• Live Feeds
    • Press Releases
    • Insider Trading
    • FDA Approvals
    • Analyst Ratings
    • Insider Trading
    • SEC filings
    • Market insights
  • Analyst Ratings
  • Alerts
  • Subscriptions
  • Settings
  • RSS Feeds
Quantisnow Logo
  • Live Feeds
    • Press Releases
    • Insider Trading
    • FDA Approvals
    • Analyst Ratings
    • Insider Trading
    • SEC filings
    • Market insights
  • Analyst Ratings
  • Alerts
  • Subscriptions
  • Settings
  • RSS Feeds
PublishGo to App
    Quantisnow Logo

    © 2026 quantisnow.com
    Democratizing insights since 2022

    Services
    Live news feedsRSS FeedsAlertsPublish with Us
    Company
    AboutQuantisnow PlusContactJobsAI superconnector for talent & startupsNEWLLM Arena
    Legal
    Terms of usePrivacy policyCookie policy

    VIZSLA SILVER ANNOUNCES 43% INCREASE IN MEASURED AND INDICATED MINERAL RESOURCES AT PANUCO, INCLUDING 46 MOZ GRADING 640 G/T AGEQ IN FIRST MEASURED RESOURCE ESTIMATE

    1/6/25 6:00:00 AM ET
    $VZLA
    Precious Metals
    Basic Materials
    Get the next $VZLA alert in real time by email

    NYSE: VZLA     TSX: VZLA

    VANCOUVER, BC, Jan. 6, 2025 /PRNewswire/ - Vizsla Silver Corp. (NYSE:VZLA) (TSX:VZLA) (Frankfurt: 0G3) ("Vizsla Silver" or the "Company") is pleased to announce the results of an updated mineral resource estimate ("Updated Mineral Resource Estimate") for its flagship, 100% owned Panuco silver-gold project (the "Project" or "Panuco") located in Sinaloa, Mexico. The Updated Mineral Resource Estimate was completed by Allan Armitage, Ph.D., P.Geo., of SGS Geological Services.

    Vizsla Silver logo (CNW Group/Vizsla Silver Corp.)

    Highlights of the Updated Mineral Resource Estimate, including a comparison to the previous mineral resource estimate released in January 2024:

    • 43% increase in combined measured and indicated mineral resources from 155.8 to 222.4 Moz AgEq
    • Added 46 Moz AgEq in new measured resources and 176 Moz AgEq in new indicated resources
      • 9.4% increase in combined measured and indicated grade at Copala (580 g/t to 635 g/t AgEq)
      • 4.5% increase in global indicated grade (511 g/t to 534 g/t AgEq)
    • 18% decrease in inferred mineral resources from 169.6 to 138.7 Moz AgEq mostly due to conversion to indicated resources
      • 4.9% decrease in inferred grade (433 g/t to 412 g/t AgEq)

    Key Statistics:

    • The Updated Mineral Resource represents less than 10% of the known vein strike of the newly consolidated district
    • 91% of the value of the Updated Mineral Resource Estimate is comprised of precious metals, including 56% from silver
    • A total of 11 epithermal veins were included in the Updated Mineral Resource Estimate
    • Total all-in exploration cost of US$0.41/oz AgEq discovered

    Combined Measured and Indicated Mineral Resources are estimated at 12.96 million tonnes ("Mt") grading 307 grams per tonne ("g/t") silver, 2.49 g/t gold, 0.27% lead, and 0.85% zinc (222.4 million ounces ("Moz") silver equivalent ("AgEq") at 534 g/t AgEq). The Updated Mineral Resource Estimate includes measured mineral resources of 28.6 Moz of silver, 214 thousand ounces ("koz") of gold, 3.3 kilotonnes ("kt") of lead, and 7.9 kt of zinc (46.1 Moz AgEq) and indicated mineral resources of 99.2 Moz of silver, 822 koz of gold, 31.6 kt of lead, and 102.3 kt of zinc (176.3 Moz AgEq).

    Inferred Mineral Resources are estimated at 10.5 Mt grading 219 g/t silver, 1.96 g/t gold, 0.30% lead, and 1.01% zinc (412 g/t AgEq). The Updated Mineral Resource Estimate includes inferred mineral resources of 73.6 Moz of silver, 660 koz of gold, 31.2 kt of lead, and 106.2 kt of zinc (138.7 Moz AgEq).

    The Updated Mineral Resource Estimate is centred on the western portion of Panuco, encompassing ~8.6 km of the known 86 km of cumulative vein strike in the district. The Updated Mineral Resource Estimate includes 157 new infill/expansion holes (69,754 metres) completed by Vizsla Silver between September 2023 and September 2024. In total, the Updated Mineral Resource Estimate is based on a total drill database of 979 holes (372,685 metres) completed by Vizsla Silver since November 2019.

    "We are pleased to announce the fourth significant resource update for the high-grade Panuco silver gold district," commented Michael Konnert, President and CEO. "This update comes just four years after the initial discovery was made at Napoleon and represents only a snapshot in time as every vein included in the global project resource remains open for further expansion."

    "Drilling throughout 2024 focused on converting resources within the Copala and Napoleon areas into higher confidence categories and was designed to in-fill previously reported intercepts used for resource estimation in the Panuco Preliminary Economic Assessment published on July 24, 2024. Global Measured and Indicated resources now stand at 222.4 Moz AgEq grading 534 g/t AgEq, representing a 43% increase in contained ounces and a 4.5% increase in average grade, relative to the previous estimate. We are particularly excited to announce our first Measured Resource Estimate, containing 46 Moz at an average grade of 640 g/t AgEq. The bulk of the Measured resource is located at Copala, in and around areas designated for the first few years of mining. This update reflects the excellent mineralized continuity that exists at Copala. Reducing the space between drill holes at Copala to 25 metres has resulted in a significantly higher-grade profile in the upper levels of the resource and PEA mine plan."

    "Going forward, we continue to employ a dual track development approach at Panuco, advancing the Project through development towards production in the back half of 2027, while continuing district scale exploration through low-cost means. Ongoing initiatives include a fully funded and permitted test mine program, Feasibility Study and a 10,000-metre discovery-based drill campaign. This is a remarkable achievement that comes as a result of hard work and perseverance. I want to thank everyone from the entire Vizsla team, including our contractors and local communities, and look forward to another successful year in 2025."

    Vizsla Silver will be hosting a webcast to discuss the Updated Mineral Resource Estimate at 10:00am PT on Thursday, January 9, 2025.  To register, please click here.

    A technical report is being prepared on the Updated Mineral Resource Estimate in accordance with National Instrument 43-101 ("NI-43-101") and will be available on the Company's website and SEDAR within 45 days of the date of this release. The effective date of the Updated Mineral Resource Estimate is September 9, 2024.

    Panuco Project Resource Summary (150 g/t AgEq cut-off)



    1Updated MRE

    2Previous MRE

    Variance

    Resource Class

    M&I

    Inferred

    Indicated

    Inferred

    M&I

    Inferred

    Tonnes (MT)

    12.96

    10.50

    9.50

    12.20

    3.46

    -1.70

    Au g/t

    2.49

    1.96

    2.41

    1.93

    0.08

    0.03

    Ag g/t

    307

    219

    289

    239

    17.84

    -20.28

    Pb %

    0.27

    0.30

    0.27

    0.29

    0.00

    0.01

    Zn %

    0.85

    1.01

    0.84

    1.03

    0.01

    -0.02

    AgEq (g/t)

    534

    412

    511

    433

    22.81

    -21.13

    AuEq (g/t)

    6.58

    4.91

    6.81

    5.76

    -0.23

    -0.85

    Au (koz)

    1,036

    660

    736

    758

    300

    -98

    Ag (koz)

    127,819

    73,621

    88,192

    93,653

    39,627

    -20,032

    Pb (kt)

    34.9

    31.2

    56.0

    35.4

    -21

    -4

    Zn (kt)

    110.2

    106.2

    79.9

    125.3

    30

    -19

    1AgEq (koz)

    222,362

    138,711

    155,841

    169,647

    66,521

    -30,936

    2AuEq (koz)

    2,739

    1,654

    2,076

    2,261

    663

    -607

    1Metal price assumptions are $26.00/oz silver, $1,975/oz gold, $2,425/t lead and $2,976/t zinc.

    2Metal price assumptions are $24.00/oz silver, $1,800/oz gold, $2,425/t lead and $2,976/t zinc.

    Panuco Project Measured, Indicated and Inferred Mineral Resource Summary by Vein (150 g/t AgEq cut-off)

    Vein

    Tonnes

    Average Grade

    Contained Metal

    Ag

    Au

    Pb

    Zn

    AgEq

    Au Eq

    Ag

    Au

    Pb

    Zn

    1AgEq

    2AuEq

    (Mt)

    (g/t)

    (g/t)

    ( %)

    ( %)

    (g/t)

    (g/t)

    (koz)

    (koz)

    (kt)

    (kt)

    (koz)

    (koz)

    Measured

    Copala

    1.88

    442

    3.09

    0.08

    0.15

    684

    8.92

    26,744

    187

    1.4

    2.9

    41,418

    540

    Napoleon

    0.36

    161

    2.34

    0.51

    1.41

    404

    4.55

    1,853

    27

    1.8

    5.1

    4,638

    52

    Total

    Measured

    2.24

    397

    2.97

    0.15

    0.35

    640

    8.22

    28,597

    214

    3.3

    7.9

    46,056

    592

    Indicated

    Copala

    4.29

    402

    2.50

    0.09

    0.17

    600

    7.80

    55,374

    345

    3.8

    7.2

    82,781

    1,076

    Tajitos

    0.72

    380

    2.34

    0.14

    0.25

    571

    7.36

    8,833

    55

    1.0

    1.8

    13,277

    171

    Cristiano

    0.36

    610

    3.67

    0.25

    0.45

    912

    11.73

    7,102

    43

    0.9

    1.6

    10,614

    137

    Copala Area

    Total

    5.37

    413

    2.56

    0.11

    0.20

    617

    8.01

    71,309

    443

    5.7

    10.6

    106,672

    1,384

    Napoleon

    3.78

    150

    2.25

    0.52

    1.78

    399

    4.32

    18,184

    273

    19.4

    67.2

    48,404

    525

    Napoleon HW

    0.99

    217

    2.09

    0.47

    1.64

    448

    5.04

    6,885

    66

    4.6

    16.2

    14,206

    160

    Luisa

    0.49

    143

    2.12

    0.31

    1.44

    364

    4.08

    2,238

    33

    1.5

    7.0

    5,693

    64

    Josephine

    0.06

    230

    2.54

    0.38

    1.09

    473

    5.64

    452

    5

    0.2

    0.7

    928

    11

    Cruz

    0.03

    145

    2.01

    0.38

    2.01

    380

    4.03

    154

    2

    0.1

    0.7

    403

    4

    NP Area Total

    5.34

    163

    2.21

    0.49

    1.72

    405

    4.44

    27,913

    379

    25.9

    91.7

    69,634

    763

    Total

    Indicated

    10.72

    288

    2.39

    0.30

    0.95

    512

    6.23

    99,222

    822

    31.6

    102.3

    176,306

    2,147

    Measured & Indicated

    Total M&I

    12.96

    307

    2.49

    0.27

    0.85

    534

    6.58

    127,819

    1,036

    34.9

    110.2

    222,362

    2,739

    Inferred

    Copala

    2.32

    322

    1.83

    0.16

    0.27

    476

    6.09

    24,014

    137

    3.7

    6.2

    35,452

    454

    Tajitos

    0.89

    346

    2.08

    0.27

    0.43

    527

    6.66

    9,936

    60

    2.4

    3.9

    15,132

    191

    Cristiano

    0.34

    460

    2.49

    0.16

    0.31

    665

    8.57

    4,959

    27

    0.5

    1.0

    7,168

    92

    Copala Area

    Total

    3.55

    341

    1.96

    0.19

    0.31

    507

    6.48

    38,909

    224

    6.7

    11.1

    57,752

    739

    Napoleon

    2.28

    159

    1.46

    0.44

    1.63

    340

    3.64

    11,637

    107

    10.0

    37.1

    24,941

    267

    Napoleon HW

    0.59

    202

    2.12

    0.64

    2.15

    458

    4.91

    3,800

    40

    3.7

    12.6

    8,619

    92

    Luisa

    2.83

    132

    2.24

    0.28

    1.24

    355

    4.05

    12,049

    204

    8.1

    35.2

    32,307

    369

    Josephine

    0.21

    176

    1.81

    0.34

    1.01

    360

    4.19

    1,180

    12

    0.7

    2.1

    2,406

    28

    Cruz

    0.35

    171

    3.58

    0.30

    1.64

    510

    5.92

    1,907

    40

    1.0

    5.7

    5,676

    66

    NP Area Total

    6.25

    152

    2.00

    0.38

    1.48

    368

    4.09

    30,573

    403

    23.5

    92.6

    73,949

    822

    *San Antonio

    0.30

    226

    1.30

    0.01

    0.03

    325

    4.33

    2,038

    12

    0.0

    0.1

    2,936

    39

    *Animas

    0.40

    169

    1.68

    0.29

    0.60

    327

    4.37

    2,101

    21

    1.1

    2.3

    4,074

    54

    Total Inferred

    10.50

    219

    1.96

    0.30

    1.01

    412

    4.91

    73,621

    660

    31.2

    106.2

    138,711

    1,654

    Note:

    1AgEq = Ag ppm + (((Au ppm x Au price/gram) + (Pb% x Pb price/t) + (Zn% x Zn price/t))/Ag price/gram). Metal price assumptions are $26.00/oz silver, $1,975/oz gold, $2,425/t lead and $2,976/t zinc.

    2AuEq = Au ppm + (((Ag ppm x Ag price/gram) + (Pb% x Pb price/t) + (Zn% x Zn price/t))/Au price/gram). Metal price assumptions are $26.00/oz silver, $1,975/oz gold, $2,425/t lead and $2,976/t zinc.

    *Animas and San Antonio use metal price assumptions are $24.00/oz silver, $1,800/oz gold, $2,425/t lead and $2,976/t zinc.

    Panuco Project Measured, Indicated & Inferred Mineral Resource Sensitivity Table

    Classification

    Tonnes

    Average Grade

    Contained Metal

    COG AgEq

    Ag

    Au

    Pb

    Zn

    AgEq

    AuEq

    Ag

    Au

    Pb

    Zn

    1AgEq

    2AuEq



    (Mt)

    (g/t)

    (koz)

    ( %)

    ( %)

    (g/t)

    (g/t)

    (koz)

    (koz)

    (kt)

    (kt)

    (koz)

    (koz)

    Measured



























    300

    1.61

    505

    3.70

    0.15

    0.33

    803

    10.37

    26,174

    192

    2.4

    5.4

    41,645

    538

    250

    1.80

    468

    3.48

    0.15

    0.35

    749

    9.67

    27,069

    201

    2.7

    6.2

    43,259

    559

    200

    1.99

    435

    3.24

    0.15

    0.35

    698

    8.99

    27,848

    207

    3.0

    7.0

    44,665

    575

    150

    2.24

    397

    2.97

    0.15

    0.35

    640

    8.22

    28,597

    214

    3.3

    7.9

    46,056

    592

    120

    2.40

    376

    2.83

    0.14

    0.35

    606

    7.80

    28,966

    218

    3.4

    8.3

    46,731

    601

    100

    2.52

    361

    2.71

    0.14

    0.34

    583

    7.48

    29,201

    219

    3.5

    8.6

    47,151

    605

    Indicated



























    300

    6.45

    409

    3.32

    0.33

    1.01

    707

    8.77

    84,819

    689

    21.2

    65.3

    146,506

    1,818

    250

    7.59

    368

    3.00

    0.32

    1.01

    642

    7.90

    89,848

    732

    24.5

    77.0

    156,602

    1,929

    200

    9.00

    327

    2.70

    0.31

    0.99

    576

    7.07

    94,704

    781

    27.8

    89.0

    166,714

    2,044

    150

    10.72

    288

    2.39

    0.30

    0.95

    512

    6.23

    99,222

    822

    31.6

    102.3

    176,306

    2,147

    120

    12.07

    263

    2.18

    0.28

    0.91

    469

    5.70

    102,055

    846

    33.6

    110.0

    182,123

    2,210

    100

    13.13

    246

    2.04

    0.27

    0.88

    440

    5.33

    103,884

    862

    35.0

    115.1

    185,927

    2,251

    Inferred*:



























    300

    4.98

    336

    2.94

    0.39

    1.25

    615

    7.43

    53,734

    471

    19.5

    62.4

    98,509

    1,190

    250

    6.18

    297

    2.61

    0.36

    1.20

    549

    6.59

    59,000

    519

    22.5

    74.0

    109,085

    1,309

    200

    7.70

    259

    2.30

    0.34

    1.14

    485

    5.78

    64,200

    570

    26.0

    87.5

    120,017

    1,431

    150

    9.80

    221

    1.99

    0.31

    1.06

    418

    4.95

    69,482

    627

    30.1

    103.7

    131,701

    1,561

    120

    11.26

    200

    1.80

    0.29

    1.02

    381

    4.49

    72,324

    653

    33.1

    114.4

    138,018

    1,626

    100

    12.38

    186

    1.68

    0.28

    0.97

    357

    4.18

    74,139

    667

    35.1

    120.5

    141,975

    1,665

    *Does not include Animas or San Antonio

    Panuco Project Updated Mineral Resource Estimate Notes:

    • The updated mineral resource was estimated by Allan Armitage, Ph.D., P. Geo. of SGS Geological Services and is an independent Qualified Person as defined by NI 43-101. Mr. Armitage conducted three site visits to the Property:  May 29, 2023, November 6 to November 8, 2023, and May 23, 2024.
    • The classification of the Updated Mineral Resource Estimate into Measured, Indicated and Inferred mineral resources is consistent with current 2014 CIM Definition Standards for Mineral Resources and Mineral Reserves. The effective date for the Updated Mineral Resource Estimate is September 9, 2024.
    • All figures are rounded to reflect the relative accuracy of the estimate and numbers may not add due to rounding.
    • All mineral resources are presented undiluted and in situ, constrained by continuous 3D wireframe models (considered mineable shapes), and are considered to have reasonable prospects for eventual economic extraction.
    • Mineral resources are not mineral reserves. Mineral resources which are not mineral reserves, do not have demonstrated economic viability. An Inferred Mineral Resource has a lower level of confidence than that applying to an Indicated or Measured Mineral Resource and must not be converted to a Mineral Reserve. It is reasonably expected that the majority of Inferred Mineral Resources could be upgraded to Indicated or Measured Mineral Resources with continued exploration.
    • The database comprises a total of 979 drill holes for 372,685 metres of drilling completed by Vizsla Silver between November 2019 and September 2024.
    • The mineral resource estimate is based on 29 three-dimensional ("3D") resource models, constructed in Leapfrog, representing the Napoleon-Cruz-Josephine area (13 wireframes), Luisa area (3 wireframes), the Copala-Tajitos-Cristiano area (7 wireframes), Animas (5 wireframes) and San Antonio (1 wireframe).
    • Silver, gold, lead and zinc were estimated for each mineralization domain in the Panuco Project. Blocks within each mineralized domain were interpolated using 1.5 metre capped composites assigned to that domain. To generate grade within the blocks, the inverse distance squared (ID2) interpolation method was used for all domains. All estimates are based on variable block dimensions (by deposit area) and estimation search parameters (by domain).
    • Average density values were assigned per zone based on 2,293 samples analysed by ALS in Zacatecas, Mexico or inhouse plus 16% standards, duplicates and sample checks.
    • It is envisioned that the Panuco Project deposits may be mined using underground mining methods. Mineral resources are reported at a base case cut-off grade of 150 g/t AgEq. The mineral resource grade blocks were quantified above the base case cut-off grade, below surface and within the constraining mineralized wireframes.
    • The base-case AgEq Cut-off grade considers metal prices of $26.00/oz Ag, $1,975/oz Au, $2425/t Pb and $2976/t Zn and considers metal recoveries of 93% for silver, 90% for gold, 94% for Pb and 94% for Zn.
    • The base case cut-off grade of 150 g/t AgEq considers a mining cost of US$45.00/t rock and processing, treatment and refining, transportation and G&A cost of US$50.00/t of mineralized material.
    • The Updated Mineral Resource Estimate may be materially affected by environmental, permitting, legal, title, taxation, socio-political, marketing, or other relevant issues.

    The Company remains well-funded for its 2025 operational objectives including 1) a fully permitted bulk sample test mine program, 2) updated metallurgical test work, 3) delivery of a Feasibility Study and 4) ongoing discovery-based drilling designed to test high priority targets located in the eastern areas of the district. Depending on ongoing exploration success, the Company plans to publish a further update to the Updated Mineral Resource Estimate in the second half of 2025.

    Discovery Costs

    To date, the Company has incurred an aggregate of approximately US$146.7 million in exploration expenditures over the life of the Project.  This equates to an estimated discovery cost per silver equivalent ounce of US$0.41 for resources defined in the Updated Mineral Resource Estimate.

    About the Panuco project

    The newly consolidated Panuco silver-gold project is an emerging high-grade discovery located in southern Sinaloa, Mexico, near the city of Mazatlán. The 17,856.5-hectare, past producing district benefits from over 86 kilometres of total vein extent, 35 kilometres of underground mines, roads, power, and permits.

    The district contains intermediate to low sulfidation epithermal silver and gold deposits related to siliceous volcanism and crustal extension in the Oligocene and Miocene. Host rocks are mainly continental volcanic rocks correlated to the Tarahumara Formation.

    About Vizsla Silver

    Vizsla Silver is a Canadian mineral exploration and development company headquartered in Vancouver, BC, focused on advancing its flagship, 100%-owned Panuco silver-gold project located in Sinaloa, Mexico. The Company recently completed a Preliminary Economic Study for Panuco in July 2024 which highlights 15.2 Moz AgEq of annual production over an initial 10.6-year mine life, an after-tax NPV5% of US$1.1B, 86% IRR and a 9-month payback at US$26/oz Ag and US$1,975/oz Au. Vizsla Silver aims to become the world's leading silver company by implementing a dual track development approach at Panuco, advancing mine development, while continuing district scale exploration through low-cost means.

    Quality Assurance / Quality Control

    Drill core and rock samples were shipped to ALS Limited in Zacatecas, Zacatecas, Mexico and in North Vancouver, Canada for sample preparation and for analysis at the ALS laboratory in North Vancouver.  The ALS Zacatecas and North Vancouver facilities are ISO 9001 and ISO/IEC 17025 certified. Silver and base metals were analyzed using a four-acid digestion with an ICP finish and gold was assayed by 30-gram fire assay with atomic absorption ("AA") spectroscopy finish. Over limit analyses for silver, lead and zinc were re-assayed using an ore-grade four-acid digestion with AA finish.

    Control samples comprising certified reference samples, duplicates and blank samples were systematically inserted into the sample stream and analyzed as part of the Company's quality assurance / quality control protocol.

    Qualified Person

    The Updated Mineral Resource Estimate was completed by Allan Armitage, Ph.D., P.Geo., of SGS Geological Services. Mr. Armitage is an independent Qualified Person as defined by NI 43-101. Mr. Armitage has reviewed and approved the technical contents of this news release.

    Information Concerning Estimates of Mineral Resources

    The scientific and technical information in this news release was prepared in accordance with NI 43-101 which differs significantly from the requirements of the U.S. Securities and Exchange Commission (the "SEC"). The terms "measured mineral resource", "indicated mineral resource" and "inferred mineral resource" used herein are in reference to the mining terms defined in the Canadian Institute of Mining, Metallurgy and Petroleum Standards (the "CIM Definition Standards"), which definitions have been adopted by NI 43-101. Accordingly, information contained herein providing descriptions of our mineral deposits in accordance with NI 43-101 may not be comparable to similar information made public by other U.S. companies subject to the United States federal securities laws and the rules and regulations thereunder.

    You are cautioned not to assume that any part or all of the mineral resources will ever be converted into reserves. Pursuant to CIM Definition Standards, "inferred mineral resources" are that part of a mineral resource for which quantity and grade or quality are estimated on the basis of limited geological evidence and sampling. Such geological evidence is sufficient to imply but not verify geological and grade or quality continuity. An inferred mineral resource has a lower level of confidence than that applying to an indicated mineral resource and must not be converted to a mineral reserve. However, it is reasonably expected that the majority of inferred mineral resources could be upgraded to indicated mineral resources with continued exploration. Under Canadian rules, estimates of inferred mineral resources may not form the basis of feasibility or pre-feasibility studies, except in rare cases. Investors are cautioned not to assume that all or any part of an inferred mineral resource is economically or legally mineable. Disclosure of "contained ounces" in a resource is permitted disclosure under Canadian regulations; however, the SEC normally only permits issuers to report mineralization that does not constitute "reserves" by SEC standards as in place tonnage and grade without reference to unit measures.

    The SEC adopted new mining disclosure rules Pursuant to subpart 1300 of Regulation S-K of the United States Securities Act of 1933, as amended (the "SEC Modernization Rules"). As a result of the adoption of the SEC Modernization Rules, the SEC now recognizes estimates of "measured mineral resources", "indicated mineral resources" and "inferred mineral resources". As an eligible issuer under the Multijurisdictional Disclosure System the Company is exempt from compliance with the SEC Modernization Rules and information regarding mineral resources contained or referenced herein may not be comparable to similar information made public by companies that report according to the SEC Modernization Rules. While the SEC Modernization Rules are purported to be "substantially similar" to the CIM Definition Standards, readers are cautioned that there are differences between the SEC Modernization Rules and the CIM Definitions Standards. Accordingly, there is no assurance any mineral resources that the Company may report as "measured mineral resources", "indicated mineral resources" and "inferred mineral resources" under NI 43-101 would be the same had the Company prepared the resource estimates under the standards adopted under the SEC Modernization Rules.

    Website: www.vizslasilvercorp.com

    X: https://x.com/VizslaSilver

    LinkedIn: https://www.linkedin.com/company/vizsla-silver

    YouTube: https://www.youtube.com/@VizslaSilver

    SPECIAL NOTE REGARDING FORWARD LOOKING STATEMENTS

    This news release includes certain "Forward–Looking Statements" within the meaning of the United States Private Securities Litigation Reform Act of 1995 and "forward–looking information" under applicable Canadian securities laws. When used in this news release, the words "anticipate", "believe", "estimate", "expect", "target", "plan", "forecast", "may", "would", "could", "schedule" and similar words or expressions, identify forward–looking statements or information. These forward–looking statements or information relate to, among other things: the exploration, development, and production at Panuco, including drilling programs; the potential for underground mining methods; the preparation of a technical report on the Updated Mineral Resource Estimate; ongoing initiatives including a test mine program, feasibility study and 10,000 metre drill program; and the potential further update to the Updated Mineral Resource Estimate in the second half of 2025.

    Forward–looking statements and forward–looking information relating to any future mineral production, liquidity, enhanced value and capital markets profile of Vizsla Silver, future growth potential for Vizsla Silver and its business, and future exploration plans are based on management's reasonable assumptions, estimates, expectations, analyses and opinions, which are based on management's experience and perception of trends, current conditions and expected developments, and other factors that management believes are relevant and reasonable in the circumstances, but which may prove to be incorrect. Assumptions have been made regarding, among other things, the price of silver, gold, and other metals; costs of exploration and development; the estimated costs of development of exploration projects; Vizsla Silver's ability to operate in a safe and effective manner and its ability to obtain financing on reasonable terms.

    These statements reflect Vizsla Silver's respective current views with respect to future events and are necessarily based upon a number of other assumptions and estimates that, while considered reasonable by management, are inherently subject to significant business, economic, competitive, political and social uncertainties and contingencies. Many factors, both known and unknown, could cause actual results, performance, or achievements to be materially different from the results, performance or achievements that are or may be expressed or implied by such forward–looking statements or forward-looking information and Vizsla Silver has made assumptions and estimates based on or related to many of these factors. Such factors include, without limitation: the Company's dependence on one mineral project; precious metals price volatility; risks associated with the conduct of the Company's mining activities in Mexico; regulatory, consent or permitting delays; risks relating to reliance on the Company's management team and outside contractors; risks regarding mineral resources and reserves; the Company's inability to obtain insurance to cover all risks, on a commercially reasonable basis or at all; currency fluctuations; risks regarding the failure to generate sufficient cash flow from operations; risks relating to project financing and equity issuances; risks and unknowns inherent in all mining projects, including the inaccuracy of reserves and resources, metallurgical recoveries and capital and operating costs of such projects; contests over title to properties, particularly title to undeveloped properties; laws and regulations governing the environment, health and safety; operating or technical difficulties in connection with mining or development activities; employee relations, labour unrest or unavailability; the Company's interactions with surrounding communities and artisanal miners; the Company's ability to successfully integrate acquired assets; the speculative nature of exploration and development, including the risks of diminishing quantities or grades of reserves; stock market volatility; conflicts of interest among certain directors and officers; lack of liquidity for shareholders of the Company; litigation risk; and the factors identified under the caption "Risk Factors" in Vizsla Silver's management discussion and analysis. Readers are cautioned against attributing undue certainty to forward–looking statements or forward-looking information. Although Vizsla Silver has attempted to identify important factors that could cause actual results to differ materially, there may be other factors that cause results not to be anticipated, estimated or intended. Vizsla Silver does not intend, and does not assume any obligation, to update these forward–looking statements or forward-looking information to reflect changes in assumptions or changes in circumstances or any other events affecting such statements or information, other than as required by applicable law.

    Cision View original content to download multimedia:https://www.prnewswire.com/news-releases/vizsla-silver-announces-43-increase-in-measured-and-indicated-mineral-resources-at-panuco-including-46-moz-grading-640-gt-ageq-in-first-measured-resource-estimate-302342492.html

    SOURCE Vizsla Silver Corp.

    Get the next $VZLA alert in real time by email

    Crush Q1 2026 with the Best AI Superconnector

    Stay ahead of the competition with Standout.work - your AI-powered talent-to-startup matching platform.

    AI-Powered Inbox
    Context-aware email replies
    Strategic Decision Support
    Get Started with Standout.work

    Recent Analyst Ratings for
    $VZLA

    DatePrice TargetRatingAnalyst
    2/11/2026Outperform → Sector Perform
    National Bank Financial
    1/24/2025Outperform
    BMO Capital Markets
    12/19/2024Outperform
    National Bank Financial
    5/17/2023$3.25Buy
    Alliance Global Partners
    9/28/2022Buy
    Stifel
    More analyst ratings

    $VZLA
    Analyst Ratings

    Analyst ratings in real time. Analyst ratings have a very high impact on the underlying stock. See them live in this feed.

    View All

    Vizsla Silver Corp. downgraded by National Bank Financial

    National Bank Financial downgraded Vizsla Silver Corp. from Outperform to Sector Perform

    2/11/26 7:51:03 AM ET
    $VZLA
    Precious Metals
    Basic Materials

    BMO Capital Markets initiated coverage on Vizsla Silver Corp.

    BMO Capital Markets initiated coverage of Vizsla Silver Corp. with a rating of Outperform

    1/24/25 7:47:11 AM ET
    $VZLA
    Precious Metals
    Basic Materials

    National Bank Financial initiated coverage on Vizsla Silver Corp.

    National Bank Financial initiated coverage of Vizsla Silver Corp. with a rating of Outperform

    12/19/24 8:38:14 AM ET
    $VZLA
    Precious Metals
    Basic Materials

    $VZLA
    Press Releases

    Fastest customizable press release news feed in the world

    View All

    Mine Output Hits a Decade High and the Silver Deficit Still Won't Close

    Issued on behalf of Americore Resources Corp.Equity-Insider.com News CommentaryVANCOUVER, BC, March 11, 2026 /CNW/ ---- Global silver mine production is forecast to climb 1% to 820 million ounces in 2026, a ten-year high fueled by new project commissioning in Mexico, Canada, and Morocco, yet the market is still expected to post a 67-million-ounce deficit for the sixth year running[1]. Silver consolidated near $80 per ounce after breaching $100 in January, and tight physical availability in London continues to underpin the structural floor beneath prices[2]. Americore Resources (TSXV:AMCO) (OTCQB:AMCOF), Santacruz Silver Mining (TSXV:SCZ), Vizsla Silver (NYSE:VZLA), Aya Gold & Silver (TSX:AYA

    3/11/26 11:15:00 AM ET
    $HL
    $SCZM
    $VZLA
    Mining & Quarrying of Nonmetallic Minerals (No Fuels)
    Industrials
    Precious Metals
    Basic Materials

    VIZSLA SILVER PROVIDES UPDATE ON SITUATION IN CONCORDIA

    NYSE: VZLA   TSX: VZLAVANCOUVER, BC, March 5, 2026 /CNW/ - Vizsla Silver Corp. (TSX:VZLA) (NYSE:VZLA) (Frankfurt: 0G3) ("Vizsla Silver" or the "Company") provided the following update on the situation in Concordia, Mexico. Vizsla Silver has been focused on supporting the families of the ten colleagues taken from its project site in Concordia, as well as its employees, through a time of pain, grief, and uncertainty. In recent days, two additional families have received confirmation that their loved one is deceased. Three colleagues remain missing, and Vizsla Silver stands with al

    3/5/26 12:51:00 PM ET
    $VZLA
    Precious Metals
    Basic Materials

    Silver's New Strategic Status Is Rewriting the Rules for Critical Mineral Investment

    Issued on behalf of Americore Resources Corp.Equity-Insider.com News CommentaryVANCOUVER, BC, March 4, 2026 /CNW/ -- Silver's formal addition to the U.S. Critical Minerals List truly triggered a structural reassessment of how markets value the metal, placing it alongside lithium and cobalt as essential to national security and economic stability[1]. The Council on Foreign Relations warns that China's expanding export controls on rare earths and strategic metals threaten Western supply chains across defense, energy, and advanced manufacturing sectors[2]. In the aftermath of these actions, capital is flowing toward Americore Resources (TSXV:AMCO) (OTCQB:AMCOF), Santacruz Silver Mining (TSXV:SC

    3/4/26 9:00:00 AM ET
    $FSM
    $SCZM
    $VZLA
    Precious Metals
    Basic Materials

    $VZLA
    SEC Filings

    View All

    SEC Form 6-K filed by Vizsla Silver Corp.

    6-K - Vizsla Silver Corp. (0001796073) (Filer)

    3/12/26 3:16:52 PM ET
    $VZLA
    Precious Metals
    Basic Materials

    SEC Form 6-K filed by Vizsla Silver Corp.

    6-K - Vizsla Silver Corp. (0001796073) (Filer)

    3/5/26 1:06:20 PM ET
    $VZLA
    Precious Metals
    Basic Materials

    SEC Form 6-K filed by Vizsla Silver Corp.

    6-K - Vizsla Silver Corp. (0001796073) (Filer)

    2/12/26 10:18:08 AM ET
    $VZLA
    Precious Metals
    Basic Materials

    $VZLA
    Leadership Updates

    Live Leadership Updates

    View All

    VIZSLA SILVER ANNOUNCES RESULTS OF ANNUAL GENERAL MEETING & AUDITOR CHANGE

    NYSE: VZLA     TSX: VZLA VANCOUVER, BC, Oct. 3, 2025 /PRNewswire/ - Vizsla Silver Corp. (TSX:VZLA) (NYSE:VZLA) (Frankfurt: 0G3) ("Vizsla Silver" or the "Company") is pleased to announce the results of the Company's annual general and special meeting of shareholders (the "Meeting") held in Vancouver, British Columbia on October 2, 2025. Shareholders were asked to vote on the following: Fix the number of directors at seven persons;Elect Craig Parry, Michael Konnert, Simon Cmrlec, Harry Pokrandt, David Cobbold, Eduardo Luna and Suki Gill as directors for the ensuing year;Re-appoi

    10/3/25 8:00:00 AM ET
    $VZLA
    Precious Metals
    Basic Materials

    VIZSLA SILVER WELCOMES SUKI GILL AS DIRECTOR

    NYSE: VZLA     TSX-V: VZLA VANCOUVER, BC, April 12, 2024 /CNW/ - Vizsla Silver Corp. (TSXV:VZLA) (NYSE:VZLA) (Frankfurt: 0G3) ("Vizsla Silver" or the "Company") is pleased to announce, the appointment of Suki Gill as an independent director of the Company effective immediately.  The appointment of Ms. Gill follows an extensive search exercise carried out by the Company's Corporate Governance and Nominating Committee over the past 12 months, as part of Vizsla Silver's ongoing commitment to Governance and Board diversity. "I am very excited to welcome Ms. Gill to the Vizsla Silv

    4/12/24 5:00:00 PM ET
    $VZLA
    Precious Metals
    Basic Materials

    VIZSLA SILVER ADDS UNPARALLELED MINE-BUILDING AND OPERATING EXPERTISE, APPOINTS SIMON CMRLEC TO THE ROLE OF COO

    NYSE: VZLA     TSX-V: VZLA VANCOUVER, BC, Jan. 30, 2024 /CNW/ - Vizsla Silver Corp. (TSXV:VZLA) (NYSE:VZLA) (Frankfurt: 0G3) ("Vizsla Silver" or the "Company") is pleased to announce Simon Cmrlec will be joining Vizsla Silver as Chief Operating Officer ("COO"). Mr. Cmrlec is a highly experienced senior engineer with over 30-years of industry experience who has been a director of Vizsla Silver since its formation and has most recently held the position of Chief Operating Officer of Ausenco, a global mining engineering and consulting firm.  He has extensive experience in building mining projects around the world and across a number of different commodities and will be tasked with advancing Viz

    1/30/24 8:00:00 AM ET
    $VZLA
    Precious Metals
    Basic Materials

    $VZLA
    Financials

    Live finance-specific insights

    View All

    Silver Mining Stocks Surge as Critical Mineral Status and Supply Deficits Redefine Valuations

    Issued on behalf of Americore Resources Corp.  VANCOUVER, British Columbia, Jan. 27, 2026 (GLOBE NEWSWIRE) -- USANewsGroup.com News Commentary — The global silver market has slammed into its sixth year of structural deficit[1]. Industrial demand is now crushing mine production by 95 million ounces every year, forcing prices past $90 per ounce in early 2026. The U.S. Geological Survey recently added silver to its Critical Minerals List[2], transforming the metal from a simple commodity into a strategic asset. This move triggers federal support for domestic supply chains and faster permitting for major projects. This paradigm shift has turned Americore Resources Corp. (TSXV:AMCO) (OTCQB:AMC

    1/27/26 11:04:41 AM ET
    $AG
    $PAAS
    $VZLA
    Precious Metals
    Basic Materials

    VIZSLA COPPER IDENTIFIES HIGH PRIORITY EXPLORATION TARGET AT POPLAR SOUTH

    VANCOUVER, BC, Aug. 12, 2024 /CNW/ - Vizsla Copper Corp. (TSXV:VCU) (OTCQB:VCUFF) (FRANKFURT: 97E0) ("Vizsla Copper" or the "Company") is pleased to provide an update on targeting activities at its Poplar South target area on the Poplar project (the "Poplar Project" or "Poplar") in central BC (Figure 1). The Poplar project is also home to the large Poplar porphyry-related copper and gold deposit. HIGHLIGHTS Recent Site Visit Identified a Large and Strong Alteration ZoneExploration Programs Have Begun"Having recently visited the Poplar South target area with our exploration team, I'm excited about the potential for discovery of a new porphyry-related deposit there," commented Craig Parry, Exe

    8/12/24 8:00:00 AM ET
    $VZLA
    Precious Metals
    Basic Materials

    Vizsla Silver Reminds Shareholders about Important Dates in Connection with the Potential Spinout of Vizsla Royalties

    NYSE: VZLA     TSX-V: VZLA VANCOUVER, BC, June 11, 2024 /PRNewswire/ - Vizsla Silver Corp. (TSXV:VZLA) (NYSE:VZLA) (Frankfurt: 0G3) ("Vizsla Silver" or the "Company") wants to remind its valued shareholders that if the spinout of Vizsla Royalties Corp. (the "Arrangement") is approved at the Special Meeting being held on June 17, 2024, the Company will seek a final order from the Supreme Court of British Columbia (the "Court") to approve the Arrangement and closing will occur on or about June 24, 2024.  It anticipates that June 21, 2024, will be the record date (the "Record Date"), which shareholders of record will be entitled to receive spinout shares and spinout warrants.

    6/11/24 7:00:00 AM ET
    $VZLA
    Precious Metals
    Basic Materials

    $VZLA
    Large Ownership Changes

    This live feed shows all institutional transactions in real time.

    View All

    SEC Form SC 13G/A filed by Vizsla Silver Corp. (Amendment)

    SC 13G/A - Vizsla Silver Corp. (0001796073) (Subject)

    2/14/24 11:39:45 AM ET
    $VZLA
    Precious Metals
    Basic Materials

    SEC Form SC 13G/A filed by Vizsla Silver Corp. (Amendment)

    SC 13G/A - Vizsla Silver Corp. (0001796073) (Subject)

    2/6/24 2:17:25 PM ET
    $VZLA
    Precious Metals
    Basic Materials

    SEC Form SC 13G filed by Vizsla Silver Corp.

    SC 13G - Vizsla Silver Corp. (0001796073) (Subject)

    2/14/23 3:51:11 PM ET
    $VZLA
    Precious Metals
    Basic Materials