• Live Feeds
    • Press Releases
    • Insider Trading
    • FDA Approvals
    • Analyst Ratings
    • Insider Trading
    • SEC filings
    • Market insights
  • Analyst Ratings
  • Alerts
  • Subscriptions
  • Settings
  • RSS Feeds
Quantisnow Logo
  • Live Feeds
    • Press Releases
    • Insider Trading
    • FDA Approvals
    • Analyst Ratings
    • Insider Trading
    • SEC filings
    • Market insights
  • Analyst Ratings
  • Alerts
  • Subscriptions
  • Settings
  • RSS Feeds
PublishGo to App
    Quantisnow Logo

    © 2026 quantisnow.com
    Democratizing insights since 2022

    Services
    Live news feedsRSS FeedsAlertsPublish with Us
    Company
    AboutQuantisnow PlusContactJobsAI superconnector for talent & startupsNEWLLM Arena
    Legal
    Terms of usePrivacy policyCookie policy

    U.S. GoldMining Inc. Selects Ausenco to Deliver Initial Economic Assessment At Whistler Gold-Copper Project, Alaska

    6/9/25 6:00:00 AM ET
    $USGO
    Precious Metals
    Basic Materials
    Get the next $USGO alert in real time by email

    PEA to incorporate updated 2024 drilling and evaluate standalone open-pit operation

    ANCHORAGE, Alaska, June 9, 2025 /PRNewswire/ - U.S. GoldMining Inc. (NASDAQ:USGO) ("U.S. GoldMining" or the "Company") is pleased to announce it has selected Ausenco Engineering Canada ULC ("Ausenco") as the principal consulting firm to lead its proposed initial assessment study ("PEA")  for the Whistler Gold-Copper Project ("Whistler" or the "Project"), located 105 miles northwest of Anchorage, Alaska. The study, as previously announced April 15, 2025, is intended to constitute an initial assessment under U.S. Regulation S-K 1300 ("S-K 1300") and a preliminary economic assessment under Canadian National Instrument 43-101 ("NI 43-101").

    Highlights:

    • The PEA is intended to explore and outline a development opportunity at the Whistler Project for a stand-alone open pit mine and concentrator facility located approximately 100 miles northwest of Anchorage in south-central Alaska, a region which has significant existing and ongoing infrastructure development.



    • The PEA will consider the Whistler mineral resource estimate which currently stands at 6.48 million ounces (Moz) gold equivalent (AuEq) compiled from the indicated resource category and 4.16 Moz AuEq in the inferred resource category (see Table 1 for details). The Project is anticipated to benefit from the deposit's near-surface, higher-grade core material in the early years of production.



    • The PEA will utilize an updated mineral resource estimate to be completed by Moose Mountain Technical Services, which will include 2024 drilling that was not available for the previous mineral resource estimate. In addition, metallurgical test work is currently being conducted by Base Metallurgical Laboratories Ltd., as previously announced on April 24, 2025.



    • The Company completed a comprehensive bidding process, receiving initial expressions of interest from 13 consulting firms, followed by a rigorous Request for Proposal ("RFP") review of six shortlisted candidate firms. Ausenco was selected from this process on the strength of its experience across all disciplines and its track record in recent delivery of comparable studies.

    Tim Smith, Chief Executive Officer of U.S. GoldMining, commented: "We're delighted to be able to announce that we have partnered with Ausenco on this important work program. We're excited to  begin working towards delivering the first PEA on Whistler, which we believe could present a robust future mining opportunity and has the potential to unlock significant value for shareholders. We look forward to providing periodic updates as the study progresses, for which we are currently targeting completion before year-end."

    David Thomas, Vice President, Minerals & Metals, Southwest USA of Ausenco, commented: "Ausenco is pleased to partner with U.S. GoldMining on the Whistler Gold-Copper Project PEA. We've successfully completed studies for clients around the world, including initial concept studies, pre-feasibility studies and definitive studies. As a lifelong Alaskan who lived many years in the Matanuska-Susitna (Mat-Su) Borough – where the Whistler Project is located - I'm delighted to add to the direct Alaskan experience of the team and help deliver U.S. GoldMining a robust, sustainable mining study."

    About U.S. GoldMining Inc.

    U.S. GoldMining Inc. is an exploration and development company focused on advancing the 100% owned Whistler Gold-Copper Project, located 105 miles (170 kilometers) northwest of Anchorage, Alaska, U.S.A. The Whistler Project consists of several gold-copper porphyry deposits and exploration targets within a large regional land package entirely on State of Alaska Mining claims totaling approximately 53,700 acres (217.5 square kilometers). Visit www.usgoldmining.us for more information.

    About Ausenco

    Ausenco is a global company redefining what's possible. The team is based out of 21 offices working across five continents to deliver services worldwide. Combining deep technical expertise with a 30-year track record, Ausenco delivers innovative, value-add consulting, studies, project delivery, asset operations and maintenance solutions to the minerals and metals and industrial sectors (www.ausenco.com).

    Table 1 Mineral Resource Estimate for the Total Project (Effective date: September 12, 2024)

    Class 

    Deposit

    Cut-off 

    Value 

    ROM 

    Tonnage 

    In situ Grades

    In situ Metal

    (US$/t) 

    (ktonnes) 

    NSR 

    (US$/t) 

    AuEqv 

    (g/t) 

    Au 

    (g/t) 

    Cu 

    (%) 

    Ag 

    (g/t) 

    AuEqv 

    (koz) 

    Au 

    (koz) 

    Cu 

    (mlbs) 

    Ag 

    (koz) 

    Indicated 

    Whistler Pit

    10

    282,205

    22.84

    0.68

    0.41

    0.16

    1.89

    6,201

    3,724

    999

    17,166

    Raintree Pit

    10

    8,905

    21.08

    0.63

    0.46

    0.08

    4.81

    180

    131

    16

    1,378

    Indicated Open Pit  

    varies

    291,410

    22.79

    0.68

    0.41

    0.16

    1.98

    6,381

    3,855

    1,015

    18,544

    Raintree UG

    25

    3,064

    34.41

    1.03

    0.79

    0.13

    4.49

    101

    78

    9

    443

    Total Indicated

    varies

    294,474

    22.91

    0.68

    0.42

    0.16

    2.01

    6,482

    3,933

    1,024

    18,987

    Inferred 

    Whistler Pit

    10

    18,224

    21.01

    0.63

    0.40

    0.13

    1.75

    368

    233

    54

    1,025

    Island Mountain Pit

    10

    124,529

    18.21

    0.54

    0.45

    0.05

    1.02

    2,180

    1,817

    139

    4,084

    Raintree Pit

    10

    15,056

    23.12

    0.69

    0.55

    0.06

    4.36

    335

    267

    21

    2,112

    Inferred Open Pit

    varies

    157,809

    19.00

    0.57

    0.45

    0.06

    1.42

    2,883

    2,317

    214

    7,221

    Raintree UG

    25

    40,432

    32.81

    0.98

    0.76

    0.12

    3.31

    1,275

    994

    103

    4,300

    Total Inferred

    varies

    198,241

    21.82

    0.65

    0.52

    0.07

    1.81

    4,158

    3,311

    317

    11,521

    Notes to Table 1:



    1.

    Mineral resources are not mineral reserves and do not have demonstrated economic viability. There is no certainty that all or any part of the mineral resources will be converted into mineral reserves.



    2.

    Inferred mineral resources are subject to uncertainty as to their existence and as to their economic and legal feasibility. The level of geological uncertainty associated with an inferred mineral resource is too high to apply relevant technical and economic factors likely to influence the prospects of economic extraction in a manner useful for evaluation of economic viability.



    3.

    The mineral resource estimate for the Whistler, Island Mountain, and the upper portions of the Raintree West deposits have been confined by an open pit with "reasonable prospects of economic extraction" using the following assumptions:





    • Metal prices of US$1,850/oz gold (Au), US$4.00/lb copper (Cu) and US$23/oz silver (Ag);
    • Payable metal of 95% payable for Au and Ag, and 96.5% payable for Cu;
    • Refining costs for g of US$8.00/oz, for Ag of US$0.60/oz and for Cu of US$0.05/lb;
    • Offsite costs for Au of US$77.50/wmt, for Ag of US$3.50/wmt and for Cu of US$55.00/wmt;
    • Royalty of 3% net smelter return royalty (NSR);
    • Pit slopes are 50 degrees;
    • Mining cost of US$2.25/t for waste and mineralized material; and
    • Processing, general and administrative costs of US$7.90/t.


    4.

    The lower portion of the Raintree West deposit has been constrained by a mineable shape with "reasonable prospects of eventual economic extraction" using a US$25.00/t cut-off.



    5.

    Metallurgical recoveries are: 70% for Au, 83% for Cu, and 65% Ag for Ag grades below 10g/t. The Ag recovery is 0% for values above 10g/t for all deposits.



    6.

    The NSR equations are: below 10g/t Ag: NSR (US$/t)=(100%-3%)*((Au*70%*US$54.646/t) + (Cu*83%*US$3.702*2204.62 + Ag*65%*US$0.664)), and above 10g/t Ag: NSR (US$/t)=(100%-3%)*((Au*70%*US$56.646g/t) + (Cu*83%*US$3.702*2204.62)).



    7.

    The Au Equivalent equations are: below 10g/t Ag: AuEq=Au + Cu*1.771 +0.0113Ag, and above 10g/t Ag: AuEq=Au + Cu*1.771.



    8.

    The specific gravity for each deposit and domain ranges from 2.76 to 2.91 for Island Mountain, 2.60 to 2.72 for Whistler with an average value of 2.80 for Raintree West.



    9.

    Numbers may not add due to rounding.

    For further information regarding the Project and the mineral resource estimates referenced herein, refer to the technical report summary titled "S-K 1300 Technical Report Summary Initial Assessment for the Whistler Project, South Central Alaska" with an effective date of September 12, 2024, and the technical report titled "NI 43-101 2024 Updated Mineral Resource Estimate for the Whistler Project, South Central Alaska" with an effective date of September 12, 2024, available under the Company's respective profiles at www.sec.gov and www.sedarplus.ca.

    Tim Smith, P.Geo., Chief Executive Officer of the Company, has supervised the preparation of this news release and has reviewed and approved the scientific and technical information contained herein. Mr. Smith is a "qualified person" as defined under NI 43-101.

    Forward-Looking Statements

    Except for the statements of historical fact contained herein, the information presented in this news release constitutes "forward-looking statements" within the meaning of the United States federal securities laws and "forward-looking information" within the meaning of applicable Canadian securities laws (collectively, "forward-looking statements"). Such statements include statements with regard to the Company's expectations regarding the Project and the proposed PEA. Words such as "expects", "anticipates", "plans", estimates" and "intends" or similar expressions are intended to identify forward-looking statements. Forward-looking statements are based on U.S. GoldMining's current expectations and are subject to inherent uncertainties, risks and assumptions that are difficult to predict and involve known and unknown risks, uncertainties and other factors, which may cause the actual results, performance or achievements of the Company to be materially different from any future results, performance or achievements expressed or implied by such forward-looking statements. Such risks and other factors include, among others, the actual results of future exploration may not confirm expectations, variations in the underlying assumptions associated with the estimation or realization of mineral resources, the availability of capital to fund programs, accidents, labor disputes and other risks of the mining industry including, without limitation, those associated with the environment, delays in obtaining governmental approvals or permits, title disputes other risks inherent in the exploration and development of mineral properties and the other risk factors set forth in the Company's filings with the U.S. Securities and Exchange Commission at.www.sec.gov and Canadian Securities Administrators at www.sedarplus.ca. Although the Company has attempted to identify important factors that could cause actual actions, events or results to differ materially from those described in forward-looking statements, there may be other factors that cause actions, events or results not to be as anticipated, estimated or intended. Accordingly, readers should not place undue reliance on forward-looking statements contained in this news release. Forward-looking statements contained in this news release are made as of this date, and U.S. GoldMining does not undertake any duty to update such information except as required under applicable law.

    Cision View original content to download multimedia:https://www.prnewswire.com/news-releases/us-goldmining-inc-selects-ausenco-to-deliver-initial-economic-assessment-at-whistler-gold-copper-project-alaska-302475805.html

    SOURCE U.S. GoldMining Inc.

    Get the next $USGO alert in real time by email

    Crush Q1 2026 with the Best AI Superconnector

    Stay ahead of the competition with Standout.work - your AI-powered talent-to-startup matching platform.

    AI-Powered Inbox
    Context-aware email replies
    Strategic Decision Support
    Get Started with Standout.work

    Recent Analyst Ratings for
    $USGO

    DatePrice TargetRatingAnalyst
    More analyst ratings

    $USGO
    SEC Filings

    View All

    U.S. GoldMining Inc. filed SEC Form 8-K: Regulation FD Disclosure

    8-K - U.S. GoldMining Inc. (0001947244) (Filer)

    3/23/26 6:45:14 AM ET
    $USGO
    Precious Metals
    Basic Materials

    SEC Form 10-K filed by U.S. GoldMining Inc.

    10-K - U.S. GoldMining Inc. (0001947244) (Filer)

    3/20/26 4:44:38 PM ET
    $USGO
    Precious Metals
    Basic Materials

    U.S. GoldMining Inc. filed SEC Form 8-K: Other Events, Financial Statements and Exhibits

    8-K - U.S. GoldMining Inc. (0001947244) (Filer)

    3/19/26 5:15:32 PM ET
    $USGO
    Precious Metals
    Basic Materials

    $USGO
    Insider Purchases

    Insider purchases reveal critical bullish sentiment about the company from key stakeholders. See them live in this feed.

    View All

    Director Schmidt Laura bought $1,995 worth of shares (383 units at $5.21) (SEC Form 4)

    4 - U.S. GoldMining Inc. (0001947244) (Issuer)

    8/16/24 7:56:21 PM ET
    $USGO
    Precious Metals
    Basic Materials

    Goldmining Inc. bought $287,446 worth of shares (18,000 units at $15.97), increasing direct ownership by 0.18% to 9,878,261 units (SEC Form 4) (Amendment)

    4/A - U.S. GoldMining Inc. (0001947244) (Issuer)

    2/20/24 8:26:06 PM ET
    $USGO
    Precious Metals
    Basic Materials

    Goldmining Inc. bought $113,749 worth of shares (8,000 units at $14.22), increasing direct ownership by 0.08% to 9,860,261 units (SEC Form 4) (Amendment)

    4/A - U.S. GoldMining Inc. (0001947244) (Issuer)

    2/20/24 8:24:28 PM ET
    $USGO
    Precious Metals
    Basic Materials

    $USGO
    Insider Trading

    Insider transactions reveal critical sentiment about the company from key stakeholders. See them live in this feed.

    View All

    SEC Form 4 filed by Wong Tyler Michael

    4 - U.S. GoldMining Inc. (0001947244) (Issuer)

    3/18/26 6:11:20 PM ET
    $USGO
    Precious Metals
    Basic Materials

    SEC Form 4 filed by Wade Lisa Jean

    4 - U.S. GoldMining Inc. (0001947244) (Issuer)

    3/18/26 6:10:39 PM ET
    $USGO
    Precious Metals
    Basic Materials

    SEC Form 4 filed by Smith Timothy Robert

    4 - U.S. GoldMining Inc. (0001947244) (Issuer)

    3/18/26 6:09:16 PM ET
    $USGO
    Precious Metals
    Basic Materials

    $USGO
    Press Releases

    Fastest customizable press release news feed in the world

    View All

    U.S. GoldMining Files PEA Technical Report for Its Whistler Project, Alaska

    ANCHORAGE, Alaska, March 23, 2026 /CNW/ - U.S. GoldMining Inc. (NASDAQ:USGO) ("U.S. GoldMining" or the "Company") is pleased to announce that it has filed an S-K 1300 technical report summary (the "S-K 1300 Report") and a Canadian National Instrument 43-101 ("NI 43-101") technical report respecting the initial economic assessment for the initial economic assessment (the "PEA") on its 100%-owned Whistler Gold-Copper Project ("Whistler" or the "Project") in Alaska reported in its news release dated March 2, 2026.  2026 Whistler PEA Highlights1:Strong economics and quick payback: A

    3/23/26 6:30:00 AM ET
    $USGO
    Precious Metals
    Basic Materials

    U.S. GoldMining Appoints Imola Götz as VP, Project Development

    ANCHORAGE, Alaska, March 5, 2026 /CNW/ - U.S. GoldMining Inc. (NASDAQ:USGO) ("U.S. GoldMining" or the "Company") is pleased to announce the appointment of Imola Götz as Vice President, Project Development. Ms. Götz is a veteran mining engineer with over 30 years of international experience in both open-pit and underground mining environments including in world renowned gold mining camps of Hemlo and Timmins. Ms. Gotz is an expert in developing life of mine plans, strategic business plans, and comparative economic evaluations of mining projects, developed over decades of experien

    3/5/26 6:30:00 AM ET
    $USGO
    Precious Metals
    Basic Materials

    GoldMining Congratulates U.S. GoldMining on the Successful Completion of the Initial PEA at its Whistler Gold-Copper Project, Alaska

    Designated News Release VANCOUVER, BC, March 2, 2026 /CNW/ - GoldMining Inc. (TSX:GOLD) (NYSE:GLDG) ("GoldMining" or the "Company") congratulates its majority owned subsidiary, U.S. GoldMining Inc. (NASDAQ:USGO) ("U.S. GoldMining") on its announcement today of a positive initial economic assessment (the "PEA") for its 100% owned Whistler Gold-Copper Project (the "Whistler Project"), located 105 miles northwest of Anchorage, Alaska. Further details are available in U.S. GoldMining's news release of today's date, which includes further information regarding the PEA and is availabl

    3/2/26 6:45:00 AM ET
    $GLDG
    $USGO
    Precious Metals
    Basic Materials

    $USGO
    Leadership Updates

    Live Leadership Updates

    View All

    U.S. GoldMining Appoints Imola Götz as VP, Project Development

    ANCHORAGE, Alaska, March 5, 2026 /CNW/ - U.S. GoldMining Inc. (NASDAQ:USGO) ("U.S. GoldMining" or the "Company") is pleased to announce the appointment of Imola Götz as Vice President, Project Development. Ms. Götz is a veteran mining engineer with over 30 years of international experience in both open-pit and underground mining environments including in world renowned gold mining camps of Hemlo and Timmins. Ms. Gotz is an expert in developing life of mine plans, strategic business plans, and comparative economic evaluations of mining projects, developed over decades of experien

    3/5/26 6:30:00 AM ET
    $USGO
    Precious Metals
    Basic Materials

    GoldMining Appoints Martin Dumont as VP, Corporate Development and Investor Relations

    VANCOUVER, BC, Jan. 22, 2026 /PRNewswire/ - GoldMining Inc. (the "Company" or "GoldMining") (TSX:GOLD, NYSE:GLDG) is pleased to announce the appointment of Martin Dumont as Vice President, Corporate Development & Investor Relations. Alastair Still, President & Chief Executive Officer of GoldMining commented: "We are pleased to welcome Martin to the GoldMining team. His mining industry experience across corporate development, capital markets, and investor relations within the gold sector will play a key role as we continue to advance our portfolio and pursue value-accretive opp

    1/22/26 6:30:00 AM ET
    $GLDG
    $GROY
    $USGO
    Precious Metals
    Basic Materials

    U.S. GoldMining Appoints Mining Industry Veteran Barry Olson as Special Advisor

    ANCHORAGE, Alaska, Sept. 3, 2025 /PRNewswire/ - U.S. GoldMining Inc. (NASDAQ:USGO) ("U.S. GoldMining" or the "Company") is pleased to announce the appointment of Barry Olson as a Special Advisor to the Company effective September 1, 2025. Barry is an experienced mining industry leader with an established track record of successfully managing and developing multi-billion-dollar international mining projects, including leading the development of Peñasquito, one of Mexico's largest open pit mines, currently operated by Newmont, the world's largest gold producer. Barry is currentl

    9/3/25 7:00:00 AM ET
    $USGO
    Precious Metals
    Basic Materials