• Live Feeds
    • Press Releases
    • Insider Trading
    • FDA Approvals
    • Analyst Ratings
    • Insider Trading
    • SEC filings
    • Market insights
  • Analyst Ratings
  • Alerts
  • Subscriptions
  • Settings
  • RSS Feeds
Quantisnow Logo
  • Live Feeds
    • Press Releases
    • Insider Trading
    • FDA Approvals
    • Analyst Ratings
    • Insider Trading
    • SEC filings
    • Market insights
  • Analyst Ratings
  • Alerts
  • Subscriptions
  • Settings
  • RSS Feeds
PublishGo to App
    Quantisnow Logo

    © 2026 quantisnow.com
    Democratizing insights since 2022

    Services
    Live news feedsRSS FeedsAlertsPublish with Us
    Company
    AboutQuantisnow PlusContactJobsAI superconnector for talent & startupsNEWLLM Arena
    Legal
    Terms of usePrivacy policyCookie policy

    Vista Gold Corp. Announces Updated Feasibility Study for the Mt Todd Gold Project

    3/13/24 6:40:00 AM ET
    $VGZ
    Precious Metals
    Basic Materials
    Get the next $VGZ alert in real time by email

    Vista Gold Corp. (TSX:VGZ) ("Vista" or the "Company") announces the results of the feasibility study update for its Mt Todd gold project ("Mt Todd" or the "Project") located in Northern Territory, Australia which was undertaken in conjunction with the Company's annual reporting of its mineral resources and mineral reserves in its Annual Report on Form 10-K, as required under Item 1300 of Regulation S-K under the Securities and Exchange Act of 1934, as amended ("S-K 1300").

    The updated feasibility study reflects changes in project economics since the feasibility study filed in February 2022. Material capital and operating cost components have been updated with quotes obtained in Q1 2024. The updated study also reflects the current outlook for the long-term gold price and foreign exchanges rates, and the recently announced royalty. Mt Todd mineral resources and mineral reserves, mine plans, gold recoveries, and gold production schedules remain unchanged.

    Highlights of the Mt Todd 2024 Updated FS appear below, with changes from the 2022 feasibility study shown in parenthesis ( ):

    • After-tax NPV5% of $1.13 billion (+$131.5 million) and IRR of 20.4% (-0.2%) at a $1,800 gold price and a $0.69 Fx rate(1)(2);
    • Average cash costs of $913 (+$96) per ounce (life of mine)(3);
    • Average all-in sustaining cost ("AISC") of $1,034 (+$104) per ounce (life of mine)(3); and
    • Initial capital requirements of $1.03 billion (+$138 million), which continues to reflect the use of a third-party owner/operator of the power plant.

    (1)

    All dollar amounts stated herein are in U.S. currency and are expressed as $ unless specified otherwise. All foreign exchange ("Fx") rates are in U.S. dollars per Australian dollar.

    (2)

    The 2022 feasibility study economics were reported at a gold price of US$1,600 and Fx rate of 0.71.

    (3)

    Cash costs per ounce and AISC per ounce are non-GAAP financial measures. See "Note Regarding Non-GAAP Financial Measures" below for a discussion on non-GAAP financial measures and a reconciliation to U.S. GAAP measures.

    Using a gold price of $2,100 and a $0.66 Fx rate, which the Company believes are more reflective of current market conditions, the after-tax NPV5% of the Project is $1.88 billion and the IRR is 29.6%.

    Frederick H. Earnest, President and CEO of Vista Gold, commented, "Mt Todd is a robust project with strong leverage to the gold price. Project economics are approximately the same or slightly better than reported two years ago, inclusive of cost increases that have affected the entire gold mining sector. We are pleased that Mt Todd's value is confirmed at the given foreign exchange rates and conservative gold price selected.

    "These results do not change our strategy for Mt Todd. We continue to work with CIBC Capital Markets ("CIBC") to identify and advance interest in Mt Todd and are focused on achieving a transaction that maximizes shareholder value. Our evaluation of a smaller-scale, staged development strategy to advance Mt Todd is ongoing and complements the work that we are doing with CIBC."

    Detailed Report

    An S-K 1300 technical report summary for the 2024 Updated FS will be included as an exhibit to the Company's Annual Report on Form 10-K for the year ended December 31, 2023. A technical report will also be prepared in accordance with Canadian National Instrument 43-101 – Standards of Disclosure for Mineral Projects ("NI 43-101") disclosure standards and filed on SEDAR+ at www.sedarplus.ca within 45 days of the date hereof. Both reports will be available on our website.

    Mineral Resources and Mineral Reserves

    The tables below present the estimated mineral resources and mineral reserves for the Project. The effective date of the mineral resources and mineral reserves estimates is December 31, 2023. The following mineral resources and mineral reserves were prepared in accordance with both S-K 1300 standards and Canadian Institute of Mining, Metallurgical and Petroleum definition standards.

    Mt Todd Gold Project – Mineral Resource (Exclusive of Gold Mineral Reserves)

    Based on US$1,300/oz Gold Pit Shell

     

     

     

     

     

     

     

     

     

     

     

     

     

     

     

     

     

     

     

     

     

     

     

     

     

     

     

    Batman Deposit

     

    Heap Leach Pad

     

    Quigleys Deposit

     

    Total

     

     

     

     

     

     

    Contained

     

     

     

     

     

    Contained

     

     

     

     

     

    Contained

     

     

     

     

     

    Contained

     

     

    Tonnes

     

    Grade

     

    Ounces

     

    Tonnes

     

    Grade

     

    Ounces

     

    Tonnes

     

    Grade

     

    Ounces

     

    Tonnes

     

    Grade

     

    Ounces

     

     

    (000s)

     

    (g Au/t)

     

    (000s)

     

    (000s)

     

    (g Au/t)

     

    (000s)

     

    (000s)

     

    (g Au/t)

     

    (000s)

     

    (000s)

     

    (g Au/t)

     

    (000s)

    Measured

     

    —

     

    —

     

    —

     

    —

     

    —

     

    —

     

    594

     

    1.15

     

    22

     

    594

     

    1.15

     

    22

    Indicated

     

    10,816

     

    1.76

     

    613

     

    —

     

    —

     

    —

     

    7,301

     

    1.11

     

    260

     

    18,117

     

    1.49

     

    873

    Measured & Indicated

     

    10,816

     

    1.76

     

    613

     

    —

     

    —

     

    —

     

    7,895

     

    1.11

     

    282

     

    18,711

     

    1.49

     

    895

    Inferred

     

    61,323

     

    0.72

     

    1,421

     

    —

     

    —

     

    —

     

    3,981

     

    1.46

     

    187

     

    65,304

     

    0.77

     

    1,608

    Notes:

    1)

    Measured & Indicated Mineral Resources exclude Proven and Probable Reserves.

    2)

    Batman and Quigleys mineral resources are quoted at a 0.40g-Au/t cut-off grade. Heap Leach resources are the average grade of the heap, no cut-off applied.

    3)

    Batman: Mineral resources constrained within a $1,300/oz gold WhittleTM pit shell. Pit parameters: Mining Cost $1.50/tonne, Milling Cost $7.80/tonne processed, G&A Cost $0.46/tonne processed, G&A Cost/Year US$8,201 K, Au Recovery- Sulfide 85%, Transition 80%, Oxide 80%, 0.2g-Au/t minimum for resource shell.

    4)

    Quigleys: Resources constrained within a $1,300/oz gold WhittleTM pit shell. Pit parameters: Mining cost $1.90/tonne, Processing Cost $9.779/tonne processed, Royalty 1% gross production, Au Recovery- Sulfide, 82.0% and Oxide/Transition 78.0%, water treatment $0.09/tonne, Tailings $0.985/tonne.

    5)

    Differences in the table due to rounding are not considered material. Differences between Batman and Quigleys mining and metallurgical parameters are due to their individual geologic and engineering characteristics.

    6)

    Rex Bryan of Tetra Tech is the QP responsible for the Statement of Mineral Resources for the Batman, Heap Leach Pad and Quigleys deposits.

    7)

    Thomas Dyer of RESPEC is the QP responsible for developing the resource WhittleTM pit shell for the Batman Deposit.

    8)

    The effective date of the Heap Leach, Batman and Quigleys resource estimate is December 31, 2023.

    9)

    Mineral resources that are not mineral reserves have no demonstrated economic viability and do not meet all relevant modifying factors.

    Mt Todd Gold Project – Mineral Reserves – 50,000 tpd, 0.35 g Au/t cut-off and $1,500 per Ounce LG Pit

     

     

     

     

     

     

     

     

     

     

     

     

     

     

     

     

     

     

     

     

     

    Batman Deposit

     

    Heap Leach Pad

     

    Total

     

     

     

     

     

     

    Contained

     

     

     

     

     

    Contained

     

     

     

     

     

    Contained

     

     

    Tonnes

     

    Grade

     

    Ounces

     

    Tonnes

     

    Grade

     

    Ounces

     

    Tonnes

     

    Grade

     

    Ounces

     

     

    (000s)

     

    (g Au/t)

     

    (000s)

     

    (000s)

     

    (g Au/t)

     

    (000s)

     

    (000s)

     

    (g Au/t)

     

    (000s)

    Proven

     

    81,277

     

    0.84

     

    2,192

     

    —

     

    —

     

    —

     

    81,277

     

    0.84

     

    2,192

    Probable

     

    185,744

     

    0.76

     

    4,555

     

    13,354

     

    0.54

     

    232

     

    199,098

     

    0.75

     

    4,787

    Proven & Probable

     

    267,021

     

    0.79

     

    6,747

     

    13,354

     

    0.54

     

    232

     

    280,375

     

    0.77

     

    6,979

    Economic analysis conducted only on proven and probable mineral reserves.

    Notes:

    1)

    Thomas L. Dyer, P.E., is the QP responsible for reporting the Batman Deposit Proven and Probable mineral reserves.

    2)

    Batman deposit mineral reserves are reported using a 0.35 g Au/t cutoff grade and $1,800 per ounce gold price. A US$ 1,500/oz-Au pit shell was used.

    3)

    Deepak Malhotra is the QP responsible for reporting the heap-leach pad mineral reserves.

    4)

    Because all the heap-leach pad reserves are to be fed through the mill, these reserves are reported without a cutoff grade applied.

    5)

    The mineral reserves point of reference is the point where material is fed into the mill.

    6)

    The effective date of the mineral reserve estimates under the requirements of S-K 1300 is December 31, 2023. There have been no changes in the mineral reserve estimates since December 31, 2022 because the Company and the relevant qualified persons determined that the same material assumptions and criteria continued to apply as of December 31, 2023, including that the Company used a cutoff grade higher than the economic cutoff grade such that any intervening changes in the underlying economic assumptions were not material and did not require use of a cutoff grade greater than 0.35 g Au/t for mineral reserve estimation purposes.

    7)

    The effective date of the mineral reserve estimates under the requirements of NI 43-101 is December 31, 2023.

    Qualified Person

    John Rozelle, a "qualified person" as defined by S-K 1300 and NI 43-101, has verified the data underlying the information contained in and has approved this press release. For additional information applicable to the 2024 Updated FS, including data verification, quality assurance and control, and key assumptions; and for other matters relating to the Project, see Vista's most recent Annual Report on Form 10-K as filed on EDGAR at www.sec.gov/edgar.shtml and on SEDAR+ at www.sedarplus.ca.

    About Vista Gold Corp.

    Vista is a gold project developer. The Company's flagship asset is Mt Todd, located in the mining friendly jurisdiction of Northern Territory, Australia. Situated approximately 250 km southeast of Darwin, Mt Todd is one of the largest development stage opportunities in Australia and demonstrates compelling economics. All major environmental and operating permits necessary to initiate development of Mt Todd are in place.

    Mt Todd benefits from its location in a leading mining jurisdiction and offers opportunities to add value through growth of mineral reserves, alternative development strategies, and other de-risking activities.

    For further information about Vista or Mt Todd, please contact Pamela Solly, Vice President of Investor Relations, at (720) 981-1185 or visit the Company's website at www.vistagold.com.

    Forward Looking Statements

    This news release contains forward-looking statements within the meaning of the U.S. Securities Act of 1933, as amended, and U.S. Securities Exchange Act of 1934, as amended, and forward-looking information within the meaning of Canadian securities laws. All statements, other than statements of historical facts, included in this news release that address activities, events or developments that we expect or anticipate will or may occur in the future, including such things as the Company's anticipated plans for Mt Todd, including finding potential development alternatives and the Company's focus on maximizing shareholder value and the realization of the intrinsic value of Mt Todd; estimates of mineral reserves and resources; projected Project economics, including anticipated production, average cash costs, after-tax NPV, IRR, capital requirements and expenditures, gold recovery after-tax payback, operating costs, average tonne per day milling, mining methods procedures, estimated gold recovery, Project design, and life of mine, ability to convert estimated mineral resources to proven or probable mineral reserves; average cash costs, average all-in sustaining costs, timing for and completion of the NI 43-101 technical report and the S-K 1300 technical report summary for the FS; our belief that using a gold price of $2,100 and a $0.66 Fx rate are more reflective of current market conditions; our belief that Mt Todd is a robust project with strong leverage to the gold price; our belief that Mt Todd's value is confirmed at the given foreign exchange rates and conservative gold price selected; our belief that Mt Todd's value is confirmed at the given foreign exchange rates and conservative gold price selected; our belief that our evaluation of a smaller-scale, staged development strategy to advance Mt Todd complements the work we are doing with CIBC; our belief that Mt Todd is one of the largest development stage opportunities in Australia and demonstrates compelling economics; our belief that Mt Todd offers opportunities to add value through growth of mineral reserves, alternative development opportunities, and other de-risking activities are forward-looking statements and forward-looking information. The material factors and assumptions used to develop the forward-looking statements and forward-looking information contained in this news release include the following: our forecasts and expected cash flows; our projected capital and operating costs; our expectations regarding mining and metallurgical recoveries; mine life and production rates; that laws or regulations impacting mine development or mining activities will remain consistent; our approved business plans, our mineral resource and reserve estimates and results of preliminary economic assessments; preliminary feasibility studies and feasibility studies on our projects, if any; our experience with regulators; political and social support of the mining industry in Australia; our experience and knowledge of the Australian mining industry and our expectations of economic conditions and the price of gold. When used in this news release, the words "optimistic," "potential," "indicate," "expect," "intend," "hopes," "believe," "may," "will," "if," "anticipate" and similar expressions are intended to identify forward-looking statements and forward-looking information. These statements involve known and unknown risks, uncertainties and other factors which may cause the actual results, performance or achievements of the Company to be materially different from any future results, performance or achievements expressed or implied by such statements. Such factors include, among others, uncertainty of resource and reserve estimates, uncertainty as to the Company's future operating costs and ability to raise capital; risks relating to cost increases for capital and operating costs; risks of shortages and fluctuating costs of equipment or supplies; risks relating to fluctuations in the price of gold; the inherently hazardous nature of mining-related activities; potential effects on our operations of environmental regulations in the countries in which it operates; risks due to legal proceedings; risks relating to political and economic instability in certain countries in which it operates; uncertainty as to the results of bulk metallurgical test work; and uncertainty as to completion of critical milestones for Mt Todd; as well as those factors discussed under the headings "Note Regarding Forward-Looking Statements" and "Risk Factors" in the Company's latest Annual Report on Form 10-K as filed in February 2023, subsequent Quarterly Reports on Form 10-Q, and other documents filed with the U.S. Securities and Exchange Commission and Canadian securities regulatory authorities. Although we have attempted to identify important factors that could cause actual results to differ materially from those described in forward-looking statements and forward-looking information, there may be other factors that cause results not to be as anticipated, estimated or intended. Except as required by law, we assume no obligation to publicly update any forward-looking statements or forward-looking information; whether as a result of new information, future events or otherwise.

    Note Regarding Non-GAAP Financial Measures

    In this press release, we have provided information prepared or calculated according to U.S. GAAP, as well as provided certain non-U.S. GAAP prospective financial performance measures. Because the non-U.S. GAAP performance measures do not have standardized meanings prescribed by U.S. GAAP, they may not be comparable to similar measures presented by other companies. These measures should not be considered in isolation or as substitutes for measures of performance prepared in accordance with U.S. GAAP. There are limitations associated with the use of such non-U.S. GAAP measures. Since these measures do not incorporate revenues, changes in working capital and non-operating cash costs, they are not necessarily indicative of potential operating profit or loss, or cash flow from operations as determined in accordance with U.S. GAAP.

    The non-U.S. GAAP measures associated with Cash Operating Costs, Cash Costs, AISC and resulting per ounce metrics are not, and are not intended to be, presentations in accordance with U.S. GAAP. These metrics represent costs and unit-cost measured related to the Project.

    We believe that these metrics help investors understand the economics of the Project. We present the non-U.S. GAAP financial measures for our Project in the tables below. Actual U.S. GAAP results may vary from the amounts disclosed in this news release. Other companies may calculate these measures differently.

    Cash Operating Costs, Cash Costs, AISC and Respective Unit Cost Measures

    Cash Operating Costs is a non-U.S. GAAP metric used by the Company to measure aggregate costs of operations that will generally be within the Company's direct control. We believe this metric reflects the operating performance potential for Mt Todd for the mining, processing, administration, and sales functions. Contractual obligations for surface land rights (project royalties) are excluded from this metric.

    Cash Costs and AISC are non-U.S. GAAP metrics developed by the World Gold Council to provide transparency into the costs associated with producing gold and provide a comparable standard. The Company reports Cash Costs and AISC on a per ounce basis because we believe this metric more completely reflects mining costs over the life of mine. Similar metrics are widely used in the gold mining industry as comparative benchmarks of performance.

    Cash Operating Costs consist of Project operating costs and refining costs, and exclude royalties.

    Cash Costs consist of Cash Operating Costs (as described above), plus royalties. The sum of these costs is divided by the corresponding payable gold ounces to determine the per ounce metrics.

    AISC consists of Cash Costs (as described above), plus sustaining capital costs. The sum of these costs is divided by the corresponding payable gold ounces to determine the per ounce metric.

    Other costs excluded from Cash Operating Costs, Cash Costs, and AISC include depreciation and amortization, income taxes, government royalties, financing charges, costs related to business combinations, asset acquisitions other than sustaining capital, and asset dispositions.

    The following tables demonstrate the calculation of Cash Operating Costs, Cash Costs, AISC, and related unit-cost metrics for amounts presented in this press release.

     

    Units

    Life of Mine

    Payable Gold

    koz

    6,313

    Operating Costs

    US$ millions

    $5,420

    Refining Cost

    US$ millions

    23

    Cash Operating Costs

    US$ millions

    5,443

    Royalties

    US$ millions

    324

    Cash Costs

    US$ millions

    $5,767

     

     

     

    Cash Cost per ounce

    US$/oz

    $913

     

     

     

    Sustaining Capital

    US$ millions

    759

    All-In-Sustaining Costs

    US$ millions

    $6,526

     

     

     

    AISC per ounce

    US$/oz

    $1,034

    Units

    Life of Mine

    Payable Gold

    koz

    6,313

    Mining Costs

    US$ millions

    $2,153

    Processing Costs

    US$ millions

    2,889

    Site General and Administrative Costs

    US$ millions

    293

    Project Services

    US$ millions

    84

    Operating Costs

    US$ millions

    5,420

    Refining Cost

    US$ millions

    23

    Cash Operating Costs

    US$ millions

    5,443

    Royalties

    US$ millions

    324

    Cash Costs

    US$ millions

    $5,767

    Note: Amounts may not add to totals due to rounding.

    View source version on businesswire.com: https://www.businesswire.com/news/home/20240312062923/en/

    Get the next $VGZ alert in real time by email

    Crush Q1 2026 with the Best AI Superconnector

    Stay ahead of the competition with Standout.work - your AI-powered talent-to-startup matching platform.

    AI-Powered Inbox
    Context-aware email replies
    Strategic Decision Support
    Get Started with Standout.work

    Recent Analyst Ratings for
    $VGZ

    DatePrice TargetRatingAnalyst
    7/26/2021$3.25 → $3.00Buy
    HC Wainwright & Co.
    More analyst ratings

    $VGZ
    Press Releases

    Fastest customizable press release news feed in the world

    View All

    Vista Gold Strengthens Mt Todd Project Team with Key Appointments in Australia

    Vista Gold Corp. (NYSE American and TSX:VGZ) ("Vista" or the "Company") is pleased to announce several key appointments as part of its ongoing program to strengthen the Company's project development capability and corporate presence in Australia. The following individuals have been appointed and recently commenced employment. Jeff Dang – Executive General Manager – Projects and Technical Services Sharon Goddard – Executive General Manager – External Relations and Social Performance Francis Atta Kuranchie – Approvals Manager Frederick H. Earnest, President and CEO of Vista, commented, "We are pleased to welcome Jeff Dang, Sharon Goddard and Francis Kuranchie to the Vista team. Th

    2/5/26 5:01:00 PM ET
    $VGZ
    Precious Metals
    Basic Materials

    Vista Gold to Present at the Metals Investor Forum 2026

    Vista Gold Corp. (NYSE American and TSX:VGZ) is pleased to announce that the Company will participate in the Metals Investor Forum 2026, to be held January 23-24, 2026, at the Fairmont Pacific Rim Hotel in Vancouver, British Columbia. Frederick H. Earnest, President and CEO of Vista, will join John Kaiser of Kaiser Research Online during Session 5 of the conference, beginning at 4:40 p.m. PST on Friday, January 23. Mr. Earnest will present to investors later that day at 5:10 p.m. PST, followed by a question-and-answer session at the Vista Gold booth. The session will be live-streamed and available for on-demand viewing. A recording of Mr. Earnest's Vista Gold presentation will also be poste

    1/21/26 6:45:00 AM ET
    $VGZ
    Precious Metals
    Basic Materials

    Vista Gold Sets Target for Start of Detailed Engineering and Design

    Vista Gold Corp. (NYSE American and TSX:VGZ) today announced continued progress at its Mt Todd gold project and outlined the pathway to initiate detailed engineering and design by early 2027. This milestone is expected to initiate a 27-month design, construction, and commissioning process. The Mt Todd Feasibility Study, which was completed in July 2025 ("2025 FS"), demonstrated the potential for near-term development of a smaller initial project by prioritizing higher grade ore to the processing plant, significantly lowering initial capital costs, and incorporating contractors to reduce development and operational risks. Since that time, we have focused on advancing Mt Todd in ways that d

    1/13/26 6:45:00 AM ET
    $VGZ
    Precious Metals
    Basic Materials

    $VGZ
    SEC Filings

    View All

    Vista Gold Corp filed SEC Form 8-K: Results of Operations and Financial Condition, Financial Statements and Exhibits

    8-K - VISTA GOLD CORP (0000783324) (Filer)

    11/12/25 5:24:11 PM ET
    $VGZ
    Precious Metals
    Basic Materials

    SEC Form 10-Q filed by Vista Gold Corp

    10-Q - VISTA GOLD CORP (0000783324) (Filer)

    11/12/25 4:28:45 PM ET
    $VGZ
    Precious Metals
    Basic Materials

    Vista Gold Corp filed SEC Form 8-K: Other Events, Financial Statements and Exhibits

    8-K - VISTA GOLD CORP (0000783324) (Filer)

    9/11/25 4:47:53 PM ET
    $VGZ
    Precious Metals
    Basic Materials

    $VGZ
    Insider Trading

    Insider transactions reveal critical sentiment about the company from key stakeholders. See them live in this feed.

    View All

    Former 10% Beneficial Owner Sun Valley Gold Llc sold $880,000 worth of shares (400,000 units at $2.20) (SEC Form 4)

    4 - VISTA GOLD CORP (0000783324) (Issuer)

    12/29/25 8:47:29 AM ET
    $VGZ
    Precious Metals
    Basic Materials

    Large owner Sun Valley Gold Llc sold $1,873,066 worth of shares (880,744 units at $2.13) (SEC Form 4)

    4 - VISTA GOLD CORP (0000783324) (Issuer)

    12/22/25 7:43:00 PM ET
    $VGZ
    Precious Metals
    Basic Materials

    Large owner Sun Valley Gold Llc sold $2,161,896 worth of shares (1,242,469 units at $1.74) (SEC Form 4)

    4 - VISTA GOLD CORP (0000783324) (Issuer)

    11/14/25 6:00:19 PM ET
    $VGZ
    Precious Metals
    Basic Materials

    $VGZ
    Insider Purchases

    Insider purchases reveal critical bullish sentiment about the company from key stakeholders. See them live in this feed.

    View All

    Tobler Douglas L. bought $1,690 worth of shares (3,500 units at $0.48), increasing direct ownership by 1% to 341,902 units (SEC Form 4)

    4 - VISTA GOLD CORP (0000783324) (Issuer)

    3/21/24 5:05:07 PM ET
    $VGZ
    Precious Metals
    Basic Materials

    Stevenson Tracy Austin bought $7,324 worth of shares (20,000 units at $0.37), increasing direct ownership by 5% to 453,199 units (SEC Form 4)

    4 - VISTA GOLD CORP (0000783324) (Issuer)

    1/11/24 2:26:05 PM ET
    $VGZ
    Precious Metals
    Basic Materials

    Tobler Douglas L. bought $1,558 worth of shares (3,500 units at $0.45), increasing direct ownership by 1% to 282,088 units (SEC Form 4) (Amendment)

    4/A - VISTA GOLD CORP (0000783324) (Issuer)

    12/21/23 2:06:12 PM ET
    $VGZ
    Precious Metals
    Basic Materials

    $VGZ
    Analyst Ratings

    Analyst ratings in real time. Analyst ratings have a very high impact on the underlying stock. See them live in this feed.

    View All

    HC Wainwright & Co. reiterated coverage on Vista Gold with a new price target

    HC Wainwright & Co. reiterated coverage of Vista Gold with a rating of Buy and set a new price target of $3.00 from $3.25 previously

    7/26/21 9:34:15 AM ET
    $VGZ
    Precious Metals
    Basic Materials

    $VGZ
    Leadership Updates

    Live Leadership Updates

    View All

    Vista Gold Corp. Appoints Michel (Mike) Sylvestre to the Board of Directors

    Vista Gold Corp. (TSX:VGZ) ("Vista" or the "Company") today announced that it has appointed Mr. Michel (Mike) Sylvestre as an independent director of the Company and increased the size of its Board of Directors from five to six. Mr. Sylvestre has also been appointed to the Health, Safety, Environment and Social Responsibility Committee of the Board. Mr. Sylvestre is a successful mining executive with over 45 years of international and domestic industry experience with major, mid-tier and junior companies. He retired in November 2022 from his position as Senior Vice President Americas at Kinross Gold Corp. Mr. Sylvestre is a director of Hochschild Mining PLC and Nickel Creek Platinum Corp.

    2/15/24 6:40:00 AM ET
    $VGZ
    Precious Metals
    Basic Materials

    Vista Gold Corp. Announces Voting Results from Annual General Meeting and Appoints Tracy A. Stevenson as New Chair of the Board

    Vista Gold Corp. ("Vista" or the "Company") (TSX:VGZ) today announced the voting results from its annual general and special meeting of shareholders held on Thursday, April 27, 2023 (the "AGM" or "Meeting"). A total of 68,925,603 common shares in the capital of the Company ("Common Shares") were represented at the meeting, being 57.93% of the Common Shares. Detailed results for the ballot votes for the election of directors are as follows: Proposal Votes For % Votes Withheld % Election of John M. Clark as Director 97.44 2.56 Election of Frederick H. Earnest as Director 96.76 3.24 Election of W. Durand Eppler as Director

    4/27/23 6:12:00 PM ET
    $VGZ
    Precious Metals
    Basic Materials

    Vista Gold Announces Retirement of Board Members at 2023 Annual Meeting of Shareholders

    Vista Gold Corp. (TSX:VGZ) ("Vista" or the "Company") today announced that Michael B. "Mike" Richings, Chair and non-executive director, and C. Thomas "Tom" Ogryzlo, non-executive director, intend to retire upon the completion of their terms at Vista's upcoming 2023 Annual General and Special Meeting of Shareholders (the "AGM") to be held on April 27, 2023. Effective as of the conclusion of the AGM, the Board of Directors has approved decreasing the number of directors of the Company from seven to five. "On behalf of the Board and management team, I would like to thank Messrs. Richings and Ogryzlo for their leadership and commitment to the Company for more than two decades," said Frederick

    3/14/23 6:40:00 AM ET
    $VGZ
    Precious Metals
    Basic Materials

    $VGZ
    Large Ownership Changes

    This live feed shows all institutional transactions in real time.

    View All

    SEC Form SC 13D filed by Vista Gold Corp

    SC 13D - VISTA GOLD CORP (0000783324) (Subject)

    3/13/23 4:55:23 PM ET
    $VGZ
    Precious Metals
    Basic Materials

    SEC Form SC 13G/A filed by Vista Gold Corp (Amendment)

    SC 13G/A - VISTA GOLD CORP (0000783324) (Subject)

    1/10/23 9:57:28 AM ET
    $VGZ
    Precious Metals
    Basic Materials

    SEC Form SC 13G filed by Vista Gold Corp

    SC 13G - VISTA GOLD CORP (0000783324) (Subject)

    6/10/22 11:43:41 AM ET
    $VGZ
    Precious Metals
    Basic Materials

    $VGZ
    Financials

    Live finance-specific insights

    View All

    Vista Gold Highlights Mt Todd Milestones and Announces Third Quarter 2025 Financial Results

    Vista Gold Corp. (NYSE American and TSX:VGZ) today announced its unaudited financial results for the quarter ended September 30, 2025, with cash totaling $13.7 million at quarter-end. All dollar amounts in this press release are in U.S. dollars. Frederick H. Earnest, President and CEO of Vista, said, "In the third quarter, Vista completed a feasibility study for Mt Todd that presents a fresh vision for the project as a 15,000 tonne per day operation – one that prioritizes lower initial capital costs and higher ore grades. It also incorporates proven Australian design and operating practices that reduce risk, simplify construction, and support long-term operational success over a 30-year m

    11/12/25 5:07:00 PM ET
    $VGZ
    Precious Metals
    Basic Materials

    Vista Gold Announces Second Quarter 2025 Financial Results

    Vista Gold Corp. (NYSE American and TSX:VGZ) today announced its unaudited financial results for the quarter ended June 30, 2025, with cash totaling $13.2 million at quarter-end. All dollar amounts in this press release are in U.S. dollars. Frederick H. Earnest, President and CEO of Vista, said, "During the second quarter, we maintained a strong balance sheet and advanced the 15,000 tonnes per day Mt Todd Feasibility Study. We announced the results of the Feasibility Study on July 29, 2025. We are very pleased with the strong economic results, reduced initial capital, increased gold mineral reserves grade, and stable gold production over many years. The Feasibility Study represents a ma

    8/12/25 5:01:00 PM ET
    $VGZ
    Precious Metals
    Basic Materials

    Vista Gold Confirms Strong Economics for Mt Todd Gold Project With Re-sized 15,000 Tonnes Per Day Feasibility Study

    After-Tax NPV (5%) of US$1.1 Billion with an After-Tax IRR of 27.8% at $2,500/oz After-Tax NPV (5%) of US$2.2 Billion with an After-Tax IRR of 44.7% at $3,300/oz Vista Gold Corp. (NYSE American and TSX:VGZ) is pleased to announce positive results of a 15,000 tonnes per day ("tpd") feasibility study (the "Study" or the "2025 FS") for its Mt Todd gold project ("Mt Todd" or the "Project"). The Study provides a favorable development alternative to Vista's previous feasibility study completed in 2024 at 50,000 tpd (the "2024 FS"). All currency values are reported in U.S. dollars, unless otherwise noted. This press release features multimedia. View the full release here: https://www.businesswi

    7/29/25 6:45:00 AM ET
    $VGZ
    Precious Metals
    Basic Materials