• Live Feeds
    • Press Releases
    • Insider Trading
    • FDA Approvals
    • Analyst Ratings
    • Insider Trading
    • SEC filings
    • Market insights
  • Analyst Ratings
  • Alerts
  • Subscriptions
  • Settings
  • RSS Feeds
Quantisnow Logo
  • Live Feeds
    • Press Releases
    • Insider Trading
    • FDA Approvals
    • Analyst Ratings
    • Insider Trading
    • SEC filings
    • Market insights
  • Analyst Ratings
  • Alerts
  • Subscriptions
  • Settings
  • RSS Feeds
Dashboard
    Quantisnow Logo

    © 2025 quantisnow.com
    Democratizing insights since 2022

    Services
    Live news feedsRSS FeedsAlerts
    Company
    AboutQuantisnow PlusContactJobs
    Legal
    Terms of usePrivacy policyCookie policy

    Trilogy Metals Announces Positive Study Results for the Bornite Copper Project Located in Alaska, USA

    1/15/25 6:30:00 AM ET
    $TMQ
    Precious Metals
    Basic Materials
    Get the next $TMQ alert in real time by email

    VANCOUVER, BC, Jan. 15, 2025 /PRNewswire/ - Trilogy Metals Inc. (TSX:TMQ) (NYSE:TMQ) ("Trilogy Metals" or the "Company") is pleased to announce the positive results of its Preliminary Economic Assessment Study ("Bornite PEA") for the Bornite copper project in the Ambler Mining District of Northwestern Alaska (the "Bornite Project"). The Bornite Project is held by Ambler Metals LLC ("Ambler Metals"), the joint venture operating company equally owned by Trilogy Metals and South32 Limited ("South32"). The Bornite PEA was prepared on a 100% ownership basis, of which Trilogy Metals' share is 50%. All amounts are in U.S. dollars unless otherwise stated.

    Trilogy Metals Inc. Logo (CNW Group/Trilogy Metals Inc.)

    Trilogy Metals will host a conference call on January 15, 2025 at 1:00pm Pacific Time or 4:00pm Eastern Time to discuss these results. 

    Please use this link to access the live webcast of the conference call:

    https://www.c-meeting.com/web3/joinTo/38ZLQJQ93P2A84/ZgO5Nop1EQzwZllpJru9iA

    Or by phone:

    Canada/USA Toll Free: 1-844-763-8274 or International Toll: +1-647-484-8814

    Highlights of the Bornite PEA 

    • 1.9 billion pounds of copper over 17-year mine life
    • Potential to extend mine activity for the Upper Kobuk Mineral Projects ("UKMP") to over 30 years
    • Pre-tax Net Present Value ("NPV")8% of $552.0 million and an Internal Rate of Return ("IRR") of 23.6% 
    • After-tax NPV8% of $394.0 million and after-tax IRR of 20.0%

    The PEA is preliminary in nature and includes Inferred mineral resources that are considered too speculative geologically to have the economic considerations applied to them that would enable them to be categorized as mineral reserves. There is no certainty that the PEA will be realized.

    The Bornite PEA describes the technical and economic viability of establishing an underground mining operation for a 6,000 tonne-per-day operation with a 17-year mine life. The PEA assumes re-purposing the infrastructure described in the Company's current Feasibility Study for the Arctic Project for use with the Bornite Project once the Arctic deposit has been depleted. The Feasibility Study for the Arctic Project can be accessed under the Company's profile on SEDAR+ at www.sedarplus.ca and on EDGAR at www.sec.gov/edgar. The base case scenario for the Bornite PEA utilizes a long-term metal price of $4.20/lb for copper.

    Tony Giardini, President and Chief Executive Officer of Trilogy Metals commented, "Although we believe that further exploration along the 100km volcanogenic massive sulphide belt will extend the mine life of the Arctic Project beyond the 13 years established by the current Arctic Feasibility Study, the Bornite PEA study shows it is possible, with existing known resources, to continue mine activity at the UKMP beyond 30 years."

    The salient details of the Bornite PEA are displayed in the tables below.

    Table 1. Metal Production and Assumed Metal Prices

    Annual Payable Metals Production



    Copper ('000 lb)

    109,061

    Metal Price



    Copper ($/lb)

    4.20

    Table 2. Operating and Capital Costs

    Operating Costs



    Mining ($/t milled)

    42.66

    Processing ($/t milled)

    24.82

    G&A ($/t milled)

    31.44

    Total Operating Cost ($/t milled)

    98.91

    Capital Expenditures



    Initial Capital ($ million)

    503.8

    Sustaining Capital ($ million)

    363.1

    Total Capex ($ million)

    866.9

    Mine Closure & Reclamation ($ million)

    81.2

    Table 3. Financial Results

    Financial Summary



    Pre-tax Cash Flow ($ million)

    1,582.2

    After-tax Cash Flow ($ million)

    1,219.0

    Pre-tax NPV8% ($ million)

    552.0

    After-tax NPV8% ($ million)

    394.0

    Cash Cost ($/lb Cu payable)

    2.76

    All-in Cost ($/lb Cu payable)

    3.35

    Pre-tax IRR (%)

    23.6

    Pre-tax Payback Period (years)

    4.0

    Post-tax IRR (%)

    20.0

    Post-tax Payback Period (years)

    4.4

    Table 4. Mineral Resources for the Bornite Deposit

    Class

    Type/Area

    Cut-off

    (Cu %)

    Tonnes

    (Mt)

    Average Grade

    Cu (%)

    Contained Metal

    Cu (Mlb)

    Inferred

    In-Pit

    0.50

    170.4

    1.15

    4,303



    Outside-Pit South Reef

    1.45

    27.5

    2.78

    1,687



    Outside-Pit Ruby Zone

    1.79

    10.4

    2.28

    521



    Underground Development

    0.70

    0.7

    0.98

    16



    Total Inferred



    208.9

    1.42

    6,527

    Note:

    (1)

     The effective date of the mineral resource is January 15, 2025.  The QP for the mineral resource is Mr. Henry Kim, P.Geo., an employee of Wood.



    (2)

    Mineral resources are prepared in accordance with CIM Definition Standards and the CIM Best Practice Guidelines.



    (3)

    Mineral resources are not mineral reserves and do not have demonstrated economic viability. Inferred mineral resources are considered too speculative geologically to have the economic considerations applied to them that would enable them to be categorized as mineral reserves. There is no certainty that the Inferred mineral resources will ever be upgraded to a higher category.



    (4)

    Mineral resources are constrained by: an open pit shell at a cut-off grade of 0.50% Cu, with an average pit slope of 43 degrees; and underground mining shapes assuming cut-and-fill mining method based on a 1.79% Cu grade shell for Ruby Zone and an optimized underground mineable stope shape assuming sub-level stoping mine method based on a cut-off grade of 1.45% Cu for South Reef. The cut-off grades assume a $4.60/lb Cu price, process recovery of 90.47%, process cost of $21/t processed, treatment, refining, sales cost of $0.78/lb Cu in concentrate, road use cost of $8.04/t processed, and 2% NSR royalty.  For the open pit, costs include mining costs of $3.34/t mined and G&A cost of $4.30/t processed. For mining at South Reef, costs include mining costs of $65/t mined and G&A cost of $14.50/t processed. For mining at Ruby Zone, costs include mining costs of $90/t mined and G&A cost of $14.50/t processed.



    (5)

    Underground development material uses a marginal cut-off of 0.70% Cu where the mining costs are excluded.



    (6)

    Figures may not sum due to rounding.



    (7)

    The mineral resource estimates are shown on a 100% ownership basis, of which Trilogy Metals' share is 50%.

    The South Reef includes a relatively high-grade mineralized zone that would be amendable to underground mining methods should a decision be made not to mine the mineral resources by open pit methods. Table 5 illustrates the portions of the South Reef at a higher cut-off grade (sensitivity to cut-off grade), representing an opportunity that could be considered for mining of this material using only underground mining methods which is illustrated in the PEA.

    Table 5. Portions of South Reef Mineral Resource Amenable to Underground Mining

    Class

    Type/Area

    Cut-off

    (Cu %)

    Tonnes

    (Mt)

    Average Grade

    Cu (%)

    Contained Metal

    Cu (Mlb)

    Inferred

    In-Pit South Reef1

    1.45

    14.2

    2.80

    876



    Outside-Pit South Reef2

    1.45

    27.5

    2.78

    1,687



    Total South Reef



    41.7

    2.79

    2,563

    Note:

    (1)

    Subset of the mineral resource using a higher cut-off to what was used in Table 4 and is not additive to the in-pit mineral resource reported in Table 4.



    (2)

    Restatement of the mineral resources outside of the pit as reported in Table 5 and is not additive to Table 4.

    Table 6. Subset of the Mineral Resources Included in the Underground LOM Plan

    Class

    Tonnes

    (Mt)

    Average Grade

    Cu (%)

    Contained Metal

    Cu (Mlb)

    Inferred

    36.9

    2.61

    2,125

    Note:

    (1)

    Mineral resources within the mine plan were estimated using sublevel stoping underground mining method and includes variable dilution and a mining recovery of 95%.



    (2)

    Mineral resources are not mineral reserves and do not have demonstrated economic viability.



    (3)

    Input assumptions used to determine mineable stope shapes include a Cu price of $4.20/lb, mine operating cost of $73.29/t, process operating cost of $19.84/t, G&A and surface costs of $9.64/t, haulage and road use costs of $28,78/t, closure and water treatment costs of $1.26/t, shipping, treatment, refining and selling costs of $0.78/lb Cu, process recovery of 90%, and NSR royalty of 2%.



    (4)

    Production stope cut-off of 1.6% Cu and development cut-off of 0.7% Cu.

    Trilogy Metals engaged independent consultants, Wood Canada Limited ("Wood"), Ausenco Engineering Canada ULC ("Ausenco"), SRK Consulting (Canada) Inc. ("SRK"), International Metallurgical & Environmental Inc. ("Int Met"), and Core Geoscience LLC ("Core") to prepare the Bornite PEA on a 100% ownership basis, under National Instrument 43-101 - Standards of Disclosure for Mineral Projects ("NI 43-101"). The full technical report will be available under the Company's profile on SEDAR+ at www.sedarplus.ca within 45 days of this news release.  An Initial Assessment for the Bornite Project was also prepared on a 100% ownership basis in accordance with Subpart 1300 and Item 601 of the Regulation S-K and the full technical report summary will be available under the Company's profile on EDGAR at www.sec.gov/edgar when published.

    The Bornite PEA forecasts total payable production to be 1.9 billion pounds of copper over a 17-year mine life.  More importantly, the Bornite PEA demonstrates the ability to extend mine activity at the UKMP to over 30 years. The Bornite PEA does not incorporate any closure cost synergies for the Arctic Project which may be significant.

    The Bornite PEA is based on a 6,000 tonne-per-day underground mining operation with conventional milling and flotation process that results in the production of copper concentrate.  Based on the Bornite PEA level metallurgical work on the sulphide mineralization, the average recoveries are projected to be 90.9% for copper, producing a copper concentrate grade average of 29.5% over the life-of-mine.

    Initial capital expenditure is $503.8 million and sustaining capital is $363.1 million for total estimated capital expenditures of $866.9 million. This includes the retrofit costs for re-purposing the Arctic mill for Bornite purposes.  In addition, closure and reclamation costs are estimated at $81.2 million.

    There has been no material change to the mineral resource estimates for the Bornite Project as reported in the Company's previous technical reports entitled "NI 43-101 Technical Report on the Mineral Resource Update of the Bornite Project, Northwest, Alaska, USA" with an effective date of January 26, 2023 and "Technical Report Summary on the Initial Assessment of the Bornite Mineral Resource, Northwest Alaska, USA" dated November 30, 2022. The Company's current mineral reserve and mineral resources tables can be found on the Company's website.

    PEA Contributors

    The Bornite PEA was prepared by the contributors listed below, each of whom is a Qualified Person under NI 43-101. 

    Qualified Person

    Company

    Scope of Responsibility

    Lewis Kitchen, P.Eng, Senior Mine Engineer

    Wood

    Mining, capital and operating costs and financial modeling

    Henry Kim, P.Geo, Principal Resource Geologist

    Wood

    Geology and mineral resources

    Kevin Murray, P.Eng, Process Lead

    Ausenco

    Process design and capital and operating costs

    Calvin Boese, P.Eng, Principal Consultant, Geotechnical

    SRK

    Geotechnical, tailings and capital and operating costs

    Dan Mackie, P.Geo, Principal Consultant, Hydrogeologist

    SRK

    Hydrogeology, hydrology and capital and operating costs

    Jeff Austin, P.Eng, President

    Int Met

    Metallurgical testing

    Jack DiMarchi, CPG, Principal

    Core

    Environment and permitting

    Data Verification

    Messrs. Kim and Boese have visited the site of the Bornite Project. The Bornite PEA Contributors have had discussions with relevant site personnel and Company management and have reviewed supporting documentation including initial source documents. Additional information on data verification can be found in the Bornite technical report which will be available under the Company's profile on SEDAR+ at www.sedarplus.ca within 45 days of this news release.

    Qualified Persons

    The Bornite PEA contributors prepared or supervised the preparation of the information that forms the basis of the Bornite PEA disclosure in this news release and have approved its dissemination.

    Richard Gosse, P.Geo., Vice President, Exploration for Trilogy Metals, is a Qualified Person as defined by NI 43-101. Mr. Gosse has reviewed and approved the scientific and technical information in this news release.

    Conference Call

    The conference call to discuss results of the Bornite PEA will be held on January 15, 2025 at 1:00pm Pacific Time or 4:00pm Eastern Time.

    Participants can access the Company's presentation by a live webcast of the conference call at the following link or phone numbers:

    https://www.c-meeting.com/web3/joinTo/38ZLQJQ93P2A84/ZgO5Nop1EQzwZllpJru9iA

    Canada/USA Toll Free: 1-844-763-8274

    International Toll: +1-647-484-8814

    There will be a question-and-answer session following the presentation. A replay of this conference call will be available on the Company's website at www.trilogymetals.com.

    About Trilogy Metals

    Trilogy Metals Inc. is a metal exploration and development company which holds a 50 percent interest in Ambler Metals LLC, which has a 100 percent interest in the Upper Kobuk Mineral Projects in northwestern Alaska. On December 19, 2019, South32, a globally diversified mining and metals company, exercised its option to form a 50/50 joint venture with Trilogy Metals. The UKMP is located within the Ambler Mining District which is one of the richest and most-prospective known copper-dominant districts in the world. It hosts world-class polymetallic volcanogenic massive sulphide ("VMS") deposits that contain copper, zinc, lead, gold and silver, and carbonate replacement deposits which have been found to host high-grade copper and cobalt mineralization. Exploration efforts have been focused on two deposits in the Ambler Mining District – the Arctic VMS deposit and the Bornite carbonate replacement deposit. Both deposits are located within a land package that spans approximately 190,929 hectares. Ambler Metals has an agreement with NANA Regional Corporation, Inc., an Alaska Native Corporation that provides a framework for the exploration and potential development of the Ambler Mining District in cooperation with local communities. Trilogy Metals' vision is to develop the Ambler Mining District into a premier North American copper producer while protecting and respecting subsistence livelihoods.

    Cautionary Note Regarding Forward-Looking Statements

    This news release includes certain "forward-looking information" and "forward-looking statements" (collectively "forward-looking statements") within the meaning of applicable Canadian and United States securities legislation including the United States Private Securities Litigation Reform Act of 1995. All statements, other than statements of historical fact, included herein, including, without limitation, the future price of copper, zinc, lead, gold and silver; the timing and amount of estimated future production; net present values and internal rates of return at Arctic and Bornite; recovery rates; payback periods; costs of production; capital expenditures; costs and timing of the development of projects; mine life; the potential future development of Arctic and Bornite; and the future operating or financial performance of the Company, are forward-looking statements. Forward-looking statements are frequently, but not always, identified by words such as "expects", "anticipates", "believes", "intends", "estimates", "potential", "possible", and similar expressions, or statements that events, conditions, or results "will", "may", "could", or "should" occur or be achieved. These forward-looking statements may include statements regarding perceived merit of properties; exploration plans and budgets; mineral reserves and resource estimates; work programs; capital expenditures; timelines; strategic plans; market prices for precious and base metals; or other statements that are not statements of fact. Forward-looking statements involve various risks and uncertainties. There can be no assurance that such statements will prove to be accurate, and actual results and future events could differ materially from those anticipated in such statements. Important factors that could cause actual results to differ materially from the Company's expectations include the Company's ability to finance the development of its mineral properties; assumptions and discount rates being appropriately applied to the Bornite PEA and Arctic Feasibility Study, uncertainty as to whether there will ever be production at the Company's mineral exploration and development properties; risks related to the Company's ability to commence production and generate material revenues or obtain adequate financing for its planned exploration and development activities; risks related to lack of infrastructure including but not limited to the risk whether or not the Ambler Access Project, or AAP, will receive the requisite permits and, if it does, whether the Alaska Industrial Development and Export Authority will build the AAP; risks related to inclement weather which may delay or hinder activities at the Company's mineral properties; risks related to the Company's dependence on a third party for the development of its projects; commodity price fluctuations; uncertainties relating to the assumptions underlying resource and reserve estimates; mining and development risks, including risks related to infrastructure, accidents, equipment breakdowns, labour disputes, bad weather, non-compliance with environmental and permit requirements or other unanticipated difficulties with or interruptions in development, construction or production; the geology, grade and continuity of the Company's mineral deposits; the uncertainties involving success of exploration, development and mining activities; permitting timelines; government regulation of mining operations; environmental risks; unanticipated reclamation expenses; prices for energy inputs, labour, materials, supplies and services; uncertainties involved in the interpretation of drilling results and geological tests and the estimation of reserves and resources; the need for cooperation of government agencies and native groups in the development and operation of properties as well as the construction of the AAP; unanticipated variation in geological structures, metal grades or recovery rates; fluctuations in currency exchange rates; unexpected cost increases in estimated capital and operating costs; the need to obtain permits and government approvals; uncertainty related to title to the Company's mineral properties and other risks and uncertainties disclosed in the Company's Annual Report on Form 10-K for the year ended November 30, 2023 filed with Canadian securities regulatory authorities and with the United States Securities and Exchange Commission ("SEC") and in other Company reports and documents filed with applicable securities regulatory authorities from time to time. The Company's forward-looking statements reflect the beliefs, opinions and projections on the date the statements are made. The Company assumes no obligation to update the forward-looking statements or beliefs, opinions, projections, or other factors, should they change, except as required by law.

    Cautionary Note to United States Investors

    This news release has been prepared in accordance with the requirements of the securities laws in effect in Canada, which differ from the requirements of U.S. securities laws. Unless otherwise indicated, all resource and reserve estimates included or referenced in this news release have been prepared in accordance with NI 43-101 and the Canadian Institute of Mining, Metallurgy and Petroleum (CIM)—CIM Definition Standards on Mineral Resources and Mineral Reserves, adopted by the CIM Council, as amended ("CIM Definition Standards"). NI 43-101 is a rule developed by the Canadian Securities Administrators which establishes standards for all public disclosure an issuer makes of scientific and technical information concerning mineral projects. Canadian standards, including NI 43-101, may differ from the requirements of the SEC, and resource and reserve information contained herein may not be comparable to similar information disclosed by U.S. companies. In particular, and without limiting the generality of the foregoing, the term "resource" does not equate to the term "reserves". Under U.S. standards, mineralization may not be classified as a "reserve" unless the determination has been made that the mineralization could be economically and legally produced or extracted at the time the reserve determination is made. Investors are cautioned not to assume that all or any part of "measured" or "indicated resources" will ever be converted into "reserves". Investors should also understand that "inferred mineral resources" have a great amount of uncertainty as to their existence and great uncertainty as to their economic and legal feasibility. Under Canadian rules, estimated "inferred mineral resources" may not form the basis of feasibility or pre-feasibility studies except in rare cases. Accordingly, information concerning mineral deposits set forth or referenced herein may not be comparable with information made public by companies that report in accordance with U.S. standards.

    Cision View original content to download multimedia:https://www.prnewswire.com/news-releases/trilogy-metals-announces-positive-study-results-for-the-bornite-copper-project-located-in-alaska-usa-302351132.html

    SOURCE Trilogy Metals Inc.

    Get the next $TMQ alert in real time by email

    Chat with this insight

    Save time and jump to the most important pieces.

    Recent Analyst Ratings for
    $TMQ

    DatePrice TargetRatingAnalyst
    2/24/2022Speculative Buy → Hold
    TD Securities
    12/23/2021Hold → Speculative Buy
    TD Securities
    12/23/2021$3.50Hold → Speculative Buy
    TD Securities
    12/17/2021Sector Perform
    Scotiabank
    More analyst ratings

    $TMQ
    Press Releases

    Fastest customizable press release news feed in the world

    See more
    • Trilogy Metals Announces Election of Directors and Voting Results from the 2025 Annual Meeting of Shareholders

      VANCOUVER, BC, May 14, 2025 /PRNewswire/ - Trilogy Metals Inc. (TSX:TMQ) (NYSE:TMQ) ("Trilogy Metals" or the "Company") is pleased to announce the detailed voting results on the items of business considered at its Annual Meeting of Shareholders ("Meeting") held in Vancouver on Tuesday, May 13, 2025. All proposals were approved and the nominees listed in the management proxy circular for the meeting were all elected as directors. A total of 122,296,116 or 74.50% of the Company's issued and outstanding shares eligible to vote were represented at the Meeting. Shareholder Voting R

      5/14/25 6:30:00 AM ET
      $TMQ
      Precious Metals
      Basic Materials
    • Trilogy Metals Files Final Base Shelf Prospectus in Canada and Registration Statement in the United States

      VANCOUVER, BC, April 14, 2025 /PRNewswire/ - Trilogy Metals Inc. (TSX:TMQ) (NYSE:TMQ) ("Trilogy Metals" or the "Company") has filed a final short form base shelf prospectus with the securities commissions in each of the provinces and territories of Canada, and a corresponding shelf registration statement on Form S-3 with the United States Securities and Exchange Commission ("SEC") allowing for the future issuance, from time to time, of up to US$50,000,000 in common shares, warrants to purchase common shares, share purchase contracts of the Company, subscription receipts and units comprised of some or all of the foregoing securities. Any amounts, prices and terms will be determined based on m

      4/14/25 6:49:00 PM ET
      $TMQ
      Precious Metals
      Basic Materials
    • Trilogy Metals Reports First Quarter Fiscal 2025 Financial Results

      VANCOUVER, BC, April 2, 2025 /PRNewswire/ - Trilogy Metals Inc. (TSX:TMQ) (NYSE:TMQ) ("Trilogy Metals" or the "Company") announces its financial results for the first quarter ended February 28, 2025. Details of the Company's financial results are contained in the interim unaudited consolidated financial statements and Management's Discussion and Analysis which will be available on the Company's website at www.trilogymetals.com, on SEDAR+ at www.sedarplus.ca and on EDGAR at www.sec.gov. All amounts are in United States dollars unless otherwise stated. Selected Results The following selected financial information is prepared in accordance with U.S. GAAP. in thousands of dollars,except for per

      4/2/25 6:30:00 AM ET
      $TMQ
      Precious Metals
      Basic Materials

    $TMQ
    Insider Trading

    Insider transactions reveal critical sentiment about the company from key stakeholders. See them live in this feed.

    See more
    • VP & CFO Sanders Elaine was granted 25,345 shares, increasing direct ownership by 0.81% to 3,149,160 units (SEC Form 4)

      4 - Trilogy Metals Inc. (0001543418) (Issuer)

      3/10/25 9:21:20 PM ET
      $TMQ
      Precious Metals
      Basic Materials
    • Amendment: VP & CFO Sanders Elaine was granted 104,750 shares and converted options into 58,333 shares, increasing direct ownership by 6% to 2,773,814 units (SEC Form 4)

      4/A - Trilogy Metals Inc. (0001543418) (Issuer)

      3/10/25 9:04:25 PM ET
      $TMQ
      Precious Metals
      Basic Materials
    • President & CEO Giardini Tony was granted 74,712 shares, increasing direct ownership by 1% to 7,208,660 units (SEC Form 4)

      4 - Trilogy Metals Inc. (0001543418) (Issuer)

      3/10/25 9:01:12 PM ET
      $TMQ
      Precious Metals
      Basic Materials

    $TMQ
    Large Ownership Changes

    This live feed shows all institutional transactions in real time.

    See more
    • SEC Form SC 13G/A filed by Trilogy Metals Inc. (Amendment)

      SC 13G/A - Trilogy Metals Inc. (0001543418) (Subject)

      5/16/23 4:06:39 PM ET
      $TMQ
      Precious Metals
      Basic Materials
    • SEC Form SC 13D/A filed by Trilogy Metals Inc. (Amendment)

      SC 13D/A - Trilogy Metals Inc. (0001543418) (Subject)

      4/26/23 4:48:19 PM ET
      $TMQ
      Precious Metals
      Basic Materials
    • SEC Form SC 13G/A filed by Trilogy Metals Inc. (Amendment)

      SC 13G/A - Trilogy Metals Inc. (0001543418) (Subject)

      2/9/23 4:43:33 PM ET
      $TMQ
      Precious Metals
      Basic Materials

    $TMQ
    Financials

    Live finance-specific insights

    See more
    • Trilogy Metals Announces Date of Annual Shareholders Meeting

      VANCOUVER, BC, March 28, 2025 /PRNewswire/ - Trilogy Metals Inc. (TSX:TMQ) (NYSE:TMQ) ("Trilogy Metals" or the "Company") will hold the Company's 2025 Annual General Meeting of the Shareholders ("AGM") on Tuesday, May 13, 2025 at 10:00 am Pacific Time at the office of the Company, Suite 901 - 510 Burrard Street, Vancouver, British Columbia. All current directors will stand for re-election at the AGM. Other items of business include the approval of unallocated entitlements under the Company's Restricted Share Unit Plan and Deferred Share Unit Plan. Pursuant to Toronto Stock Exchange rules, all unallocated options, rights and entitlements require shareholder approval every three years followi

      3/28/25 4:45:00 PM ET
      $TMQ
      Precious Metals
      Basic Materials
    • Trilogy Metals Announces Positive Study Results for the Bornite Copper Project Located in Alaska, USA

      VANCOUVER, BC, Jan. 15, 2025 /PRNewswire/ - Trilogy Metals Inc. (TSX:TMQ) (NYSE:TMQ) ("Trilogy Metals" or the "Company") is pleased to announce the positive results of its Preliminary Economic Assessment Study ("Bornite PEA") for the Bornite copper project in the Ambler Mining District of Northwestern Alaska (the "Bornite Project"). The Bornite Project is held by Ambler Metals LLC ("Ambler Metals"), the joint venture operating company equally owned by Trilogy Metals and South32 Limited ("South32"). The Bornite PEA was prepared on a 100% ownership basis, of which Trilogy Metals' share is 50%. All amounts are in U.S. dollars unless otherwise stated.

      1/15/25 6:30:00 AM ET
      $TMQ
      Precious Metals
      Basic Materials
    • Trilogy Metals to Hold an Investor Webinar to Discuss Results from the Bornite Preliminary Economic Assessment on January 15, 2025

      VANCOUVER, BC, Jan. 13, 2025 /PRNewswire/ - Trilogy Metals Inc. (TSX:TMQ) (NYSE American: TMQ) ("Trilogy Metals" or the "Company") will release the results of the Preliminary Economic Assessment for the Bornite copper project ("Bornite PEA") in Alaska on Wednesday, January 15, 2025.  In addition, Trilogy Metals will hold an investor webinar to discuss the results of the Bornite PEA on Wednesday, January 15 at 1:00 pm Pacific Time or 4:00 pm Eastern Time. Participants can access the Company's presentation by a live webcast of the conference call at the following link or phone numbers: https://www.c-meeting.com/web3/joinTo/38ZLQJQ93P2A84/ZgO5Nop1EQzwZllpJru9iA Canada/USA Toll Free: 1-844-763-

      1/13/25 4:30:00 PM ET
      $TMQ
      Precious Metals
      Basic Materials

    $TMQ
    Leadership Updates

    Live Leadership Updates

    See more
    • Trilogy Metals Announces Election of Directors and Voting Results from the 2025 Annual Meeting of Shareholders

      VANCOUVER, BC, May 14, 2025 /PRNewswire/ - Trilogy Metals Inc. (TSX:TMQ) (NYSE:TMQ) ("Trilogy Metals" or the "Company") is pleased to announce the detailed voting results on the items of business considered at its Annual Meeting of Shareholders ("Meeting") held in Vancouver on Tuesday, May 13, 2025. All proposals were approved and the nominees listed in the management proxy circular for the meeting were all elected as directors. A total of 122,296,116 or 74.50% of the Company's issued and outstanding shares eligible to vote were represented at the Meeting. Shareholder Voting R

      5/14/25 6:30:00 AM ET
      $TMQ
      Precious Metals
      Basic Materials
    • Trilogy Metals Announces Election of Directors and Voting Results from the 2024 Annual Meeting of Shareholders

      VANCOUVER, BC, May 23, 2024 /CNW/ - Trilogy Metals Inc. (TSX:TMO) (NYSE:TMQ) ("Trilogy Metals" or the "Company") is pleased to announce the detailed voting results on the items of business considered at its Annual Meeting of Shareholders ("Meeting") held in Vancouver on Wednesday, May 22, 2024. All proposals were approved and the nominees listed in the management proxy circular for the meeting were all elected as directors. A total of 98,964,326 or 61.79% of the Company's issued and outstanding shares eligible to vote were represented at the Meeting. Shareholder Voting ResultsThe Shareholders voted on the following matters at this year's Meeting. Other than Proposals 1 and 3, which represen

      5/23/24 6:30:00 AM ET
      $TMQ
      Precious Metals
      Basic Materials
    • Trilogy Metals Announces Election of Directors and Voting Results from the 2023 Annual Meeting of Shareholders

      VANCOUVER, BC, May 18, 2023 /PRNewswire/ - Trilogy Metals Inc. (TSX:TMQ) (NYSE:TMQ) ("Trilogy Metals" or the "Company") is pleased to announce the detailed voting results on the items of business considered at its Annual Meeting of Shareholders ("Meeting") held in Vancouver on Wednesday, May 17, 2023. All proposals were approved and the nominees listed in the management proxy circular for the meeting were all elected as directors. A total of 114,556,428 or 76.91% of the Company's issued and outstanding shares eligible to vote were represented at the Meeting. Shareholder Voting ResultsThe Shareholders voted on the following matters at this year's Meeting. Other than Proposal 2, which represen

      5/18/23 6:30:00 AM ET
      $TMQ
      Precious Metals
      Basic Materials

    $TMQ
    Analyst Ratings

    Analyst ratings in real time. Analyst ratings have a very high impact on the underlying stock. See them live in this feed.

    See more
    • Trilogy Metals downgraded by TD Securities

      TD Securities downgraded Trilogy Metals from Speculative Buy to Hold

      2/24/22 9:39:52 AM ET
      $TMQ
      Precious Metals
      Basic Materials
    • Trilogy Metals upgraded by TD Securities

      TD Securities upgraded Trilogy Metals from Hold to Speculative Buy

      12/23/21 9:20:59 AM ET
      $TMQ
      Precious Metals
      Basic Materials
    • Trilogy Metals upgraded by TD Securities with a new price target

      TD Securities upgraded Trilogy Metals from Hold to Speculative Buy and set a new price target of $3.50

      12/23/21 7:50:04 AM ET
      $TMQ
      Precious Metals
      Basic Materials

    $TMQ
    SEC Filings

    See more
    • Trilogy Metals Inc. filed SEC Form 8-K: Leadership Update, Submission of Matters to a Vote of Security Holders, Regulation FD Disclosure, Financial Statements and Exhibits

      8-K - Trilogy Metals Inc. (0001543418) (Filer)

      5/14/25 12:11:55 PM ET
      $TMQ
      Precious Metals
      Basic Materials
    • SEC Form EFFECT filed by Trilogy Metals Inc.

      EFFECT - Trilogy Metals Inc. (0001543418) (Filer)

      4/15/25 12:15:18 AM ET
      $TMQ
      Precious Metals
      Basic Materials
    • Trilogy Metals Inc. filed SEC Form 8-K: Regulation FD Disclosure, Financial Statements and Exhibits

      8-K - Trilogy Metals Inc. (0001543418) (Filer)

      4/14/25 8:48:07 PM ET
      $TMQ
      Precious Metals
      Basic Materials