• Live Feeds
    • Press Releases
    • Insider Trading
    • FDA Approvals
    • Analyst Ratings
    • Insider Trading
    • SEC filings
    • Market insights
  • Analyst Ratings
  • Alerts
  • Subscriptions
  • Settings
  • RSS Feeds
Quantisnow Logo
  • Live Feeds
    • Press Releases
    • Insider Trading
    • FDA Approvals
    • Analyst Ratings
    • Insider Trading
    • SEC filings
    • Market insights
  • Analyst Ratings
  • Alerts
  • Subscriptions
  • Settings
  • RSS Feeds
Dashboard
    Quantisnow Logo

    © 2025 quantisnow.com
    Democratizing insights since 2022

    Services
    Live news feedsRSS FeedsAlerts
    Company
    AboutQuantisnow PlusContactJobs
    Legal
    Terms of usePrivacy policyCookie policy

    Vast Receives $30M from Australian Renewable Energy Agency for Green Technology to Decarbonise Australia's Grid and Power Green Fuels Production

    11/25/24 8:00:00 AM ET
    $VSTE
    Building Products
    Industrials
    Get the next $VSTE alert in real time by email

    SYDNEY, Nov. 25, 2024 (GLOBE NEWSWIRE) -- Vast Renewables Limited ("Vast") (NASDAQ:VSTE) today announced it has signed an updated funding agreement to access up to $30 million of its existing $65 million grant from the Australian Renewable Energy Agency ("ARENA"). The funding will support Vast's green technology manufacturing and project development activities as it deploys its next generation concentrated solar thermal power (CSP) solution to deliver the clean, dispatchable power and heat that the world needs.

    CSP is an obvious technology to deploy in Australia's energy transition in one of the sunniest countries on earth. By capturing and storing the sun's energy as heat, CSP can power homes, industry and transport with green, reliable and affordable energy. The technology's dispatchable capacity will be a critical complement to intermittent solar PV and wind in Australia's energy mix, delivering longer-lasting power that's cost effective when the sun isn't shining and the wind isn't blowing.

    Vast has pioneered the next generation of proprietary CSP technology, promising superior performance at lower cost and risk. It has a global pipeline of projects that will help to decarbonise electricity generation and power the production of green methanol and sustainable aviation fuels. Proven at its grid-connected pilot project in New South Wales, Vast's leading technology is set to be deployed at utility-scale at Vast Solar 1 ("VS1"), a 30MW power plant with 8 hours of storage located in the Port Augusta Green Energy Hub, South Australia.

    Vast's Port Augusta utility-scale CSP project will generate clean, dispatchable electricity which will be sold into the National Electricity Market, and it will help to power a world-first co-located green methanol production facility, Solar Methanol 1 ("SM1"), also being developed by Vast. A real world, in-demand application for hydrogen, green methanol has the potential to decarbonise shipping and is already being used to power major container vessels.

    Vast's internationally awarded, Australian-made technology is currently produced at its Queensland facility. ARENA's funding will see Vast scale up its Australian green technology manufacturing to supply VS1 and future projects. The $30 million funding will also support Vast in the final project development activities ahead of Final Investment Decision (FID) on VS1 in early 2025. Vast's Australian projects and manufacturing facility are anticipated to create dozens of green manufacturing and construction jobs, and long-term plant operations roles.

    The support of the Australian Government has been key for Vast, which has the potential to be a catalyst for a domestic CSP industry and expects to export its green technology around the world to its global pipeline of projects, according to Vast CEO Craig Wood.

    Wood said, "Unlocking this funding helps accelerate our Australian green technology manufacturing and the final stages of development for our first utility-scale project. ARENA's backing has been pivotal, getting us to a point where we are garnering significant interest from investors, industry and international governments keen to explore how our technology can play a key role in decarbonising hard-to-abate sectors including electricity, industry and fuels.

    "With the continued support of the Australian Government and our investors, we are looking forward to building our next projects, and to helping Australia become an export powerhouse for this next generation of green technology."

    The $30 million non-dilutive grant will be released from $65 million of funding announced in February 2023 by the Minister for Climate Change and Energy, Hon Chris Bowen MP, and ARENA. Construction of VS1 is anticipated to begin in Q2 2025, with capital expenditures estimated to be in the range of AUD360 million - AUD390 million.

    Vast Renewables Limited

    Vast's 1.1MW demonstration project in Forbes, New South Wales

    About Vast 

    Vast is a renewable energy company that has CSP systems to generate, store, and dispatch carbon-free, utility-scale electricity, industrial heat, or a combination to enable the production of green fuels. Vast's CSP v3.0 approach utilises a proprietary, modular sodium loop to efficiently capture and convert solar heat into these end products. 

    On December 19, 2023, Vast listed on the Nasdaq under the ticker symbol "VSTE", while remaining headquartered in Australia. 

    Visit www.vast.energy for more information.

    Contacts 

    For Investors: 

    Caldwell Bailey 

    ICR, Inc. 

    [email protected] 

    For US media: 

    Matt Dallas 

    ICR, Inc. 

    [email protected] 

    For Australian media: 

    Nick Albrow 

    Wilkinson Butler 

    [email protected] 

    ‍Forward Looking Statements

    The information included herein and in any oral statements made in connection herewith include "forward-looking statements" within the meaning of Section 27A of the Securities Act of 1933, as amended, and Section 21E of the Securities Exchange Act of 1934, as amended. All statements, other than statements of present or historical fact included herein, regarding VS1, Vast's future financial performance, Vast's strategy, future operations, financial position, estimated revenues and losses, projected costs, prospects, plans and objectives of management are forward-looking statements. When used herein, including any oral statements made in connection herewith, the words "anticipate," "believe," "could," "estimate," "expect," "intend," "may," "project," "should," "will," the negative of such terms and other similar expressions are intended to identify forward-looking statements, although not all forward-looking statements contain such identifying words. These forward-looking statements are based on Vast management's current expectations and assumptions about future events and are based on currently available information as to the outcome and timing of future events. Except as otherwise required by applicable law, Vast disclaims any duty to update any forward-looking statements, all of which are expressly qualified by the statements in this section, to reflect events or circumstances after the date hereof. Vast cautions you that these forward-looking statements are subject to risks and uncertainties, most of which are difficult to predict and many of which are beyond the control of Vast. These risks include, but are not limited to, general economic, financial, legal, political and business conditions and changes in domestic and foreign markets; Vast's ability to obtain financing on commercially acceptable terms or at all; Vast's ability to manage growth; Vast's ability to execute its business plan, including the completion of the Port Augusta project (including VS1), at all or in a timely manner and meet its projections; potential litigation, governmental or regulatory proceedings, investigations or inquiries involving Vast, including in relation to Vast's recent business combination; the inability to recognize the anticipated benefits of Vast's recent business combination; costs related to that business combination; changes in applicable laws or regulations and general economic and market conditions impacting demand for Vast's products and services. Additional risks are set forth in the section titled "Risk Factors" in the Annual Report on Form 20-F for the year ended June 30, 2024, dated September 9, 2024, as amended on November 7, 2024, and other documents filed, or to be filed with the SEC by Vast. Should one or more of the risks or uncertainties described herein and in any oral statements made in connection therewith occur, or should underlying assumptions prove incorrect, actual results and plans could differ materially from those expressed in any forward-looking statements. Additional information concerning these and other factors that may impact Vast's expectations can be found in Vast's periodic filings with the SEC. Vast's SEC filings are available publicly on the SEC's website at www.sec.gov

    A photo accompanying this announcement is available at https://www.globenewswire.com/NewsRoom/AttachmentNg/943211e9-90bd-492d-b33b-c3c83fb5ebc5



    Primary Logo

    Get the next $VSTE alert in real time by email

    Chat with this insight

    Save time and jump to the most important pieces.

    Q&A

    New
    • What recent funding agreement has Vast Renewables signed?

      Vast Renewables Limited has signed an updated funding agreement to access up to $30 million from its existing $65 million grant from ARENA to support its green technology initiatives.

    • What will the $30 million funding be used for?

      The funding will primarily support Vast's concentrated solar thermal power (CSP) manufacturing and project development activities.

    • How does Vast's CSP technology fit into Australia's energy transition?

      Vast's technology will complement intermittent solar PV and wind energy, providing reliable and dispatchable power, essential for Australia's energy needs.

    • When is the construction for Vast Solar 1 expected to start and what are the estimated costs?

      Construction of the utility-scale CSP project, Vast Solar 1 (VS1), is anticipated to begin in Q2 2025, with estimated capital expenditures between AUD360 million - AUD390 million.

    • What are Vast's future plans regarding the domestic and international markets?

      With the support of the Australian Government, Vast aims to become a key player in the domestic CSP industry and plans to export its technology globally.

    Recent Analyst Ratings for
    $VSTE

    DatePrice TargetRatingAnalyst
    More analyst ratings

    $VSTE
    Press Releases

    Fastest customizable press release news feed in the world

    See more
    • Vast Announces Voluntary Nasdaq Delisting and Strategic Leadership Changes

      SYDNEY, May 06, 2025 (GLOBE NEWSWIRE) -- Vast Renewables Limited (Vast) (Nasdaq: VSTE), a leading Australian clean energy technology company, today announced that it has notified The Nasdaq Stock Market LLC (Nasdaq) of its intention to voluntarily delist its ordinary shares and public warrants from Nasdaq. Delisting from Nasdaq marks the first step in Vast's broader strategy to cease its public reporting obligations in the U.S. The decision to delist and deregister is a strategic step by Vast to simplify its corporate structure, reduce regulatory and administrative costs, and align its governance with the scale and needs of its business. As a growth-stage enterprise focused on long-term in

      5/6/25 4:15:00 PM ET
      $VSTE
      Building Products
      Industrials
    • Vast Secures AUD 700,000 Grant from Australia-Singapore Initiative for Decarbonising Shipping to Progress World-First South Australia Solar Fuels Project

      SA Solar Fuels will have the capacity to produce 7,500 tonnes per annum of sustainable fuels to meet the growing demand from maritime and aviation industriesFunding will support industry-leading optimisation work as the project advances towards FEED following successful completion of pre-FEED SYDNEY, March 26, 2025 (GLOBE NEWSWIRE) -- HyFuel Solar Refinery Pty Ltd, a subsidiary of Vast Renewables Limited (Vast) (Nasdaq: VSTE), has been awarded AUD 700,000 through the Australia-Singapore Low Emissions Technologies (ASLET) initiative for maritime and port operations. The funding will progress the development of South Australia Solar Fuels (SA Solar Fuels), a world-first sustainable fuels pr

      3/26/25 8:30:00 AM ET
      $VSTE
      Building Products
      Industrials
    • Vast's Clean Energy Project Secures up to AUD180 Million from the Australian Renewable Energy Agency to Power South Australia's Grid and Green Fuels Production

      Vast secures up to AUD180 million of funding from ARENA for construction of groundbreaking South Australian clean energy project, conditional on meeting certain milestonesProject to deploy Vast's innovative clean energy solution, delivering clean power for South Australia's grid when intermittent renewables are not available, as well as for green fuels productionVast on-track to export its solution to a global pipeline of projects, enabling long duration energy storage and generation critical to the world's energy transition SYDNEY, March 12, 2025 (GLOBE NEWSWIRE) -- Vast Renewables Limited ("Vast") (NASDAQ:VSTE) today announced it has secured up to AUD180 million of conditional funding f

      3/12/25 7:00:00 AM ET
      $NBR
      $VSTE
      Oil & Gas Production
      Energy
      Building Products
      Industrials

    $VSTE
    Leadership Updates

    Live Leadership Updates

    See more
    • Vast Announces Voluntary Nasdaq Delisting and Strategic Leadership Changes

      SYDNEY, May 06, 2025 (GLOBE NEWSWIRE) -- Vast Renewables Limited (Vast) (Nasdaq: VSTE), a leading Australian clean energy technology company, today announced that it has notified The Nasdaq Stock Market LLC (Nasdaq) of its intention to voluntarily delist its ordinary shares and public warrants from Nasdaq. Delisting from Nasdaq marks the first step in Vast's broader strategy to cease its public reporting obligations in the U.S. The decision to delist and deregister is a strategic step by Vast to simplify its corporate structure, reduce regulatory and administrative costs, and align its governance with the scale and needs of its business. As a growth-stage enterprise focused on long-term in

      5/6/25 4:15:00 PM ET
      $VSTE
      Building Products
      Industrials
    • Vast and Mabanaft Award SM1 Engineering Contracts to Fichtner and bse Methanol, with Arup's Dr. Amy Philbrook as Project Manager

      PORT AUGUSTA, South Australia, Oct. 08, 2024 (GLOBE NEWSWIRE) -- Vast Renewables Limited ("Vast") (NASDAQ:VSTE), a renewable energy company planning to power green fuels production, today announced a significant milestone in the development of its green methanol plant, SM1. Vast and its consortium partner, global energy company Mabanaft, have awarded international engineering group Fichtner and German e-fuels leader bse Methanol contracts to commence pre-front-end engineering and design (FEED) work. This follows the appointment of Dr. Amy Philbrook, Arup's Australasia Clean Fuels Technical Lead, as Project Manager. Part of the Port Augusta Green Energy Hub in South Australia, SM1 will hav

      10/8/24 7:00:00 AM ET
      $VSTE
      Building Products
      Industrials

    $VSTE
    Large Ownership Changes

    This live feed shows all institutional transactions in real time.

    See more
    • Amendment: SEC Form SC 13D/A filed by Vast Renewables Limited

      SC 13D/A - Vast Renewables Ltd (0001964630) (Subject)

      12/16/24 8:59:53 PM ET
      $VSTE
      Building Products
      Industrials
    • Amendment: SEC Form SC 13D/A filed by Vast Renewables Limited

      SC 13D/A - Vast Renewables Ltd (0001964630) (Subject)

      11/27/24 6:49:39 PM ET
      $VSTE
      Building Products
      Industrials
    • Amendment: SEC Form SC 13D/A filed by Vast Renewables Limited

      SC 13D/A - Vast Renewables Ltd (0001964630) (Subject)

      11/25/24 9:02:15 AM ET
      $VSTE
      Building Products
      Industrials

    $VSTE
    Financials

    Live finance-specific insights

    See more
    • Vast Renewables Limited Announces Operational and Financial Results for First Half of Fiscal 2024

      Operational and Funding Highlights Investment of €10.0 million from EDF Australia, a subsidiary of EDF GroupEquity investment from the Canberra Airport Group valued at USD $9.2 millionSubsequently announced funding agreements for up to AUD $40.0 million from the Australian and German governments to construct the Solar Methanol 1 project along with consortium partner Mabanaft in January 2024Closed business combination with Nabors Energy Transition Corp. on December 18, 2023 Financial Metrics for Six Months Ending December 31, 2023 Total revenue consisting of $768,000, made up of both customer and grant revenueAvailable cash and equivalents of $16.5 millionNet loss of ($281.5) million prima

      3/28/24 1:15:55 AM ET
      $VSTE
      Building Products
      Industrials

    $VSTE
    SEC Filings

    See more
    • SEC Form 25 filed by Vast Renewables Limited

      25 - Vast Renewables Ltd (0001964630) (Filer)

      5/15/25 4:06:44 PM ET
      $VSTE
      Building Products
      Industrials
    • SEC Form 6-K filed by Vast Renewables Limited

      6-K - Vast Renewables Ltd (0001964630) (Filer)

      5/6/25 4:16:28 PM ET
      $VSTE
      Building Products
      Industrials
    • SEC Form 6-K filed by Vast Renewables Limited

      6-K - Vast Renewables Ltd (0001964630) (Filer)

      3/26/25 8:26:56 AM ET
      $VSTE
      Building Products
      Industrials