• Live Feeds
    • Press Releases
    • Insider Trading
    • FDA Approvals
    • Analyst Ratings
    • Insider Trading
    • SEC filings
    • Market insights
  • Analyst Ratings
  • Alerts
  • Subscriptions
  • Settings
  • RSS Feeds
Quantisnow Logo
  • Live Feeds
    • Press Releases
    • Insider Trading
    • FDA Approvals
    • Analyst Ratings
    • Insider Trading
    • SEC filings
    • Market insights
  • Analyst Ratings
  • Alerts
  • Subscriptions
  • Settings
  • RSS Feeds
Dashboard
    Quantisnow Logo

    © 2025 quantisnow.com
    Democratizing insights since 2022

    Services
    Live news feedsRSS FeedsAlerts
    Company
    AboutQuantisnow PlusContactJobs
    Legal
    Terms of usePrivacy policyCookie policy

    Vista Gold 2024 Drilling Demonstrated Potential to Increase Mt Todd Mineral Reserves

    2/4/25 6:45:00 AM ET
    $VGZ
    Precious Metals
    Basic Materials
    Get the next $VGZ alert in real time by email

    Vista Gold Corp. (NYSE American and TSX:VGZ) announced that the results of its 2024 Mt Todd drilling program indicate the potential to increase gold mineral reserves in the Batman deposit and have successfully delineated the South Cross Lode ("SXL") over a 400 meter strike length. These drill results, and those from the 2020-2022 drilling program, will be included in the block model for the updated Mt Todd mineral resources estimate and new feasibility study.

    This press release features multimedia. View the full release here: https://www.businesswire.com/news/home/20250203295324/en/

    Figure 1. Phase 1 drill holes located within the current mineral resource shell and nearby holes from the 2020-2022 drilling program, showing the extension of the mineralized boundaries of the Batman core zone and relative position to the SXL zone. (Graphic: Business Wire)

    Figure 1. Phase 1 drill holes located within the current mineral resource shell and nearby holes from the 2020-2022 drilling program, showing the extension of the mineralized boundaries of the Batman core zone and relative position to the SXL zone. (Graphic: Business Wire)

    Phase 1 drilling, in conjunction with the 2020-2022 drilling program, provided information to extend the boundaries of the mineralization in the northern section of the Batman deposit. As shown in Figures 2, 3, and 4, drilling intercepted gold grades higher than estimated in the current block model and mineralization outside the limits of the current resource envelope. These results provide a basis to increase gold mineral resources in the area of the Batman deposit and convert a portion of the current mineral resources in this area into proven and probable mineral reserves.

    Phase 2 drilling defined the mineralized boundaries of the SXL over the strike length drilled and intersected high-grade sub-structures in the lower portion of thirteen holes, as shown in Figure 5. Additionally, the drill hole spacings are acceptable for the definition of measured and indicated mineral resources. Given the location of the SXL, these drilling results are expected to support the expansion of the mineral resource shell, with the potential to increase gold mineral reserves.

    Frederick H. Earnest, President and CEO of Vista, stated, "The results of our 2024 Mt Todd drill program are encouraging. We drilled 34 diamond core holes totaling 6,776 meters and every hole intercepted mineralization, with many holes in Phase 1 encountering higher grades than estimated in the current block model. The results indicate potential to upgrade previously defined mineral resources to mineral reserves and add new mineral resources from an extension to the Batman core zone. We believe we successfully accomplished the objectives of Phase 1 of the drill program.

    "The Phase 2 drilling results provide us with a much better understanding of the mineralization in the South Cross Lode. We encountered sheeted-vein mineralization consistent with the Batman deposit in the upper portions of the holes and regularly intersected more distinct, wider, and in many instances, higher grade veins deeper in the drill holes. The discovery of higher-grade and wider veins in the South Cross Lode is exciting and something that we believe merits more analysis."

    Mr. Earnest concluded, "The results from the 2024 and 2020-2022 drilling programs are expected to be included in the mineral resource block model that is currently being completed as part of the recently announced Mt Todd feasibility study. Our analysis of the results of these drilling programs indicates potential to convert mineral resources to mineral reserves at the Mt Todd gold project. The new mineral resource estimate is anticipated to be announced as part of the Mt Todd feasibility study, scheduled for completion mid-2025."

    Overview

    Phase 1

    The Phase 1 drilling was designed to augment historical data from reverse circulation ("RC") drilling and to generally improve the quality of geologic data in the northern part of the Batman deposit. The augmentation was completed through core drilling in the area just south of where drilling was completed in 2020-2022. Figure 1 shows the location of the Phase 1 and relevant 2020-2022 drill holes. The combined results of these drilling programs provide better definition of the mineralized boundaries, continuity, and limits in the north portion of the Batman deposit.

    During Phase 1, a total of 11 holes were drilled in the northern end of the Batman deposit including several holes drilled outside the limits of blocks defined in the current mineral resource model. All of the holes were collared within the limits of the pit design for the 2024 Feasibility Study (as defined below). Some holes exceeded our expectations in terms of the length of mineralized intercepts and gold grade, with many intercepts having returned gold grades that exceeded block model values in the current mineral resource model. This has occurred in the past as we have replaced RC drilling data with core drilling data and further demonstrates potential to increase gold mineral reserves in the Batman deposit. See Figures 2, 3, and 4.

    Phase 1 drilling is expected to result in an increase in mineral resources in the north end of the Batman deposit. Additionally, we expect this drilling to result in the conversion of inferred mineral resources to measured and indicated mineral resources within the 2024 Feasibility Study pit design. This provides further confidence that mineral reserves will be increased.

    The geological characteristics observed in these holes are consistent with the rest of the Batman deposit. While we believe that the metallurgical characteristics of material in the north extension will be very similar to the rest of the Batman deposit, metallurgical testing on samples from this phase of drilling is in progress.

    Phase 2

    Phase 2 drilling focused on the SXL, a narrower mineralized structure adjacent to the Batman deposit, with a defined strike length of over 400 meters. The 23 holes in Phase 2 delineated the SXL mineralization identified in the data from historical RC drilling holes. The data collected from this drilling define the mineralized boundaries of the SXL structure and demonstrate the potential to increase Mt Todd mineral resources. Phase 2 drilling was conducted with adequate density and spacing to define a portion of the expected increase as measured and indicated mineral resources. Hence, we anticipate that some shallower areas may be included in mineral reserves for the 2025 feasibility study.

    The drilling results revealed that the SXL is host to more discreet and, in certain zones, wider high-grade veins with thicknesses that exceed one meter, compared to the thinner, more closely spaced sheeted veins typically observed in the Batman deposit. While we anticipate that the SXL material will be amenable to processing using the same flowsheet as the ore from the Batman deposit, metallurgical testing on samples from the SXL is currently in progress.

    The results from the Phase 2 drilling intersected mineralized intervals both near the surface and at depth, with exceptionally higher grades observed at depths greater than 100 meters downhole. Please refer to Figure 5 for a long section illustrating the results of the SXL drilling. These findings indicate potential for expansion in the northeastern section of the current mineral resource shell, including areas of the block model that were previously unclassified due to low data density. The SXL structure offers opportunity to increase mineral reserves, as we believe it remains open at depth and along strike to the northeast, potentially connecting with other exploration targets identified in our 2020-2022 drilling program.

    Table 1. Summary of Phase 1 drill holes.

    Hole No.

    Grid Coordinates

    Survey Data

    Intersections*

     

    MGA94 Grid Easting

    MGA94 Grid Northing

    RL (m)

    Azimuth (°)

    Dip (°)

    Depth (m)

     

    From (m)

    To (m)

    Interval (m)

    True Thickness (m)

    Grade (g Au/t )

    VB24-001

    187320

    8435851

    162

    267.6

    -55.5

    362.2

     

    41.0

    51.0

    10.0

    7.8

    0.62

     

     

     

     

     

     

     

    and

    142.0

    199.5

    57.5

    46.0

    1.17

     

     

     

     

     

     

     

    and

    214.0

    238.0

    24.0

    19.4

    0.54

     

     

     

     

     

     

     

     

     

     

     

     

     

    VB24-002

    187251

    8435649

    171

    267.3

    -53.8

    341.3

     

    49.0

    67.0

    18.0

    14.2

    0.49

     

     

     

     

     

     

     

    and

    72.0

    85.0

    13.0

    10.3

    0.60

     

     

     

     

     

     

     

    and

    90.0

    98.0

    8.0

    6.4

    0.45

     

     

     

     

     

     

     

    and

    103.0

    117.0

    14.0

    11.5

    0.49

     

     

     

     

     

     

     

    and

    123.0

    152.0

    29.0

    23.5

    0.47

     

     

     

     

     

     

     

    and

    158.0

    180.0

    22.0

    17.6

    0.77

     

     

     

     

     

     

     

    and

    209.1

    217.0

    7.9

    6.4

    0.73

     

     

     

     

     

     

     

     

     

     

     

     

     

    VB24-003

    187271

    8435598

    171

    268.0

    -54.6

    368.3

     

    53.0

    60.0

    7.0

    5.4

    0.54

     

     

     

     

     

     

     

    and

    87.0

    107.9

    20.9

    16.1

    1.00

     

     

     

     

     

     

     

    and

    166.0

    175.0

    9.0

    7.0

    0.59

     

     

     

     

     

     

     

    and

    183.0

    219.0

    36.0

    28.0

    0.62

     

     

     

     

     

     

     

    and

    249.0

    267.0

    18.0

    14.1

    0.87

     

     

     

     

     

     

     

    and

    272.0

    280.0

    8.0

    6.3

    0.50

     

     

     

     

     

     

     

     

     

     

     

     

     

    VB24-004

    187236

    8435699

    171

    267.6

    -54.6

    233.4

     

    69.0

    102.0

    33.0

    25.5

    0.50

     

     

     

     

     

     

     

     

     

     

     

     

     

    VB24-005

    187267

    8435748

    167

    267.4

    -57.8

    290.5

     

    13.0

    22.0

    9.0

    6.8

    0.46

     

     

     

     

     

     

     

    and

    44.0

    49.0

    5.0

    3.8

    0.78

     

     

     

     

     

     

     

    and

    83.0

    88.0

    5.0

    3.8

    0.49

     

     

     

     

     

     

     

    and

    110.0

    144.0

    34.0

    26.1

    0.54

     

     

     

     

     

     

     

    and

    170.0

    209.0

    39.0

    30.3

    0.90

     

     

     

     

     

     

     

    and

    264.0

    276.0

    12.0

    9.5

    0.93

     

     

     

     

     

     

     

     

     

     

     

     

     

    VB24-006

    187259

    8435848

    152

    275.8

    -55.3

    212.0

     

    51.0

    88.0

    37.0

    29.6

    0.44

     

     

     

     

     

     

     

    and

    93.0

    102.0

    9.0

    7.2

    0.44

     

     

     

     

     

     

     

    and

    110.0

    113.0

    3.0

    2.4

    0.72

     

     

     

     

     

     

     

    and

    118.0

    127.0

    9.0

    7.2

    0.86

     

     

     

     

     

     

     

    and

    132.0

    145.0

    13.0

    10.4

    0.53

     

     

     

     

     

     

     

    and

    192.0

    195.0

    3.0

    2.5

    0.78

     

     

     

     

     

     

     

     

     

     

     

     

     

    VB24-007

    187264

    8435797

    154

    267.1

    -54.9

    220.7

     

    76.0

    101.0

    25.0

    20.1

    0.49

     

     

     

     

     

     

     

    and

    106.0

    121.0

    15.0

    12.2

    0.47

     

     

     

     

     

     

     

    and

    136.0

    145.0

    9.0

    7.4

    0.55

     

     

     

     

     

     

     

    and

    153.0

    162.0

    9.0

    7.4

    0.48

     

     

     

     

     

     

     

     

     

     

     

     

     

    VB24-008

    187346

    8435658

    158

    261.7

    -55.0

    422.4

     

    141.0

    145.0

    4.0

    3.1

    0.92

     

     

     

     

     

     

     

    and

    217.0

    221.2

    4.2

    3.4

    0.87

     

     

     

     

     

     

     

    and

    255.0

    277.0

    22.0

    17.8

    0.44

     

     

     

     

     

     

     

    and

    282.0

    294.0

    12.0

    9.9

    1.13

     

     

     

     

     

     

     

    and

    299.0

    305.0

    6.0

    5.0

    0.72

     

     

     

     

     

     

     

    and

    311.0

    381.0

    70.0

    58.8

    0.76

     

     

     

     

     

     

     

    including

    363.6

    381.0

    17.4

    14.6

    1.51

     

     

     

     

     

     

     

    and

    391.0

    394.0

    3.0

    0.8

    0.81

     

     

     

     

     

     

     

    and

    400.0

    410.0

    10.0

    0.5

    0.45

     

     

     

     

     

     

     

     

     

     

     

     

     

    VB24-009

    187191

    8435657

    171

    268.8

    -57.2

    210.3

     

    7.0

    25.0

    18.0

    13.6

    0.86

     

     

     

     

     

     

     

    and

    30.0

    42.0

    12.0

    8.9

    0.41

     

     

     

     

     

     

     

    and

    47.0

    115.0

    68.0

    50.5

    0.63

     

     

     

     

     

     

     

    and

    126.0

    131.6

    5.6

    4.2

    0.84

     

     

     

     

     

     

     

    and

    136.0

    150.0

    14.0

    10.5

    0.41

     

     

     

     

     

     

     

    and

    164.0

    168.1

    4.1

    3.1

    0.78

     

     

     

     

     

     

     

     

     

     

     

     

     

    VB24-010

    187139

    8435544

    162

    274.1

    -55.1

    144.8

     

    0.5

    9.0

    8.5

    6.8

    0.64

     

     

     

     

     

     

     

    and

    55.0

    67.0

    12.0

    9.6

    0.83

     

     

     

     

     

     

     

    and

    92.1

    124.0

    31.9

    25.7

    0.41

     

     

     

     

     

     

     

    and

    129.0

    134.0

    5.0

    4.0

    0.66

     

     

     

     

     

     

     

     

     

     

     

     

     

    VB24-011

    187190

    8435750

    178

    269.0

    -53.0

    105.4

     

    2.0

    9.0

    7.0

    5.6

    0.61

     

     

     

     

     

     

     

    and

    14.0

    21.0

    7.0

    5.7

    0.81

     

     

     

     

     

     

     

    and

    27.0

    42.0

    15.0

    12.2

    0.43

     

     

     

     

     

     

     

    and

    68.0

    72.0

    4.0

    3.2

    0.69

     

     

     

     

     

     

     

    and

    76.0

    79.0

    3.0

    2.4

    0.74

     

     

     

     

     

     

     

    and

    81.0

    85.0

    4.0

    3.3

    0.73

     

     

     

     

     

     

     

     

     

     

     

     

     

    *Sample Type - HQ 1/2 Core

    Table 2. Summary of Phase 2 drill holes – highlighting intercepts greater than 5.0 g Au/t.

    Hole No.

    Grid Coordinates

    Survey Data

    Intersections*

     

    MGA94 Grid Easting

    MGA94

    Grid

    Northing

    RL (m)

    Azimuth (°)

    Dip (°)

    Depth (m)

     

    From (m)

    To (m)

    Interval (m)

    True Thickness (m)

    Grade (g Au/t )

    VB24-012

    187535

    8435697

    139

    88.7

    -55.9

    122.3

     

    75.0

    78.0

    3.0

    1.0

    1.14

     

     

     

     

     

     

     

    and

    117.0

    122.3

    5.3

    1.8

    0.52

     

     

     

     

     

     

     

     

     

     

     

     

     

    VB24-013

    187824

    8435946

    142

    266.7

    -56.5

    174.0

     

    16.2

    24.0

    7.8

    4.7

    0.55

     

     

     

     

     

     

     

    and

    40.0

    49.0

    9.0

    5.3

    0.65

     

     

     

     

     

     

     

    and

    150.0

    154.8

    4.8

    2.8

    1.66

     

     

     

     

     

     

     

    including

    150.0

    151.0

    1.0

    0.6

    7.59

     

     

     

     

     

     

     

     

     

     

     

     

     

    VB24-014

    187806

    8435898

    140

    266.7

    -55.6

    139.4

     

    102.8

    112.2

    9.4

    5.8

    3.35

     

     

     

     

     

     

     

    including

    111.7

    112.2

    0.5

    0.3

    50.00

     

     

     

     

     

     

     

     

     

     

     

     

     

    VB24-015

    187598

    8435800

    139

    87.2

    -55.6

    161.3

     

    29.0

    35.0

    6.0

    2.4

    0.5

     

     

     

     

     

     

     

    and

    46.0

    50.0

    4.0

    1.6

    0.58

     

     

     

     

     

     

     

    and

    56.0

    59.0

    3.0

    1.2

    4.77

     

     

     

     

     

     

     

    and

    67.0

    75.0

    8.0

    3.3

    0.57

     

     

     

     

     

     

     

    and

    83.0

    92.0

    9.0

    3.8

    1.18

     

     

     

     

     

     

     

    and

    121.0

    123.3

    2.3

    1.0

    2.59

     

     

     

     

     

     

     

    and

    132.0

    140.0

    8.0

    3.5

    1.82

     

     

     

     

     

     

     

    including

    132.0

    133.0

    1.0

    0.6

    12.57

     

     

     

     

     

     

     

     

     

     

     

     

     

    VB24-016

    187757

    8435859

    137

    271.8

    -56.0

    173.7

     

    111.0

    120.0

    9.0

    5.0

    1.01

     

     

     

     

     

     

     

    and

    124.0

    130.0

    6.0

    3.3

    1.52

     

     

     

     

     

     

     

    including

    127.0

    128.0

    1.0

    0.6

    6.81

     

     

     

     

     

     

     

    and

    146.0

    168.0

    22.0

    12.1

    1.74

     

     

     

     

     

     

     

    including

    150.7

    153.0

    2.3

    1.2

    7.93

     

     

     

     

     

     

     

     

     

     

     

     

     

    VB24-017

    187577

    8435603

    137

    270.2

    -55.1

    151.2

     

    95.8

    130.0

    34.2

    20.3

    0.43

     

     

     

     

     

     

     

     

     

     

     

     

     

     

     

     

     

     

     

     

     

     

     

     

     

     

    VB24-018

    187660

    8435747

    137

    269.7

    -56.2

    150.2

     

    49.0

    73.0

    24.0

    13.3

    0.78

     

     

     

     

     

     

     

    including

    62.0

    64.2

    2.2

    1.2

    5.96

     

     

     

     

     

     

     

    and

    109.0

    126.0

    17.0

    9.4

    0.72

     

     

     

     

     

     

     

    including

    114.0

    126.0

    12.0

    6.6

    0.90

     

     

     

     

     

     

     

     

     

     

     

     

     

    VB24-019

    187518

    8435552

    142

    266.9

    -60.1

    141.6

     

    29.0

    36.6

    7.6

    3.8

    0.82

     

     

     

     

     

     

     

    and

    64.0

    72.0

    8.0

    4.0

    0.44

     

     

     

     

     

     

     

    and

    136.6

    141.6

    5.0

    2.5

    0.42

     

     

     

     

     

     

     

     

     

     

     

     

     

    VB24-020

    187569

    8435647

    136

    267.4

    -60.0

    141.0

     

    35.0

    45.1

    10.1

    5.1

    0.69

     

     

     

     

     

     

     

    and

    67.1

    77.0

    9.9

    5.0

    0.44

     

     

     

     

     

     

     

    and

    96.0

    102.4

    6.4

    3.3

    2.49

     

     

     

     

     

     

     

    and

    121.0

    130.0

    9.0

    4.6

    0.48

     

     

     

     

     

     

     

     

     

     

     

     

     

    VB24-021

    187798

    8436002

    143

    266.5

    -59.5

    154.7

     

    0.0

    4.0

    4.0

    2.0

    0.81

     

     

     

     

     

     

     

    and

    27.0

    36.0

    9.0

    4.6

    0.56

     

     

     

     

     

     

     

    and

    49.0

    56.0

    7.0

    3.6

    0.74

     

     

     

     

     

     

     

    and

    84.0

    114.0

    30.0

    14.9

    0.72

     

     

     

     

     

     

     

    and

    127.0

    135.0

    8.0

    4.1

    0.62

     

     

     

     

     

     

     

     

     

     

     

     

     

    VB24-022

    187788

    8435951

    141

    268.4

    -60.0

    151.4

     

    45.0

    50.0

    5.0

    2.5

    0.51

     

     

     

     

     

     

     

    and

    106.0

    110.0

    4.0

    2.0

    7.18

     

     

     

     

     

     

     

    including

    106.0

    107.0

    1.0

    0.5

    25.89

     

     

     

     

     

     

     

    and

    115.0

    125.0

    10.0

    4.8

    0.85

     

     

     

     

     

     

     

    and

    136.4

    140.2

    3.8

    2.0

    3.25

     

     

     

     

     

     

     

    including

    136.4

    137.0

    0.6

    0.3

    18.13

     

     

     

     

     

     

     

     

     

     

     

     

     

    VB24-023

    187817

    8436054

    147

    264.8

    -59.1

    155.4

     

    5.0

    13.9

    8.9

    4.4

    0.41

     

     

     

     

     

     

     

    and

    48.0

    53.4

    5.4

    2.6

    0.66

     

     

     

     

     

     

     

    and

    79.0

    93.0

    14.0

    6.7

    0.67

     

     

     

     

     

     

     

    and

    97.7

    104.0

    6.3

    3.1

    0.69

     

     

     

     

     

     

     

     

     

     

     

     

     

    VB24-024

    187597

    8435750

    140

    88.9

    -59.5

    89.1

     

    9.0

    14.0

    5.0

    1.8

    2.18

     

     

     

     

     

     

     

    including

    12.9

    14.0

    1.1

    0.6

    6.37

     

     

     

     

     

     

     

    and

    20.0

    24.0

    4.0

    1.4

    0.61

     

     

     

     

     

     

     

    and

    38.1

    49.0

    10.9

    3.9

    0.98

     

     

     

     

     

     

     

    and

    74.0

    84.2

    10.2

    3.7

    0.59

     

     

     

     

     

     

     

     

     

     

     

     

     

    VB24-025

    187623

    8435695

    138

    268.8

    -60.4

    239.4

     

    22.5

    30.5

    8.0

    3.9

    1.20

     

     

     

     

     

     

     

    including

    27.9

    30.5

    2.7

    1.3

    3.22

     

     

     

     

     

     

     

    and

    46.0

    52.0

    6.0

    3.0

    0.50

     

     

     

     

     

     

     

    and

    60.0

    63.8

    3.8

    1.9

    0.50

     

     

     

     

     

     

     

    and

    70.0

    91.0

    21.0

    10.4

    0.60

     

     

     

     

     

     

     

    including

    70.0

    71.0

    1.0

    0.5

    5.57

     

     

     

     

     

     

     

    and

    96.0

    106.0

    10.0

    5.0

    0.61

     

     

     

     

     

     

     

    and

    119.0

    122.4

    3.4

    1.7

    0.57

     

     

     

     

     

     

     

    and

    142.5

    163.3

    20.8

    10.9

    1.96

     

     

     

     

     

     

     

    including

    147.0

    150.9

    3.9

    2.0

    3.06

     

     

     

     

     

     

     

    including

    155.0

    156.0

    1.0

    0.5

    9.19

     

     

     

     

     

     

     

    including

    160.0

    163.3

    3.3

    1.7

    4.93

     

     

     

     

     

     

     

    and

    192.0

    199.0

    7.0

    3.6

    0.98

     

     

     

     

     

     

     

    including

    192.0

    192.4

    0.4

    0.2

    12.56

     

     

     

     

     

     

     

    and

    205.0

    211.4

    6.3

    3.3

    0.66

     

     

     

     

     

     

     

     

     

     

     

     

     

    VB24-026

    187416

    8435503

    149

    271.2

    -60.1

    119.5

     

    41.2

    43.6

    2.4

    1.2

    0.93

     

     

     

     

     

     

     

     

     

     

     

     

     

    VB24-027

    187547

    8435603

    140

    268.5

    -60.3

    121.1

     

    11.3

    14.0

    2.8

    1.4

    0.66

     

     

     

     

     

     

     

    and

    37.0

    52.0

    15.0

    7.5

    0.77

     

     

     

     

     

     

     

    and

    59.7

    62.0

    2.3

    1.2

    2.09

     

     

     

     

     

     

     

    and

    68.0

    91.0

    23.0

    11.9

    0.93

     

     

     

     

     

     

     

    including

    72.2

    76.0

    3.8

    2.0

    2.84

     

     

     

     

     

     

     

    and

    102.0

    107.0

    5.0

    2.7

    0.82

     

     

     

     

     

     

     

     

     

     

     

     

     

    VB24-028

    187629

    8435749

    138

    270.3

    -60.0

    125.5

     

    25.0

    37.0

    12.0

    6.5

    0.96

     

     

     

     

     

     

     

    including

    31.0

    32.2

    1.2

    0.6

    3.66

     

     

     

     

     

     

     

    and

    71.2

    75.2

    4.0

    2.0

    2.49

     

     

     

     

     

     

     

    including

    74.0

    75.2

    1.2

    0.6

    6.82

     

     

     

     

     

     

     

    and

    84.0

    91.0

    7.0

    3.4

    0.99

     

     

     

     

     

     

     

    including

    84.0

    85.0

    1.0

    0.5

    3.24

     

     

     

     

     

     

     

    and

    120.4

    124.4

    4.1

    2.0

    2.48

     

     

     

     

     

     

     

    including

    123.5

    124.0

    1.0

    0.5

    4.14

     

     

     

     

     

     

     

     

     

     

     

     

     

    VB24-029

    187548

    8435558

    140

    264.3

    -60.8

    212.4

     

    18.2

    20.0

    1.9

    0.9

    0.96

     

     

     

     

     

     

     

    and

    62.0

    66.0

    4.0

    2.0

    0.45

     

     

     

     

     

     

     

     

     

     

     

     

     

    VB24-030

    187594

    8435701

    138

    270.4

    -60.1

    203.1

     

    92.2

    97.0

    4.8

    2.4

    1.11

     

     

     

     

     

     

     

    including

    92.2

    93.0

    0.8

    0.4

    4.07

     

     

     

     

     

     

     

    and

    142.0

    146.2

    4.2

    2.1

    0.64

    VB24-031

    187719

    8435853

    134

    268.6

    -60.1

    230.3

     

    34.3

    39.3

    5.0

    2.5

    0.81

     

     

     

     

     

     

     

    and

    53.4

    58.2

    4.8

    2.3

    0.68

     

     

     

     

     

     

     

    and

    63.1

    73.0

    9.9

    4.8

    0.43

     

     

     

     

     

     

     

    including

    63.1

    64.1

    1.0

    0.5

    2.21

     

     

     

     

     

     

     

    and

    84.0

    93.0

    9.0

    4.4

    1.01

     

     

     

     

     

     

     

    including

    88.0

    89.1

    1.0

    0.5

    6.49

     

     

     

     

     

     

     

    and

    137.0

    149.0

    12.0

    6.2

    0.72

     

     

     

     

     

     

     

    and

    186.0

    196.0

    10.0

    5.3

    0.45

     

     

     

     

     

     

     

    and

    212.0

    220.0

    8.0

    4.3

    0.56

     

     

     

     

     

     

     

    including

    212.0

    212.9

    0.9

    0.4

    3.92

     

     

     

     

     

     

     

     

     

     

     

     

     

    VB24-032

    187675

    8435809

    133

    271.1

    -60.4

    176.3

     

    3.8

    14.0

    10.2

    5.2

    0.56

     

     

     

     

     

     

     

    including

    13.0

    14.0

    1.0

    0.5

    2.11

     

     

     

     

     

     

     

    and

    21.0

    31.2

    10.2

    5.2

    0.46

     

     

     

     

     

     

     

    and

    35.5

    48.0

    12.5

    6.4

    0.73

     

     

     

     

     

     

     

    and

    61.0

    66.0

    5.0

    2.5

    0.50

     

     

     

     

     

     

     

    and

    96.1

    102.1

    5.9

    3.0

    1.28

     

     

     

     

     

     

     

    including

    96.1

    96.7

    0.6

    0.3

    6.36

     

     

     

     

     

     

     

    and

    109.0

    112.0

    3.0

    1.5

    2.06

     

     

     

     

     

     

     

    and

    121.1

    124.1

    3.0

    1.5

    4.13

     

     

     

     

     

     

     

    including

    123.5

    124.1

    0.6

    0.3

    18.34

     

     

     

     

     

     

     

    and

    142.9

    144.0

    1.1

    0.5

    16.00

     

     

     

     

     

     

     

    including

    142.9

    143.2

    0.3

    0.1

    65.42

     

     

     

     

     

     

     

    and

    167.9

    176.0

    8.1

    4.1

    0.51

     

     

     

     

     

     

     

     

     

     

     

     

     

    VB24-033

    187380

    8435449

    157

    268.6

    -62.1

    293.8

     

    109.0

    152.3

    43.3

    29.9

    0.82

     

     

     

     

     

     

     

    including

    134.0

    135.0

    1.0

    0.7

    7.55

     

     

     

     

     

     

     

    and

    157.2

    170.0

    12.8

    8.8

    0.74

     

     

     

     

     

     

     

    and

    182.1

    213.0

    30.9

    21.3

    0.53

     

     

     

     

     

     

     

    and

    232.0

    241.0

    9.0

    6.2

    0.56

     

     

     

     

     

     

     

    and

    260.2

    270.0

    9.8

    6.8

    1.00

     

     

     

     

     

     

     

    including

    268.0

    269.0

    1.0

    0.7

    6.12

     

     

     

     

     

     

     

     

     

     

     

     

     

    VB24-034

    187822

    8436002

    146

    268.9

    -60.4

    238.1

     

    94.0

    105.3

    11.3

    5.3

    0.96

     

     

     

     

     

     

     

    and

    125.4

    148.8

    23.5

    10.9

    0.57

     

     

     

     

     

     

     

    and

    156.0

    185.0

    29.0

    13.4

    1.55

     

     

     

     

     

     

     

    including

    172.1

    174.0

    1.9

    0.9

    8.01

     

     

     

     

     

     

     

    and

    202.1

    208.6

    6.5

    3.0

    1.28

     

     

     

     

     

     

     

    and

    226.0

    230.1

    4.1

    1.9

    1.45

     

     

     

     

     

     

     

    including

    229.6

    230.1

    0.5

    0.2

    7.53

     

     

     

     

     

     

     

     

     

     

     

     

     

    *Sample Type - HQ 1/2 Core.

    Highlighting intercepts greater than 5.0 g Au/t.

    Notes:
    (i) Results are based on ore grade 50g fire assay for Au.
    (ii) Intersections are from diamond core drilling with half-core samples.
    (iii) Core sample intervals were constrained by geology, alteration or structural boundaries, intervals varied between a minimum of 0.2 metres to a maximum of 1.2 metres.
    (iv) Weighted mean grades have been calculated on a 0.4g/t Au lower cut-off grade with no upper cut-off grade applied, and maximum internal waste of 4.0 metres.
    (v) All intersections are downhole intervals and reflect approximate true widths.
    (vi) All downhole deviations have been verified by downhole gyro.
    (vii) Collar coordinates surveyed by Cross Solutions Pty Ltd. Using survey grade GNSS RTK equipment.
    (viii) The Company maintains a Quality Control and Quality Assurance procedures (QA/QC) program in accordance with the requirements and guidelines of CIM Standards of Disclosure for Mineral Projects.
    (ix) The independent laboratory responsible for the assays was North Australian Laboratories NAL Pty Ltd, Pine Creek, NT.

    QA/QC Protocols and Sampling Procedure

    All sampling was conducted under the supervision of the Company's geologists and the chain of custody from Mt Todd facilities to the independent sample preparation facility at North Australian Laboratories Pty Ltd ("NAL") in Pine Creek, NT was continuously monitored.

    • The core is marked, geologically logged, geotechnically logged, photographed, and sawn into halves using diamond saws. One-half is placed into pre-numbered sample bags as per industry standards with sample lengths between a minimum of 0.2 meters to a maximum of 1.2 meters. The other half of the core is retained for future reference by the Company. The only exception to this is when a portion of the remaining core has been flagged for use in metallurgical testwork.
    • Following common industry practices, blanks and standards are also placed in plastic bags for inclusion in the shipment. A reference blank or a standard is inserted at a minimum ratio of 1 in 10 and additional blank samples are added at suspected high-grade intervals to monitor assay accuracy. Standard reference material is sourced from Ore Research & Exploration Pty Ltd and provided in 60-gram sealed packets. When a sequence of four samples is completed, they are placed in a shipping bag and tied closed. All of these samples are kept in a secure area on-site until sealed crated for shipping. This ensures a clear chain of custody from collection to analysis, minimizing the risk of sample errors.
    • Vista employees ship and transport the sealed crates to the NAL. At the lab, the samples are pulverized and split down to 50-gram assay samples prior to assaying. The industry-standard 3 assay-ton fire assay is followed by an atomic absorption (AA) finish.
    • Vista conducts regular internal reviews of drilling data, where geologists validate the results against QA/QC findings before finalizing reports.
    • For the purposes of this release, mineralized intervals are defined as runs of mineralization with a maximum internal waste of 4.0 meters.
    • NAL is independent of Vista.

    It is the opinion of the QP (as defined below) that the sample preparation methods and quality control measures employed before the dispatch of samples to an analytical or testing laboratory ensured the validity and integrity of samples taken.

    About Vista Gold Corp.

    Vista holds the Mt Todd gold project, a ready-to-build development-stage gold deposit located in the Tier-1 mining jurisdiction of Northern Territory, Australia. Vista is positioning Mt Todd as a leading development opportunity within the gold sector. Mt Todd offers significant scale, development optionality, growth opportunities, advanced local infrastructure, community support, and demonstrated economic feasibility. All major environmental and operating permits necessary to initiate development of Mt Todd are in place.

    Vista's strategy is to advance Mt Todd in ways that efficiently position the project for development while exercising the discipline necessary to best realize value at the right time. Vista believes its strategy of advancing Mt Todd in this manner will deliver a more fully valued project to its shareholders.

    For further information about Vista or Mt Todd, please contact Pamela Solly, Vice President of Investor Relations, at (720) 981-1185 or visit the Company's website at www.vistagold.com.

    Qualified Person

    Maria Vallejo, Vista's Director of Projects and Technical Services, a Qualified Person ("QP") as defined by Item 1300 of Regulation S-K under the Securities Exchange Act of 1934, as amended, and Canadian National Instrument 43-101 – Standards of Disclosure for Mineral Projects, has verified the data underlying the information contained herein and has approved this press release. The information contained in this press release is provided as a summary of the 2024 drilling program for the Mt Todd project.

    Technical Studies

    For more information on the Company's March 2024 Feasibility Study (the "2024 Feasibility Study"), including with respect to mineral resource and mineral reserve estimates, please refer to the technical report summary entitled "S‑K 1300 Technical Report Summary – Mt Todd Gold Project – 50,000 tpd Feasibility Study – Northern Territory, Australia" with an effective date of March 12, 2024 and an issue date of March 14, 2024 available at www.sec.gov and, for Canadian purposes, the technical report entitled "National Instrument 43-101 Technical Report – Mt Todd Gold Project – 50,000 tpd Feasibility Study – Northern Territory, Australia" with an effective date of March 12, 2024 and an issue date of April 16, 2024 under Vista's profile at www.sedarplus.ca. For more information on the Company's 2024 drilling results, please refer to the Company's previous 2024 and 2025 drilling news releases available under the Company's profile at www.sedarplus.ca.

    Forward Looking Statements

    This news release contains forward-looking statements within the meaning of the U.S. Securities Act of 1933, as amended, and U.S. Securities Exchange Act of 1934, as amended, and forward-looking information within the meaning of Canadian securities laws. All statements, other than statements of historical facts, included in this news release that address activities, events or developments that the Company expects or anticipate will or may occur in the future, including such things as the Company's belief that the 2024 Mt Todd drilling program is expected to increase gold mineral reserves in the Batman deposit; the Company's belief that the Phase 1 and Phase 2 drill results and the drill results from the 2020–2022 drilling program will be included in the updated Mt Todd mineral resources estimate and new feasibility study; statements regarding expectations that Vista will, on the basis of 2024 drilling results, increase its mineral resource and mineral reserve estimates, convert mineral resources to mineral reserves and expand the mineral resource shell, all with respect to the Batman deposit; the Company's choice to announce the new mineral resource estimate as part of the Mt Todd feasibility study, scheduled for completion mid-2025; the Company's belief that the intercepts that returned gold grades that exceeded block model values in the current mineral resource model further demonstrate potential to increase gold mineral reserves; Vista's belief that the metallurgical characteristics of the material in the north extension will be very similar to the rest of the Batman deposit; the Company's belief that shallower areas of the SXL may be included in mineral reserves for the 2025 feasibility study; the Company's belief that the SXL material will be amenable to processing using the same flowsheet as the ore from the Batman deposit; the Company's belief that the findings from Phase 2 drilling indicate promising potential for expansion in the northeastern section of the current resource shell, including areas of the block model that were previously unclassified due to low data density; the Company's belief that the SXL structure remains open at depth and along the strike to the northeast, potentially connecting with other exploration targets identified in our 2020-2022 drilling program; the Company's belief that Northern Territory, Australia is a Tier 1 mining friendly jurisdiction; the Company's belief that it is positioning Mt Todd as a leading development opportunity within the gold sector; the Company's belief that Mt Todd offers significant scale, development optionality, growth opportunities, advanced local infrastructure, community support, and demonstrated economic feasibility; the Company's belief that all major environmental and operating permits necessary to initiate development of Mt Todd are in place; the Company's belief that Mt Todd is a ready-to-build development stage gold deposit; the Company's strategy to advance Mt Todd in ways that efficiently position the Project for development while exercising the discipline necessary will best realize value at the right time; and the Company's belief that advancing Mt Todd in this manner will deliver a more fully valued project to its shareholders are forward-looking statements and forward-looking information. The material factors and assumptions used to develop the forward-looking statements and forward-looking information contained in this news release include the following: the Company's forecasts and expected cash flows; the Company's projected capital and operating costs; the Company's expectations regarding mining and metallurgical recoveries; mine life and production rates; that laws or regulations impacting mine development or mining activities will remain consistent; the Company's approved business plans, mineral resource and reserve estimates and results of preliminary economic assessments; preliminary feasibility studies and feasibility studies on the Company's projects, if any; the Company's experience with regulators; political and social support of the mining industry in Australia; the Company's experience and knowledge of the Australian mining industry and expectations of economic conditions and the price of gold. When used in this news release, the words "optimistic," "potential," "indicate," "expect," "intend," "hopes," "believe," "may," "will," "if," "anticipate" and similar expressions are intended to identify forward-looking statements and forward-looking information. These statements involve known and unknown risks, uncertainties and other factors which may cause the actual results, performance, or achievements of the Company to be materially different from any future results, performance or achievements expressed or implied by such statements. Such factors include, among others, uncertainty of resource and reserve estimates, uncertainty as to the Company's future operating costs and ability to raise capital; risks relating to cost increases for capital and operating costs; risks of shortages and fluctuating costs of equipment or supplies; risks relating to fluctuations in the price of gold; the inherently hazardous nature of mining-related activities; potential effects on our operations of environmental regulations in the countries in which it operates; risks due to legal proceedings; risks relating to political and economic instability in certain countries in which it operates; uncertainty as to the results of bulk metallurgical test work; and uncertainty as to completion of critical milestones for Mt Todd; as well as those factors discussed under the headings "Note Regarding Forward-Looking Statements" and "Risk Factors" in the Company's latest Annual Report on Form 10-K as filed in March 2024, subsequent Quarterly Reports on Form 10-Q, and other documents filed with the U.S. Securities and Exchange Commission and Canadian securities regulatory authorities. Although Vista has attempted to identify important factors that could cause actual results to differ materially from those described in forward-looking statements and forward-looking information, there may be other factors that cause results not to be as anticipated, estimated or intended. Except as required by law, Vista assumes no obligation to publicly update any forward-looking statements or forward-looking information, whether as a result of new information, future events or otherwise.

    View source version on businesswire.com: https://www.businesswire.com/news/home/20250203295324/en/

    Pamela Solly

    Vice President of Investor Relations

    (720) 981-1185

    Get the next $VGZ alert in real time by email

    Chat with this insight

    Save time and jump to the most important pieces.

    Recent Analyst Ratings for
    $VGZ

    DatePrice TargetRatingAnalyst
    7/26/2021$3.25 → $3.00Buy
    HC Wainwright & Co.
    More analyst ratings

    $VGZ
    Analyst Ratings

    Analyst ratings in real time. Analyst ratings have a very high impact on the underlying stock. See them live in this feed.

    See more
    • HC Wainwright & Co. reiterated coverage on Vista Gold with a new price target

      HC Wainwright & Co. reiterated coverage of Vista Gold with a rating of Buy and set a new price target of $3.00 from $3.25 previously

      7/26/21 9:34:15 AM ET
      $VGZ
      Precious Metals
      Basic Materials

    $VGZ
    Press Releases

    Fastest customizable press release news feed in the world

    See more
    • Vista Gold Announces First Quarter 2025 Financial Results

      Vista Gold Corp. (NYSE American and TSX:VGZ) today announced its unaudited financial results for the quarter ended March 31, 2025, with cash totaling $15.0 million at quarter-end. All dollar amounts in this press release are in U.S. dollars. Frederick H. Earnest, President and CEO of Vista, said, "During the quarter, we made significant progress toward achieving our 2025 corporate goals. We continued to advance the 15,000 tonne per day Mt Todd feasibility study as planned, completed 1,264 consecutive days without a lost time accident, and ended the quarter with a strong cash position. We remain focused on delivering the feasibility study by mid-2025, prioritizing the efficient use of our c

      5/1/25 5:01:00 PM ET
      $VGZ
      Precious Metals
      Basic Materials
    • Vista Gold Announces Voting Results from Annual General and Special Meeting of Shareholders

      Vista Gold Corp. ("Vista" or the "Company") (NYSE American and TSX:VGZ) today announced the voting results from its annual general and special meeting of shareholders held on Tuesday, April 29, 2025 (the "AGM" or "Meeting"). A total of 70,182,716 common shares in the capital of the Company ("Common Shares") were represented at the meeting, being 56.39% of the Common Shares. Detailed results for the ballot votes for the election of directors are as follows: Proposal Votes For % Votes Withheld % Election of John M. Clark as Director 93.03 6.97 Election of Frederick H. Earnest as Director 92.37 7.63 Election of Deborah J. Friedman as Director 93.00 7.

      4/29/25 5:01:00 PM ET
      $VGZ
      Precious Metals
      Basic Materials
    • Vista Gold to Present at the Mining Forum Europe 2025 Conference

      Vista Gold Corp. (NYSE American and TSX:VGZ) announced today that Frederick H. Earnest, President and CEO of Vista, will be speaking at the Mining Forum Europe 2025 conference in Zurich, Switzerland. Mr. Earnest's presentation is scheduled for Wednesday, April 2, at 1:10 pm Zurich time (5:10 a.m. MDT or 7:10 a.m. EDT). The session will be live-streamed and available for on-demand viewing starting Friday, April 4. It can be accessed on the Company's website at www.vistagold.com. Additionally, Vista's management team will host a series of meetings with institutional investors and others during the conference from March 31 to April 2, 2025. Presentation Webcast Link: https://europe.miningfor

      3/28/25 12:55:00 PM ET
      $VGZ
      Precious Metals
      Basic Materials

    $VGZ
    Large Ownership Changes

    This live feed shows all institutional transactions in real time.

    See more
    • SEC Form SC 13D filed by Vista Gold Corp

      SC 13D - VISTA GOLD CORP (0000783324) (Subject)

      3/13/23 4:55:23 PM ET
      $VGZ
      Precious Metals
      Basic Materials
    • SEC Form SC 13G/A filed by Vista Gold Corp (Amendment)

      SC 13G/A - VISTA GOLD CORP (0000783324) (Subject)

      1/10/23 9:57:28 AM ET
      $VGZ
      Precious Metals
      Basic Materials
    • SEC Form SC 13G filed by Vista Gold Corp

      SC 13G - VISTA GOLD CORP (0000783324) (Subject)

      6/10/22 11:43:41 AM ET
      $VGZ
      Precious Metals
      Basic Materials

    $VGZ
    Insider Trading

    Insider transactions reveal critical sentiment about the company from key stakeholders. See them live in this feed.

    See more
    • VP, Investor Relations Solly Pamela A. converted options into 82,583 shares and covered exercise/tax liability with 33,069 shares, increasing direct ownership by 22% to 271,945 units (SEC Form 4)

      4 - VISTA GOLD CORP (0000783324) (Issuer)

      3/6/25 8:57:42 PM ET
      $VGZ
      Precious Metals
      Basic Materials
    • CFO Tobler Douglas L. converted options into 172,668 shares and covered exercise/tax liability with 81,237 shares, increasing direct ownership by 27% to 433,333 units (SEC Form 4)

      4 - VISTA GOLD CORP (0000783324) (Issuer)

      3/6/25 8:47:39 PM ET
      $VGZ
      Precious Metals
      Basic Materials
    • President & CEO Earnest Frederick Hume converted options into 333,917 shares and covered exercise/tax liability with 154,117 shares, increasing direct ownership by 9% to 2,150,539 units (SEC Form 4)

      4 - VISTA GOLD CORP (0000783324) (Issuer)

      3/6/25 8:38:09 PM ET
      $VGZ
      Precious Metals
      Basic Materials

    $VGZ
    Insider Purchases

    Insider purchases reveal critical bullish sentiment about the company from key stakeholders. See them live in this feed.

    See more
    • Tobler Douglas L. bought $1,690 worth of shares (3,500 units at $0.48), increasing direct ownership by 1% to 341,902 units (SEC Form 4)

      4 - VISTA GOLD CORP (0000783324) (Issuer)

      3/21/24 5:05:07 PM ET
      $VGZ
      Precious Metals
      Basic Materials
    • Stevenson Tracy Austin bought $7,324 worth of shares (20,000 units at $0.37), increasing direct ownership by 5% to 453,199 units (SEC Form 4)

      4 - VISTA GOLD CORP (0000783324) (Issuer)

      1/11/24 2:26:05 PM ET
      $VGZ
      Precious Metals
      Basic Materials
    • Tobler Douglas L. bought $1,558 worth of shares (3,500 units at $0.45), increasing direct ownership by 1% to 282,088 units (SEC Form 4) (Amendment)

      4/A - VISTA GOLD CORP (0000783324) (Issuer)

      12/21/23 2:06:12 PM ET
      $VGZ
      Precious Metals
      Basic Materials

    $VGZ
    Financials

    Live finance-specific insights

    See more
    • Vista Gold Announces First Quarter 2025 Financial Results

      Vista Gold Corp. (NYSE American and TSX:VGZ) today announced its unaudited financial results for the quarter ended March 31, 2025, with cash totaling $15.0 million at quarter-end. All dollar amounts in this press release are in U.S. dollars. Frederick H. Earnest, President and CEO of Vista, said, "During the quarter, we made significant progress toward achieving our 2025 corporate goals. We continued to advance the 15,000 tonne per day Mt Todd feasibility study as planned, completed 1,264 consecutive days without a lost time accident, and ended the quarter with a strong cash position. We remain focused on delivering the feasibility study by mid-2025, prioritizing the efficient use of our c

      5/1/25 5:01:00 PM ET
      $VGZ
      Precious Metals
      Basic Materials
    • Vista Gold Corp. Announces 2024 Financial Results

      Vista Gold Corp. (NYSE American and TSX:VGZ) ("Vista" or the "Company") today announced its audited financial results for the year ended December 31, 2024, with cash totaling $16.9 million at year-end. All dollar amounts in this press release are in U.S. dollars. Frederick H. Earnest, President and CEO of Vista, stated, "Our achievements in 2024 underscore our commitment to creating greater value for our shareholders and positioning Vista and Mt Todd for long-term success. Receipt of the remaining proceeds under our 2023 royalty transaction enabled us to advance Mt Todd work programs and end the year with a strong balance sheet. We efficiently completed the 2024 drilling program and sever

      2/28/25 5:01:00 PM ET
      $VGZ
      Precious Metals
      Basic Materials
    • Vista Gold Corp. Announces Third Quarter 2024 Financial Results

      Vista Gold Corp. (TSX:VGZ) ("Vista" or the "Company") today announced its unaudited financial results for the quarter ended September 30, 2024, with cash totaling $19.0 million at quarter-end. All dollar amounts in this press release are in U.S. dollars. Frederick H. Earnest, President and CEO of Vista, said, "During the third quarter, we continued to successfully execute our corporate strategy and demonstrated significant progress toward achieving our 2024 goals and objectives. We announced positive results from our ongoing drilling program, advanced technical studies to support our evaluation of an alternative scale development option at Mt Todd, continued to prioritize low overall spend

      10/23/24 5:01:00 PM ET
      $VGZ
      Precious Metals
      Basic Materials

    $VGZ
    SEC Filings

    See more
    • Vista Gold Corp filed SEC Form 8-K: Results of Operations and Financial Condition, Financial Statements and Exhibits

      8-K - VISTA GOLD CORP (0000783324) (Filer)

      5/1/25 5:04:38 PM ET
      $VGZ
      Precious Metals
      Basic Materials
    • SEC Form 10-Q filed by Vista Gold Corp

      10-Q - VISTA GOLD CORP (0000783324) (Filer)

      5/1/25 4:05:20 PM ET
      $VGZ
      Precious Metals
      Basic Materials
    • Vista Gold Corp filed SEC Form 8-K: Submission of Matters to a Vote of Security Holders, Regulation FD Disclosure, Financial Statements and Exhibits

      8-K - VISTA GOLD CORP (0000783324) (Filer)

      4/29/25 5:18:36 PM ET
      $VGZ
      Precious Metals
      Basic Materials

    $VGZ
    Leadership Updates

    Live Leadership Updates

    See more
    • Vista Gold Corp. Appoints Michel (Mike) Sylvestre to the Board of Directors

      Vista Gold Corp. (TSX:VGZ) ("Vista" or the "Company") today announced that it has appointed Mr. Michel (Mike) Sylvestre as an independent director of the Company and increased the size of its Board of Directors from five to six. Mr. Sylvestre has also been appointed to the Health, Safety, Environment and Social Responsibility Committee of the Board. Mr. Sylvestre is a successful mining executive with over 45 years of international and domestic industry experience with major, mid-tier and junior companies. He retired in November 2022 from his position as Senior Vice President Americas at Kinross Gold Corp. Mr. Sylvestre is a director of Hochschild Mining PLC and Nickel Creek Platinum Corp.

      2/15/24 6:40:00 AM ET
      $VGZ
      Precious Metals
      Basic Materials
    • Vista Gold Corp. Announces Voting Results from Annual General Meeting and Appoints Tracy A. Stevenson as New Chair of the Board

      Vista Gold Corp. ("Vista" or the "Company") (TSX:VGZ) today announced the voting results from its annual general and special meeting of shareholders held on Thursday, April 27, 2023 (the "AGM" or "Meeting"). A total of 68,925,603 common shares in the capital of the Company ("Common Shares") were represented at the meeting, being 57.93% of the Common Shares. Detailed results for the ballot votes for the election of directors are as follows: Proposal Votes For % Votes Withheld % Election of John M. Clark as Director 97.44 2.56 Election of Frederick H. Earnest as Director 96.76 3.24 Election of W. Durand Eppler as Director

      4/27/23 6:12:00 PM ET
      $VGZ
      Precious Metals
      Basic Materials
    • Vista Gold Announces Retirement of Board Members at 2023 Annual Meeting of Shareholders

      Vista Gold Corp. (TSX:VGZ) ("Vista" or the "Company") today announced that Michael B. "Mike" Richings, Chair and non-executive director, and C. Thomas "Tom" Ogryzlo, non-executive director, intend to retire upon the completion of their terms at Vista's upcoming 2023 Annual General and Special Meeting of Shareholders (the "AGM") to be held on April 27, 2023. Effective as of the conclusion of the AGM, the Board of Directors has approved decreasing the number of directors of the Company from seven to five. "On behalf of the Board and management team, I would like to thank Messrs. Richings and Ogryzlo for their leadership and commitment to the Company for more than two decades," said Frederick

      3/14/23 6:40:00 AM ET
      $VGZ
      Precious Metals
      Basic Materials