UNITED STATES
SECURITIES AND EXCHANGE COMMISSION
Washington, D.C. 20549
FORM 6-K
REPORT OF FOREIGN PRIVATE ISSUER
PURSUANT TO RULE 13A-16 OR 15D-16
UNDER THE SECURITIES EXCHANGE ACT OF 1934
For the month of June 2025
Commission File Number: 001-41613
Enlight Renewable Energy Ltd.
(Translation of registrant’s name into English)
13 Amal St., Afek Industrial Park
Rosh Ha’ayin, Israel
+ 972 (3) 900-8700
(Address of principal executive office)
Indicate by check mark whether the registrant files or will file annual reports under cover of Form 20-F or Form 40-F.
Form 20-F ☒ Form 40-F ☐
Enlight Announces the Financial Close for the Hybridization of the Gecama Project
Tel Aviv, Israel, June 3, 2025, Enlight Renewable Energy Ltd. (NASDAQ: ENLT, TASE: ENLT) (“Enlight” or the “Company”) announces that the Company, through its indirect subsidiary, Generacion Eolica Castilla La Mancha S.A.U1, has entered into euro-denominated re-financing agreement totaling approximately $310
million for the hybridization of Gecama Project in Spain (the "Gecama Project").
Currently, the Gecama project includes an operational windfarm ("Gecama Wind Project"). The Hybridization of the Gecama
project will include the construction of 225 MW of PV and 220 MWh of battery energy storage facility (the "Hybrid Project") alongside the 329 MW Gecama Wind Project, totaling a combined capacity of 554 MW and
220 MWh.
Subject to the completion of last development milestones, the Hybrid Project is expected to reach commercial operation (COD) in the second half of 2026 and to
increase Gecama Project’s annual revenues by $38–40 million and EBITDA by $31–33 million, in the first full year of operation. With all three components – wind, solar, and energy storage – in full operation, the integrated Gecama Project is expected
to generate annual revenues of $95–105 million and EBITDA of $75–80 million2.
The financing transaction of $310 million includes two tranches covering refinancing of the Gecama Wind project and financing for the construction of the Hybrid
Project. Both tranches of the financing bear a fixed interest rate of 5.1% and are structured as fully amortizing loans maturing in 2045 and 2046, respectively.
After repaying the existing debt and funding necessary reserves and transaction costs, approximately $150–155 million of the secured debt will be allocated to
the construction of the Hybrid Project, with a total estimated cost of $195–205 million, while the remaining balance will be funded by equity.
The financing is led by the MEAG Infrastructure Debt Transactions team, acting as sole arranger in its capacity as portfolio manager of certain funds and accounts, along with
additional institutional co-investors.
The financing is structured on a merchant basis where all generated power may be sold on the open market, or in a mix with a PPA.
Non-IFRS Financial Measures
This filing presents EBITDA, which is a non-IFRS financial measure. Non-IFRS financial measures have limitations as analytical tools and should not be
considered in isolation or as substitutes for financial information presented under IFRS. There are a number of limitations related to the use of non-IFRS financial measures versus comparable financial measures determined under IFRS. For example,
other companies in our industry may calculate the non-IFRS financial measures that we use differently or may use other measures to evaluate their performance. All of these limitations could reduce the usefulness of our non-IFRS financial measures as
analytical tools.
Incorporation by Reference
Other than as indicated below, the information in this Form 6-K (including Exhibit 99.1) shall not be deemed “filed” for purposes of Section 18 of the
Securities Exchange Act of 1934, as amended (the “Exchange Act”), or otherwise subject to the liabilities of that section, nor shall it be deemed incorporated by reference in any filing under the Securities Act
of 1933, as amended, or the Exchange Act.
This Form 6-K (but not including Exhibit 99.1) is hereby incorporated by reference into the Company’s Registration Statement on Form S-8 (File No. 333-271297).
1 The Company indirectly holds approximately 72% of Generacion Eolica Castilla La Mancha S.A.U (Gecama), with the remaining held by several Israeli institutional
investors.
2 The annual revenues and EBITDA are based on expected first full year of the Hybrid Project and the actual results of the Gecama Wind Project for the 12 months ended
March 2025.
Cautionary Note Regarding Forward-Looking Statements
This report on Form 6-K contains forward-looking statements within the meaning of the U.S. Private Securities Litigation Reform Act of 1995. We intend such forward-looking
statements to be covered by the safe harbor provisions for forward-looking statements as contained in Section 27A of the Securities Act of 1933, as amended, and Section 21E of the Securities Exchange Act of 1934, as amended. All statements contained
in this filing other than statements of historical fact, including, without limitation, statements regarding the Company’s expectations relating to the Project, plans, projections, predicted or anticipated future results, and the completion timeline
for the Project, are forward-looking statements. The words “may,” “might,” “will,” “could,” “would,” “should,” “expect,” “plan,” “anticipate,” “intend,” “target,” “seek,” “believe,” “estimate,” “predict,” “potential,” “continue,” “contemplate,”
“possible,” “forecasts,” “aims” or the negative of these terms and similar expressions are intended to identify forward-looking statements, though not all forward-looking statements use these words or expressions. These statements are neither
promises nor guarantees, but involve known and unknown risks, uncertainties and other important factors that may cause our actual results, performance or achievements to be materially different from any future results, performance or achievements
expressed or implied by the forward-looking statements, including, but not limited to, the following: our ability to site suitable land for, and otherwise source, renewable energy projects and to successfully develop and convert them into Operational
Projects; availability of, and access to, interconnection facilities and transmission systems; our ability to obtain and maintain governmental and other regulatory approvals and permits, including environmental approvals and permits; construction
delays, operational delays and supply chain disruptions leading to increased cost of materials required for the construction of our projects, as well as cost overruns and delays related to disputes with contractors; our suppliers’ ability and
willingness to perform both existing and future obligations; competition from traditional and renewable energy companies in developing renewable energy projects; potential slowed demand for renewable energy projects and our ability to enter into new
offtake contracts on acceptable terms and prices as current offtake contracts expire; offtakers’ ability to terminate contracts or seek other remedies resulting from failure of our projects to meet development, operational or performance benchmarks;
various technical and operational challenges leading to unplanned outages, reduced output, interconnection or termination issues; the dependence of our production and revenue on suitable meteorological and environmental conditions, and our ability to
accurately predict such conditions; our ability to enforce warranties provided by our counterparties in the event that our projects do not perform as expected; government curtailment, energy price caps and other government actions that restrict or
reduce the profitability of renewable energy production; electricity price volatility, unusual weather conditions (including the effects of climate change, could adversely affect wind and solar conditions), catastrophic weather-related or other
damage to facilities, unscheduled generation outages, maintenance or repairs, unanticipated changes to availability due to higher demand, shortages, transportation problems or other developments, environmental incidents, or electric transmission
system constraints and the possibility that we may not have adequate insurance to cover losses as a result of such hazards; our dependence on certain operational projects for a substantial portion of our cash flows; our ability to continue to grow
our portfolio of projects through successful acquisitions; changes and advances in technology that impair or eliminate the competitive advantage of our projects or upsets the expectations underlying investments in our technologies; our ability to
effectively anticipate and manage cost inflation, interest rate risk, currency exchange fluctuations and other macroeconomic conditions that impact our business; our ability to retain and attract key personnel; our ability to manage legal and
regulatory compliance and litigation risk across our global corporate structure; our ability to protect our business from, and manage the impact of, cyber-attacks, disruptions and security incidents, as well as acts of terrorism or war; changes to
existing renewable energy industry policies and regulations that present technical, regulatory and economic barriers to renewable energy projects; the reduction, elimination or expiration of government incentives for, or regulations mandating the use
of, renewable energy; our ability to effectively manage our supply chain and comply with applicable regulations with respect to international trade relations, tariffs, sanctions, export controls and anti-bribery and anti-corruption laws; our ability
to effectively comply with Environmental Health and Safety and other laws and regulations and receive and maintain all necessary licenses, permits and authorizations; our performance of various obligations under the terms of our indebtedness (and the
indebtedness of our subsidiaries that we guarantee) and our ability to continue to secure project financing on attractive terms for our projects; limitations on our management rights and operational flexibility due to our use of tax equity
arrangements; potential claims and disagreements with partners, investors and other counterparties that could reduce our right to cash flows generated by our projects; our ability to comply with tax laws of various jurisdictions in which we currently
operate as well as the tax laws in jurisdictions in which we intend to operate in the future; the unknown effect of the dual listing of our ordinary shares on the price of our ordinary shares; various risks related to our incorporation and location
in Israel; the costs and requirements of being a public company, including the diversion of management’s attention with respect to such requirements; certain provisions in our Articles of Association and certain applicable regulations that may delay
or prevent a change of control; and other risk factors set forth in the section titled “Risk factors” in our Annual Report on Form 20-F for the fiscal year ended December 31, 2024, filed with the Securities and Exchange Commission (the “SEC”) and our
other documents filed with or furnished to the SEC.
These statements reflect management’s current expectations regarding future events and speak only as of the date of this filing. You should not put undue reliance on any
forward-looking statements. Although we believe that the expectations reflected in the forward-looking statements are reasonable, we cannot guarantee that future results, levels of activity, performance and events and circumstances reflected in the
forward-looking statements will be achieved or will occur. Except as may be required by applicable law, we undertake no obligation to update or revise publicly any forward-looking statements, whether as a result of new information, future events or
otherwise, after the date on which the statements are made or to reflect the occurrence of unanticipated events.
Pursuant to the requirements of the Securities Exchange Act of 1934, as amended, the registrant has duly caused this report to be signed on its behalf by the
undersigned, thereunto duly authorized.
|
Enlight Renewable Energy Ltd.
|
|
|
Date: June 3, 2025
|
By:
|
/s/ Lisa Haimovitz
|
|
|
Lisa Haimovitz
|
|
|
VP General Counsel
|