• Live Feeds
    • Press Releases
    • Insider Trading
    • FDA Approvals
    • Analyst Ratings
    • Insider Trading
    • SEC filings
    • Market insights
  • Analyst Ratings
  • Alerts
  • Subscriptions
  • AI Executive AssistantNEW
  • Settings
  • RSS Feeds
Quantisnow Logo
  • Live Feeds
    • Press Releases
    • Insider Trading
    • FDA Approvals
    • Analyst Ratings
    • Insider Trading
    • SEC filings
    • Market insights
  • Analyst Ratings
  • Alerts
  • Subscriptions
  • AI Executive AssistantNEW
  • Settings
  • RSS Feeds
PublishGo to AppAI Helper
    Quantisnow Logo

    © 2025 quantisnow.com
    Democratizing insights since 2022

    Services
    Live news feedsRSS FeedsAlertsPublish with Us
    Company
    AboutQuantisnow PlusContactJobsAI employees for your businessNEW
    Legal
    Terms of usePrivacy policyCookie policy

    SS-2H ST1 Delivers Record Beetaloo Basin IP30 Flow Rate of 7.2 MMcf/d, In-Line With Average IP30 Rate From Marcellus Dry Gas Area

    6/16/25 5:46:00 AM ET
    $TBN
    Oil & Gas Production
    Energy
    Get the next $TBN alert in real time by email

    Highlights

    • The Shenandoah South 2H sidetrack (SS-2H ST1) well achieved a Beetaloo Basin record average 30-day initial production (IP30) flow rate of 7.2 million cubic feet per day (MMcf/d) over a 5,483-foot (1,671-metre), 35 stage stimulated length within the Mid Velkerri B Shale.
    • The flow rate of 13.2 MMcf/d over an extrapolated 10,000-foot horizontal section is in-line with the average of more than 11,000 wells in the Marcellus Shale dry gas area with production for over a 12-month period. The result demonstrates Tamboran's view of commercial deliverability of gas from the Mid Velkerri B Shale to the East Coast gas market that typically sells at a premium to Henry Hub.
    • The exit rate trajectory maintains a steady, low-declining curve at 6.7 MMcf/d (normalized at 12.2 MMcf/d per 10,000-feet) with a flowing wellhead pressure of ~910 psi. The steady state decline curve on SS-2H ST1 is consistent with that achieved from the SS-1H well.
    • The Shenandoah South drilling campaign is planned to commence in 2H 2025, targeting up to three 10,000-foot horizontal wells from the SS2 well pad, subject to final joint venture approval.
    • Once completed, the five wells on the SS2 pad are planned to be tied into the Sturt Plateau Compression Facility (SPCF) to feed into the 40 MMcf/d Gas Sales Agreement with the Northern Territory Government. Production remains on track to commence in mid-2026, subject to standard regulatory and stakeholder approvals and favourable weather conditions.
    • Managing Director, Joel Riddle, will hold a webcast with analysts at 8:00am EDT (US time) (10:00pm AEST) on Monday June 16, 2025.

    Tamboran Resources Corporation (NYSE:TBN, ASX: TBN)):

    This press release features multimedia. View the full release here: https://www.businesswire.com/news/home/20250616242684/en/

    Figure 1: The SS-2H ST1 flow rates achieved a material step-up in IP30 rates as testing increases to longer lateral sections. Source: Company data

    Figure 1: The SS-2H ST1 flow rates achieved a material step-up in IP30 rates as testing increases to longer lateral sections. Source: Company data

    Tamboran Resources Corporation Chief Executive Officer, Joel Riddle, said:

    "The Shenandoah South 2H sidetrack well has delivered a record average IP30 flow result of 7.2 MMcf/d from the Beetaloo Basin to date. Results show a material step up in flow rate from a horizontal section stimulated approximately three times longer than the SS-1H well.

    "The IP30 flow rate over a 5,482-foot horizontal section is another positive data point that demonstrates potential commercial productivity of the shale formation in the Australian East Coast gas market that typically sells at a premium to Henry Hub in the US and under long term CPI-linked contracts.

    "Importantly, the results from SS-2H ST1 are in-line with the average of more than 11,000 wells produced for over 12-months in the Marcellus Shale dry gas area, the most prolific shale gas basin in the world.

    "At the end of the 30-day period, the well continues to experience steady flow performance, low decline rates and favorable wellhead pressures, which underscore the reliability and scalability of our operations.

    "Importantly, Tamboran continues to bring key lessons from the US to accelerate the commercial development of the Beetaloo Basin. We have already delivered an impressive improvement in drilling efficiency and stimulation intensity in the first two wells of the Shenandoah South area.

    "Lessons from the completion and flow back of the SS-2H ST1 well will be incorporated into the design of the remaining four wells required to deliver first gas sales in mid-2026, subject to standard regulatory and stakeholder approvals. SS-2H ST1 is another foundation well, that demonstrates the Beetaloo Basin has characteristics similar to wells drilled across the Marcellus dry gas area. We believe, like in the US, with more well results and incorporation of lessons we can improve and deliver this world-scale energy resource."

    Shenandoah South 2H ST1 flow results

    The SS-2H ST1 well in Tamboran B2-operated Exploration Permit (EP) 98 achieved average IP30 flow rates of 7.2 MMcf/d following the 35-stage stimulation program across a 5,483 feet (1,671 metres) lateral section in the Mid Velkerri B Shale.

    During the 30-day production testing period, the choke was opened from 10/64" to 40/64" at staged intervals. Gas rates declined from 10.4 MMcf/d to 6.6 MMcf/d, with an average IP30 flow rate of 7.2 MMcf/d and cumulative production of 217.2 MMcf over that period. Flowing wellhead pressures were drawn down from 4,565 to 906 psi.

    Table 1: Breakdown of the SS-2H ST1 IP30 flow result

    Rates (MMcf/d)

    Actual

    (5,483 ft, 1,671 m)

    Normalized

    (10,000 ft)

    Average IP30 flow rate

    7.2

    13.2

    Peak rate

    10.4

    N/A

    IP30 exit rate

    6.7

    12.2

    Source: Company data

    Ongoing Shenandoah South development activity

    Tamboran plans to commence the 2025 Shenandoah South drilling program in July 2025. The program includes drilling three wells, each with a 10,000-foot horizontal section and completed with up to 60 stimulation stages, subject to joint venture approval.

    The SS-3H well is planned to be completed and flow tested by the end of 2025, with the remaining three wells drilled in the 2025 campaign to be completed during 1H 2026. Completion of the remaining four wells will incorporate lessons from the SS-1H and SS-2H ST1 wells. The wells are expected to be tied into the SPCF ahead of the commencement of production in mid-2026 and supply gas sales to the Northern Territory Government under a take-or-pay GSA, subject to standard regulatory and stakeholder approvals and favorable weather conditions.

    The five wells are expected to deliver the required 40 MMcf/d volume under the take-or-pay agreement with the Northern Territory Government. The GSA with Tamboran is a significant contract for the Northern Territory given the high reliance on gas for power generation.

    Falcon Oil & Gas Australia Limited have elected not to participate in the 2025 Shenandoah South drilling program. As a result, the work program will be equally funded by Tamboran and Daly Waters Energy, LP.

    Webcast details

    Managing Director and Chief Executive Officer, Joel Riddle will hold a webcast on 8:00am EDT (New York) (10:00pm AEST, Sydney, Melbourne) on Monday June 16, 2025.

    Details for the webcast can be found on Tamboran's website at https://ir.tamboran.com/

    Tamboran net prospective acres across the Beetaloo Basin assets

    Company

    Gross Acreage

    Interest

    Net Acreage

    Proposed Northern Pilot Project Area1,2

    20,309

    47.50%

    9,647

    Proposed Southern Pilot Project Area

    20,309

    38.75%

    7,870

    Phase 2 Development Area

    406,693

    58.12%

    236,370

    Proposed Retention Lease 10

    219,030

    67.83%

    148,568

    Remaining ex-EP 76, 98 and 117 acreage

    1,487,418

    77.50%

    1,152,749

    EP 136

    207,000

    100.00%

    207,000

    EP 161

    512,000

    25.00%

    128,000

    Total

    2,872,759

     

    1,890,204

    May not add due to rounding.

    1Subject to the completion of the SS-2H ST1 and SS-3H wells on the Shenandoah South pad 2.

    2Working interest may change as a result of future drilling spacing units (DSUs) being created based on Falcon's participation.

    Working Interests – Phase 2 Development Area

    Company

    Previous

    New

    Tamboran (West) Pty Limited1

    38.75%

    58.12%

    Daly Waters Energy, LP

    38.75%

    19.38%

    Falcon Oil and Gas Australia Limited

    22.50%

    22.50%

    Total

    100.0%

    100.0%

    Working Interests – Proposed RL10

    Company

    Previous

    New

    Tamboran (West) Pty Limited1

    38.75%

    67.83%

    Daly Waters Energy, LP

    38.75%

    9.67%

    Falcon Oil and Gas Australia Limited

    22.5%

    22.50%

    Total

    100.0%

    100.0%

    Working Interests – Remaining Tamboran owned Ex-EP 76, 98 and 117 acreage

    Company

    Previous

    New

    Tamboran (West) Pty Limited1

    38.75%

    77.5%

    Daly Waters Energy, LP

    38.75%

    -

    Falcon Oil and Gas Australia Limited

    22.5%

    22.5%

    Total

    100.0%

    100.0%

    All working interests are subject to participation of parties in the Joint Venture.

    This ASX announcement was approved and authorised for release by Joel Riddle, the Chief Executive Officer of Tamboran Resources Corporation.

    About Tamboran Resources Corporation

    Tamboran Resources Corporation ("Tamboran" or the "Company"), through its subsidiaries, is the largest acreage holder and operator with approximately 1.9 million net prospective acres in the Beetaloo Sub-basin within the Greater McArthur Basin in the Northern Territory of Australia.

    Tamboran's key assets include a 47.5% operating interest over 20,309 acres in the proposed northern Pilot Area, a 38.75% non-operating interest over 20,309 acres in the proposed southern Pilot Area, a 58.13% operating interest in the proposed Phase 2 development area covering 406,693 acres, a 67.83% operated interest over 219,030 acres in a proposed Retention License 10, a 77.5% operating interest across 1,487,418 acres over ex-EPs 76, 98 and 117, a 100% working interest and operatorship in EP 136 and a 25% non-operated working interest in EP 161, which are all located in the Beetaloo Basin.

    The Company has also secured ~420 acres (170 hectares) of land at the Middle Arm Sustainable Development Precinct in Darwin, the location of Tamboran's proposed NTLNG project. Pre-FEED activities are being undertaken by Bechtel Corporation.

    Disclaimer

    Tamboran makes no representation, assurance or guarantee as to the accuracy or likelihood of fulfilment of any forward-looking statement or any outcomes expressed or implied in any forward-looking statement. The forward-looking statements in this report reflect expectations held at the date of this document. Except as required by applicable law or the ASX Listing Rules, Tamboran disclaims any obligation or undertaking to publicly update any forward-looking statements, or discussion of future financial prospects, whether as a result of new information or of future events.

    The information contained in this announcement does not take into account the investment objectives, financial situation or particular needs of any recipient and is not financial product advice. Before making an investment decision, recipients of this announcement should consider their own needs and situation and, if necessary, seek independent professional advice. To the maximum extent permitted by law, Tamboran and its officers, employees, agents and advisers give no warranty, representation or guarantee as to the accuracy, completeness or reliability of the information contained in this presentation. Further, none of Tamboran nor its officers, employees, agents or advisers accept, to the extent permitted by law, responsibility for any loss, claim, damages, costs or expenses arising out of, or in connection with, the information contained in this announcement.

    Note on Forward-Looking Statements

    This press release contains "forward-looking" statements related to the Company within the meaning of Section 21E of the Securities Exchange Act of 1934, as amended (the "Exchange Act") and Section 27A of the Securities Act of 1933, as amended. Forward-looking statements reflect the Company's current expectations and projections about future events at the time, and thus involve uncertainty and risk. The words "believe," "expect," "anticipate," "will," "could," "would," "should," "may," "plan," "estimate," "intend," "predict," "potential," "continue," "participate," "progress," "conduct" and the negatives of these words and other similar expressions generally identify forward-looking statements.

    It is possible that the Company's future financial performance may differ from expectations due to a variety of factors, including but not limited to: our early stage of development with no material revenue expected until 2026 and our limited operating history; the substantial additional capital required for our business plan, which we may be unable to raise on acceptable terms; our strategy to deliver natural gas to the Australian East Coast and select Asian markets being contingent upon constructing additional pipeline capacity, which may not be secured; the absence of proved reserves and the risk that our drilling may not yield natural gas in commercial quantities or quality; the speculative nature of drilling activities, which involve significant costs and may not result in discoveries or additions to our future production or reserves; the challenges associated with importing U.S. practices and technology to the Northern Territory, which could affect our operations and growth due to limited local experience; the critical need for timely access to appropriate equipment and infrastructure, which may impact our market access and business plan execution; the operational complexities and inherent risks of drilling, completions, workover, and hydraulic fracturing operations that could adversely affect our business; the volatility of natural gas prices and its potential adverse effect on our financial condition and operations; the risks of construction delays, cost overruns, and negative effects on our financial and operational performance associated with midstream projects; the potential fundamental impact on our business if our assessments of the Beetaloo are materially inaccurate; the concentration of all our assets and operations in the Beetaloo, making us susceptible to region-specific risks; the substantial doubt raised by our recurring operational losses, negative cash flows, and cumulative net losses about our ability to continue as a going concern; complex laws and regulations that could affect our operational costs and feasibility or lead to significant liabilities; community opposition that could result in costly delays and impede our ability to obtain necessary government approvals; exploration and development activities in the Beetaloo that may lead to legal disputes, operational disruptions, and reputational damage due to native title and heritage issues; the requirement to produce natural gas on a Scope 1 net zero basis upon commencement of commercial production, with internal goals for operational net zero, which may increase our production costs; the increased attention to ESG matters and environmental conservation measures that could adversely impact our business operations; risks related to our corporate structure; risks related to our common stock and CDIs; and the other risk factors discussed in the this report and the Company's filings with the Securities and Exchange Commission.

    It is not possible to foresee or identify all such factors. Any forward-looking statements in this document are based on certain assumptions and analyses made by the Company in light of its experience and perception of historical trends, current conditions, expected future developments, and other factors it believes are appropriate in the circumstances. Forward-looking statements are not a guarantee of future performance and actual results or developments may differ materially from expectations. While the Company continually reviews trends and uncertainties affecting the Company's results of operations and financial condition, the Company does not assume any obligation to update or supplement any particular forward-looking statements contained in this document.

    Table 2: Disclosures under ASX Listing Rule 5.30 (Shenandoah South 2H ST1)

    1. The name and type of well.



      Shenandoah South 2H horizontal sidetrack (SS-2H ST1) well.



    2. The location of the well and details of the permit or lease in which the well is located.



      EP 98 of Beetaloo Sub-basin, Northern Territory (future Northern Pilot Area acreage, once checkerboard process and Retention Lease designation is formally completed).



    3. The entities working interest in the well.



      Tamboran holds a 47.5% interest in the well.



    4. If the gross pay thickness is reported for an interval of conventional resources, the net pay thickness.



      Not applicable—this is not a conventional reservoir.



    5. The geological rock type of the formation drilled.



      Organic-rich shale.



    6. The depth of the zones tested.



      Average depth of horizontal 3,017 metres Total Vertical Depth (TVD) (9,899 feet TVD), with 1,671 metres (5,483 ft) of stimulated lateral length.



    7. The types of test(s) undertaken and the duration of the test(s).



      30-day initial production (IP30) gas flow test.



    8. The hydrocarbon phases recovered in the test(s).



      Dry gas - mole %. Methane – 91.8, Ethane – 2.8, Propane – 0.17, Butane & higher <0.03.



    9. Any other recovery, such as, formation water and water, associated with the test(s) and their respective proportions.



      Fracture stimulation fluid is being recovered during testing. The well is currently producing approx. 160 barrels of water per day with a cumulative 21,689 bbls of water recovered from day 1 of cleanup.



    10. The choke size used, the flow rates and, if measured, the volumes of hydrocarbon phases measured.



      During the 30-day production testing period, the choke was opened from 10/64" to 40/64" at staged intervals. Gas rates declined from 10.4 MMcf/d to 6.6 MMcf/d, with an average IP30 flow rate of 7.2 MMcf/d and cumulative production of 217.2 MMcf over that period. Flowing wellhead pressures were drawn down from 4,565 to 906 psi.



    11. If applicable, the number of fracture stimulation stages and the size and nature of fracture stimulation applied.



      35 stage fracture stimulation stages and a toe stage covering over 1,671 metres (5,483 feet) at an average of 40 to 50-metre (131 - 164-foot) interval spacing within the Mid Velkerri B Shale. Average proppant concentrations of 2,706 lbs/ft across the 35 main stages with a total of over 14 million pounds of sand placed.



    12. Any material volumes of non-hydrocarbon gases, such as carbon dioxide, nitrogen, hydrogen sulphide or sulphur.



      Reported as Mol %: CO2, – 3.1, N2 – 2.0.



    13. Any other information that is material to understanding the reported results.



      The well is planned to be flow tested over a full 90-day period, subject to joint venture approval.

    View source version on businesswire.com: https://www.businesswire.com/news/home/20250616242684/en/

    Investor enquiries:

    Chris Morbey, Vice President – Investor Relations

    +61 2 8330 6626

    [email protected]

    Media enquiries:

    +61 2 8330 6626

    [email protected]

    Get the next $TBN alert in real time by email

    Crush Q3 2025 with the Best AI Executive Assistant

    Stay ahead of the competition with Tailforce.ai - your AI-powered business intelligence partner.

    AI-Powered Inbox
    Context-aware email replies
    Strategic Decision Support
    Get Started with Tailforce.ai

    Recent Analyst Ratings for
    $TBN

    DatePrice TargetRatingAnalyst
    5/28/2025$36.00Outperform
    Northland Capital
    1/21/2025$32.00Buy
    Alliance Global Partners
    7/23/2024$47.00Buy
    Johnson Rice
    7/22/2024$32.00Buy
    Citigroup
    7/22/2024$31.00Sector Perform
    RBC Capital Mkts
    7/22/2024$41.00Overweight
    Piper Sandler
    More analyst ratings

    $TBN
    Insider Purchases

    Insider purchases reveal critical bullish sentiment about the company from key stakeholders. See them live in this feed.

    See more
    • Large owner Sheffield Bryan bought $249,944 worth of shares (12,424 units at $20.12) (SEC Form 4)

      4 - Tamboran Resources Corp (0001997652) (Issuer)

      9/4/24 4:44:22 PM ET
      $TBN
      Oil & Gas Production
      Energy
    • Amendment: Chief Financial Officer Dyer Eric Steven bought $12,000 worth of shares (500 units at $24.00), increasing direct ownership by 0.89% to 56,532 units (SEC Form 4)

      4/A - Tamboran Resources Corp (0001997652) (Issuer)

      7/8/24 4:30:02 PM ET
      $TBN
      Oil & Gas Production
      Energy
    • Amendment: Director Stoneburner Richard K bought $199,200 worth of shares (8,300 units at $24.00), increasing direct ownership by 27% to 39,033 units (SEC Form 4)

      4/A - Tamboran Resources Corp (0001997652) (Issuer)

      7/8/24 4:30:04 PM ET
      $TBN
      Oil & Gas Production
      Energy

    $TBN
    Press Releases

    Fastest customizable press release news feed in the world

    See more
    • SS-2H ST1 Delivers Record Beetaloo Basin IP30 Flow Rate of 7.2 MMcf/d, In-Line With Average IP30 Rate From Marcellus Dry Gas Area

      Highlights The Shenandoah South 2H sidetrack (SS-2H ST1) well achieved a Beetaloo Basin record average 30-day initial production (IP30) flow rate of 7.2 million cubic feet per day (MMcf/d) over a 5,483-foot (1,671-metre), 35 stage stimulated length within the Mid Velkerri B Shale. The flow rate of 13.2 MMcf/d over an extrapolated 10,000-foot horizontal section is in-line with the average of more than 11,000 wells in the Marcellus Shale dry gas area with production for over a 12-month period. The result demonstrates Tamboran's view of commercial deliverability of gas from the Mid Velkerri B Shale to the East Coast gas market that typically sells at a premium to Henry Hub. The exit r

      6/16/25 5:46:00 AM ET
      $TBN
      Oil & Gas Production
      Energy
    • Tamboran announces successful closing of First Tranche of PIPE

      Highlights Tamboran Resource Corporation has closed the first tranche of its previously announced Private Investment Public Equity (PIPE) of Common Stock (First Tranche) to fund ongoing drilling activities to reach plateau production from the proposed SS Pilot Project. Tamboran expects to receive gross proceeds of approximately US$55.4 million upon closing of the second tranche of the PIPE (Second Tranche), before deducting placement agent fees and other offering expenses. Pursuant to the closing of the First Tranche, the Company has issued 2,180,515 shares of Common Stock at US$17.74 per share to raise approximately US$38.7 million for the Company. Bank of America acted as the sol

      5/30/25 2:11:00 AM ET
      $TBN
      Oil & Gas Production
      Energy
    • Falcon Oil & Gas Ltd. - Beetaloo Operational Update – Stimulation Campaign & Remaining Shenandoah South Pilot Project

      Falcon Oil & Gas Ltd. Beetaloo Operational Update – Stimulation Campaign & Remaining Shenandoah South Pilot Project 14 May 2025 – Falcon Oil & Gas Ltd. (TSXV:FO, AIM: FOG)) notes the press releases from Tamboran Resources Corporation (NYSE:TBN, ASX: TBN)) ("Tamboran") issued on 13 May 2025. Tamboran's announcements confirmed: the commencement of flow testing at the Shenandoah S2-2H ST1 ("SS-2H ST1") well in the Beetaloo Sub-basin, Northern Territory, Australia;agreements entered to complete a US$55.4 million private placement and a US$15 million asset sale (at US$150/acre) to provide Tamboran with necessary funding to drill three wells commencing in mid-2025 and stimulate four wells (inc

      5/14/25 2:00:00 AM ET
      $TBN
      Oil & Gas Production
      Energy

    $TBN
    Analyst Ratings

    Analyst ratings in real time. Analyst ratings have a very high impact on the underlying stock. See them live in this feed.

    See more
    • Northland Capital initiated coverage on Tamboran Resources with a new price target

      Northland Capital initiated coverage of Tamboran Resources with a rating of Outperform and set a new price target of $36.00

      5/28/25 9:27:07 AM ET
      $TBN
      Oil & Gas Production
      Energy
    • Alliance Global Partners initiated coverage on Tamboran Resources with a new price target

      Alliance Global Partners initiated coverage of Tamboran Resources with a rating of Buy and set a new price target of $32.00

      1/21/25 8:06:58 AM ET
      $TBN
      Oil & Gas Production
      Energy
    • Johnson Rice initiated coverage on Tamboran Resources with a new price target

      Johnson Rice initiated coverage of Tamboran Resources with a rating of Buy and set a new price target of $47.00

      7/23/24 11:12:00 AM ET
      $TBN
      Oil & Gas Production
      Energy

    $TBN
    SEC Filings

    See more
    • SEC Form S-3 filed by Tamboran Resources Corporation

      S-3 - Tamboran Resources Corp (0001997652) (Filer)

      6/27/25 4:06:04 PM ET
      $TBN
      Oil & Gas Production
      Energy
    • SEC Form DEF 14A filed by Tamboran Resources Corporation

      DEF 14A - Tamboran Resources Corp (0001997652) (Filer)

      6/24/25 8:25:57 PM ET
      $TBN
      Oil & Gas Production
      Energy
    • SEC Form PRE 14A filed by Tamboran Resources Corporation

      PRE 14A - Tamboran Resources Corp (0001997652) (Filer)

      6/12/25 8:50:20 PM ET
      $TBN
      Oil & Gas Production
      Energy

    $TBN
    Insider Trading

    Insider transactions reveal critical sentiment about the company from key stakeholders. See them live in this feed.

    See more
    • Director Bellman Jeffrey Lance was granted 5,002 shares (SEC Form 4)

      4 - Tamboran Resources Corp (0001997652) (Issuer)

      5/20/25 9:53:18 PM ET
      $TBN
      Oil & Gas Production
      Energy
    • Director Stoneburner Richard K was granted 5,002 shares, increasing direct ownership by 11% to 50,924 units (SEC Form 4)

      4 - Tamboran Resources Corp (0001997652) (Issuer)

      5/20/25 9:45:34 PM ET
      $TBN
      Oil & Gas Production
      Energy
    • Director Barrett Fredrick J was granted 5,002 shares, increasing direct ownership by 30% to 21,540 units (SEC Form 4)

      4 - Tamboran Resources Corp (0001997652) (Issuer)

      5/20/25 9:44:44 PM ET
      $TBN
      Oil & Gas Production
      Energy

    $TBN
    Leadership Updates

    Live Leadership Updates

    See more
    • Tamboran Announces the Appointment of Mr. Jeff Bellman as new Non-Executive Director

      Highlights Tamboran Resource Corporation has appointed Mr. Jeff Bellman as Non-Executive Directors to its Board, effective May 2, 2025. Mr. Bellman brings a 33-year track record in the investment management industry, with a specific focus on analysing and investing in the global public oil and gas sector. Throughout his career, Mr. Bellman has managed equity portfolios across a wide spectrum of market capitalizations and cultivated strong relationships with management teams across multiple energy cycles. The Tamboran Board has also appointed Mr. Bellman to the Audit & Risk and Sustainability Committees. Tamboran Resources Corporation (NYSE:TBN, ASX: TBN)): Tamboran Resources Corp

      5/5/25 8:00:00 AM ET
      $TBN
      Oil & Gas Production
      Energy

    $TBN
    Financials

    Live finance-specific insights

    See more
    • Tamboran Schedules 3Q FY25 Earnings Release and Webcast

      Tamboran Resources Corporation (NYSE:TBN, ASX: TBN)) plans to release the Company's third quarter earnings and operational update after NYSE market closes on Wednesday, May 14, 2025 (US time). Managing Director and Chief Executive Officer, Mr. Joel Riddle will host a webcast commencing at 6:00pm EDT to provide an update on the Company's operations in the Beetaloo Basin. This will be followed by a short Q&A session with analysts. Access to the live audio webcast for the conference call is available via Tamboran's website at https://ir.tamboran.com/. A recording of the webcast will be available on the Tamboran Resources website following completion of the presentation. Time:    

      4/15/25 9:27:00 PM ET
      $TBN
      Oil & Gas Production
      Energy
    • Tamboran Schedules 1Q FY25 Earnings Release and Webcast

      Tamboran Resources Corporation (NYSE:TBN, ASX: TBN)) plans to release the Company's fourth quarter earnings and operational update before NYSE market opens on Tuesday November 12, 2024. Managing Director and Chief Executive Officer, Mr. Joel Riddle will host a webcast commencing at 8:00am ET to provide an update on the Company's operations in the Beetaloo Basin. This will be followed by a short Q&A session with analysts. Access to the live audio webcast for the conference call is available via Tamboran's website at https://ir.tamboran.com/. A recording of the webcast will be available on the Tamboran Resources website following completion of the presentation. Time: 8:00am EST (Ne

      11/4/24 7:09:00 PM ET
      $TBN
      Oil & Gas Production
      Energy
    • Tamboran Schedules Fourth Quarter and FY24 Earnings Release and Webcast

      Tamboran Resources Corporation (NYSE:TBN, ASX: TBN))) plans to release the Company's fourth quarter earnings and operational update before NYSE market opens on Friday September 20, 2024. Managing Director and Chief Executive Officer, Mr. Joel Riddle will host a webcast commencing at 8:00am ET to provide an update on the Company's operations in the Beetaloo Basin. This will be followed by a short Q&A session with analysts. Access to the live audio webcast for the conference call is available via Tamboran's website at https://ir.tamboran.com/. A recording of the webcast will be available on the Tamboran Resources website following completion of the presentation. Time: 8:00am ET (New

      9/11/24 8:07:00 AM ET
      $TBN
      Oil & Gas Production
      Energy

    $TBN
    Large Ownership Changes

    This live feed shows all institutional transactions in real time.

    See more
    • SEC Form SC 13G filed by Tamboran Resources Corporation

      SC 13G - Tamboran Resources Corp (0001997652) (Subject)

      10/25/24 4:15:42 PM ET
      $TBN
      Oil & Gas Production
      Energy
    • SEC Form SC 13G filed by Tamboran Resources Corporation

      SC 13G - Tamboran Resources Corp (0001997652) (Subject)

      7/8/24 5:04:00 PM ET
      $TBN
      Oil & Gas Production
      Energy
    • SEC Form SC 13D filed by Tamboran Resources Corporation

      SC 13D - Tamboran Resources Corp (0001997652) (Subject)

      7/8/24 4:30:56 PM ET
      $TBN
      Oil & Gas Production
      Energy