApril 8, 2024 Grant Date
    Risk-free interest rate4%4.6%
    Dividend yieldnilnil
    Estimated volatility61.6%60.1%
    Expected option life4 years4 years
    The risk-free interest rate assumption was based on the U.S. treasury constant maturity yield at the date of the grant over the expected life of the option. No dividends are expected to be paid. We calculated the estimated volatility based on the historical volatility of a group of peer companies’ common stock and a group of relevant stock market indices over the expected option life as we only commenced publicly trading in June 2022. The computation of expected option life was determined based on a reasonable expectation of the option life prior to the option being exercised or forfeited.
    Income taxes
    We make estimates and judgments in determining the provision for income tax expense, deferred tax assets and liabilities and liabilities for unrecognized tax benefits, including interest and penalties. We are subject to income tax laws in many jurisdictions, including the United States, Canada, Colombia, Peru, Australia, the Ivory Coast and the PRC.
    We report income tax in accordance with U.S. GAAP, which requires the establishment of deferred tax accounts for all temporary differences between the financial reporting and tax bases of assets and liabilities, using currently enacted tax rates. In addition, deferred tax accounts must be adjusted to reflect new rates if enacted into law.
    Realization of deferred tax assets is contingent on the generation of future taxable income. As a result, we consider whether it is more likely than not that all or a portion of such assets will be realized during periods when they are available, and if not, we provide a valuation allowance for amounts not likely to be recognized. In determining our valuation allowance, we have not assumed future taxable income from sources other than the reversal of existing temporary differences. The extent to which a valuation allowance is warranted may vary as a result of changes in our estimates of future taxable income. In addition to the potential generation of future taxable income through the establishment of economic feasibility, development and operation of mines on our exploration assets, estimates of future taxable income could change in the event of disposal of assets, the identification of tax-planning strategies or changes in tax laws that would allow the benefits of future deductible temporary differences in certain entities or jurisdictions to be offset against future taxable temporary differences in other entities or jurisdictions.
    We recognize the effect of uncertain income tax positions if those positions are more likely than not of being sustained. The amount recognized is subject to estimates and our judgment with respect to the likely outcome of each uncertain tax position. The amount that is ultimately incurred for an individual uncertain tax position or for all uncertain tax positions in the aggregate could differ from the amount recognized. We had no uncertain tax positions as of June 30, 2024.
    24


    Item 3. Quantitative and Qualitative Disclosures about Market Risk.
    Not Applicable.
    Item 4. Controls and Procedures.
    Management’s Evaluation of our Disclosure Controls and Procedures
    We maintain disclosure controls and procedures that are designed to ensure that information required to be disclosed in the reports that we file or submit under the Exchange Act is (1) recorded, processed, summarized, and reported within the time periods specified in the SEC’s rules and forms and (2) accumulated and communicated to our management, including our principal executive officer and principal financial officer, to allow timely decisions regarding required disclosure.
    As of June 30, 2024, our management, with the participation of our principal executive officer and principal financial officer, evaluated the effectiveness of our disclosure controls and procedures (as defined in Rules 13a-15(e) and 15d-15(e) under the Exchange Act). Our management recognizes that any controls and procedures, no matter how well designed and operated, can provide only reasonable assurance of achieving their objectives, and management necessarily applies its judgment in evaluating the cost-benefit relationship of possible controls and procedures. Our principal executive officer and principal financial officer have concluded based upon the evaluation described above that, as of June 30, 2024, our disclosure controls and procedures were effective at the reasonable assurance level.
    Changes in Internal Control over Financial Reporting
    During the quarter ended June 30, 2024, there were no changes in our internal control over financial reporting, as such term is defined in Rules 13a-15(f) and 15(d)-15(f) promulgated under the Exchange Act, that have materially affected, or are reasonably likely to materially affect, our internal control over financial reporting.
    25


    PART II—OTHER INFORMATION
    Item 1. Legal Proceedings.
    From time to time, we and our subsidiaries may become subject to various legal proceedings that are incidental to the ordinary conduct of our business. Although we cannot accurately predict the amount of any liability that may ultimately arise with respect to any of these matters, we make a provision for potential liabilities when we deem them probable and reasonably estimable. These provisions are based on current information and legal advice and may be adjusted from time to time according to developments.
    Our subsidiary Cordoba is currently involved in two legal proceedings. The first is a criminal lawsuit filed by Cordoba in late 2018 and in January 2019 with the Colombian prosecutors against nine members of former Colombian management alleging breach of fiduciary obligations, abuse of trust, theft and fraud. This proceeding is ongoing. In the second proceeding, Cordoba (along with the National Mining Agency, Ministry of Mines and Energy, the local environmental authority, the Municipality of Puerto Libertador and the State of Cordoba) were served with a class action claim by the Alacran Community. This class action seeks (i) an injunction against Cordoba´s operations in the Alacrán area and (ii) an injunction against the prior declaration by the authorities that the Alacran Community´s mining activities were illegal. The claim was initially filed with the Administrative Court of Medellín, which remanded the case to the Administrative Court of Montería, which contested it and submitted the case to the Council of State. The Council of State determined the Administrative Court of Montería as the competent tribunal, where the process is currently being conducted. The Administrative Court of Montería admitted the commencement of the class action on September 2021. The decision was challenged by Cordoba and other defendants and confirmed by the Court. Cordoba timely filed its: (i) response to the lawsuit and statement of defense; and (ii) opposition to the injunction requested by plaintiffs. The Court now should: (i) issue a decision on the injunction; and (ii) schedule date and time for the initial hearing. While the court matters proceed, Cordoba will incur additional costs that will negatively impact its financial position. As well, the litigation process is uncertain and it is possible that the second proceeding is resolved against Cordoba, which could have a material adverse effect on its business, results of operations, financial condition and prospects.
    Item 1A. Risk Factors.
    There have been no material changes to our risk factors previously disclosed in Part I, Item 1A. “Risk Factors” of our 2023 Form 10-K.
    Item 2. Unregistered Sales of Equity Securities and Use of Proceeds.
    Unregistered Sales of Equity Securities for the Three Months Ended June 30, 2024
    There were no unregistered sales of equity securities during the three months ended June 30, 2024.

    26


    Item 6. Exhibits.
    Exhibit
    Number
    Description
    10.1
    Annual Compensation Letter – Robert Friedland (incorporated by reference to Exhibit 10.1 to the Company’s Current Report on Form 8-K filed with the SEC on May 9, 2024).
    10.2##
    Exploration Alliance Agreement dated May 7, 2024 (incorporated by reference to Exhibit 10.1 to the Company’s Current Report on Form 8-K filed with the SEC on May 8, 2024).
    10.3*
    Computational Geosciences Inc. Amended & Restated 2011 Incentive Stock Option Plan.
    31.1*
    Certification of Principal Executive Officer Pursuant to Rules 13a-14(a) and 15d-14(a) under the Exchange Act, as Adopted Pursuant to Section 302 of the Sarbanes-Oxley Act of 2002.
    31.2*
    Certification of Principal Financial Officer Pursuant to Rules 13a-14(a) and 15d-14(a) under the Exchange Act, as Adopted Pursuant to Section 302 of the Sarbanes-Oxley Act of 2002.
    32.1*
    Certification of Principal Executive Officer Pursuant to 18 U.S.C. Section 1350, as Adopted Pursuant to Section 906 of the Sarbanes-Oxley Act of 2002.
    32.2*
    Certification of Principal Financial Officer Pursuant to 18 U.S.C. Section 1350, as Adopted Pursuant to Section 906 of the Sarbanes-Oxley Act of 2002.
    101.INSInline XBRL Instance Document – the instance document does not appear in the Interactive Data File because XBRL tags are embedded within the Inline XBRL document.
    101.SCHInline XBRL Taxonomy Extension Schema Document
    101.CALInline XBRL Taxonomy Extension Calculation Linkbase Document
    101.DEFInline XBRL Taxonomy Extension Definition Linkbase Document
    101.LABInline XBRL Taxonomy Extension Label Linkbase Document
    101.PREInline XBRL Taxonomy Extension Presentation Linkbase Document
    104Cover Page Interactive Data File (embedded within the Inline XBRL document)
    *Filed herewith.
    ## Certain schedules or portions thereof are omitted pursuant to Item 601(a)(5) of Regulation S-K. The Company agrees to provide on a supplemental basis a copy of any omitted schedule to the U.S. Securities and Exchange Commission or its staff upon request.
    27


    SIGNATURES
    Pursuant to the requirements of the Securities Exchange Act of 1934, as amended, the registrant has duly caused this report to be signed on its behalf by the undersigned thereunto duly authorized.
    Date: August 7, 2024
    By:/s/ Taylor Melvin
    Taylor Melvin
    Chief Executive Officer
    (Principal Executive Officer)
    Date: August 7, 2024
    By:/s/ Jordan Neeser
    Jordan Neeser
    Chief Financial Officer
    (Principal Financial Officer)
    28
    Get the next $IE alert in real time by email

    Crush Q1 2026 with the Best AI Superconnector

    Stay ahead of the competition with Standout.work - your AI-powered talent-to-startup matching platform.

    AI-Powered Inbox
    Context-aware email replies
    Strategic Decision Support
    Get Started with Standout.work

    Recent Analyst Ratings for
    $IE

    DatePrice TargetRatingAnalyst
    8/21/2025$17.00Overweight
    Cantor Fitzgerald
    6/30/2025$15.00Outperform
    Raymond James
    10/17/2023$18.00Overweight
    JP Morgan
    12/22/2022$14.00Sector Perform
    Scotiabank
    9/28/2022$12.00Outperform
    Raymond James
    8/18/2022$12.00Neutral
    JP Morgan
    More analyst ratings

    $IE
    Insider Trading

    Insider transactions reveal critical sentiment about the company from key stakeholders. See them live in this feed.

    View All

    Officer Markin Quentin sold $1,470,600 worth of shares (90,000 units at $16.34), decreasing direct ownership by 11% to 728,493 units (SEC Form 4)

    4 - Ivanhoe Electric Inc. (0001879016) (Issuer)

    12/31/25 4:25:30 PM ET
    $IE
    Metal Mining
    Basic Materials

    President and CEO Melvin Joseph Taylor covered exercise/tax liability with 97,835 shares, decreasing direct ownership by 13% to 632,918 units (SEC Form 4)

    4 - Ivanhoe Electric Inc. (0001879016) (Issuer)

    11/21/25 5:08:30 PM ET
    $IE
    Metal Mining
    Basic Materials

    Large owner Chow Tai Fook Enterprises Ltd sold $31,789,460 worth of shares (3,418,295 units at $9.30) (SEC Form 4)

    4 - Ivanhoe Electric Inc. (0001879016) (Issuer)

    9/29/25 4:16:23 PM ET
    $IE
    Metal Mining
    Basic Materials

    $IE
    Insider Purchases

    Insider purchases reveal critical bullish sentiment about the company from key stakeholders. See them live in this feed.

    View All

    President and CEO Melvin Joseph Taylor bought $288,000 worth of shares (50,000 units at $5.76), increasing direct ownership by 7% to 730,753 units (SEC Form 4)

    4 - Ivanhoe Electric Inc. (0001879016) (Issuer)

    3/11/25 9:01:58 AM ET
    $IE
    Metal Mining
    Basic Materials

    Senior VP, Exploration Boyd Graham Richard Thomas bought $29,150 worth of shares (5,000 units at $5.83) and was granted 33,442 shares, increasing direct ownership by 591% to 44,952 units (SEC Form 4)

    4 - Ivanhoe Electric Inc. (0001879016) (Issuer)

    3/10/25 3:48:16 PM ET
    $IE
    Metal Mining
    Basic Materials

    Chief Financial Officer Neeser Jordan bought $58,775 worth of shares (10,000 units at $5.88), increasing direct ownership by 25% to 50,000 units (SEC Form 4)

    4 - Ivanhoe Electric Inc. (0001879016) (Issuer)

    3/7/25 3:41:55 PM ET
    $IE
    Metal Mining
    Basic Materials

    $IE
    Press Releases

    Fastest customizable press release news feed in the world

    View All

    Super Copper Appoints Veteran Exploration Executive Mark Gibson as Technical Advisor

    VANCOUVER, BC, Oct. 29, 2025 /CNW/ - SUPER COPPER CORP. (CSE:CUPR) (OTCQB:CUPPF) (FSE: N60) ("Super Copper" or the "Company"), is pleased to announce the appointment of Mark Gibson as Technical Advisor to the Company. Mr. Gibson is a veteran geophysicist and mining executive with more than 35 years of global experience spanning exploration, operations, and project development. He served as Chief Operating Officer and later Chief Geophysics Officer at Ivanhoe Electric Inc. (NYSE:IE), where he led geophysics focused exploration campaigns in the Americas and Middle East. While at

    10/29/25 9:10:00 AM ET
    $IE
    Metal Mining
    Basic Materials

    COPPER GIANT STRENGTHENS TECHNICAL LEADERSHIP AS MOCOA DRAWS WORLD-CLASS EXPERTISE

    Edwin Naranjo Sierra Promoted to VP of Exploration; Mark Gibson Appointed to Board of Directors and Joey Wilkins Joins as Strategic Advisor VANCOUVER, BC, July 28, 2025 /CNW/ - Copper Giant Resources Corp. ("Copper Giant" or the "Company") (TSXV: CGNT) (OTCQB: LBCMF) (FRA: 29H0) is pleased to announce the strengthening of its leadership team with three major appointments: Mark Gibson, former senior executive with Ivanhoe Electric and Cordoba Minerals, joins the Board of Directors as an Independent DirectorJoey Wilkins, a renowned porphyry exploration geologist, joins as Strate

    7/28/25 7:30:00 AM ET
    $IE
    Metal Mining
    Basic Materials

    XtremeX Mining Technology Announces Plans for First Deployment of Its Revolutionary Mineral Drilling Rig with Ivanhoe Electric Following an $11M Series-A Financing Led by GoGreen Partners

    XtremeX Mining Technology Inc. (XMT), a leader in innovative drilling solutions, is excited to announce its cutting-edge AC-electric automated coiled tubing and electric top-drive diamond core drilling rig. This state-of-the-art technology will perform a funded field trial with Ivanhoe Electric (NYSE:IE, TSX:IE) at the Santa Cruz copper project in Arizona, targeting depths of up to 2,000 meters by twinning historic holes. Under the agreement, Ivanhoe Electric secures exclusivity on three XMT rigs for contracts lasting up to five years. The XMT rig adapts proven oil and gas technology for the mining sector, enabling faster, safer, and more sustainable drilling. This patented hybrid drillin

    1/14/25 12:00:00 AM ET
    $IE
    $PDS
    Metal Mining
    Basic Materials
    Oil & Gas Production
    Energy

    $IE
    SEC Filings

    View All

    Amendment: SEC Form SCHEDULE 13G/A filed by Ivanhoe Electric Inc.

    SCHEDULE 13G/A - Ivanhoe Electric Inc. (0001879016) (Subject)

    1/28/26 6:18:34 PM ET
    $IE
    Metal Mining
    Basic Materials

    Amendment: SEC Form SCHEDULE 13G/A filed by Ivanhoe Electric Inc.

    SCHEDULE 13G/A - Ivanhoe Electric Inc. (0001879016) (Subject)

    1/8/26 12:14:20 PM ET
    $IE
    Metal Mining
    Basic Materials

    Ivanhoe Electric Inc. filed SEC Form 8-K: Entry into a Material Definitive Agreement, Creation of a Direct Financial Obligation, Regulation FD Disclosure, Financial Statements and Exhibits

    8-K - Ivanhoe Electric Inc. (0001879016) (Filer)

    12/15/25 4:36:22 PM ET
    $IE
    Metal Mining
    Basic Materials

    $IE
    Analyst Ratings

    Analyst ratings in real time. Analyst ratings have a very high impact on the underlying stock. See them live in this feed.

    View All

    Cantor Fitzgerald initiated coverage on Ivanhoe Electric with a new price target

    Cantor Fitzgerald initiated coverage of Ivanhoe Electric with a rating of Overweight and set a new price target of $17.00

    8/21/25 8:05:28 AM ET
    $IE
    Metal Mining
    Basic Materials

    Raymond James resumed coverage on Ivanhoe Electric with a new price target

    Raymond James resumed coverage of Ivanhoe Electric with a rating of Outperform and set a new price target of $15.00

    6/30/25 8:51:47 AM ET
    $IE
    Metal Mining
    Basic Materials

    JP Morgan initiated coverage on Ivanhoe Electric with a new price target

    JP Morgan initiated coverage of Ivanhoe Electric with a rating of Overweight and set a new price target of $18.00

    10/17/23 7:48:40 AM ET
    $IE
    Metal Mining
    Basic Materials

    $IE
    Leadership Updates

    Live Leadership Updates

    View All

    Super Copper Appoints Veteran Exploration Executive Mark Gibson as Technical Advisor

    VANCOUVER, BC, Oct. 29, 2025 /CNW/ - SUPER COPPER CORP. (CSE:CUPR) (OTCQB:CUPPF) (FSE: N60) ("Super Copper" or the "Company"), is pleased to announce the appointment of Mark Gibson as Technical Advisor to the Company. Mr. Gibson is a veteran geophysicist and mining executive with more than 35 years of global experience spanning exploration, operations, and project development. He served as Chief Operating Officer and later Chief Geophysics Officer at Ivanhoe Electric Inc. (NYSE:IE), where he led geophysics focused exploration campaigns in the Americas and Middle East. While at

    10/29/25 9:10:00 AM ET
    $IE
    Metal Mining
    Basic Materials

    LithiumBank Announces Intellectual Property License Agreement with G2L Greenview Resources Inc. for Direct Lithium Extraction Technology, Pilot Plant Testing and Commercialization

    Exclusive Access to One of the Largest DLE Pilot Plants in North America Updated Boardwalk PEA for Q4 2023 CALGARY, Alberta, Sept. 11, 2023 (GLOBE NEWSWIRE) -- LithiumBank Resources Corp. (TSXV:LBNK) (OTCQX:LBNKF) ("LithiumBank'' or the "Company") is pleased to announce it has entered into an intellectual property license agreement on September 8th 2023 (the "Agreement") with G2L Greenview Resources Inc. ("G2L"), a subsidiary of Go2Lithium Inc., whereby G2L shall grant to the Company a license (the "License") in Alberta and Saskatchewan for a full suite of continuous ion exchange technologies (the "Licensed Technology"). The Direct Lithium Extraction ("DLE") technology will be used to ex

    9/11/23 10:35:05 AM ET
    $IE
    Metal Mining
    Basic Materials

    Ivanhoe Electric Announces the Election of Directors at its Annual Meeting of Stockholders

    PHOENIX, AZ / ACCESSWIRE / June 8, 2023 / Ivanhoe Electric Inc. ("Ivanhoe Electric") (NYSE:IE)(TSX:IE) announces the results of voting by shareholders at its 2023 Annual Meeting of Stockholders (the "Annual Meeting") held today in Tempe, Arizona. The election of the director nominees was confirmed with voting results as follows:Director Nominee Votes For % For Against % Against Withheld % Withheld Robert Friedland 73,927,159 98.00% 1,510,836 2.00% 580 0.00%Taylor Melvin 75,340,904 99.87% 97,061 0.13% 610 0.00%Russell Ball 68,258,527 90.48% 7,179,438 9.52% 610 0.00%Hirofumi Katase 74,221,317 98.39% 1,216,648 1.61% 610 0.00%Patrick Loftus-Hills 75,414,

    6/8/23 4:40:00 PM ET
    $IE
    Metal Mining
    Basic Materials

    $IE
    Large Ownership Changes

    This live feed shows all institutional transactions in real time.

    View All

    Amendment: SEC Form SC 13G/A filed by Ivanhoe Electric Inc.

    SC 13G/A - Ivanhoe Electric Inc. (0001879016) (Subject)

    11/14/24 1:22:40 PM ET
    $IE
    Metal Mining
    Basic Materials

    Amendment: SEC Form SC 13G/A filed by Ivanhoe Electric Inc.

    SC 13G/A - Ivanhoe Electric Inc. (0001879016) (Subject)

    11/12/24 10:32:13 AM ET
    $IE
    Metal Mining
    Basic Materials

    SEC Form SC 13G/A filed by Ivanhoe Electric Inc. (Amendment)

    SC 13G/A - Ivanhoe Electric Inc. (0001879016) (Subject)

    5/8/24 2:27:27 PM ET
    $IE
    Metal Mining
    Basic Materials

    $IE
    Financials

    Live finance-specific insights

    View All

    Ivanhoe Electric Provides Update on Activities at its Santa Cruz Copper Project in Arizona

    37 Drill Holes Totaling 25,176 Meters of Development Drilling Completed Since Release of the September 2023 Initial AssessmentOngoing Technical Work is Advancing to Support a Preliminary Feasibility Study Expected to be Completed by the End of Q2 2025Recent Infill Drilling Has Delineated a High-Grade Oxide Copper Domain at Santa Cruz; Drill Hole SCC-125 Intersected 66 Meters at 2.85% Total Copper14 Drill Holes Totaling 12,510 Meters of Exploration Drilling Completed in 2023Recent Assays at Texaco Ridge Confirm Step-out Mineralization; Drill Hole SCC-122 Intersected 327 Meters Grading 0.81% Total Copper, Southwest of the Existing Texaco Mineral ResourceRecent Acquisition of Approximately 6,90

    1/8/24 7:00:00 AM ET
    $IE
    Metal Mining
    Basic Materials

    CORRECTING AND REPLACING: Ivanhoe Electric Announces Completion of the Initial Assessment for the Santa Cruz Copper Project in Arizona

    The Initial Assessment Focuses on a Small Surface Footprint, 5.9 Million Tonnes per Year High Grade Underground Copper Mining Operation Supported Solely by the High-Grade Exotic, Oxide and Enriched Domains of the Santa Cruz and East Ridge DepositsAdditional Resources at the Texaco Deposit and the Large, Primary Sulfide Resources at Santa Cruz Provide Potential for Future GrowthLife of Mine ("LOM") Copper Production Estimated to be 1.6 Million Tonnes over a 20-Year Mine Life, with an Average Grade of 1.58% Total Copper and C1 Cash Costs[1] of $1.36 per PoundEstimated LOM Copper Production Includes 1.0 Million Tonnes of 99.99% Pure Copper Cathode and 0.6 Million Tonnes of Copper Contained in a

    9/6/23 11:35:00 AM ET
    $IE
    Metal Mining
    Basic Materials

    Ivanhoe Electric Announces Completion of the Initial Assessment for the Santa Cruz Copper Project in Arizona

    The Initial Assessment Focuses on a Small Surface Footprint, 5.9 Million Tonnes per Year High Grade Underground Copper Mining Operation Supported Solely by the High-Grade Exotic, Oxide and Enriched Domains of the Santa Cruz and East Ridge DepositsAdditional Resources at the Texaco Deposit and the Large, Primary Sulfide Resources at Santa Cruz Provide Potential for Future GrowthLife of Mine ("LOM") Copper Production Estimated to be 1.6 Million Tonnes over a 20-Year Mine Life, with an Average Grade of 1.58% Total Copper and C1 Cash Costs[1] of $1.36 per PoundEstimated LOM Copper Production Includes 1.0 Million Tonnes of 99.99% Pure Copper Cathode and 0.6 Million Tonnes of Copper Contained in a

    9/6/23 6:50:00 AM ET
    $IE
    Metal Mining
    Basic Materials