• Live Feeds
    • Press Releases
    • Insider Trading
    • FDA Approvals
    • Analyst Ratings
    • Insider Trading
    • SEC filings
    • Market insights
  • Analyst Ratings
  • Alerts
  • Subscriptions
  • Settings
  • RSS Feeds
Quantisnow Logo
  • Live Feeds
    • Press Releases
    • Insider Trading
    • FDA Approvals
    • Analyst Ratings
    • Insider Trading
    • SEC filings
    • Market insights
  • Analyst Ratings
  • Alerts
  • Subscriptions
  • Settings
  • RSS Feeds
PublishGo to App
    Quantisnow Logo

    © 2026 quantisnow.com
    Democratizing insights since 2022

    Services
    Live news feedsRSS FeedsAlertsPublish with Us
    Company
    AboutQuantisnow PlusContactJobsAI superconnector for talent & startupsNEWLLM Arena
    Legal
    Terms of usePrivacy policyCookie policy

    Tailings Storage Facility No. 3 and New 1,500 tonne per day Mill Expansion Completed and in Operation at Ying Mine, China

    1/14/25 8:00:00 AM ET
    $SVM
    Precious Metals
    Basic Materials
    Get the next $SVM alert in real time by email

    Silvercorp Metals Inc. (CNW Group/Silvercorp Metals Inc)

    Trading Symbols: SVM (TSX/NYSE American)

    VANCOUVER, BC, Jan. 14, 2025 /PRNewswire/ - Silvercorp Metals Inc. ("Silvercorp" or the "Company") (TSX:SVM) (NYSE:SVM), reports the construction of tailings storage facility ("TSF") No. 3 and the new 1,500 tonne per day ("tpd") flotation production line at the Ying Mining District, Henan Province, China ("Ying") were completed in early December 2024, on time and under budget. Both facilities are now fully operating as designed, following a one-month commissioning period. The addition of the new flotation production line will enable the milling capacity at Ying to be increased to over 1.3 million tonnes per year.

    Operation of TSF No. 3

    Currently the Company is operating three TSFs at Ying, with TSF No. 1 in the process of closing and decommissioning, and TSF No. 2. having 6 years of life remaining.  The first phase of TSF No. 3, with storage capacity of approximately 9.92 million cubic metres, will support Ying at the expanded operating rate of 1.3 million tonnes of ore per year over 12 years. The second phase of TSF No. 3 will have approximately 9.29 million cubic metres of capacity. The total storage capacity of TSF No. 3 is 19.21 million cubic metres.

    Phase 1 of TSF No. 3 was constructed for approximately US$28 million, less than the original budget of $38 million (February 24, 2022 news release); the main components of the project included:

    1. Land purchasing and compensation;
    2. Upstream "non-contact water" dam and 1,825 metre long "non-contact water" discharge tunnel, with a 40 centimetre thick steel reinforced concrete liner;  
    3. A 3,200 metre long tailings water discharge tunnel, with a 40 centimetre thick reinforced concrete liner.  Eleven decant towers/wells (shown in Figure 1) at different elevations connected to the 3,200 metre long tunnel to discharge re-settled water to a recycling pond downstream;
    4. A 52 metre high starter dam;
    5. Non-contact water channels and emergency access road surrounding the entire tailings impoundment area,
    6. Impoundment area covered by approximately 400,000 square metres of high density poly-ethylene liner to prevent tailings water from penetrating into the ground;
    7. Tailings discharge and water recycle pumping system; and
    8. Real-time tailings dam stability monitoring and video surveillance system.

    In accordance with Chinese safety regulations, TSF No. 3 will be checked and assessed after a three month test run for safety and quality by the Department of Emergency Response of Henan Province, then have a safety production license issued.

    Figure 1: Impoundment Area of TSF No. 3 

    Figure 1: Impoundment Area of TSF No. 3 (CNW Group/Silvercorp Metals Inc)

    1,500 tpd New Flotation Production Line

    As previously announced (April 23, 2024 news release), the Company started to construct a 1,500 tpd flotation production line at Ying's No. 2 Mill with a completion date by Q4 2024 and a cost of $7.2 million pursuant to a signed EPCM contract. The 1,500 tpd line was completed on time and on budget, with commissioning taking place in November 2024. 

    The relatively low capital expenditures are in part due to taking advantage of existing facilities and infrastructure at the No. 2 mill, including the crushing circuit, concentrate thickener and dewatering system, and the existing tailings discharge system.

    The new 1,500 tpd flotation production line, equipped with a Knelson gravity concentrator, is able to produce silver-lead, zinc and copper concentrates, plus gold gravity concentrate.  The robust design of the production line allowed it to achieve 1,700 tpd capacity after one month in operation, with a final target of 1,800 tpd capacity.

    With the addition of the new production line, the total milling capacity at Ying is expected to reach over 1.3 million tonnes per year, enough to process increased mining capacity at Ying, plus future production from the nearby Kuanping mine.

    Figure 2: Completion Ceremony for the 1,500 tpd New Production Line

    Figure 2: Completion Ceremony for the 1,500 tpd New Production Line (CNW Group/Silvercorp Metals Inc)

    About Silvercorp

    Silvercorp is a Canadian mining company producing silver, gold, lead, and zinc with a long history of profitability and growth potential. The Company's strategy is to create shareholder value by 1) focusing on generating free cashflow from long-life mines; 2) organic growth through extensive drilling for discovery; 3) ongoing merger and acquisition efforts to unlock value; and 4) a long-term commitment to responsible mining and ESG. For more information, please visit our website at www.silvercorpmetals.com.

    For further information:

    Silvercorp Metals Inc.

    Lon Shaver 

    President

    Phone: (604) 669-9397

    Toll Free 1(888) 224-1881

    Email: [email protected]

    Website: www.silvercorpmetals.com   

    CAUTIONARY DISCLAIMER - FORWARD-LOOKING STATEMENTS

    This news release includes "forward-looking statements" within the meaning of the United States Private Securities Litigation Reform Act of 1995 and "forward-looking information" within the meaning of applicable securities laws relating to, among other things statements regarding future milling capacity;  the timing of receipt of licenses and regulatory approvals; remaining life and decomissioning of TSFs; processing of ore stockpiles; and upcoming mine production from the proposed Kuang-Ping underground mine . By their very nature, forward-looking statements involve known and unknown risks, uncertainties and other factors that may cause our actual results, performance or achievements to be materially different from any future results, performance or achievements expressed or implied by the forward-looking statements.  Forward-looking information may in some cases be identified by words such as "will", "anticipates", "expects", "intends" and similar expressions suggesting future events or future performance.

    We caution that all forward-looking information is inherently subject to change and uncertainty and that actual results may differ materially from those expressed or implied by the forward-looking information. A number of risks, uncertainties and other factors, including  fluctuating commodity prices; recent market events and condition; estimation of mineral resources, mineral reserves and mineralization and metal recovery; interpretations and assumptions of mineral resource and mineral reserve estimates; exploration and development programs; climate change; economic factors affecting the Company; timing, estimated amount, capital and operating expenditures and economic returns of future production; integration of future acquisitions into existing operations; permits and licences for mining and exploration in China; title to properties; non-controlling interest shareholders; acquisition of commercially mineable mineral rights; financing; competition; operations and political conditions; regulatory environment in China; regulatory environment and political climate in Bolivia and Ecuador; integration and operations of Adventus; environmental risks; natural disasters; dependence on management and key personnel; foreign exchange rate fluctuations; insurance; risks and hazards of mining operations; conflicts of interest; internal control over financial reporting as per the requirements of the Sarbanes-Oxley Act; outcome of current or future litigation or regulatory actions; bringing actions and enforcing judgments under U.S. securities laws; cyber-security risks; public health crises; the Company's investment in New Pacific Metals Corp. and Tincorp Metals Inc.;  and the other risk factors described in the Company's Annual Information Form and other filings with Canadian and U.S. regulators on www.sedarplus.ca and www.sec.gov; could cause actual results and events to differ materially from those expressed or implied in the forward-looking information or could cause our current objectives, strategies and intentions to change. Accordingly, we warn investors to exercise caution when considering statements containing forward-looking information and that it would be unreasonable to rely on such statements as creating legal rights regarding our future results or plans. We cannot guarantee that any forward-looking information will materialize and you are cautioned not to place undue reliance on this forward-looking information. Any forward-looking information contained in this news release represent expectations as of the date of this news release and are subject to change after such date. However, we are under no obligation (and we expressly disclaim any such obligation) to update or alter any statements containing forward-looking information, the factors or assumptions underlying them, whether as a result of new information, future events or otherwise, except as required by law. All of the forward-looking information in this news release is qualified by the cautionary statements herein.

    A comprehensive discussion of other risks that impact Silvercorp can also be found in their public reports and filings which are available under its profile at www.sedarplus.ca.

    Cision View original content to download multimedia:https://www.prnewswire.com/news-releases/tailings-storage-facility-no-3-and-new-1-500-tonne-per-day-mill-expansion-completed-and-in-operation-at-ying-mine-china-302350165.html

    SOURCE Silvercorp Metals Inc

    Get the next $SVM alert in real time by email

    Crush Q1 2026 with the Best AI Superconnector

    Stay ahead of the competition with Standout.work - your AI-powered talent-to-startup matching platform.

    AI-Powered Inbox
    Context-aware email replies
    Strategic Decision Support
    Get Started with Standout.work

    Recent Analyst Ratings for
    $SVM

    DatePrice TargetRatingAnalyst
    1/20/2026Buy → Neutral
    Roth Capital
    1/31/2023Mkt Perform → Outperform
    Raymond James
    1/18/2022$7.00 → $6.50Market Perform
    Raymond James
    8/9/2021$9.00 → $8.50Buy
    Roth Capital
    More analyst ratings

    $SVM
    SEC Filings

    View All

    SEC Form 6-K filed by Silvercorp Metals Inc.

    6-K - SILVERCORP METALS INC (0001340677) (Filer)

    2/9/26 8:26:25 PM ET
    $SVM
    Precious Metals
    Basic Materials

    SEC Form 6-K filed by Silvercorp Metals Inc.

    6-K - SILVERCORP METALS INC (0001340677) (Filer)

    2/3/26 5:19:13 PM ET
    $SVM
    Precious Metals
    Basic Materials

    SEC Form 6-K filed by Silvercorp Metals Inc.

    6-K - SILVERCORP METALS INC (0001340677) (Filer)

    2/3/26 2:50:35 PM ET
    $SVM
    Precious Metals
    Basic Materials

    $SVM
    Press Releases

    Fastest customizable press release news feed in the world

    View All

    Polymetallic Explorers Gain Ground as Copper Deficit Reshapes Discovery Premiums

    Issued on behalf of GoldHaven Resource Corp. VANCOUVER, BC, Feb. 11, 2026 /PRNewswire/ -- Equity Insider News Commentary — The International Copper Study Group now projects a 150,000-tonne refined copper deficit for 2026, reversing its earlier surplus forecast as production growth slows to just 0.9% against demand that continues to outpace new supply[1]. Federal investment is widening beyond rare earths to cover high-risk minerals including tungsten and antimony, with MINING.COM reporting that Washington's 2026 policy agenda will prioritize processing capacity for metals where the U.S. remains almost entirely dependent on foreign supply[2]. GoldHaven Resources (CSE:GOH), Emerita Resources (

    2/11/26 9:42:00 AM ET
    $ELBM
    $SVM
    Industrial Machinery/Components
    Miscellaneous
    Precious Metals
    Basic Materials

    SILVERCORP REPORTS ADJUSTED NET INCOME OF $47.9 MILLION, $0.22 PER SHARE, AND CASH FLOW FROM OPERATING ACTIVITIES OF $132.9 MILLION FOR Q3 FISCAL 2026

    Trading Symbol:  TSX/NYSE AMERICAN: SVM VANCOUVER, BC, Feb. 9, 2026 /PRNewswire/ - Silvercorp Metals Inc. ("Silvercorp" or the "Company") (TSX:SVM) (NYSE:SVM) reported its financial and operating results for the three months ended December 31, 2025 ("Q3 Fiscal 2026"). All amounts are expressed in US dollars, and figures may not add due to rounding. HIGHLIGHTS FOR Q3 Fiscal 2026 Steady Silver Equivalent Production: Produced approximately 1.9 million ounces of silver, 2,096 ounces of gold, or approximately 2.0 million ounces of silver equivalent1 (silver and gold only);Record Quarterly Revenue: Sold approximately 1.9 million ounces of silver, 2,250 ounces of gold, 16.4 million pounds of lead,

    2/9/26 7:01:00 PM ET
    $SVM
    Precious Metals
    Basic Materials

    Silvercorp Announces Project Update for El Domo

    Trading Symbol:           TSX/NYSE American: SVM VANCOUVER, BC, Feb. 4, 2026 /PRNewswire/ - Silvercorp Metals Inc. ("Silvercorp" or the "Company") (NYSE:SVM) (the "Company") announces an update for its budget and construction schedule for the construction of the El Domo Project (the "Project").  The construction budget for the Project has been updated to $284 million, an increase of $44 million compared to the $240 million estimate dated March 31, 2025 (for reference, the 2021 Feasibility Study Budget was $248 million). The main items of increase or decrease are as follows: The VAT: rate has been revised from 10% ($19 million) to 15% ($35 million), resulting in a $16 million increase, which

    2/4/26 5:05:00 PM ET
    $SVM
    Precious Metals
    Basic Materials

    $SVM
    Analyst Ratings

    Analyst ratings in real time. Analyst ratings have a very high impact on the underlying stock. See them live in this feed.

    View All

    Silvercorp Metals downgraded by Roth Capital

    Roth Capital downgraded Silvercorp Metals from Buy to Neutral

    1/20/26 9:11:16 AM ET
    $SVM
    Precious Metals
    Basic Materials

    Silvercorp Metals upgraded by Raymond James

    Raymond James upgraded Silvercorp Metals from Mkt Perform to Outperform

    1/31/23 9:12:58 AM ET
    $SVM
    Precious Metals
    Basic Materials

    Raymond James reiterated coverage on Silvercorp Metals with a new price target

    Raymond James reiterated coverage of Silvercorp Metals with a rating of Market Perform and set a new price target of $6.50 from $7.00 previously

    1/18/22 9:13:31 AM ET
    $SVM
    Precious Metals
    Basic Materials

    $SVM
    Leadership Updates

    Live Leadership Updates

    View All

    Silvercorp Announces CFO Transition

    Trading Symbol:           TSX/NYSE American: SVM VANCOUVER, BC, Nov. 12, 2025 /PRNewswire/ - Silvercorp Metals Inc. ("Silvercorp" or the "Company") (TSX:SVM) (NYSE:SVM) announces changes to its senior accounting and finance team. Effective November 10, Derek Liu, who has served as Chief Financial Officer since 2015, retired from his role as CFO. He will continue to provide assistance to the Company as needed during a transition period in a consulting capacity. The Company thanks Mr. Liu for his long-standing dedication and significant contributions to Silvercorp, and wishes him all the best in his retirement. Silvercorp is pleased to announce the appointment of Winnie Wang as Interim Chief

    11/12/25 8:00:00 AM ET
    $SVM
    Precious Metals
    Basic Materials

    Silvercorp Reports 2025 AGM Results

    Trading Symbol: TSX/NYSE American: SVM VANCOUVER, BC, Sept. 26, 2025 /PRNewswire/ - Silvercorp Metals Inc. ("Silvercorp" or the "Company") (TSX:SVM) (NYSE: SVM) is pleased to report that all matters submitted to shareholders for approval as set out in the Company's Notice of Meeting and Information Circular, both dated August 11, 2025, were approved by the requisite majority of votes cast at Silvercorp's annual general meeting ("AGM") held today.  A total of 108,216,233 common shares, representing 49.50% of the votes attached to all outstanding shares as at the record date for the meeting, were represented at the AGM.  The voting results for the election of directors are set out below: Vote

    9/26/25 5:18:00 PM ET
    $SVM
    Precious Metals
    Basic Materials

    Helen Cai Joins Silvercorp Board

    Trading Symbol: TSX: SVM                              NYSE AMERICAN: SVM VANCOUVER, BC, Feb. 7, 2024 /PRNewswire/ - Silvercorp Metals Inc. ("Silvercorp" or the "Company") (TSX: SVM) (NYSE American: SVM) today announced the appointment of Helen Cai to its Board as an independent director.  Ms. Cai is a finance and investment professional with over two decades of experience, she is extensively versed in capital markets and all aspects of corporate finance from strategic planning to M&A transactions.  Ms. Cai is currently an independent director of Barrick Gold Corporation and La

    2/7/24 7:30:00 AM ET
    $SVM
    Precious Metals
    Basic Materials

    $SVM
    Financials

    Live finance-specific insights

    View All

    SILVERCORP REPORTS ADJUSTED NET INCOME OF $47.9 MILLION, $0.22 PER SHARE, AND CASH FLOW FROM OPERATING ACTIVITIES OF $132.9 MILLION FOR Q3 FISCAL 2026

    Trading Symbol:  TSX/NYSE AMERICAN: SVM VANCOUVER, BC, Feb. 9, 2026 /PRNewswire/ - Silvercorp Metals Inc. ("Silvercorp" or the "Company") (TSX:SVM) (NYSE:SVM) reported its financial and operating results for the three months ended December 31, 2025 ("Q3 Fiscal 2026"). All amounts are expressed in US dollars, and figures may not add due to rounding. HIGHLIGHTS FOR Q3 Fiscal 2026 Steady Silver Equivalent Production: Produced approximately 1.9 million ounces of silver, 2,096 ounces of gold, or approximately 2.0 million ounces of silver equivalent1 (silver and gold only);Record Quarterly Revenue: Sold approximately 1.9 million ounces of silver, 2,250 ounces of gold, 16.4 million pounds of lead,

    2/9/26 7:01:00 PM ET
    $SVM
    Precious Metals
    Basic Materials

    Silvercorp Completes Acquisition of the Tulkubash/Kyzyltash Gold Projects, Kyrgyzstan

    Trading Symbol: TSX/NYSE American: SVM VANCOUVER, BC, Jan. 27, 2026 /PRNewswire/ - Silvercorp Metals Inc. (TSX:SVM) (NYSE:SVM) ("Silvercorp" or the "Company"), further to its news release of January 20, 2026, Silvercorp is pleased to announce it has completed the acquisition of Chaarat ZAAV CJSC ("ZAAV") per the Share Purchase Agreement with Chaarat Gold Holdings Limited ("Chaarat").  The Kyrgyz government having issued a waiver of its statutory pre-emptive right and Silvercorp having made the $92 million payment to Chaarat. Per the agreements between the parties, Silvercorp will proceed to convert ZAAV into a joint venture company ("JVC") with Kyrgyzaltyn (a wholly-owned subsidiary of the

    1/27/26 5:05:00 PM ET
    $SVM
    Precious Metals
    Basic Materials

    Silvercorp Acquires 70% Interest in the Tulkubash/Kyzyltash Gold Projects, Kyrgyzstan

    VANCOUVER, BC, Jan. 20, 2026 /PRNewswire/ - Silvercorp Metals Inc. (TSX: SVM) ("Silvercorp" or the "Company") is pleased to report that it has signed a Share Purchase Agreement with Chaarat Gold Holdings Limited ("Chaarat") and a Cooperation Agreement with the National Investment Agency under the President of the Kyrgyz Republic (the "NIA"). Pursuant to these agreements, the Company will acquire a 70% interest in Chaarat ZAAV CJSC ("ZAAV"), which holds a 100% interest in the mining license (~7 square kilometres) hosting the fully-permitted Tulkubash/Kyzyltash gold projects as well as surrounding exploration licenses (27.42 square kilometres) hosting the Karator and Ishakuld gold zones (the "

    1/20/26 7:30:00 AM ET
    $SVM
    Precious Metals
    Basic Materials

    $SVM
    Large Ownership Changes

    This live feed shows all institutional transactions in real time.

    View All

    Amendment: SEC Form SC 13G/A filed by Silvercorp Metals Inc.

    SC 13G/A - SILVERCORP METALS INC (0001340677) (Subject)

    10/8/24 11:37:25 AM ET
    $SVM
    Precious Metals
    Basic Materials

    SEC Form SC 13G filed by Silvercorp Metals Inc.

    SC 13G - SILVERCORP METALS INC (0001340677) (Subject)

    2/14/24 1:29:59 PM ET
    $SVM
    Precious Metals
    Basic Materials

    SEC Form SC 13G/A filed by Silvercorp Metals Inc. (Amendment)

    SC 13G/A - SILVERCORP METALS INC (0001340677) (Subject)

    2/10/22 4:51:06 PM ET
    $SVM
    Precious Metals
    Basic Materials