• Live Feeds
    • Press Releases
    • Insider Trading
    • FDA Approvals
    • Analyst Ratings
    • Insider Trading
    • SEC filings
    • Market insights
  • Analyst Ratings
  • Alerts
  • Subscriptions
  • Settings
  • RSS Feeds
Quantisnow Logo
  • Live Feeds
    • Press Releases
    • Insider Trading
    • FDA Approvals
    • Analyst Ratings
    • Insider Trading
    • SEC filings
    • Market insights
  • Analyst Ratings
  • Alerts
  • Subscriptions
  • Settings
  • RSS Feeds
PublishGo to App
    Quantisnow Logo

    © 2026 quantisnow.com
    Democratizing insights since 2022

    Services
    Live news feedsRSS FeedsAlertsPublish with Us
    Company
    AboutQuantisnow PlusContactJobsAI superconnector for talent & startupsNEWLLM Arena
    Legal
    Terms of usePrivacy policyCookie policy

    Vista Gold Announces Interim Phase 2 Drilling Results at Mt Todd Including Vein Intercepts with Grade – Thicknesses Greater than 20 g Au/t - m

    9/24/24 6:40:00 AM ET
    $VGZ
    Precious Metals
    Basic Materials
    Get the next $VGZ alert in real time by email

    Vista Gold Corp. (TSX:VGZ) ("Vista" or the "Company") today announced interim results from Phase 2 of its 2024 drilling program at the Company's Mt Todd gold project ("Mt Todd" or the "Project") located in Northern Territory, Australia. Phase 2 drilling commenced in July 2024 with near-surface drilling in the South Cross Lode zone (the "SXL"), a known mineralized structure with high-grade intercepts that intersects the Batman deposit and extends up to 400 meters northeast.

    This press release features multimedia. View the full release here: https://www.businesswire.com/news/home/20240923441188/en/

    Figure 1: Plan view of the Mt Todd as-built terrain showing Phase 2 drill hole locations with respective orientation to date. (Graphic: Business Wire)

    Figure 1: Plan view of the Mt Todd as-built terrain showing Phase 2 drill hole locations with respective orientation to date. (Graphic: Business Wire)

    Drill Hole Highlights

    VB24-014 – 9.4 meters @ 3.35 grams of gold per tonne ("g Au/t") from 102.8 meters down hole, including

    • 0.5 meters @ 50.0 g Au/t from 111.7 meters down hole (grade thickness of 25.0 g Au/t per meter ("g Au/t – m")

    VB24-015 – Returned three intervals of greater than 1 g Au/t, ranging 3 – 9 meters thick, including

    • 8.0 meters at @ 1.82 g Au/t from 132.0 meters down hole, including 1.0 meter @ 12.57 g Au/t from 132.0 meters down hole (grade thickness of 12.57 g Au/t – m)

    VB24-016 – Returned three intervals of greater than 1 g Au/t, ranging 6 – 22 meters thick, including

    • 22.0 meters at @ 1.74 g Au/t from 146.0 meters down hole, including 2.3 meters @ 7.93 g Au/t from 150.7 meters down hole (grade thickness 18.24 g Au/t – m)

    VB24-022 – Returned two intervals of greater than 1 g Au/t, with thickness up to 4 meters

    • 4 meters at @ 7.18 g Au/t from 106.0 meters down hole, including 1.0 meter @ 25.89 g Au/t from 106.0 meters down hole (grade thickness of 25.89 g Au/t m)
    • 3.8 meters at @ 3.25 g Au/t from 136.4 meters down hole, including 0.6 meters @ 18.13 g Au/t from 136.4 meters down hole (grade thickness of 10.88 g Au/t – m)

    VB24-024 – near surface high-grade interval of 5.0 meters @ 2.18 g Au/t from 9.0 meters down hole, including

    • 1.1 meters @ 6.37 g Au/t from 12.9 meters down hole (grade thickness of 7.01 g Au/t – m)

    Phase 2 drilling to date has focused on the shallow portion of the SXL and approximately half of the strike length drilled is within the limits of the resource shell, with eight holes drilled (see Figures 1 and 2) in an area previously classified as waste in the 2024 Feasibility Study (as defined below). The overall objective of Phase 2 drilling is to better understand the structure and mineralization of the SXL.

    Frederick H. Earnest, President and CEO, commented, "Interim results from the second phase of our Mt Todd drilling program are very encouraging and support our belief that the mineralization in the SXL zone is distinct to the Batman deposit. The SXL zone is host to more discreet and in certain zones, wider high-grade veins with thicknesses that exceed one meter, compared to the thinner, more closely spaced sheeted veins typically observed in the Batman deposit. Drilling in the SXL included several holes that intersected higher-grade mineralized veins within the limits of our resource pit. Phase 2 of the drilling program is expected to be completed by the end of this year.

    "At the conclusion of the 2024 drilling program, we plan to update the Mt Todd mineral resource estimate. We will leverage the results of prior technical studies to advance evaluations of a development scenario for Mt Todd, initially targeting 150,000 to 200,000 ounces of annual gold production, with a raised cut-off grade of 0.45 to 0.50 g Au/t. We are targeting a mineral reserve grade of approximately 1 g Au/t and an initial capex of less than $400 million, while preserving the option for expansion at some future time.

    "This work is expected to further de-risk the Mt Todd project and position it as a leading, shovel-ready development opportunity. We expect continued strength in the gold price and believe our strategy of advancing Mt Todd with discipline will deliver a more fully valued project."

    Figure 1 displays the plan view of the current topography at the Mt Todd project and Phase 2 drill hole locations with orientations to date. Figure 2 shows the locations of the drill holes relative to the 2024 Feasibility Study resource shell and the current pit design. Figure 3 is a cross-section view of the drill results for VB24-012, VB24-018 and VB24-024, the resource block model, resource shell, and pit design on the 8435720N cross-section as defined by the 2024 Feasibility Study. Table 1 highlights multiple vein intercepts with grades above 5 g Au/t. A total of 12 holes intercepted near-surface mineralized zones (<100 m depth) with grades ranging from 0.41 to 4.77 g Au/t.

    Table 1. Summary of Phase 2 Drill Hole Program to Date – highlighting intercepts greater than 5 g Au/t.

    Hole No. Grid Coordinates Survey Data Intersections
    MGA94 Grid Easting MGA94 Grid Northing RL (m) Azimuth (°) Dip (°) Depth (m) From (m) To (m) Interval (m) True Thickness (m) Grade (g Au/t) Sample Type
    VB24-012

    187535

    8435697

    139.0

    88.7

    -55.9

    122.3

     

    75.0

    78.0

    3.0

    1.0

    1.14

    HQ ½ Core

     

     

     

     

     

     

     

    117.0

    122.3

    5.3

    1.8

    0.52

    HQ ½ Core

     

     

     

     

     

     

     

     

     

     

     

     

    VB24-013

    187821

    8435944

    143.0

    266.7

    -56.5

    174.0

     

    16.2

    24.0

    7.8

    4.7

    0.55

    HQ ½ Core

     

     

     

     

     

     

    and

    40.0

    49.0

    9.0

    5.3

    0.65

    HQ ½ Core

     

     

     

     

     

     

    and

    150.0

    154.8

    4.8

    2.8

    1.66

    HQ ½ Core

     

     

     

     

     

     

    including

    150.0

    151.0

    1.0

    0.6

    7.59

    HQ ½ Core

     

     

     

     

     

     

     

     

     

     

     

     

    VB24-014

    187802

    8435896

    140.0

    266.7

    -55.6

    139.4

     

    102.8

    112.2

    9.4

    5.8

    3.35

    HQ ½ Core

     

     

     

     

     

     

    including

    111.7

    112.2

    0.5

    0.3

    50.00

    HQ ½ Core

     

     

     

     

     

     

     

     

     

     

     

     

    VB24-015

    187597

    8435799

    140.0

    87.2

    -55.6

    161.3

     

    29.0

    35.0

    6.0

    2.0

    0.50

    HQ ½ Core

     

     

     

     

     

     

    and

    46.0

    50.0

    4.0

    2.3

    0.58

    HQ ½ Core

     

     

     

     

     

     

    and

    56.0

    59.0

    3.0

    1.7

    4.77

    HQ ½ Core

     

     

     

     

     

     

    and

    67.0

    75.0

    8.0

    4.6

    0.57

    HQ ½ Core

     

     

     

     

     

     

    and

    83.0

    92.0

    9.0

    5.2

    1.18

    HQ ½ Core

     

     

     

     

     

     

    and

    121.0

    123.3

    2.3

    1.3

    2.59

    HQ ½ Core

     

     

     

     

     

     

    and

    132.0

    140.0

    8.0

    4.7

    1.82

    HQ ½ Core

     

     

     

     

     

     

    including

    132.0

    133.0

    1.0

    0.6

    12.57

    HQ ½ Core

     

     

     

     

     

     

     

     

     

     

     

     

    VB24-016

    187756

    8435860

    135.0

    271.8

    -56.0

    173.7

     

    111.0

    120.0

    9.0

    5.0

    1.01

    HQ ½ Core

     

     

     

     

     

     

    and

    124.0

    130.0

    6.0

    3.3

    1.52

    HQ ½ Core

     

     

     

     

     

     

    including

    127.0

    128.0

    1.0

    0.6

    6.81

    HQ ½ Core

     

     

     

     

     

     

    and

    146.0

    168.0

    22.0

    12.1

    1.74

    HQ ½ Core

     

     

     

     

     

     

    including

    150.7

    153.0

    2.3

    1.2

    7.93

    HQ ½ Core

     

     

     

     

     

     

     

     

     

     

     

     

    VB24-017

    187576

    8435601

    137.0

    270.2

    -55.1

    151.2

     

    95.8

    130.0

    34.2

    20.3

    0.43

    HQ ½ Core

     

     

     

     

     

     

     

     

     

     

     

     

     

     

     

     

     

     

     

     

     

     

     

     

    VB24-018

    187660

    8435746

    137.0

    269.7

    -56.2

    150.2

     

    49.0

    73.0

    24.0

    13.3

    0.78

    HQ ½ Core

     

     

     

     

     

     

    including

    62.0

    64.2

    2.2

    1.2

    5.96

    HQ ½ Core

     

     

     

     

     

     

    and

    109.0

    126.0

    17.0

    9.4

    0.72

    HQ ½ Core

     

     

     

     

     

     

    including

    114.0

    126.0

    12.0

    6.6

    0.90

    HQ ½ Core

     

     

     

     

     

     

     

     

     

     

     

     

    VB24-019

    187516

    8435549

    142.0

    266.9

    -60.1

    141.6

     

    29.0

    36.6

    7.6

    3.8

    0.82

    HQ ½ Core

     

     

     

     

     

     

    and

    64.0

    72.0

    8.0

    4.0

    0.44

    HQ ½ Core

     

     

     

     

     

     

    and

    136.6

    141.6

    5.0

    2.5

    0.42

    HQ ½ Core

     

     

     

     

     

     

     

     

     

     

     

     

    VB24-020

    187568

    8435647

    142.0

    267.4

    -60.0

    141.0

     

    35.0

    45.1

    10.1

    5.1

    0.69

    HQ ½ Core

     

     

     

     

     

     

    and

    67.1

    77.0

    9.9

    5.0

    0.44

    HQ ½ Core

     

     

     

     

     

     

    and

    96.0

    102.4

    6.4

    3.3

    2.49

    HQ ½ Core

     

     

     

     

     

     

    and

    121.0

    130.0

    9.0

    4.6

    0.48

    HQ ½ Core

     

     

     

     

     

     

     

     

     

     

     

     

    VB24-021

    187797

    8436003

    143.0

    266.5

    -59.5

    154.7

     

    0.0

    4.0

    4.0

    2.0

    0.81

    HQ ½ Core

     

     

     

     

     

     

    and

    27.0

    36.0

    9.0

    4.6

    0.56

    HQ ½ Core

     

     

     

     

     

     

    and

    49.0

    56.0

    7.0

    3.6

    0.74

    HQ ½ Core

     

     

     

     

     

     

    and

    84.0

    114.0

    30.0

    15.2

    0.72

    HQ ½ Core

     

     

     

     

     

     

    and

    127.0

    135.0

    8.0

    4.1

    0.62

    HQ ½ Core

     

     

     

     

     

     

     

     

     

     

     

     

    VB24-022

    187785

    8435950

    142.0

    268.4

    -60.0

    151.4

     

    45.0

    50.0

    5.0

    2.5

    0.51

    HQ ½ Core

     

     

     

     

     

     

    and

    106.0

    110.0

    4.0

    2.0

    7.18

    HQ ½ Core

     

     

     

     

     

     

    including

    106.0

    107.0

    1.0

    0.5

    25.89

    HQ ½ Core

     

     

     

     

     

     

    and

    115.0

    125.0

    10.0

    4.9

    0.85

    HQ ½ Core

     

     

     

     

     

     

    and

    136.4

    140.2

    3.8

    2.0

    3.25

    HQ ½ Core

     

     

     

     

     

     

    including

    136.4

    137.0

    0.6

    0.3

    18.13

    HQ ½ Core

     

     

     

     

     

     

     

     

     

     

     

     

    VB24-023

    187818

    8436053

    144.0

    264.8

    -59.1

    155.4

     

    5.0

    13.9

    8.9

    4.6

    0.41

    HQ ½ Core

     

     

     

     

     

     

    and

    48.0

    53.4

    5.4

    2.8

    0.66

    HQ ½ Core

     

     

     

     

     

     

    and

    79.0

    93.0

    14.0

    7.1

    0.67

    HQ ½ Core

     

     

     

     

     

     

    and

    97.7

    104.0

    6.3

    3.2

    0.69

    HQ ½ Core

     

     

     

     

     

     

     

     

     

     

     

     

    VB24-024

    187596

    8435748

    139.0

    88.9

    -59.5

    89.1

     

    9.0

    14.0

    5.0

    2.5

    2.18

    HQ ½ Core

     

     

     

     

     

     

    including

    12.9

    14.0

    1.1

    0.6

    6.37

    HQ ½ Core

     

     

     

     

     

     

    and

    20.0

    24.0

    4.0

    2.0

    0.61

    HQ ½ Core

     

     

     

     

     

     

    and

    38.1

    49.0

    10.9

    5.6

    0.98

    HQ ½ Core

     

     

     

     

     

     

    and

    74.0

    84.2

    10.2

    5.2

    0.59

    HQ ½ Core
     

    Notes:

    (i)

    Results are based on ore grade 50g fire assay for Au.

    (ii)

    Intersections are from diamond core drilling with half-core samples.

    (iii)

    Core sample intervals were constrained by geology, alteration or structural boundaries, intervals varied between a minimum of 0.2 meters to a maximum of 1.2 meters.

    (iv)

    Mean grades have been calculated on a 0.4g Au/t lower cut-off grade with no upper cut-off grade applied, and maximum internal waste of 4.0 meters.

    (v)

    All intersections are downhole intervals.

    (vi)

    All downhole deviations have been verified by downhole camera and or downhole gyro.

    (vii)

    Collar coordinates are given as Map Grid Australia MGA94 using a multi-band GNSS Garmin GPS 750i.

    (viii)

    The Company maintains a Quality Assurance and Quality Control procedures (QA/QC) program in accordance with the requirements and guidelines of CIM Standards of Disclosure for Mineral Projects.

    (ix)

    The independent laboratory responsible for the assays was North Australian Laboratories Pty Ltd, Pine Creek, NT.

    QA/QC Protocols and Sampling Procedure

    All sampling was conducted under the supervision of the Company's geologists and the chain of custody from Mt Todd facilities to the independent sample preparation facility at North Australian Laboratories Pty Ltd. ("NAL") in Pine Creek, NT was continuously monitored.

    • The core is marked, geologically logged, geotechnically logged, photographed, and sawn into halves using diamond saws. One-half is placed into pre-numbered sample bags as per industry standards with sample lengths between a minimum of 0.2 meters to a maximum of 1.2 meters. The other half of the core is retained for future reference by the Company. The only exception to this is when a portion of the remaining core has been flagged for use in metallurgical testwork.
    • Following common industry practices, blanks and standards are also placed in plastic bags for inclusion in the shipment. A reference blank or a standard is inserted at a minimum ratio of 1 in 10 and additional blank samples are added at suspected high-grade intervals. Standard reference material is sourced from Ore Research & Exploration Pty Ltd and provided in 60-gram sealed packets. When a sequence of four samples is completed, they are placed in a shipping bag and tied closed. All of these samples are kept in a secure area on-site until crated for shipping.
    • Vista employees ship and transport the samples to the NAL. At the lab, the samples are pulverized and split down to 50-gram assay samples prior to assaying. The industry-standard 3 assay-ton fire assay is followed by an atomic absorption (AA) finish.
    • For the purposes of this release, mineralized intervals are defined as runs of mineralization with a maximum internal waste of 4.0 meters.
    • NAL is independent of Vista.

    It is the opinion of the QP (as defined below) that the sample preparation methods and quality control measures employed before the dispatch of samples to an analytical or testing laboratory ensured the validity and integrity of samples taken.

    Maria Vallejo, Vista's Director of Projects and Technical Services, a Qualified Person ("QP") as defined by Item 1300 of Regulation S-K under the Securities Exchange Act of 1934, as amended, and Canadian National Instrument 43-101 – Standards of Disclosure for Mineral Projects, has verified the data underlying the information contained herein and has approved this press release. The information contained in this press release is provided to inform the reader of the advancement of the 2024 drilling program for the Mt Todd project.

    For more information on the Company's March 2024 feasibility study (the "2024 Feasibility Study"), including with respect to mineral resource and mineral reserve estimates, please refer to the technical report summary entitled "S-K 1300 Technical Report Summary – Mt Todd Gold Project – 50,000 tpd Feasibility Study – Northern Territory, Australia" with an effective date of March 12, 2024 and an issue date of March 14, 2024 available at www.sec.gov and, for Canadian purposes, the technical report entitled "National Instrument 43-101 Technical Report – Mt Todd Gold Project – 50,000 tpd Feasibility Study – Northern Territory, Australia" with an effective date of March 12, 2024 and an issue date of March 14, 2024 under our profile at www.sedarplus.ca. The 2024 Feasibility Study is not incorporated by reference into this news release.

    About Vista Gold Corp.

    Vista holds the Mt Todd gold project, an advanced development-stage gold deposit located in the low risk, Tier-1 mining friendly jurisdiction of Northern Territory, Australia. Vista seeks to position Mt Todd as a leading development opportunity within the gold sector. Mt Todd offers significant scale, development optionality, growth opportunities, advanced local infrastructure, community support, and demonstrated financial strength. All major environmental and operating permits necessary to initiate development of Mt Todd are in place.

    Vista believes that Mt Todd is an especially attractive shovel-ready development opportunity in the current environment of a strong gold market, diminishing major gold deposit discoveries, and depleting gold reserves.

    The Company believes that Vista and its shareholders will be major beneficiaries of a strong gold market and rising gold prices. Vista's strategy is to advance Mt Todd in ways that efficiently position the Project for development while exercising the discipline necessary to best realize value at the right time.

    For further information about Vista or Mt Todd, please contact Pamela Solly, Vice President of Investor Relations, at (720) 981-1185 or visit the Company's website at www.vistagold.com.

    Forward Looking Statements

    This news release contains forward-looking statements within the meaning of the U.S. Securities Act of 1933, as amended, and U.S. Securities Exchange Act of 1934, as amended, and forward-looking information within the meaning of Canadian securities laws. All statements, other than statements of historical facts, included in this news release that address activities, events or developments that we expect or anticipate will or may occur in the future, including such things as our belief that interim results from the second phase of our Mt Todd drilling program have been very encouraging and support our belief that the mineralization in the SXL zone is distinct to the Batman deposit; our belief that the SXL zone is host to more discreet and in certain zones, wider veins with thicknesses that exceed one meter, compared to the thinner, more closely spaced sheeted veins typically observed in the Batman deposit; our expectation to complete Phase 2 of the drilling program by the end of this year; at the conclusion of the 2024 drilling program, Vista plans to update the Mt Todd mineral resource estimate and leverage the results of prior technical studies to advance evaluations of a development scenario for Mt Todd, initially targeting 150,000 to 200,000 ounces of annual gold production, with a raised cut-off grade of 0.45 to 0.50 g Au/t; the Company is targeting a mineral reserve grade of approximately 1 g Au/t and an initial capex of less than $400 million while preserving the option for expansion at some future time; the updated Mt Todd mineral resource estimate and technical studies are expected to further de-risk the Mt Todd project and position it as a leading, shovel-ready development opportunity; our expectation of continued strength in the gold price and our belief that our strategy of advancing Mt Todd with discipline will deliver a more fully valued project; our belief that Northern Territory, Australia is a low risk, Tier 1 mining friendly jurisdiction; our belief that Mt Todd offers significant scale, development optionality, growth opportunities, advanced local infrastructure, community support, and demonstrated financial strength; our belief that all major environmental and operating permits necessary to initiate development of Mt Todd are in place; our plan to position Mt Todd as a leading development opportunity within the gold sector; Vista believes that Mt Todd is an especially attractive shovel-ready development opportunity in the current environment of a strong gold market, diminishing major gold deposit discoveries, and depleting gold reserves; our belief that Vista and its shareholders will be major beneficiaries of a strong gold market and rising gold prices; Vista's strategy to advance Mt Todd in ways that efficiently position the Project for development while exercising the discipline necessary will best realize value at the right time; are forward-looking statements and forward-looking information. The material factors and assumptions used to develop the forward-looking statements and forward-looking information contained in this news release include the following: our forecasts and expected cash flows; our projected capital and operating costs; our expectations regarding mining and metallurgical recoveries; mine life and production rates; that laws or regulations impacting mine development or mining activities will remain consistent; our approved business plans, our mineral resource and reserve estimates and results of preliminary economic assessments; preliminary feasibility studies and feasibility studies on our projects, if any; our experience with regulators; political and social support of the mining industry in Australia; our experience and knowledge of the Australian mining industry and our expectations of economic conditions and the price of gold. When used in this news release, the words "optimistic," "potential," "indicate," "expect," "intend," "hopes," "believe," "may," "will," "if," "anticipate" and similar expressions are intended to identify forward-looking statements and forward-looking information. These statements involve known and unknown risks, uncertainties and other factors which may cause the actual results, performance, or achievements of the Company to be materially different from any future results, performance or achievements expressed or implied by such statements. Such factors include, among others, uncertainty of resource and reserve estimates, uncertainty as to the Company's future operating costs and ability to raise capital; risks relating to cost increases for capital and operating costs; risks of shortages and fluctuating costs of equipment or supplies; risks relating to fluctuations in the price of gold; the inherently hazardous nature of mining-related activities; potential effects on our operations of environmental regulations in the countries in which it operates; risks due to legal proceedings; risks relating to political and economic instability in certain countries in which it operates; uncertainty as to the results of bulk metallurgical test work; and uncertainty as to completion of critical milestones for Mt Todd; as well as those factors discussed under the headings "Note Regarding Forward-Looking Statements" and "Risk Factors" in the Company's latest Annual Report on Form 10-K as filed in March 2024, subsequent Quarterly Reports on Form 10-Q, and other documents filed with the U.S. Securities and Exchange Commission and Canadian securities regulatory authorities. Although we have attempted to identify important factors that could cause actual results to differ materially from those described in forward-looking statements and forward-looking information, there may be other factors that cause results not to be as anticipated, estimated or intended. Except as required by law, we assume no obligation to publicly update any forward-looking statements or forward-looking information, whether as a result of new information, future events or otherwise.

    View source version on businesswire.com: https://www.businesswire.com/news/home/20240923441188/en/

    Get the next $VGZ alert in real time by email

    Crush Q1 2026 with the Best AI Superconnector

    Stay ahead of the competition with Standout.work - your AI-powered talent-to-startup matching platform.

    AI-Powered Inbox
    Context-aware email replies
    Strategic Decision Support
    Get Started with Standout.work

    Recent Analyst Ratings for
    $VGZ

    DatePrice TargetRatingAnalyst
    7/26/2021$3.25 → $3.00Buy
    HC Wainwright & Co.
    More analyst ratings

    $VGZ
    Insider Trading

    Insider transactions reveal critical sentiment about the company from key stakeholders. See them live in this feed.

    View All

    CFO Tobler Douglas L. converted options into 283,667 shares and covered exercise/tax liability with 127,304 shares, increasing direct ownership by 36% to 589,696 units (SEC Form 4)

    4 - VISTA GOLD CORP (0000783324) (Issuer)

    3/17/26 9:18:57 PM ET
    $VGZ
    Precious Metals
    Basic Materials

    President & CEO Earnest Frederick Hume converted options into 548,669 shares and covered exercise/tax liability with 242,200 shares, increasing direct ownership by 14% to 2,457,008 units (SEC Form 4)

    4 - VISTA GOLD CORP (0000783324) (Issuer)

    3/17/26 9:15:04 PM ET
    $VGZ
    Precious Metals
    Basic Materials

    VP, Investor Relations Solly Pamela A. converted options into 137,335 shares and covered exercise/tax liability with 54,367 shares, increasing direct ownership by 31% to 354,913 units (SEC Form 4)

    4 - VISTA GOLD CORP (0000783324) (Issuer)

    3/17/26 9:10:57 PM ET
    $VGZ
    Precious Metals
    Basic Materials

    $VGZ
    Press Releases

    Fastest customizable press release news feed in the world

    View All

    Vista Gold Announces 2025 Financial Results

    Vista Gold Corp. (NYSE American and TSX:VGZ) today announced its audited financial results for the year ended December 31, 2025, with cash totaling $13.6 million at year-end. All dollar amounts in this press release are in U.S. dollars. Frederick H. Earnest, President and CEO of Vista, stated, "2025 was a pivotal year for our Company. The completion of the new Mt Todd Feasibility Study in July 2025 was a defining moment for the Mt Todd gold project and Vista. The study demonstrates an achievable path to near-term production centered on a smaller initial operation that prioritizes higher grade ore to the processing plant, significantly lowers initial capital costs, and incorporates contrac

    3/11/26 5:01:00 PM ET
    $VGZ
    Precious Metals
    Basic Materials

    Vista Gold Corp. Announces Closing of US$44.85 Million Public Offering of Common Shares and Full Exercise by the Underwriters of Option to Purchase Additional Common Shares

    Vista Gold Corp. (NYSE American and TSX:VGZ) ("Vista" or the "Company") is pleased to announce the closing of its previously announced underwritten public offering of 17,940,000 of its common shares, which includes the full exercise of the underwriters' option to purchase 2,340,000 additional common shares, at a price to the public of US$2.50 per share. The total gross proceeds to Vista were US$44.85 million, before deducting underwriting discounts and commission and other offering expenses payable by Vista. The Company intends to allocate the net proceeds from the offering to advance exploration and development activities at the Company's Mt. Todd gold project, a development-stage gold

    3/9/26 9:45:00 AM ET
    $VGZ
    Precious Metals
    Basic Materials

    Vista Gold Corp. Announces Pricing of US$39.0 million Public Offering of Common Shares

    DENVER, Feb. 26, 2026 (GLOBE NEWSWIRE) -- Vista Gold Corp. (NYSE American and TSX:VGZ) ("Vista" or the "Company") is pleased to announce the pricing of its previously announced underwritten public offering of 15,600,000 of its common shares at a price to the public of US$2.50 per share. The total gross proceeds to Vista are expected to be US$39.0 million, before deducting underwriting discounts and commission and other offering expenses payable by Vista. The offering is expected to close on March 9, 2026, subject to the satisfaction of customary closing conditions, including the approval of the NYSE American and the Toronto Stock Exchange. In addition, Vista has granted the underwriters

    2/26/26 9:42:26 AM ET
    $VGZ
    Precious Metals
    Basic Materials

    $VGZ
    Insider Purchases

    Insider purchases reveal critical bullish sentiment about the company from key stakeholders. See them live in this feed.

    View All

    Tobler Douglas L. bought $1,690 worth of shares (3,500 units at $0.48), increasing direct ownership by 1% to 341,902 units (SEC Form 4)

    4 - VISTA GOLD CORP (0000783324) (Issuer)

    3/21/24 5:05:07 PM ET
    $VGZ
    Precious Metals
    Basic Materials

    Stevenson Tracy Austin bought $7,324 worth of shares (20,000 units at $0.37), increasing direct ownership by 5% to 453,199 units (SEC Form 4)

    4 - VISTA GOLD CORP (0000783324) (Issuer)

    1/11/24 2:26:05 PM ET
    $VGZ
    Precious Metals
    Basic Materials

    Tobler Douglas L. bought $1,558 worth of shares (3,500 units at $0.45), increasing direct ownership by 1% to 282,088 units (SEC Form 4) (Amendment)

    4/A - VISTA GOLD CORP (0000783324) (Issuer)

    12/21/23 2:06:12 PM ET
    $VGZ
    Precious Metals
    Basic Materials

    $VGZ
    Analyst Ratings

    Analyst ratings in real time. Analyst ratings have a very high impact on the underlying stock. See them live in this feed.

    View All

    HC Wainwright & Co. reiterated coverage on Vista Gold with a new price target

    HC Wainwright & Co. reiterated coverage of Vista Gold with a rating of Buy and set a new price target of $3.00 from $3.25 previously

    7/26/21 9:34:15 AM ET
    $VGZ
    Precious Metals
    Basic Materials

    $VGZ
    SEC Filings

    View All

    SEC Form DEFA14A filed by Vista Gold Corp

    DEFA14A - VISTA GOLD CORP (0000783324) (Filer)

    3/17/26 1:36:08 PM ET
    $VGZ
    Precious Metals
    Basic Materials

    SEC Form DEF 14A filed by Vista Gold Corp

    DEF 14A - VISTA GOLD CORP (0000783324) (Filer)

    3/17/26 1:34:28 PM ET
    $VGZ
    Precious Metals
    Basic Materials

    Vista Gold Corp filed SEC Form 8-K: Results of Operations and Financial Condition, Financial Statements and Exhibits

    8-K - VISTA GOLD CORP (0000783324) (Filer)

    3/11/26 5:05:25 PM ET
    $VGZ
    Precious Metals
    Basic Materials

    $VGZ
    Large Ownership Changes

    This live feed shows all institutional transactions in real time.

    View All

    SEC Form SC 13D filed by Vista Gold Corp

    SC 13D - VISTA GOLD CORP (0000783324) (Subject)

    3/13/23 4:55:23 PM ET
    $VGZ
    Precious Metals
    Basic Materials

    SEC Form SC 13G/A filed by Vista Gold Corp (Amendment)

    SC 13G/A - VISTA GOLD CORP (0000783324) (Subject)

    1/10/23 9:57:28 AM ET
    $VGZ
    Precious Metals
    Basic Materials

    SEC Form SC 13G filed by Vista Gold Corp

    SC 13G - VISTA GOLD CORP (0000783324) (Subject)

    6/10/22 11:43:41 AM ET
    $VGZ
    Precious Metals
    Basic Materials

    $VGZ
    Financials

    Live finance-specific insights

    View All

    Vista Gold Highlights Mt Todd Milestones and Announces Third Quarter 2025 Financial Results

    Vista Gold Corp. (NYSE American and TSX:VGZ) today announced its unaudited financial results for the quarter ended September 30, 2025, with cash totaling $13.7 million at quarter-end. All dollar amounts in this press release are in U.S. dollars. Frederick H. Earnest, President and CEO of Vista, said, "In the third quarter, Vista completed a feasibility study for Mt Todd that presents a fresh vision for the project as a 15,000 tonne per day operation – one that prioritizes lower initial capital costs and higher ore grades. It also incorporates proven Australian design and operating practices that reduce risk, simplify construction, and support long-term operational success over a 30-year m

    11/12/25 5:07:00 PM ET
    $VGZ
    Precious Metals
    Basic Materials

    Vista Gold Announces Second Quarter 2025 Financial Results

    Vista Gold Corp. (NYSE American and TSX:VGZ) today announced its unaudited financial results for the quarter ended June 30, 2025, with cash totaling $13.2 million at quarter-end. All dollar amounts in this press release are in U.S. dollars. Frederick H. Earnest, President and CEO of Vista, said, "During the second quarter, we maintained a strong balance sheet and advanced the 15,000 tonnes per day Mt Todd Feasibility Study. We announced the results of the Feasibility Study on July 29, 2025. We are very pleased with the strong economic results, reduced initial capital, increased gold mineral reserves grade, and stable gold production over many years. The Feasibility Study represents a ma

    8/12/25 5:01:00 PM ET
    $VGZ
    Precious Metals
    Basic Materials

    Vista Gold Confirms Strong Economics for Mt Todd Gold Project With Re-sized 15,000 Tonnes Per Day Feasibility Study

    After-Tax NPV (5%) of US$1.1 Billion with an After-Tax IRR of 27.8% at $2,500/oz After-Tax NPV (5%) of US$2.2 Billion with an After-Tax IRR of 44.7% at $3,300/oz Vista Gold Corp. (NYSE American and TSX:VGZ) is pleased to announce positive results of a 15,000 tonnes per day ("tpd") feasibility study (the "Study" or the "2025 FS") for its Mt Todd gold project ("Mt Todd" or the "Project"). The Study provides a favorable development alternative to Vista's previous feasibility study completed in 2024 at 50,000 tpd (the "2024 FS"). All currency values are reported in U.S. dollars, unless otherwise noted. This press release features multimedia. View the full release here: https://www.businesswi

    7/29/25 6:45:00 AM ET
    $VGZ
    Precious Metals
    Basic Materials

    $VGZ
    Leadership Updates

    Live Leadership Updates

    View All

    Vista Gold Corp. Appoints Michel (Mike) Sylvestre to the Board of Directors

    Vista Gold Corp. (TSX:VGZ) ("Vista" or the "Company") today announced that it has appointed Mr. Michel (Mike) Sylvestre as an independent director of the Company and increased the size of its Board of Directors from five to six. Mr. Sylvestre has also been appointed to the Health, Safety, Environment and Social Responsibility Committee of the Board. Mr. Sylvestre is a successful mining executive with over 45 years of international and domestic industry experience with major, mid-tier and junior companies. He retired in November 2022 from his position as Senior Vice President Americas at Kinross Gold Corp. Mr. Sylvestre is a director of Hochschild Mining PLC and Nickel Creek Platinum Corp.

    2/15/24 6:40:00 AM ET
    $VGZ
    Precious Metals
    Basic Materials

    Vista Gold Corp. Announces Voting Results from Annual General Meeting and Appoints Tracy A. Stevenson as New Chair of the Board

    Vista Gold Corp. ("Vista" or the "Company") (TSX:VGZ) today announced the voting results from its annual general and special meeting of shareholders held on Thursday, April 27, 2023 (the "AGM" or "Meeting"). A total of 68,925,603 common shares in the capital of the Company ("Common Shares") were represented at the meeting, being 57.93% of the Common Shares. Detailed results for the ballot votes for the election of directors are as follows: Proposal Votes For % Votes Withheld % Election of John M. Clark as Director 97.44 2.56 Election of Frederick H. Earnest as Director 96.76 3.24 Election of W. Durand Eppler as Director

    4/27/23 6:12:00 PM ET
    $VGZ
    Precious Metals
    Basic Materials

    Vista Gold Announces Retirement of Board Members at 2023 Annual Meeting of Shareholders

    Vista Gold Corp. (TSX:VGZ) ("Vista" or the "Company") today announced that Michael B. "Mike" Richings, Chair and non-executive director, and C. Thomas "Tom" Ogryzlo, non-executive director, intend to retire upon the completion of their terms at Vista's upcoming 2023 Annual General and Special Meeting of Shareholders (the "AGM") to be held on April 27, 2023. Effective as of the conclusion of the AGM, the Board of Directors has approved decreasing the number of directors of the Company from seven to five. "On behalf of the Board and management team, I would like to thank Messrs. Richings and Ogryzlo for their leadership and commitment to the Company for more than two decades," said Frederick

    3/14/23 6:40:00 AM ET
    $VGZ
    Precious Metals
    Basic Materials